BidTabulationReport NM FS 220(1) Romero Creek Bridge LK.pdf
PDF 605 KB Posted
- Attached to
- NM FS 220(1), Romero Creek Bridge
- Solicitation number
- 6982AF25B000012
About this file
This is a Bid Tabulation Report for the Romero Creek Bridge project (Project No. NM FS 220(1)) managed by Central Federal Lands. The solicitation (No. 6982AF25B000012) was opened on 09/16/2025 in Lakewood, CO, located in Catron County, New Mexico, within the Gila National Forest. Six contractors submitted bids, with bid amounts ranging from $1,363,775.22 to $2,348,405.86, compared to the Engineer's Estimate of $1,870,000.00. Whelcon Contractors LLC was awarded the contract on 11/05/2025 with the lowest bid of $1,363,775.22.
The bid tabulation details line-item pricing for various construction activities including mobilization, survey and staking, clearing and grubbing, embankment construction, structure excavation, roadway aggregate, asphalt concrete pavement, structural concrete, reinforcing steel, pre-fabricated steel bridge installation, guardrail systems, temporary traffic control, and field office setup. Bid prices vary significantly across line items and contractors, with some items showing substantial differences between the lowest and highest bidders. The project involves constructing a 14' x 48' modular steel vehicular bridge and associated infrastructure work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : NM FS 220(1) Project Name: ROMERO CREEK BRIDGE
Contractor Responsive? Base Schedule A STGP Malcom JV LLC $2,348,405.86 GC Works, Inc. $1,612,489.00 Monitor Construction Company, Inc. $1,498,888.00
Siete, Inc. $1,458,850.00 KIMO Constructors, Inc. $1,428,138.43 Whelcon Contractors LLC. $1,363,775.22 Engineer's Estimate $1,870,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Leslie Karsten
Project No. : NM FS 220(1) Project Name: ROMERO CREEK
BRIDGE
Division: Central Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Roxannie Gonzalez- Sosa
Solicitation No. : 6982AF25B000012 Opened at: Lakewood, CO Opened by: Laura Slauter State: NM County: Catron Federal Land: Gila National Forest Bid Open Date and Time: 09/16/2025
Contract Awarded to: Whelcon Contractors
LLC.
Award Date: 11/05/2025
Contractor Comment Bid Amount Responsive STGP Malcom JV LLC, 3700 Centerpoint DR, Anchorage, 99503
$2,348,405.86
GC Works, Inc., 9894 Bissonnet Street, Suite #241, Houston, 44, 77036
$1,612,489.00
Monitor Construction Company, Inc., 8 Old Highway Lane, Sonoita, 4, 85637
$1,498,888.00
Siete, Inc., P.O. Box 202, Rye, 81069
$1,458,850.00
KIMO Constructors, Inc., 3681 hwy 47, Bosque Farms, 87068
$1,428,138.43
Whelcon Contractors LLC., 1 W Wetmore Rd., Suite 203, Tucson, 4, 85745
$1,363,775.22
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Leslie Karsten
Leslie Karsten
Contracting Officer
10.31.25
Engineer's Estimate $1,870,000.00
Project No. : NM FS 220(1) Project Name: ROMERO CREEK BRIDGE Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION STGP Malcom JV LLC $348,000.00 GC Works, Inc. $250,646.00 Monitor Construction Company, Inc. $149,000.00
Siete, Inc. $145,000.00 KIMO Constructors, Inc. $139,500.00
Whelcon Contractors
LLC. $91,688.69
Engineer's Estimate ALL LPSM LPSM $171,280.00
A0040 15214-1000 SURVEY AND
STAKING, BRIDGE
Whelcon Contractors
LLC. $25,301.44
GC Works, Inc. $24,000.00 STGP Malcom JV LLC $22,500.00 Siete, Inc. $20,000.00 KIMO Constructors, Inc. $11,275.00
Monitor Construction Company, Inc. $8,200.00
Engineer's Estimate ALL LPSM LPSM $30,000.00
A0060 15225-0000 SLOPE, REFERENCE,
AND CLEARING
AND GRUBBING
CONTROL
Whelcon Contractors
LLC. 0.041 $617,108.29 $25,301.44
KIMO Constructors, Inc. 0.041 $506,250.00 $20,756.25
STGP Malcom JV LLC 0.041 $265,000.00 $10,865.00 Siete, Inc. 0.041 $150,000.00 $6,150.00 Monitor Construction Company, Inc. 0.041 $79,800.00 $3,271.80
GC Works, Inc. 0.041 $32,400.00 $1,328.40 Engineer's Estimate 0.041 MILE $240,000.00 $9,840.00
A0080 15236-2000 SURVEY CONTROL,
GRADE FINISHING
KIMO Constructors, Inc. 0.082 $459,800.00 $37,703.60
Whelcon Contractors
LLC. 0.082 $205,702.80 $16,867.63
STGP Malcom JV LLC 0.082 $115,000.00 $9,430.00 Siete, Inc. 0.082 $100,000.00 $8,200.00 Monitor Construction Company, Inc. 0.082 $40,800.00 $3,345.60
GC Works, Inc. 0.082 $30,000.00 $2,460.00 Engineer's Estimate 0.082 MILE $150,000.00 $12,300.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0100 15301-0000 CONTRACTOR
QUALITY CONTROL
Monitor Construction Company, Inc. $212,200.00
Siete, Inc. $200,000.00 STGP Malcom JV LLC $194,350.00 GC Works, Inc. $103,928.00 Whelcon Contractors
LLC. $82,916.24
KIMO Constructors, Inc. $34,500.00
Engineer's Estimate ALL LPSM LPSM $225,000.00
A0120 15401-0000 CONTRACTOR
TESTING
Siete, Inc. $100,000.00 Whelcon Contractors
LLC. $75,904.31
STGP Malcom JV LLC $61,000.00 KIMO Constructors, Inc. $50,300.00
GC Works, Inc. $38,400.00 Monitor Construction Company, Inc. $18,200.00
Engineer's Estimate ALL LPSM LPSM $60,000.00
A0140 15501-0000 CONSTRUCTION
SCHEDULE
Whelcon Contractors
LLC. $21,067.90
STGP Malcom JV LLC $19,900.00 Siete, Inc. $15,000.00 GC Works, Inc. $11,000.00 Monitor Construction Company, Inc. $9,800.00
KIMO Constructors, Inc. $7,100.00
Engineer's Estimate ALL LPSM LPSM $17,000.00
A0160 15701-0000 SOIL EROSION
CONTROL
Siete, Inc. $50,000.00 Whelcon Contractors
LLC. $26,287.15
STGP Malcom JV LLC $22,600.00 GC Works, Inc. $21,600.00 Monitor Construction Company, Inc. $15,600.00
KIMO Constructors, Inc. $9,325.00
Engineer's Estimate ALL LPSM LPSM $50,000.00
A0180 20101-0000 CLEARING AND
GRUBBING
Monitor Construction Company, Inc. 0.320 $168,000.00 $53,760.00
Siete, Inc. 0.320 $65,000.00 $20,800.00 KIMO Constructors, Inc. 0.320 $53,650.00 $17,168.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 20101-0000 CLEARING AND
GRUBBING
STGP Malcom JV LLC 0.320 $35,250.00 $11,280.00 Whelcon Contractors
LLC. 0.320 $32,919.31 $10,534.18
GC Works, Inc. 0.320 $28,800.00 $9,216.00 Engineer's Estimate 0.320 ACRE $65,000.00 $20,800.00
A0200 20304-2000 REMOVAL OF
BRIDGE
STGP Malcom JV LLC $322,602.86 GC Works, Inc. $152,640.00 Monitor Construction Company, Inc. $85,900.00
Siete, Inc. $75,000.00 Whelcon Contractors
LLC. $55,296.72
KIMO Constructors, Inc. $35,550.00
Engineer's Estimate ALL LPSM LPSM $140,000.00
A0220 20420-0000 EMBANKMENT
CONSTRUCTION
GC Works, Inc. 320.000 $420.00 $134,400.00 Whelcon Contractors
LLC. 320.000 $179.38 $57,401.60
STGP Malcom JV LLC 320.000 $175.00 $56,000.00 Monitor Construction Company, Inc. 320.000 $140.00 $44,800.00
KIMO Constructors, Inc. 320.000 $127.30 $40,736.00
Siete, Inc. 320.000 $80.00 $25,600.00 Engineer's Estimate 320.000 CUYD $130.00 $41,600.00
A0240 20801-0000 STRUCTURE
EXCAVATION
STGP Malcom JV LLC 210.000 $775.00 $162,750.00 GC Works, Inc. 210.000 $420.00 $88,200.00 Siete, Inc. 210.000 $190.00 $39,900.00 KIMO Constructors, Inc. 210.000 $99.25 $20,842.50
Whelcon Contractors
LLC. 210.000 $87.10 $18,291.00
Monitor Construction Company, Inc. 210.000 $83.00 $17,430.00
Engineer's Estimate 210.000 CUYD $500.00 $105,000.00
A0260 20803-0000 STRUCTURAL
BACKFILL
STGP Malcom JV LLC 70.000 $1,210.00 $84,700.00 Whelcon Contractors
LLC. 70.000 $833.04 $58,312.80
Siete, Inc. 70.000 $500.00 $35,000.00 GC Works, Inc. 70.000 $420.00 $29,400.00 Monitor Construction Company, Inc. 70.000 $390.00 $27,300.00
KIMO Constructors, Inc. 70.000 $286.40 $20,048.00
Engineer's Estimate 70.000 CUYD $600.00 $42,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0280 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Whelcon Contractors
LLC. 220.000 $251.88 $55,413.60
STGP Malcom JV LLC 220.000 $200.00 $44,000.00 Siete, Inc. 220.000 $175.00 $38,500.00 KIMO Constructors, Inc. 220.000 $168.35 $37,037.00
GC Works, Inc. 220.000 $144.00 $31,680.00 Monitor Construction Company, Inc. 220.000 $130.00 $28,600.00
Engineer's Estimate 220.000 TON $200.00 $44,000.00
A0300 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
Monitor Construction Company, Inc. 82.000 $920.00 $75,440.00
Whelcon Contractors
LLC. 82.000 $843.38 $69,157.16
KIMO Constructors, Inc. 82.000 $498.84 $40,904.88
STGP Malcom JV LLC 82.000 $480.00 $39,360.00 Siete, Inc. 82.000 $450.00 $36,900.00 GC Works, Inc. 82.000 $240.00 $19,680.00 Engineer's Estimate 82.000 TON $800.00 $65,600.00
A0320 41201-0000 TACK COAT KIMO Constructors, Inc. 0.320 $30,800.00 $9,856.00
GC Works, Inc. 0.320 $9,000.00 $2,880.00 Monitor Construction Company, Inc. 0.320 $5,500.00 $1,760.00
Siete, Inc. 0.320 $5,000.00 $1,600.00 Whelcon Contractors
LLC. 0.320 $2,530.15 $809.65
STGP Malcom JV LLC 0.320 $1,650.00 $528.00 Engineer's Estimate 0.320 TON $4,000.00 $1,280.00
A0340 55201-0100 STRUCTURAL
CONCRETE, CLASS
A (AE)
STGP Malcom JV LLC 46.000 $5,672.40 $260,930.40 KIMO Constructors, Inc. 46.000 $4,545.45 $209,090.70
Monitor Construction Company, Inc. 46.000 $4,300.00 $197,800.00
Siete, Inc. 46.000 $3,000.00 $138,000.00 Whelcon Contractors
LLC. 46.000 $2,267.19 $104,290.74
GC Works, Inc. 46.000 $420.00 $19,320.00 Engineer's Estimate 46.000 CUYD $3,500.00 $161,000.00
A0360 55401-1000 REINFORCING
STEEL
GC Works, Inc. 4,900.000 $10.20 $49,980.00 KIMO Constructors, Inc. 4,900.000 $7.40 $36,260.00
Whelcon Contractors
LLC. 4,900.000 $5.90 $28,910.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0360 55401-1000 REINFORCING
STEEL
Monitor Construction Company, Inc. 4,900.000 $5.50 $26,950.00
STGP Malcom JV LLC 4,900.000 $4.50 $22,050.00 Siete, Inc. 4,900.000 $3.00 $14,700.00 Engineer's Estimate 4,900.000 LB $6.00 $29,400.00
A0380 55504-0000 PRE-FABRICATED
STEEL BRIDGE (14'
x 48' modular steel vehicular bridge)
GC Works, Inc. $439,704.60 STGP Malcom JV LLC $371,325.60 KIMO Constructors, Inc. $363,000.00
Monitor Construction Company, Inc. $329,970.60
Whelcon Contractors
LLC. $272,757.94
Siete, Inc. $250,000.00 Engineer's Estimate ALL LPSM LPSM $378,000.00
A0400 60101-0000 CONCRETE Siete, Inc. 10.000 $3,500.00 $35,000.00 STGP Malcom JV LLC 10.000 $2,974.55 $29,745.50 KIMO Constructors, Inc. 10.000 $1,860.75 $18,607.50
Whelcon Contractors
LLC. 10.000 $1,427.35 $14,273.50
Monitor Construction Company, Inc. 10.000 $1,200.00 $12,000.00
GC Works, Inc. 10.000 $600.00 $6,000.00 Engineer's Estimate 10.000 CUYD $2,500.00 $25,000.00
A0420 61701-4550 GUARDRAIL
SYSTEM MGS, TYPE
2, CLASS A WOOD
POSTS
STGP Malcom JV LLC 50.000 $324.77 $16,238.50 GC Works, Inc. 50.000 $300.00 $15,000.00 KIMO Constructors, Inc. 50.000 $292.50 $14,625.00
Whelcon Contractors
LLC. 50.000 $253.01 $12,650.50
Siete, Inc. 50.000 $175.00 $8,750.00 Monitor Construction Company, Inc. 50.000 $120.00 $6,000.00
Engineer's Estimate 50.000 LNFT $300.00 $15,000.00
A0440 61702-1500 TERMINAL
SECTION, TYPE
MGS TANGENT
Whelcon Contractors
LLC. 4.000 $11,469.99 $45,879.96
STGP Malcom JV LLC 4.000 $9,000.00 $36,000.00 KIMO Constructors, Inc. 4.000 $6,900.00 $27,600.00
GC Works, Inc. 4.000 $6,000.00 $24,000.00 Monitor Construction Company, Inc. 4.000 $5,300.00 $21,200.00
Siete, Inc. 4.000 $4,300.00 $17,200.00 Engineer's Estimate 4.000 EACH $9,500.00 $38,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0460 61707-0000 STRUCTURE
TRANSITION
RAILING
STGP Malcom JV LLC 50.000 $720.00 $36,000.00 GC Works, Inc. 50.000 $600.00 $30,000.00 KIMO Constructors, Inc. 50.000 $599.50 $29,975.00
Whelcon Contractors
LLC. 50.000 $480.73 $24,036.50
Siete, Inc. 50.000 $375.00 $18,750.00 Monitor Construction Company, Inc. 50.000 $120.00 $6,000.00
Engineer's Estimate 50.000 LNFT $600.00 $30,000.00
A0480 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
GC Works, Inc. 20.000 $390.00 $7,800.00 KIMO Constructors, Inc. 20.000 $317.50 $6,350.00
Whelcon Contractors
LLC. 20.000 $272.12 $5,442.40
Monitor Construction Company, Inc. 20.000 $250.00 $5,000.00
STGP Malcom JV LLC 20.000 $225.00 $4,500.00 Siete, Inc. 20.000 $130.00 $2,600.00 Engineer's Estimate 20.000 HOUR $220.00 $4,400.00
A0500 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
GC Works, Inc. 20.000 $390.00 $7,800.00 KIMO Constructors, Inc. 20.000 $316.50 $6,330.00
Whelcon Contractors
LLC. 20.000 $228.08 $4,561.60
STGP Malcom JV LLC 20.000 $225.00 $4,500.00 Monitor Construction Company, Inc. 20.000 $170.00 $3,400.00
Siete, Inc. 20.000 $130.00 $2,600.00 Engineer's Estimate 20.000 HOUR $200.00 $4,000.00
A0520 62201-0950 WHEEL LOADER, 3
CUBIC YARD
MINIMUM RATED
CAPACITY
GC Works, Inc. 20.000 $390.00 $7,800.00 KIMO Constructors, Inc. 20.000 $355.00 $7,100.00
Whelcon Contractors
LLC. 20.000 $314.59 $6,291.80
Monitor Construction Company, Inc. 20.000 $260.00 $5,200.00
STGP Malcom JV LLC 20.000 $225.00 $4,500.00 Siete, Inc. 20.000 $150.00 $3,000.00 Engineer's Estimate 20.000 HOUR $210.00 $4,200.00
A0540 62201-2750 MOTOR GRADER KIMO Constructors, Inc. 20.000 $400.95 $8,019.00
GC Works, Inc. 20.000 $390.00 $7,800.00 STGP Malcom JV LLC 20.000 $350.00 $7,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0540 62201-2750 MOTOR GRADER Whelcon Contractors
LLC. 20.000 $346.05 $6,921.00
Monitor Construction Company, Inc. 20.000 $340.00 $6,800.00
Siete, Inc. 20.000 $150.00 $3,000.00 Engineer's Estimate 20.000 HOUR $240.00 $4,800.00
A0560 62201-3350 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY
GC Works, Inc. 20.000 $390.00 $7,800.00 KIMO Constructors, Inc. 20.000 $355.00 $7,100.00
STGP Malcom JV LLC 20.000 $350.00 $7,000.00 Whelcon Contractors
LLC. 20.000 $259.54 $5,190.80
Monitor Construction Company, Inc. 20.000 $210.00 $4,200.00
Siete, Inc. 20.000 $200.00 $4,000.00 Engineer's Estimate 20.000 HOUR $230.00 $4,600.00
A0580 62301-0000 GENERAL LABOR STGP Malcom JV LLC 20.000 $135.00 $2,700.00 GC Works, Inc. 20.000 $117.30 $2,346.00 Whelcon Contractors
LLC. 20.000 $97.14 $1,942.80
KIMO Constructors, Inc. 20.000 $93.95 $1,879.00
Monitor Construction Company, Inc. 20.000 $87.00 $1,740.00
Siete, Inc. 20.000 $60.00 $1,200.00 Engineer's Estimate 20.000 HOUR $70.00 $1,400.00
A0600 62302-1100 SPECIAL LABOR,
HIRED SURVEY
SERVICES
STGP Malcom JV LLC 20.000 $500.00 $10,000.00 KIMO Constructors, Inc. 20.000 $498.95 $9,979.00
Whelcon Contractors
LLC. 20.000 $353.92 $7,078.40
Monitor Construction Company, Inc. 20.000 $320.00 $6,400.00
GC Works, Inc. 20.000 $270.00 $5,400.00 Siete, Inc. 20.000 $165.00 $3,300.00 Engineer's Estimate 20.000 HOUR $300.00 $6,000.00
A0620 62406-0300 PLACING
CONSERVED
TOPSOIL, 4-INCH
DEPTH
Whelcon Contractors
LLC. 0.300 $60,518.45 $18,155.54
STGP Malcom JV LLC 0.300 $40,000.00 $12,000.00 Siete, Inc. 0.300 $26,000.00 $7,800.00 Monitor Construction Company, Inc. 0.300 $25,000.00 $7,500.00
GC Works, Inc. 0.300 $21,600.00 $6,480.00 KIMO Constructors, Inc. 0.300 $19,400.00 $5,820.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0620 62406-0300 PLACING
CONSERVED
TOPSOIL, 4-INCH
DEPTH
Engineer's Estimate 0.300 ACRE $35,000.00 $10,500.00
A0640 62510-1000 SEEDING, DRY
METHOD
GC Works, Inc. 0.300 $30,000.00 $9,000.00 KIMO Constructors, Inc. 0.300 $28,050.00 $8,415.00
Monitor Construction Company, Inc. 0.300 $14,500.00 $4,350.00
Whelcon Contractors
LLC. 0.300 $13,494.07 $4,048.22
STGP Malcom JV LLC 0.300 $13,000.00 $3,900.00 Siete, Inc. 0.300 $10,500.00 $3,150.00 Engineer's Estimate 0.300 ACRE $50,000.00 $15,000.00
A0660 62515-1000 MULCHING, DRY
METHOD
KIMO Constructors, Inc. 0.300 $35,450.00 $10,635.00
Whelcon Contractors
LLC. 0.300 $33,735.26 $10,120.58
GC Works, Inc. 0.300 $24,000.00 $7,200.00 Siete, Inc. 0.300 $20,500.00 $6,150.00 STGP Malcom JV LLC 0.300 $13,000.00 $3,900.00 Monitor Construction Company, Inc. 0.300 $9,100.00 $2,730.00
Engineer's Estimate 0.300 ACRE $50,000.00 $15,000.00
A0680 63316-1000 REMOVE AND
RESET SIGN
STGP Malcom JV LLC 2.000 $10,700.00 $21,400.00 GC Works, Inc. 2.000 $1,200.00 $2,400.00 Siete, Inc. 2.000 $1,000.00 $2,000.00 Monitor Construction Company, Inc. 2.000 $970.00 $1,940.00
KIMO Constructors, Inc. 2.000 $888.00 $1,776.00
Whelcon Contractors
LLC. 2.000 $502.01 $1,004.02
Engineer's Estimate 2.000 EACH $1,500.00 $3,000.00
A0700 63501-0000 TEMPORARY
TRAFFIC CONTROL
KIMO Constructors, Inc. $75,900.00
Monitor Construction Company, Inc. $70,100.00
Whelcon Contractors
LLC. $55,663.16
Siete, Inc. $55,000.00 STGP Malcom JV LLC $52,700.00 GC Works, Inc. $17,600.00 Engineer's Estimate ALL LPSM LPSM $45,000.00
A0720 63701-0000 FIELD OFFICE Siete, Inc. 1.000 $65,000.00 $65,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0720 63701-0000 FIELD OFFICE KIMO Constructors, Inc. 1.000 $47,075.00 $47,075.00
Whelcon Contractors
LLC. 1.000 $44,004.26 $44,004.26
STGP Malcom JV LLC 1.000 $32,150.00 $32,150.00 Monitor Construction Company, Inc. 1.000 $25,000.00 $25,000.00
GC Works, Inc. 1.000 $17,600.00 $17,600.00 Engineer's Estimate 1.000 EACH $40,000.00 $40,000.00
Report Generated on 10/31/2025 12:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
| 2025-10-31T10:42:06-0600 | |
| LESLIE N KARSTEN |
File details come from the government source that posted it. Updated .