This is a Questions and Answers document for the AZ NP GRCA 14(2) Roadway Improvements contract opportunity, issued July 8, 2026.
The document addresses eleven questions from bidders regarding contract specifications and requirements. Key clarifications include: bid bonds must be submitted as hard copy originals separately from electronic submissions; the QCM role requirements are defined in Sections 10 and 11 of the contract; commercially available bag concrete is acceptable as a substitute for ADOT or UDOT mix design for gate foundations and sign/object marker foundations, with prepackaged concrete also permitted (per Amendments A001 and A002); backfill acceptance for guardrail and signpost removal will be determined by visual inspection only, with measured or tested conformance requirements removed in Amendment A002; three post types (u-channel, square, and wood) are options, with u-channel steel preferred for type 2 object markers and 2-inch square posts preferred for sign systems; any of the five sheeting types listed in special provisions are acceptable; type 2 object marker dimensions should reference the Manual on Uniform Traffic Control Devices (MUTCD); the desired guardrail system is Type 2, Class A Steel Posts with item description changes in Amendment A002; questions regarding winter shutdown periods for guardrail and sign items due to 6-8 week material lead times and 7-8 week staining cure periods remain under Government review; and no extension to the quote submittal date will be granted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Reminder to show in SAM.gov profile as a Small Business for NAICS 237310.pdf | ||
| QnA 26.07.14.pdf | ||
| Amendment A003.pdf | ||
| QnA 26.07.09 .pdf | ||
| Amendment A002.pdf | ||
| AZ NP GRCA 14(2) ROADWAY IMPROVEMENTS PRE BID VIRTUAL SITE VISIT PRESENTATION.pptx | PPTX presentation | |
| AZ NP GRCA 14(2) Phyiscal Data.zip | ZIP file | |
| A001 SF30.pdf | ||
| ALI(GRCA)FTNP.txt | TXT text file | |
| Horizontal Alignment Review Report.pdf | ||
| 6982AF26Q000018 AZ GRCA 14(2).pdf | ||
| AZ NP GRCA 14(2) PLANS 6-24-26.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for AZ NP GRCA 14(2) Roadway Improvements
July 8, 2026
Questions Answers 1 Can bid bonds be submitted separate from the electronic submission? Yes. Bid bonds must be submitted as originals/hard copy.
2 Can the QCM be a “Triple Hat”? Please see Sections 10 and 11 of the contract requirements for more information.
3 The specifications require an ADOT mix design (batch plant and delivered in a truck) for the concrete foundations for the gate foundations. Would the Government accept a commercially available bag concrete (mixed onsite) in lieu of batched concrete due to the small quantities and remote nature of the project?
A commercially available material (bag concrete) may be used in place of and ADOT or UDOT mix design. This change will be reflected in Amendment A002
4 Guardrail removal and backfill is to be included in the lump sum removal item. The scope requires existing posts to be removed and backfilled. If existing wood posts are in place but below grade do they still need to be dug out and removed, or can they be backfilled to grade?
Please confirm that the Government will accept backfill of sign and guardrail removals by visual inspection and that we will not need to perform compaction testing on every guardrail and signpost hole.
For existing posts below grade, refer to Item 2, Removing Material (b) Partial removal, and Backfilling subsections.
For backfill acceptance, Visual inspection will be performed. Amendment A002 will remove measured or tested for conformance.
5 The plans and specs show u-channel, square and wood post details but do not state which one is to be used. Please confirm the following is the intent of the Government:
a. U-channel post is to be used for all type 2 object markers.
b. 2" square post is to be used for all sign systems.
c. All u-channel or square posts are to be driven (no concrete foundation).
d. If concrete foundations are required, please confirm that bag concrete is acceptable for all sign and object marker foundations.
The three different post types shown are options. The preferred material type for each subsection is below:
a. U-Channel steel post (See ITEMS 16, 17 AND 18
– Permanent Traffic Control Material subsection)
b. 2” square post desired for all sign systems.
c. Refer to ITEMS 16, 17 AND 18 – PERMANENT
TRAFFIC CONTROL, Construction Requirements, Sign Posts subsection.
d. If a concrete backfill/foundation is used, prepackaged concrete may be used. Refer to Amendment A001.
6 The special provisions list 5 EA different types of sheeting but do not specify which is to be used. Please confirm sheeting type for all signs and object markers.
Any of the sheeting types shown are acceptable.
7 Please confirm type 2 object marker dimensions. They are not listed in the sign schedule, and no dimensions were provided.
Refer to the Manual on Uniform Traffic Control Devices (MUTCD) for size requirements.
8 The guardrail item is TYPE 4, CLASS B which is 10 gauge weathering steel
(coreten) material. Coreten material is no longer used for end treatments and the special provisions indicate that Natina stain is to be used. Please confirm if the Government is wanting coreten gut rail sections with galvanized Natina stain end treatments or if the Government is wanting ALL rail to be galvanized with Natina stain.
The desired MGS guardrail System is Type 2, Class A Steel Posts. The Item Description will be changed in Amendment A002.
9 Suppliers are reporting lead times of 6-8 weeks to produce the guardrail material and 7-8 weeks to perform the staining. These lead times would not fit into the proposed project timeline. Would the Government consider allowing a winter shutdown period for the guardrail items due to material procurement? The 7-8 week lead time on the staining is mainly due to the cure period on the staining. This could be reduced to as soon as 4 weeks but would void the warranty and risk the stain bleeding after installation. Would the Government be willing to accept the voided warranty and potential bleeding of the stain to reduce the lead time?
The Government is reviewing this question and will provide an answer soon.
10 Suppliers are reporting lead times of 2-3 weeks to produce the sign post material and 7-8 weeks to perform the staining. These lead times would not fit into the proposed project timeline. Would the Government consider allowing a winter shutdown period for the sign items due to material procurement? The 7-8 week lead time on the staining is mainly due to the cure period on the staining. This could be reduced to as soon as 4 weeks but would void the warranty and risk the stain bleeding after installation. Would the Government be willing to accept the voided warranty and potential bleeding of the stain to reduce the lead time?
The Government is reviewing this question and will provide an answer soon.
11 Would the Government consider providing some additional time? No extension to quote submittal date will be made at this time.