This is a Questions and Answers document for RFQ 6982AF25R000016, a Construction Inspection Indefinite Delivery Indefinite Quantity (IDIQ) contract solicitation issued by the Central Federal Lands Highway Division (CFLHD).
The Q&A document addresses 13 questions received from potential offerors regarding submission requirements and evaluation criteria. Key clarifications include: firms must hold a state-level Engineering Firm License or Certificate of Authorization (COA) to practice architect-engineer services in at least one state served by CFLHD; the RFQ requires submission of Standard Form 330 (SF-330) Parts I and II along with written responses to evaluation factors, which should be integrated into a single qualifications package; narrative responses supplement structured SF-330 data and should not merely reiterate the form; firms may include information in SF-330 Section H—Additional Information; no specific target range or minimum/maximum number of personnel is mandated for Section E; written narratives for up to ten projects count toward the 50-page limit, but CPARS reports and equivalent performance documentation do not; firms must include only the signed first page of Standard Form 30 to acknowledge receipt of amendments; and Attachment A serves as a navigational index rather than merely a cover sheet. The document clarifies that graphical covers and tables of contents do not count toward the 50-page limit, while cover letters, tab dividers, and appendices containing maps, graphs, and charts are excluded. Regarding SBA Mentor-Protégé eligibility, offerors are directed to 13 C.F.R. Part 121 and applicable SBA rules. The document references amendment A001 for corrections to the number of evaluation factors and directs inquiries about incumbent contract holders to the Federal Lands Highway Division website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF25R000016
Construction Inspection IDIQ
Questions Answers
1. We have a question regarding the RFQ requirements, the RFQ states that firms must be licensed to practice A&E services could you please clarify what specific licenses are required beyond an individual Professional
Engineer (PE) license for providing engineering services?
The RFQ requires that firms be licensed to practice architect-engineer (A&E) services within at least one of the states served by CFLHD. Beyond individual Professional Engineer (PE) licenses, this refers to a state-level Engineering Firm License or a
Certificate of Authorization (COA). Firms responding to the RFQ must specify the Engineering
Firm License, Certificate of Authorization, or other state-issued approval that permits the Firm to practice architecture and engineering (A&E).
Include the license number(s) and the state(s) of issuance.
2. Section 3.2.2 of the RFQ reads: "Firms that have the qualifications to perform the services described in this RFQ and wish to be considered for contract award shall submit a qualifications package to include a Standard
Form 330 (SF 330) Architect-Engineer
Qualifications, parts I and II, as well as a written response to the evaluation factors 1-5 outlined in RFQ Attachment A - Evaluation
Factors." However, Attachment A lists only
Evaluation Factors 1–3. Please clarify how many Evaluation Factors there are.
Please see amendment A001 to RFQ
#6982AF25R000016.
3. The RFQ requires submission of both an SF-
330 and a written response to the Evaluation
Factors. Evaluation Factor 2 (Personnel
Qualifications) and Evaluation Factor 3 (Past
Performance) correspond directly to information requested in SF-330 Section E
(Resumes of Key Personnel) and Section F
(Example Projects Which Best Illustrate
Proposed Team’s Qualifications for this
Contract), respectively. In fact, Evaluation
Factor 2 specifically states, “The Firm shall submit these qualifications using the Standard
Form 330 (SF-330), clearly demonstrating each individual’s capability to perform the required construction inspection services and to meet all performance expectations associated with the contract.” How are these two responses (the information provided in the SF-330 and the
The narrative responses serve as a supplement to the structured data in the SF 330. Firms are to address all evaluation items within the SF 330 while providing the information in the sequence required by Attachment A. Written responses to the
Evaluation Factors should be included alongside the
SF 330 as part of a single, integrated qualifications package.
information provided in the Evaluation Factor narrative) supposed to be different or similar?
Should the Evaluation Factor narrative response reiterate what is stated in the corresponding SF-
330 section?
4. Should the written responses to the Evaluation
Factors be provided as a separate document, or included within the SF-330 as Section H -
Additional Information? Also, is the Attachment
A chart intended to be included in the submission as a cover sheet for the Evaluation
Factor response?
Written responses to the Evaluation Factors should be included alongside the SF 330 as part of a single, integrated qualifications package. Firms may input information deemed necessary into SF 330 Section
H – Additional Information. The Attachment A chart is intended to be included in your submission, but it functions more as a navigational index or reference table rather than just a cover sheet.
5. How many proposed staff does CFLHD expect to see included in Section E of the SF-330? Is there a target range or minimum/maximum number of personnel the Government prefers for COTAs and/or CIs?
The Government does not provide a specific target range or a numerical minimum/maximum for the number of personnel to be included in Section E of the SF-330. Firms should offer sufficient staff to meet the requirements of CFLHD.
6. On Page 20 of the RFQ , it states that
“documentation submitted to identify contracts will not be counted toward the total page limit.” Can you clarify what type of documentation this refers to and/or what CFLHD is expecting to see as far as this documentation?
While your written narrative responses for up to ten
(10) projects will count toward the 50-page limit, the actual CPARS reports or equivalent performance documentation from non-federal agencies will not count toward that total. This allows you to provide full, unedited performance reports to validate your experience without sacrificing space for your technical qualifications.
7. Can you also please confirm when responses to questions are anticipated to be issued?
Please see RFQ Section 4.6. Communications.
8. Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
Please see https://highways.dot.gov/federal-lands/business/ae-services/contract-holders for information regarding incumbent contract holders.
Questions received on 4/15/2026
9. Our firm intends to submit a proposal under this solicitation as a Joint Venture formed pursuant to an
SBA-approved Mentor-Protégé Agreement. The
Mentor-Protégé Agreement will remain active through the proposal submission date but is scheduled to expire prior to contract award. Can you please confirm whether the Joint Venture will still be considered eligible and evaluated as a small business under the Mentor-Protégé Program for this
Please see 13 C.F.R. pt. 121 and applicable rules for the SBA Mentor-Protégé program.
https://highways.dot.gov/federal-lands/business/ae-services/contract-holders https://highways.dot.gov/federal-lands/business/ae-services/contract-holders procurement, provided it was properly certified and compliant at the time of proposal submission?
10. With our acknowledgement of amendments, do we include only the first page (SF 30 form) in our submittal, or would you like the entire document included? (e.g., Amendment 1 - 80 pages).
Firms should include the signed first page of
Standard Form 30 for each amendment to acknowledge receipt, rather than the entire amendment package.
11. Do amendments have a mandatory location in the document, or is their placement at our discretion?
There is no mandated location for the placement of amendments within your submission.
12. Section 3.2 Submission Format, 3.2.3 (pg 11). In the list of pages that do not count toward the 50 pages, please advise if the following can be included with our submittal and whether or not they count towards the 50 page count:
-Graphical Cover
-Table of Contents
The RFQ specifically excludes cover letter, tab dividers, amendments to this RFQ, and back cover.
Additionally, supporting materials in an appendix, such as maps, graphs, and charts, are excluded.
13. Attachment A - Evaluation Factors Form (pg. 17)
Does Attachment A have a mandatory location in the document, or is its placement at our discretion?
There is no mandated location for Attachment A within your submission.