This is a cruise map for the Lincoln Springs Designated Harvest Project (DxP), dated December 5, 2025, created by J. Reller. The map displays timber cruise plot locations and haul routes across two strata within the project area, rendered at a scale of 1:11,880.

The map illustrates cruise plots for Stratum 1 (shown in purple) and Stratum 2 (shown in pink), with additional Stratum 2 plots marked separately. Green shaded areas represent timber harvest units, while yellow polygons indicate haul routes dated October 21, 2025. The legend identifies four categories of road work associated with the project: construction of temporary roads, reconstruction of existing motorized trails, reconditioning of system roads, and reconstruction of system roads. The project area encompasses terrain shown through topographic contour lines, with a compass rose and scale bar provided for geographic reference.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

626- C1

T-471-1

T-471-1

-G

T-471

T-471

-A

4043-B1

6- C

607-E1

1824-D1

T-471

1824-B

T-471

607-A1

3b3b

3a3a

313313

317317

22c22c

22b22b

22a22a

14b14b

14a14a

30 31

35 36

3 4

6 7 8

9 10

12 13

16 17

18 19

20 21 22 23 24

25 26

39 40 41

45 46

Lincoln Springs DxP Cruise Map 12/05/2025

Legend LS_Units_20251114_2

Cruise Plots - Stratum 1

Cruise Plots - Stratum 2

Cruise_St2_add

Haul Routes 20251021 Construction of Temporary Road

Reconstruction of Existing Motorized Trail

Reconditioning of System Road

Reconstruction of System Road

1:11,880

J. Reller

File details come from the government source that posted it. Updated .