This document is an amendment to a solicitation for the NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge project. The amendment removes and replaces page E-40, which provides updated technical specifications for the modular steel girder bridge design. Key requirements include using high-strength, low-alloy steel conforming to AASHTO standards, providing galvanized open steel grid decking, and designing the bridge to be assembled in the field with minimal specialized tools or skills. Bidders must acknowledge receipt of this amendment by the specified date and hour, or their offer may be rejected. The original solicitation number is 6982AF25B000001, and the project is being administered by the Federal Highway Administration.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A005
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Jon Holsopple
9A. AMENDMENT OF SOLICITATION NUMBER
6982AF25B000001
5. PROJECT NUMBER (If applicable)
NM ERFO FS SNTFE 2022-1(1)
11/22/2024
9B. DATED (SEE ITEM 11)
10/15/2024
0*
*See Item 14
HFLCEO240429PR
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IFB
Remove and Replace page E-40 with the attached corresponding page.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
X
E-40
NM ERFO SNTFE 2022-1(1)
El Porvenir Bridge shop drawings for the bridge will be combined with the contract drawings to become the record set of plans for the bridge.
555.03A General. Add the following subsection:
The bridge consists of a modular design which employs steel rolled beams (four minimum) and structural steel decking and includes steel bridge railings. Create a final configuration which is consistent with that shown on contract plans. Design and fabricate the bridge such that the components may be assembled in the field with a minimum of specialized tools or skills.
Perform welding and weld qualification tests according to the provisions of AASHTO/AWS D1.5M/D1.5 Bridge Welding Code. The bridge shall meet the following requirements:
(a) Use high—strength, low alloy, steel conforming to AASHTO M270, Grade 50W (ASTM A709, Grade 50W) for all major structural steel components (girders, diaphragms, splice plates, bridge railing posts, bearing plates, etc.). Use bolts, nuts, and washers for structural steel connections conforming to ASTM F3125, Grade A325, Type 3. All structural steel components of the bridge including girder, diaphragms, splices and connection bolts shall be galvanized after fabrication according to AASHTO M111 or AASHTO M232, as applicable. Minimum thickness of structural steel is 3/16”.
(b) Provide galvanized open steel grid bridge decking conforming to ASTM A709, Grade 50, or ASTM A572, Grade 50. Provide positive connections between steel girders and steel bridge decking.
(c) Provide anchor bolts conforming to ASTM F1554, Grade 55 or 105. Galvanize anchor bolts after fabrication.
(d) Provide steel reinforced elastomeric bearings conforming to AASHTO M251, 60 Durometer hardness, elastomer grade 2 or higher. The bearings at each abutment shall be designed as expansion bearings, so that thermal deformations are divided equally to each abutment. Design bearings per AASHTO LRFD method A.
(e) Provide galvanized steel thrie-beam guardrail components conforming to AASHTO M180, Type I, Class B.
Design criteria is as follows:
(a) Provide a fully engineered modular steel girder bridge designed in accordance with these specifications. Prior to fabrication, submit for approval complete structural calculations, showing the governing capacity and demand values for all members and connections, and detailed shop drawings bearing the seal of a registered Professional Engineer. Design in accordance with current edition of the AASHTO LRFD Bridge Design Specifications.
(b) Provide a modular bridge with a clear deck surface width as shown on the contract plans. Steel girder and diaphragm sections may be fabricated into two or more
Amendment A005 11.22.2024
Leslie.Karsten Cross-Out
Leslie.Karsten Cross-Out
Leslie.Karsten Cross-Out
Leslie.Karsten Cross-Out
File details come from the government source that posted it. Updated .