This document contains questions and answers from an advertisement for a federal transportation project in Arizona. The project involves improvements to approximately 0.6 miles of Joe Tank Road from State Route 260 to Apache-Sitgreaves National Forest land, including widening the roadway bench, constructing new aggregate base and asphalt pavement, drainage improvements, culvert extensions and replacements, replacement of a cattle guard, and installation of new signage. The principal work items include 4,500 cubic yards of excavation, 5,000 tons of aggregate, 1,900 tons of asphalt, 6,600 linear feet of curb and gutter, 1,150 linear feet of pipe culverts and structures. The anticipated schedule is to advertise in late February 2024, award in late March 2024, and complete construction from May through August 2024, with an estimated bid range of $2,000,000 to $5,000,000.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
AZ FLAP NAV FR136(1) JOE TANK ROAD
March 14, 2024
Questions Answers 1 Who is the assigned Construction Operations Engineer? To be determined 2 Who is the assigned Project Engineer? To be determined
3 What is the grate elevation for the Manhole 109+34, 33.09’ RT? The rim elevation for that manhole is 6352.4 ft. Please refer to the Hydraulics Report for the headwater elevations for the culverts.
4 Due to the current volatility in the oil market, will the Government add a price adjustment for bituminous products?
An escalation clause for asphalt will not be added to the contract.
5 Due to the current volatility in the oil market, will the Government add a price adjustment for fuel?
An escalation clause for fuel will not be added to the contract.
6 Plan Sheet T4, Piping Plug.
o Please provide High water elevation or dimension above the top of pipe.
Please refer to the Hydraulics Report for the headwater elevations for the culverts.
7 Will the Government accept cattleguards that meet AzDOT details?
Any cattleguards meeting the requirements of the contract will be accepted.
8 Will the Government add a Bid Item for the Biologist? A bid item for the biologist will not be added to the contract.