3472-2
| Project Cost Summary Level 3 | |||||||||||
| Project: | Design Stage: | Gross Area (SF): | Date: | Sheet No. 1 of 2 | |||||||
| Location: | |||||||||||
| Uniformat Element (Levels 2 &3) | MATERIAL QUALITY OR SYSTEM TYPE | SYSTEM COST | PARAMETER QUANTITY | UNIT MEAS. | NOTE | UNIT COST | % COST | ||||
| A | 10 | FOUNDATIONS | ERROR:#DIV/0! | ||||||||
| A1010 | Standard foundations | SF | 1 | ERROR:#DIV/0! | |||||||
| A1020 | Special Foundations | SF | 1 | ERROR:#DIV/0! | |||||||
| A1030 | Slab on Grade | SF | 1 | ERROR:#DIV/0! | |||||||
| 20 | BASEMENT CONSTRUCTION | CY | 2 | ERROR:#DIV/0! | |||||||
| A2010 | Basement Excavation | CY | 3 | ERROR:#DIV/0! | |||||||
| A2020 | Basement walls | SF | 4 | ERROR:#DIV/0! | |||||||
| B | 10 | SUPERSTRUCTURE | SF | 5 | ERROR:#DIV/0! | ||||||
| B1010 | Floor Construction | SF | 6 | ERROR:#DIV/0! | |||||||
| B1020 | Roof Construction | SF | 7 | ERROR:#DIV/0! | |||||||
| 20 | EXTERIOR ENCLOSURE | SF | 8 | ERROR:#DIV/0! | |||||||
| B2010 | Exterior Walls | SF | 8 | ERROR:#DIV/0! | |||||||
| B2020 | Exterior Windows | SF | 9 | ERROR:#DIV/0! | |||||||
| B2030 | Exterior Doors | EA | 10 | ERROR:#DIV/0! | |||||||
| 30 | ROOFING | SF | 11 | ERROR:#DIV/0! | |||||||
| B3010 | Roof Coverings | SF | 11 | ERROR:#DIV/0! | |||||||
| C | 10 | INTERIOR CONSTRUCTION | SF | 12 | ERROR:#DIV/0! | ||||||
| C1010 | Partitions | SF | 13 | ERROR:#DIV/0! | |||||||
| C1020 | Interior Doors | LEF | 14 | ERROR:#DIV/0! | |||||||
| C1030 | Fittings | SF | 12 | ERROR:#DIV/0! | |||||||
| 20 | STAIRS | FLT | 15 | ERROR:#DIV/0! | |||||||
| C2010 | Stair Construction | FLT | 15 | ERROR:#DIV/0! | |||||||
| C2020 | Stair Finishes | SF | 16 | ERROR:#DIV/0! | |||||||
| 30 | INTERIOR FINISHES | SF | 17 | ERROR:#DIV/0! | |||||||
| C3010 | Wall Finishes | SF | 18 | ERROR:#DIV/0! | |||||||
| C3020 | Floor Finishes | SF | 19 | ERROR:#DIV/0! | |||||||
| C3030 | Ceiling Finishes | SF | 20 | ERROR:#DIV/0! | |||||||
| D | 10 | CONVEYING | STY | 21 | ERROR:#DIV/0! | ||||||
| D1010 | Elevators & Lifts | STP | 22 | ERROR:#DIV/0! | |||||||
| D1020 | Escalators, Moving Walks & Other | LF | 23 | ERROR:#DIV/0! | |||||||
| D1090 | Other Conveying Systems | EA | |||||||||
| 20 | PLUMBING | EA | 24 | ERROR:#DIV/0! | |||||||
| D2010 | Plumbing Fixtures | EA | 24 | ERROR:#DIV/0! | |||||||
| D2020 | Domestic Water Distribution | EA | 24 | ERROR:#DIV/0! | |||||||
| D2030 | Sanitary Waste | EA | 24 | ERROR:#DIV/0! | |||||||
| D2040 | Rain Water Drainage | SF | 25 | ERROR:#DIV/0! | |||||||
| D2090 | Other Plumbing Systems | EA | 26 | ERROR:#DIV/0! | |||||||
| 30 | HVAC | MBH | 27 | ERROR:#DIV/0! | |||||||
| D3010 | Energy Supply | MBH | 28 | ERROR:#DIV/0! | |||||||
| D3020 | Heat Generating Systems | MBH | 28 | ERROR:#DIV/0! | |||||||
| D3030 | Cooling Generating Systems | TON | 29 | ERROR:#DIV/0! | |||||||
| D3040 | Distribution Systems | MBH | 30 | ERROR:#DIV/0! | |||||||
| D3050 | Terminal & Package Units | MBH | 30 | ERROR:#DIV/0! | |||||||
| D3060 | Controls & Instrumentation | MBH | 30 | ERROR:#DIV/0! | |||||||
| D3070 | Systems Testing & Balancing | MBH | 30 | ERROR:#DIV/0! | |||||||
| D3090 | Other HVAC Systems and Equipment | EA | 31 | ERROR:#DIV/0! | |||||||
| 40 | FIRE PROTECTION | SF | 12 | ERROR:#DIV/0! | |||||||
| D4010 | Fire Alarm & Detection Systems | SF | 12 | ERROR:#DIV/0! | |||||||
| D4020 | Fire Suppression Water Supply and Equipment | LF | 32 | ERROR:#DIV/0! | |||||||
| D4030 | Standpipe Systems | EA | 33 | ERROR:#DIV/0! | |||||||
| D4040 | Sprinklers | EA | 33 | ERROR:#DIV/0! | |||||||
| D4050 | Fire Protection Specialties | EA | 34 | ERROR:#DIV/0! | |||||||
| D4090 | Other Fire Protecction Systems | EA | 35 | ERROR:#DIV/0! | |||||||
| 50 | ELECTRICAL | AMP | 12 | ERROR:#DIV/0! | |||||||
| D5010 | Electrical Service & Distribution | AMP | 12 | ERROR:#DIV/0! | |||||||
| D5020 | Lighting & Branch Wiring | SF | 36 | ERROR:#DIV/0! | |||||||
| D5030 | Communications & Security | SF | 36 | ERROR:#DIV/0! | |||||||
| D5090 | Other Electrical Systems | SF | 12 | ERROR:#DIV/0! | |||||||
| E | 10 | EQUIPMENT | SF | 12 | ERROR:#DIV/0! | ||||||
| E1010 | Commercial Equipment | SF | 36 | ERROR:#DIV/0! | |||||||
| E1020 | Institutional Equipment | SF | 36 | ERROR:#DIV/0! | |||||||
| E1030 | Vehicular Equipment | EA | 37 | ERROR:#DIV/0! | |||||||
| E1090 | Other Equipment | ERROR:#DIV/0! | |||||||||
| 20 | FURNISHINGS | SF | 12 | ERROR:#DIV/0! | |||||||
| E2010 | Fixed Furnishings | SF | 12 | ERROR:#DIV/0! | |||||||
| E2020 | Moveable Furnishings | ERROR:#DIV/0! | |||||||||
| F | 10 | SPECIAL CONSTRUCTION | SF | 12 | ERROR:#DIV/0! | ||||||
| F1010 | Special Structures | SF | 12 | ERROR:#DIV/0! | |||||||
| F1020 | Integrated Construction | SF | 12 | ERROR:#DIV/0! | |||||||
| F1030 | Special Construction Systems | SF | 38 | ERROR:#DIV/0! | |||||||
| F1040 | Special Facilities | SF | 38 | ERROR:#DIV/0! | |||||||
| F1050 | Special Controls and Instrumentation | XX | ERROR:#DIV/0! | ||||||||
| 20 | Selective Building Demolition | SF | 42 | ERROR:#DIV/0! | |||||||
| F2010 | Building Elements Demolition | SF | 42 | ERROR:#DIV/0! | |||||||
| F2020 | Hazardous Components Abatement | SF | 42 | ERROR:#DIV/0! | |||||||
| G | 10 | BUILDING-RELATED SITEWORK | ERROR:#DIV/0! | ||||||||
| G1010 | Site Preparations | ACR | 39 | ERROR:#DIV/0! | |||||||
| G1020 | Site Improvements | SF | 43 | ERROR:#DIV/0! | |||||||
| G1030 | Site Civil/Mechanical Utilities | EA | 40 | ERROR:#DIV/0! | |||||||
| G1040 | Site Electrical Utilities | EA | 41 | ERROR:#DIV/0! | |||||||
| 20 | NON-BUILDING-RELATED SITEWORK | ERROR:#DIV/0! | |||||||||
| G2010 | Site Preparations | ACR | 39 | ERROR:#DIV/0! | |||||||
| G2020 | Site Improvements | SF | 43 | ERROR:#DIV/0! | |||||||
| G2030 | Site Civil/Mechanical Utilities | EA | 40 | ERROR:#DIV/0! | |||||||
| G2040 | Site Electrical Utilities | EA | 41 | ERROR:#DIV/0! | |||||||
| 30 | OTHER SITE CONSTRUCTION | LS | ERROR:#DIV/0! | ||||||||
| G3010 | Service and Pedestrial Tunnels | ERROR:#DIV/0! | |||||||||
| G3020 | Other Site Construction | XX | ERROR:#DIV/0! | ||||||||
| DIRECT COST SUBTOTAL | $0 | ERROR:#REF! | |||||||||
| DESIGN CONTINGENCY PERCENTAGE (Based on subtotal) | $0.00 | ERROR:#DIV/0! | |||||||||
| ESCALATION (Lump Sum) FROM TO | ERROR:#DIV/0! | ||||||||||
| SUBTOTAL (ECW on Pricing Form) | $0 | ERROR:#DIV/0! | |||||||||
| GENERAL CONDITIONS % | $0.00 | ERROR:#DIV/0! | **NOTE: SUM OF LINE 98 (GENERAL CONDITIONS % AND LINE 99 (OVERHEAD & PROFIT) IS DEFINED AS 'FEE' ON PRICING FORM | ||||||||
| OVERHEAD & PROFIT | |||||||||||
| SUBTOTAL | $0 | ERROR:#DIV/0! | |||||||||
| TOTAL ECCA | $0 | ERROR:#DIV/0! |
| Notes: | |
| 1. Footprint area at grade | 23. Length of Stairs or Walks |
| 2. Volume of excavation | 24. Number of Fixtures |
| 3. Area of basement plan measured to outside of enclosing wall and average depth of ifnished grade to underside of slab on grade | 25. Area of Roof |
| 4. Area of wall | 26. Number of special fixtures, etc. |
| 5. Sum area of supported floors and roof structure | 27. Total MBH Capacity |
| 6. Area of supported floors | 28. Total Power of Heating System |
| 7. Area of supported roof | 29. Total Power of Cooling Capacity |
| 8. Area of exterior walls | 30. Power |
| 9. Area of Windows | 31. Number of Special Mechanical Systems |
| 10. Number of Doors | 32. Length of System |
| 11. Gross Area of Roof | 33. Number of Sprinkler Heads |
| 12. Gross floor area | 34. Number of extinguishers |
| 13. Area of partitions | 35. Each System |
| 14. Number of leaves | 36. Floor Area |
| 15. Number of flights | 37. Pieces of Equipment |
| 16. Area of finishes landings, treads, risers | 38. Area of Room |
| 17. Area of finishing | 39. Total Area of Site |
| 18. Area of finished walls | 40. Each Utility |
| 19. Area of finished floors | 41. Systems Total |
| 20. Area of ceilings | 42. Square foot of affected area |
| 21. Number of Stories | 43. Square foot of improved area |
| 22. Number of Stops |
&"Times New Roman,Regular"&14 &"Times New Roman,Regular"&16GSA Form 3472-2 (July, 2005) &"Times New Roman,Regular"&14