Amendment No. 001 to Solicitation 6991PE26Q000007
This amendment, issued by the Maritime Administration's Division of Pacific Operations on July 17, 2026, extends the bid due date from August 12, 2026 to August 19, 2026 and modifies the Period of Performance to September 2, 2026 through October 16, 2026. The solicitation requires fabrication and delivery of two boat landing platforms in accordance with provided statements of work and fabrication drawings. The contract is for a small-business set-aside, with a requisition number identified as 6991PE. All terms and conditions of the original solicitation remain in full force and effect except as modified by this amendment.
Technical and Delivery Requirements
Quoters must submit technically acceptable proposals containing sufficient detail demonstrating compliance with specifications, past experience fabricating similar structures, and references from at least two previous projects completed within the last three years. Fabrication must comply with AWSD 1.6 welding code with visual inspection only; no nondestructive examination is required. Material test reports or certificates of conformance are required for 316L stainless steel, ER316L filler metal, and stainless-steel hardware, while manufacturers' cut sheets are required for fiberglass grating, virgin HMPE (ASTM D6712, black), and fendering. Although McNICHOLS grating and Duramax DB100 fenders are preferred, technically equivalent products are acceptable if supported by evidence. The Government will conduct virtual inspections via FaceTime, Google Meet, or Zoom, or in-person inspections for facilities in the greater San Francisco Bay Area with two days' notice. Delivery requires two-day advance notice and must occur Monday through Thursday in the parking lot; the Government will offload using a forklift. Country-of-origin restrictions prohibit materials from embargoed or sanctioned countries under FAR 25.7/OFAC, but other foreign-sourced materials complying with specifications are acceptable. The Nonmanufacturer Rule does not apply. Quoters should note that Column D on the revised Attachment 2 reflects labor cost, not labor hours.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Robert J. McDermott
See continuation page
MARITIME ADMINISTRATION
DIVISION OF PACIFIC OPERATIONS
1301 CLAY STREET SUITE 140N
OAKLAND CA 94612
6991PE
6991PE26Q000007
07/17/2026
07/17/2026
1 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
6991PE26Q000007/0001
Fabricate and delivery two (2) boat landing platforms according to the provided statement of work and fabrication drawings.
LIST OF CHANGES:
Bids due date : 12-AUG-26 changed to
19-AUG-26
Period of Performance: 09/02/2026 to
10/16/2026
6991PE26Q000007 Fab Boat Landing Platforms
1. Accept quotes with lead times longer than 45 days after the award of purchase order.
Government Response:
No.
2. Please identify the specific technical evaluation criteria and minimum documentation required for a quotation to receive a technically acceptable rating.
Government Response:
In accordance with the Simplified Procedures of the Revolutionary FAR Overhaul (RFO)
Part 12, the Government will evaluate quotations on a pass/fail basis to determine technical acceptability. No formal technical scoring, evaluation plans, or competitive ranges are utilized for commercial simplified acquisitions.
To receive a technically acceptable rating, the quoter's submission must contain:
• Sufficient detail to demonstrate that the proposed fabricated landing platforms will conform precisely to the specifications outlined in Attachment 3 (Landing Platform
Statement of Work) and Attachment 4 (Landing Platform Design),
• Past experience in fabricating similar structures,
• Past performance references from at least two previous projects within the last three years that were similar to this project.
3. The solicitation references an acceptable or neutral past-performance rating. How many past-performance projects should be submitted, and what information should be provided for each project?
Government Response:
Please see the answer to Q#2 above.
4. What welding code or standard governs fabrication and inspection, including welding-procedure qualifications, welder qualifications, and weld-acceptance criteria?
Government Response:
AWSD 1.6 (the American Welding Society structural welding code that governs the welding of stainless steel)
5. Will any nondestructive examination, including liquid/dye-penetrant testing, be required, or will weld inspection be limited to visual inspection?
Visual inspection only.
6. Are certified material test reports or certificates of conformance required for the 316L stainless steel, ER316L filler metal, stainless-steel hardware, fiberglass grating, UHMWPE material, or fendering?
Government Response:
Yes, material test reports or certificates of conformance are required for the 316L stainless steel, ER316L filler metal, stainless-steel hardware.
With regard to the fiberglass grating, UHMWPE and fendering material, manufacturers’ cut sheets will be required for the products being offered.
7. Is chemical pickling or passivation required after fabrication, or will the specified
Scotch-Brite cleaning and polishing of weld-affected zones satisfy the finishing requirement?
Government Response:
Scotch-Brite cleaning and polishing is sufficient.
8. Is any proof-load, structural-load, lifting-point, or operational testing required before
Government acceptance?
Government Response:
No.
9. How much advance notice must the contractor provide to schedule the Government’s pre-shipment inspection at the fabrication facility, and who will serve as the inspection scheduling point of contact?
Government Response:
The Government would like to conduct the inspections virtually—via FaceTime, Google
Meet or Zoom—unless the contractor's facility is local (greater San Francisco Bay
Area). If the contractor's facility is in the greater San Francisco Bay Area, the
Government would like two days' notice for pre-shipment inspection, Monday -
Thursday.
10. Must both platforms be fully fabricated and assembled before the Government’s inspection?
No. If virtual or on-site periodic inspections determine that the first platform is being constructed as specified, the COR may give permission to begin fabrication of the second unit.
11. Will the Government require an in-process inspection before the fiberglass grating and fender systems are installed, or will inspection occur only after the platforms are fully completed?
Government Response:
Yes. The Government would like to conduct the inspection virtually, via FaceTime, Google Meet or Zoom, unless the contractor's facility is local (greater San Francisco Bay
Area).
12. What documentation must be available during the Government inspection, such as welding procedures, welder qualifications, material certifications, dimensional inspection records, photographs, or quality-control checklists?
Government Response:
The Government should already possess the welding procedures, welder qualifications, material certifications since they are to be provided with your proposal. Dimensional inspection records, photographs, or quality-control checklists must be provided weekly.
13. If corrective work or reinspection is required, how will Government inspection or reinspection scheduling delays affect the required delivery date?
Government Response:
Reinspection should not create any delays, provided that periodic virtual or on-site inspections are conducted and any required corrections are made then.
14. Are the specified McNICHOLS grating and clips and the Duramax DB100 fender mandatory brand-name products, or may technically equivalent products be proposed?
Government Response:
Although the name brands are preferred, the Government will accept technically equivalent products if the Quoter provides evidence that it is equivalent.
15. If equivalent products are permitted, what product data and technical documentation must be included with the quotation?
Manufacturer name and URL, model number or style type, and a manufacturer’s cut sheet.
16. Please confirm that this is a fabrication-to-print requirement and that the contractor is not required to perform independent structural design, engineering calculations, or professional engineering certification of the Government-furnished design.
Government Response:
This is completely a fabrication-to-print requirement. No independent structural design, engineering calculations, or professional engineering certification of Government-furnished design are required.
17. Are native electronic design files, such as CAD, DXF, STEP, or other cutting/fabrication files, available to the successful contractor?
Government Response:
No.
18. Please clarify the small-business manufacturing requirements applicable to this supply acquisition. Specifically, does the nonmanufacturer rule apply, is any waiver applicable, and may a small-business prime contractor satisfy the set-aside requirement by subcontracting fabrication to another qualifying small-business manufacturer?
Government Response:
The Nonmanufacturer rule does not apply to this procurement.
19. The solicitation states that the place of delivery has the capability to offload the platforms and that SBRF personnel will hang the platforms using wire rope. Please confirm that the Government will provide the offloading equipment and operators, suspension rigging, and lifting rigging, and identify any rigging, dunnage, or offloading assistance that must be provided by the contractor.
Government Response:
Yes, the Government will offload the delivery truck with a capable forklift. Other than unsecuring the load, no offloading assistance from the contractor is required. The
Government will provide everything else necessary to install the platforms as required.
20. In addition to coordinating delivery with Mr. Joe Pecoraro, are there any minimum advance-notice, driver-identification, security, gate-access, vehicle-size, packaging, preservation, blocking, bracing, or weather-protection requirements for delivery?
• No deliveries on Fridays.
• Two-day advance notice.
• Driver shall show his ID to the security guard at the gate to the parking lot. No other access documentation is required.
• Delivery is to be made in the parking lot.
21. Attachment 2 identifies Column D as “Labor Hours,” while the Price formula adds the material cost directly to the labor-hours entry. Please confirm whether Column D is intended to reflect labor cost rather than labor hours. If actual labor hours are required, please advise how the total item price should be calculated and entered.
Government Response:
Column D is intended to reflect LABOR COST rather than LABOR HOURS.
Attachment 2 - Vendor Price Sheet has been corrected to reflect the change and is now labeled Attachment 2 - Vendor Price Sheet REV 1.
22. Will the Platforms require any NDE (PT or PMI)?
Government Response:
Visual inspection only.
23. Please confirm whether the fabricated landing platforms will require any Non-
Destructive Examination (NDE), specifically:
• Liquid Penetrant Testing (PT)
• Positive Material Identification (PMI)
If either is required, could you please advise whether the Government has an applicable standard or specification that should be followed?
Government Response:
Visual inspection only.
24. Please confirm whether any Nondestructive Examination (NDE) is required for the fabricated boat landing platforms? Specifically, please advise whether the Government requires any of the following:
• Liquid Penetrant Testing (PT)
• Positive Material Identification (PMI)
• Magnetic Particle Testing (MT)
• Ultrasonic Testing (UT)
• Radiographic Testing (RT)
If NDE is required, please identify the applicable inspection standard, acceptance criteria, and the components or welds subject to testing.
Government Response:
Visual inspection only.
25. Please confirm whether the Government requires any of the following prior to delivery?
• Liquid Penetrant Testing (PT) of welds
• Positive Material Identification (PMI)
• Any other NDE (UT, MT, RT, etc.)
• Material test reports or any additional inspection documentation beyond standard material certifications
If no NDE is required, please confirm that standard fabrication in accordance with the drawings and specifications, along with the required material certifications, will be sufficient.
Government Response:
Visual inspection only. Standard fabrication in accordance with the drawings and specifications, along with the required material certifications, will be sufficient.
26. Please confirm whether there are any domestic source or country-of-origin requirements applicable to this procurement? Specifically, are the materials incorporated into the boat landing platforms (including 316L stainless steel, fiberglass grating, UHMWPE components, fendering, and hardware) required to be manufactured or melted and poured in the United States, or will compliant foreign-sourced materials be acceptable?
If domestic source requirements apply, please identify the applicable FAR or other contractual provision governing those requirements.
Government Response:
Prohibited Foreign Sources (FAR 25.7 / OFAC): Components or materials cannot originate from embargoed or sanctioned countries (e.g., North Korea, Iran, Cuba, Syria).
27. Please confirm whether there are any country-of-origin restrictions applicable to the materials used for this project? Specifically, are all materials required to be manufactured in the United States, or are materials manufactured in other countries acceptable, provided they otherwise comply with the solicitation requirements?
Government Response:
Prohibited Foreign Sources (FAR 25.7 / OFAC): Components or materials cannot originate from embargoed or sanctioned countries (e.g., North Korea, Iran, Cuba, Syria).
28. Is reprocessed UHMW acceptable or is virgin UHMW required for this project?
Virgin HMPE. ASTM D6712, black (see General Notes #5 on page one of the drawings).
29. The spec calls out stainless steel washers and nuts—should these be flat washers with stainless steel nyloc nuts, or lock washers with standard stainless steel nuts?
Government Response:
Flat washers with stainless steel nyloc nuts.
30. Will there be a crane on site at the time of delivery to unload the platforms?
We will unload the delivery truck using a forklift.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |