QnA 10 23 24 .pdf
PDF 103 KB Posted
- Attached to
- NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
- Solicitation number
- 6982AF25B000001
About this file
This document is a set of Questions and Answers related to the federal contract opportunity for the NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge project.
The key details are:
- The fabricators for the steel bridge structure must be certified as IBR (Certified Bridge Fabricator - Intermediate), as confirmed in Amendment A001 dated 10/23/24.
- The project scope includes replacing a previously destroyed bridge with a new prefabricated steel structure with a 97-foot span and 16-foot width, founded on drilled shafts with a metal deck and concrete topping. Additional work includes removing an existing low water crossing and realigning the road.
- The project is located in the Santa Fe National Forest, approximately 17 miles northwest of Las Vegas, New Mexico, and is being procured by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
NM ERFO FS SNTFE 2022-1(1)
October 23, 2024
Questions Answers 1 Ref. Section 555 Steel Structures; Article 555.07 Fabrication states fabricators must be certified as IBR (Certified Bridge Fabricator – Intermediate). Article 555.21 Fabrication states fabricators must be certified as SBR (Simple Steel Bridges). We assume that IBR fabricators are required. Please confirm.
• Fabrication must be certified as IBR (Certified Bridge Fabricator – Intermediate).
• See Amendment A001 Dated 10/23/24.