CENTRAL FEDERAL LANDS HIGHWAY DIVISION
100 PERCENT HYDRAULICS REPORT
JOE TANK ROAD
NAVAJO COUNTY, ARIZONA
PROJECT #32782022
DECEMBER 14, 2022
100 PERCENT
HYDRAULICS
REPORT
JOE TANK ROAD
NAVAJO COUNTY, ARIZONA
CENTRAL FEDERAL LANDS
HIGHWAY DIVISION
PROJECT NO.: 32782022
DATE: DECEMBER 14, 2022
WSP
2000 S. COLORADO BLVD., STE. 2-1000
DENVER, CO 80222
T: +0 303-935-6505
F: +0 303-935-6575
WSP.COM
100 Percent Hydraulic Report Project No. 32782202 Central Federal Lands
WSP
December 2022
Page i
EXECUTIVE SUMMARY
Hydrologic and hydraulic analyses were conducted for the AZ FLAP FR136 Joe Tank Road project located in
Navajo County, Arizona. Proposed improvements include widening the roadway, new asphalt, modifications to existing culverts and drainage ditches, new storm drain, and new curb-and-gutter inlet design. The hydraulic design frequency is the 25-year flood for all cross culverts and the 10-year flood for all side drainages and inlet design.
All design flows were estimated using the Rational Method as presented by the Rational Method Tool developed by the Arizona Department of Transportation (ADOT). Hydraulic analysis of the cross culverts was evaluated using HY-8 (FHWA, 2021), and open channel hydraulics necessary for the roadside ditches were modeled using Bentley FlowMaster V8i (Bentley Systems, Inc., 2009).
All cross culverts and side-drainage culverts will be replaced with corrugated metal pipes. Riprap will provide outlet protection for each culvert and was designed per Federal Highway Administration (FHWA) standard details.
Triangular roadside ditches will convey along the north and south of the proposed roadway until approximately
300 feet west of State Road 260. The remaining 300 feet will be lined with curb and gutter.
Drainage will be mitigated through the curb-and-gutter sections via inlets and a proposed storm sewer. Outlet protection at the storm drain outfall will be a riprap apron.
100 Percent Hydraulics Report
Central Federal Lands Highway Division
WSP
December 2022
Page ii
TABLE OF
CONTENTS
Figure 1: Project Location Map
Central Federal Lands Highway Division
WSP
December 2022
Page iii
TABLE OF
CONTENTS
EXECUTIVE SUMMARY ....................................... I
1 PROJECT BACKGROUND INFORMATION
2 HYDROLOGY
2.1 Hydrologic Setting
2.2 FEMA Flood Insurance Study
2.3 Available Hydrologic Data
3 HYDRAULIC DESIGN CRITERIA
3.1 Determination of Design Discharge
3.1.1 Drainage Basin Delineations
3.1.2 Rational Method
4 EXISTING CONDITIONS MODEL
DEVELOPMENT
4.1 Existing Conditions Culvert and storm sewer
Geometry
4.2 Existing Conditions Model Results
4.2.1 Cross Culverts
4.2.2 Side-Drainage Culverts
5 PROPOSED CONDITIONS MODEL
DEVELOPMENT
5.1 Proposed Conditions Culvert Geometry
5.2 Proposed Conditions Culvert Results
5.3 Proposed Culvert Outlet Protection
5.4 Roadside Ditches
5.5 Inlet Design
5.6 Storm Sewer Design
5.7 Storm Sewer Outlet Protection
Central Federal Lands Highway Division
WSP
December 2022
Page iv
TABLE OF
CONTENTS
6 CONCLUSIONS AND
RECOMMENDATIONS
7 REFERENCES
TABLES
TABLE 1: PDDM HYDRAULIC DESIGN CRITERIA FOR LOW-
STANDARD ROADWAYS
TABLE 2: SUB-BASIN PEAK FLOWS
TABLE 3: EXISTING CROSS-CULVERT GEOMETRY
TABLE 4: EXISTING SIDE-DRAINAGE CULVERT GEOMETRY
TABLE 5: EXISTING STORM SEWER GEOMETRY
TABLE 6: EXISTING CONDITIONS HYDRAULIC RESULTS
FOR THE DESIGN EVENT
TABLE 7: EXISTING CONDITIONS HYDRAULIC RESULTS
FOR THE DESIGN EVENT
TABLE 8: PROPOSED CROSS-CULVERT GEOMETRY
TABLE 9: PROPOSED SIDE-DRAINAGE CULVERT
GEOMETRY
TABLE 10: PROPOSED CONDITIONS CROSS CULVERTS –
HYDRAULIC RESULTS FOR THE 25-YEAR
DESIGN EVENT
TABLE 11: PROPOSED CONDITIONS SIDE-DRAINAGE
CULVERTS – HYDRAULIC RESULTS FOR
THE 10-YEAR DESIGN EVENT
TABLE 12: PROPOSED RIPRAP APRON DIMENSIONS FOR
CULVERTS
TABLE 13: MAXIMUM DITCH PEAK FLOWS (10-YEAR
DESIGN EVENT)
TABLE 14: STORM SEWER PROPOSED RIPRAP APRON AT
OUTLET
FIGURES
FIGURE 1: PROJECT LOCATION MAP .................................. II
FIGURE 2: EXISTING CULVERTS
FIGURE 3: DRAINAGE BASIN MAP
FIGURE 4: EXCERPT OF FHWA CLFHD DETAIL FOR
PLACED RIPRAP AT CULVERT OUTLETS
(FHWA, 2021)
APPENDICES
APPENDIX A: FIRMETTE – PORTION OF MAP NUMBER
04017C4488F
APPENDIX B: PEAK FLOW ADOT RATIONAL METHOD
RESULTS
APPENDIX C: EXISTING CONDITIONS MODELING RESULTS
Central Federal Lands Highway Division
WSP
December 2022
Page v
TABLE OF
CONTENTS
APPENDIX D: PROPOSED CONDITIONS MODELING
RESULTS
APPENDIX E: MARICOPA ASSOCIATION OF
GOVERNMENTS CATCH BASIN TYPE “E”
Central Federal Lands Highway Division
WSP
December 2022
1 PROJECT BACKGROUND
INFORMATION
The Federal Highway Administration (FHWA), Central Federal Lands Highway Division (CFLHD) in partnership with the City of Show Low and the United Stated Forest Service (USFS) will be improving approximately 3,170 feet (0.60 miles) of Joe Tank Road from State Route 260 to Apache-Sitgreaves National
Forest Land.
Joe Tank Road will be widened from 20 feet to 28 feet, adding a paved shoulder to both sides. Existing drainage ditches, cross culverts, and side-drainage culverts must be modified to accommodate the wider roadway. In conjunction with the widening of the road, approximately 300 feet of curb and gutter will be installed in lieu of roadside ditches.
Across the project site, six cross culverts, three side-drainage culverts, and storm sewer infrastructure are designed as part of this project.
2 HYDROLOGY
2.1 HYDROLOGIC SETTING
The project is located entirely within Navajo County, Arizona in the Apache-Sitgreaves National Forest just west of the City of Show Low.
Joe Tank Road runs along a ridgeline between steep forest land and a subdivision. Overland flow that is not captured by the subdivision’s drainage infrastructure generally drains toward Joe Tank Road.
2.2 FEMA FLOOD INSURANCE STUDY
The Federal Emergency Management Agency (FEMA) provides flood insurance rate maps that detail special flood hazard areas. Land that is inundated by the base (100-year) flood are subject to National Flood Insurance
Program (NFIP) floodplain management regulations.
The national flood hazard map indicates that the project limits for Joe Tank Road fall within Zone X. FEMA
Zone X is defined as an area outside of the 500-year flood zone. A FEMA FIRMette is included in Appendix A that presents FEMA floodplain mapping near Joe Tank Road project site.
2.3 AVAILABLE HYDROLOGIC DATA
The project site does not include any National Hydrography Dataset (NHD) stream crossings. No flow records are available at the project site.
3 HYDRAULIC DESIGN CRITERIA
The Federal Lands Highway (FLH) Project Development and Design Manual (PDDM) establishes the hydraulic design criteria for this project (FLH, 2012). Joe Tank Road has a speed limit of 25 miles per hour and an average daily traffic (ADT) estimate of 250. The relatively slow speed and low traffic volume indicate that the roadway should be classified as “low standard” for hydraulic design purposes. The corresponding PDDM hydraulic design criterion are detailed in Table 1.
Hydraulic adequacy for roadway culverts is determined by conformance to all applicable design criterion including allowable headwater (AHW) and the respective headwater to depth ratio (HW/D).
Central Federal Lands Highway Division
WSP
December 2022
The design event for cross culverts on a low-standard roadway is the 25-year event. Roadside ditches, driveway culverts, and storm sewer inlet design must be designed to meet the 10-year event.
In the PDDM, three sets of criteria are used to determine the allowable headwater elevation:
1. New versus existing culvert,
2. Ratio of headwater depth to culvert diameter or rise (HW/D), and
3. Site-specific reference elevations.
There are no site-specific reference elevations that would represent unacceptable hazards at any of the culvert locations.
The FLH prefers cross culverts be replaced with pipe sizes no smaller than 24 inches. The minimum size for culverts in the drainage ditch is 18 inches. Design exceptions may be requested via the procedures outlined in the PDDM Section 9.1.3.
Figure 2 presents the existing drainage conditions along Joe Tank Road.
Central Federal Lands Highway Division
WSP
December 2022
Table 1: PDDM Hydraulic Design Criteria for Low-Standard Roadways
TOPIC DESIGN EVENT CRITERIA VALUE
Cross Culvert Design Flood: 25-Year
Check Flood: Overtopping
Allowable Headwater (AHW) New: AHW ≤ bottom of aggregate base layer
Existing: AHW ≤ shoulder hinge point.
Headwater to Structure Depth Ratio
(HW/D)
48 inches or smaller: HW/D ≤ 1.5
Larger than 48 inches: HW/D ≤ 1.2
Minimum Size 24 inches
Slope Stream Crossings: Match Streambed
Ditch Relief: Min 2%, Max 10%
Ditches Capacity Design: 10-Year
Permanent Linings: 10-Year
Flood
Temporary Linings: 2-Year Flood
Depth New: WSEL ≤ Bottom of Aggregate Base Layer
Existing: WSEL ≤ Shoulder Hinge Point
Existing: WSEL ≤ Shoulder Hinge
Point
Minimum 0.5%
Slope Permissible shear stress
Pavement
Drainage
Design Flood: 10-Year
Sumps: 50-Year
Spread Half of One Travel Lane
Depth On-Grade and Sags: Allowable spread, not to exceed curb height
Sumps and Parking Areas: 6 inches
Inlet Clogging Factor 50%
Central Federal Lands
WSP
December 2022
Figure 2: Existing Culverts
Central Federal Lands
WSP
December 2022
3.1 DETERMINATION OF DESIGN DISCHARGE
3.1.1 DRAINAGE BASIN DELINEATIONS
The contributing drainage basins for each crossing along the project corridor were delineated against a 1-meter resolution Digital Elevation Model (DEM) coupled with detailed survey along the existing Joe Tank Road corridor. The 1-meter DEM encompassing the project site was published by the USFS in 2019 (Quantum
Spatial, Inc., 2019).
The City Engineer for the City of Show Low verified that the subdivision south of Joe Tank Road contains a raised curb-and-gutter system, so the sub-basin delineations (See Figure 3) account for this independent drainage system. Note that sub-basin South 1 includes a region where an existing culvert conveys flow from the subdivision towards Joe Tank Road.
Central Federal Lands
WSP
December 2022
Figure 3: Drainage Basin Map
Central Federal Lands
WSP
December 2022
3.1.2 RATIONAL METHOD
The drainage basins contributing to the culverts and roadside ditches along Joe Tank Road were relatively small and generally uniform in slope and coverage. Peak flows from the 11 drainage sub-basins along Joe Tank Road were estimated using the Rational Method Tool available on the ADOT website (ADOT, 2014).
Landcover was characterized as “developed” based on aerial imagery from the ArcGIS Pro base maps.
Imperviousness across the sub-basins ranged from approximately 10 to 90 percent.
Rainfall intensity values were obtained at the centroid of the contributing watershed using the National Oceanic and Atmospheric Administration (NOAA) Atlas 14-point precipitation frequency server (NOAA, 2017). The time of concentration was calculated for each sub-basin directly within ADOT’s Rational Method tool based on inputs for the longest flow path and sub-basin slope.
Table 2 presents the maximum design peak flows from each drainage sub-basin. A full presentation of output from the ADOT Rational Method tool is included in Appendix B.
Table 2: Sub-basin Peak Flows
DRAINAGE
SUB-
BASIN
PEAK FLOW (CFS)
2-YEAR 5-YEAR
10-
YEAR
25-
YEAR
50-
YEAR
100-
YEAR
South 1 22.4 35.8 46.9 63.5 76.0 90.0
South 2 5.0 8.0 10.5 14.1 16.9 20.0
South 3 1.9 3.5 4.7 6.4 7.9 9.4
South 4 4.5 7.2 9.4 12.8 15.3 18.1
South 5 2.4 3.7 4.8 6.4 7.6 8.9
South 6 0.6 0.8 1.0 1.3 1.5 1.7
South 7 0.5 0.6 0.8 1.0 1.2 1.3
South 8 0.6 0.9 1.1 1.4 1.6 1.9
North 1 0.7 1.2 1.6 2.2 2.7 3.2
North 2 0.3 0.5 0.7 0.9 1.1 1.3
North 3 0.3 0.5 0.7 0.9 1.2 1.4
4 EXISTING CONDITIONS MODEL
DEVELOPMENT
The repair/replacement design for every cross culvert must meet the FLH HW/D requirements for the design event. Hydraulic analysis was performed for the existing conditions to identify whether any of the cross drainages should be enlarged to comply with the requirements laid out in the PDDM.
The hydraulic performance of the existing culverts was evaluated using the FHWA’s HY-8 Version 7.6 software package (FHWA, 2021). Required input included design discharge, upstream and downstream invert elevations, culvert dimensions, culvert material, inlet type, tailwater data, and roadway data.
Hydraulic analyses of ditch capacities were performed using Bentley FlowMaster V8i (Bentley Systems, Inc., 2009).
All culvert and ditch analyses were based on the flows reported in Table 2.
Central Federal Lands
WSP
December 2022
4.1 EXISTING CONDITIONS CULVERT AND STORM SEWER
GEOMETRY
Six cross culverts and three side-drainage culverts are to be replaced as part of this project. All existing culverts have a “thin edge projecting” inlet configuration.
Summaries of the existing cross-culvert geometry and side-drainage culvert geometry are provided in Table 3 and Table 4, respectively. A storm sewer system will be included in the proposed design as discussed in later sections. For reference, the existing storm sewer system properties are provided in Table 5.
Table 3: Existing Cross-Culvert Geometry
CULVERT
APPROXIMATE
STATIONING EXISTING PIPE
INVERT INLET
ELEVATION
(FT)
INVERT
OUTLET
ELEVATION
(FT)
ROADWAY
ELEVATION
(NAVD, FT) LENGTH (FT)
107+83 18-inch CMP 6345.91 6344.85 6348.91 35
112+53 12-inch CMP 6364.76 6362.29 6365.89 31
122+20 18-inch CMP 6361.08 6360.52 6367.21 46
126+46 18-inch CMP 6348.38 6348.07 6351.23 58
129+85 18-inch CMP 6342.39 6342.06 6346.39 54
132+05 18-inch CMP 6337.11 6335.32 6340.22 54
Table 4: Existing Side-Drainage Culvert Geometry
CULVERT
APPROXIMATE
STATIONING EXISTING PIPE
INVERT INLET
ELEVATION
INVERT
OUTLET
ELEVATION
(FT)
ROADWAY
ELEVATION
(NAVD, FT)
LENGTH
(FT)
109+53 18-inch CMP 6350.99 6349.30 6350.91 50
129+20 18-inch CMP 6342.99 6342.00 6345.11 72
131+44 18-inch CMP 6340.14 6336.93 6341.98 141
Table 5: Existing Storm Sewer Geometry
APPROXIMATE
STATIONING EXISTING PIPE
INVERT INLET
ELEVATION
INVERT
OUTLET
ELEVATION
(FT)
ROADWAY
ELEVATION
(NAVD, FT)
LENGTH
(FT)
132+44 to
135+74
10x24-inch elliptical CMP
6334.92 6315.81 Varies – storm sewer system
4.2 EXISTING CONDITIONS MODEL RESULTS
Detailed output information for the existing cross and side-drainage culverts is included in Appendix C.
4.2.1 CROSS CULVERTS
A summary of the hydraulic results for the existing conditions cross drainage structures and the 25-year (design) event is shown in Table 6.
The total thickness of the asphalt and base course is approximately 1 foot. Crossings where the headwater elevation exceeds 1 foot lower than the existing roadway surface are indicated in red text to indicate non-compliance. Additionally, three crossings had unallowable headwater to depth ratios for the design event.
Central Federal Lands
WSP
December 2022
Table 6: Existing Conditions Hydraulic Results for the Design Event
CULVERT
APPROXIMATE
STATIONING
25-YEAR
DESIGN
EVENT
DISCHARGE
HEADWATER
ELEVATION
(NAVD88 FT) HW/D
CULVERT
EXIT
DEPTH
(FT)
CULVERT
EXIT
VELOCITY
(FPS)
CONTRIBUTING
DRAINAGE
AREA
107+83 77.6 6349.27 2.2 1.31 7.26 South 1
South 2
112+53 6.4 6365.94 1.2 0.48 6.84 South 3
122+20 12.8 6365.82 3.0 1.34 7.67 South 4
126+46 6.4 6350.39 1.1 0.98 5.24 South 5
129+85 1.3 6343.09 0.5 0.43 3.14 South 6
132+05 1.0 6337.64 0.5 0.31 3.72 South 7
4.2.2 SIDE-DRAINAGE CULVERTS
A summary of the hydraulic results for the existing conditions side-drainage structures and the 10-year (design) event is shown in Table 7.
Table 7: Existing Conditions Hydraulic Results for the Design Event
CULVERT
APPROXIMATE
STATIONING
10-YEAR
DESIGN
EVENT
DISCHARGE
(CFS)
HEADWATER
ELEVATION
(NAVD88 FT) HW/D
CULVERT
EXIT
DEPTH
(FT)
CULVERT
EXIT
VELOCITY
(FPS)
CONTRIBUTING
DRAINAGE AREA
109+53 10.5 6351.00 0.7 0.58 3.74 South 2
129+20 16.8 6345.21 1.4 1.09 5.76 North 1 South 4 South 5 South 6
131+44 17.50 6342.09 1.3 1.05 5.56 North 1 North 2 South 4 South 5
South 6
Central Federal Lands
WSP
December 2022
5 PROPOSED CONDITIONS MODEL
DEVELOPMENT
The replacement design for every cross culvert, roadside ditch, and curb-and-gutter inlet must meet CFLHD criteria for their respective design events.
5.1 PROPOSED CONDITIONS CULVERT GEOMETRY
Geotechnical field testing identifies naturally corrosive soils exist at the project site. The City of Show Low has historically had success using corrugated metal piping (CMPs) despite the corrosivity of soils in the area. Per recommendation from the City of Show Low, all replaced culverts will be CMP. Reference the geotechnical investigation for further information.
Summaries of the design geometries for the six proposed cross-culvert geometry and two proposed side-drainage culverts are provided in Table 8 and Table 9, respectively. The side-drainage culvert that is proposed at
Station 109+53 has been separated into two culvert segments by a manhole that intercepts an existing 12-inch line from the southwest. It is assumed that the 12-inch line has a minimal baseflow and will negligibly impact culvert hydraulics for this segment. See Civil Plans for culvert configuration and additional information for culverts at Station 109+53. Detailed model output information for the proposed drainage structures is included in Appendix D.
There is a proposed storm sewer system from station 132+08.76 to 135+91.96. See Section 5.6.
Central Federal Lands
WSP
December 2022
Table 8: Proposed Cross-Culvert Geometry
CULVERT
APPROXIMATE
STATIONING
ROADWAY
ELEVATION
(NAVD88 FT)
SUBGRADE
ELEVATION
PROPOSED
PIPE(S)
END
TREATMENT
INVERT
INLET
ELEVATION
(NAVD88 FT)
INVERT
OUTLET
ELEVATION
(NAVD88 FT)
LENGTH
(FT)
MAXIMUM
ALLOWABLE
DESIGN HW/D
MAXIMUM
ALLOWABLE
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT)
107+83 6350.15 6348.82 One
54-inch CMP
Square Edge with
Headwall
6343.61 6339.71 49 1.2 6348.82
112+51 6366.36 6365.12 24-inch CMP Flared End
Section
6363.11 6361.35 46 1.5 6365.12
121+18 6366.66 6365.62 Two
24-inch CMP
Flared End
Section
6363.09 6361.80 66 1.5 6365.62
126+46 6351.50 6350.38 18-inch CMP Flared End
Section
6348.52 6347.88 56 1.5 6350.38
129+81 6345.29 6344.10 24-inch CMP Flared End
Section
6342.16 6340.86 49 1.5 6344.10
132+06 6340.38 6339.11 18-inch RCP Into Catch
Basin
6337.26 6335.85 44 1.5 6339.11
Central Federal Lands
WSP
December 2022
Table 9: Proposed Side-Drainage Culvert Geometry
CULVERT
APPROXIMATE
STATIONING
ROADWAY
ELEVATION
(NAVD88
FT)
SUBGRADE
ELEVATION
PROPOSED
PIPE(S) END TREATMENT
INVERT INLET
ELEVATION
(NAVD88 FT)
INVERT
OUTLET
ELEVATION
(NAVD88
FT)
LENGTH
(FT)
MAXIMUM
ALLOWABLE
DESIGN
HW/D
MAXIMUM
ALLOWABLE
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT)
109+53 (into catch basin)*
6353.14 6352.04 24-inch
CMP
Flared End Section 6349.44 6347.89 48 1.5 6352.04
109+53 (out of catch basin)*
6353.14 6352.04 24-inch
CMP
Flared End Section 6347.89 6347.80 19 1.5 6352.04
129+20 6346.45 6345.41 30-inch
CMP
Flared End Section 6342.73 6341.62 63 1.5 6345.41
131+44 (inlet station
130+73.60)*
6342.78 6341.74 30-inch
RCP
Into Catch Basin 6338.50 6334.00 128 1.5 6341.74
*Refer to Civil Plans for configuration.
Central Federal Lands
WSP
December 2022
5.2 PROPOSED CONDITIONS CULVERT RESULTS
A summary of the hydraulic results for the proposed culvert replacements is included in Table 10 and Table 11. The design headwater elevation is below the aggregate base course at all crossings and HW/D requirements are met for all culverts. No roadway overtopping is observed during the 100-year event.
Table 10: Proposed Conditions Cross Culverts – Hydraulic Results for the 25-Year Design Event
CULVERT
APPROXIMATE
STATIONING
25-YEAR
DESIGN
EVENT
DISCHARGE
(CFS)
MAXIMUM
ALLOWABLE
MAXIMUM
ALLOWABLE
25-YEAR
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT)
25-YEAR
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT) HW/D
CULVERT
EXIT
DEPTH
(FT)
CULVERT
EXIT
VELOCITY
(FPS)
APPROXIMATE
TAILWATER
DEPTH
(FT)
APPROXIMATE
TAILWATER
VELOCITY
(FPS)
CONTRIBUTING
DRAINAGE
AREA
107+83 77.6 6348.82 6347.25 0.81 1.63 14.92 2.19 5.38 South 1
South 2
112+51 6.4 6365.12 6364.47 0.68 0.70 6.47 0.70 4.36 South 3
121+18 12.8 6365.62 6350.21 0.63 0.85 5.07 0.97 4.52 South 4
126+46 6.4 6350.38 6350.21 1.13 0.98 5.24 0.84 3.04 South 5
129+81 1.3 6344.10 6342.73 0.29 0.34 3.59 0.46 2.04 South 6
132+06 1.0 6339.11 6337.76 0.33 0.23 5.99 0.42 1.91 South 7
Table 11: Proposed Conditions Side-Drainage Culverts – Hydraulic Results for the 10-Year Design Event
Central Federal Lands
WSP
December 2022
CULVERT
APPROXIMATE
STATIONING
10-YEAR
DESIGN
EVENT
DISCHARGE
(CFS)
MAXIMUM
ALLOWABLE
10-YEAR
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT)
10-YEAR
DESIGN
HEADWATER
ELEVATION
(NAVD88 FT) HW/D
CULVERT
EXIT DEPTH
(FT)
CULVERT
EXIT
VELOCITY
(FPS)
APPROXIMATE
TAILWATER
DEPTH
(FT)
APPROXIMATE
TAILWATER
VELOCITY
(FPS)
CONTRIBUTING
DRAINAGE
AREA
109+53 (into catch basin)
10.50 6351.58 6351.31 0.94 0.97 6.94 1.04 3.26 South 2
109+53 (out of catch basin)
10.50 6351.58 6349.90 0.95 1.16 5.55 1.04 3.26 South 2
129+20 16.80 6345.41 6344.85 0.85 1.35 6.21 1.20 3.87 North 1
South 4
South 5
South 6
131+44 (inlet station
130+73.60)
17.50 6341.74 6340.62 0.80 0.79 13.08 0.44 4.00 North 1
North 2
South 4
South 5
South 6
Central Federal Lands
WSP
December 2022
5.3 PROPOSED CULVERT OUTLET PROTECTION
Outlet protection for all proposed culverts was designed according to the methods outlined in the FHWA’s
CFLHD Detail for Placed Riprap at Culvert Outlets (FHWA, 2006). The minimum required riprap sizes for cross culverts and side-drainage culverts were based on their respective parameters according to the FHWA’s
Standard Detail (FHWA, 2021). A 54-inch culvert is not included in the FHWA Standard Detail; however, the dimensions and riprap class were extrapolated with additional conservancy included.
Table 12: Proposed Riprap Apron Dimensions for Culverts
CULVERT
APPROXIMATE
STATIONING
FHWA RIPRAP
CLASS
APRON LENGTH
(FT)
APRON THICKNESS
(FT)
107+83 Class 4 30 2.5
109+53 (into catch basin)
Culvert connects directly to catch basin
109+53 (out of catch basin)
Class 2 8 1.5
112+51 Class 2 8 1.5
121+18 Class 2 8 1.5
126+46 Class 2 6 1.5
129+20 Class 3 12.5 2
129+81 Class 2 8 1.5
131+44 Culvert connects directly to catch basin
132+06 Culvert connects directly to catch basin
Figure 4: Excerpt of FHWA CLFHD Detail for Placed Riprap at Culvert Outlets (FHWA, 2021)
Central Federal Lands
WSP
December 2022
5.4 ROADSIDE DITCHES
The PDDM requires that roadside ditches be designed to convey the 10-year event with a maximum water surface elevation no higher than the bottom of the aggregate base layer. Proposed roadside ditch cross-sections were designed using Bentley FlowMaster V8i (Bentley Systems, Inc., 2009).
The proposed grass-lined ditches are not expected to carry a baseflow. A Manning’s roughness coefficient of
0.035 was selected to represent the proposed ditch coverage. Calculated 10-year design velocities are below 5 feet per second and are not expected to scour or erode the grass-lined roadside ditches.
The proposed ditch cross-sections are triangular with 1:3 (H:V) and 1:4 (H:V) side slopes. Roadside ditches are identified by their approximate stationing noted on the design plan set. A summary of the approximate stationing, channel location, slope, and minimum channel depths to maintain compliance with the PDDM are presented in Table 13.
Table 13: Maximum Ditch Peak Flows (10-Year Design Event)
APPROXIMATE
STATIONING
(FT)
CHANNEL
SLOPE
(FT/FT)
10-YEAR
PEAK
FLOW
(CFS)
10-YEAR
DEPTH
(FT)
10-YEAR
VELOCITY
(FPS)
UPSTREAM
DRAINAGE
AREA
DOWNSTREAM
ROUTING
CULVERT
STATION
North Ditch
120+50 to
130+67
0.01745 16.8 1.01 4.68 South 4
South 5
South 6
North 1
131+44 to catch basin
South Ditch
104+68 to
112+56
0.01523 57.4 1.84 4.83 South 1
South 2
107+83
112+56 to
116+68.75
0.04596 4.7 0.59 3.91 South 3 112+51
116+68.75 to
121+02
0.03176 9.4 0.81 4.05 South 4 121+18
121+02 to
126+28
0.03176 4.8 0.63 3.42 South 5 126+46
126+28 to
129+73
0.01745 1.0 0.39 1.85 South 6 129+81
129+73 to
132+04
0.01745 0.8 0.36 1.75 South 7 132+06 to catch basin
5.5 INLET DESIGN
The proposed inlet design for the curb-and-gutter section is based on the standard details presented in adjacent
Maricopa County standard details for a Catch Basin Type “E”. The City of Show Low uses Maricopa
Association of Governments standard details. The PDDM specifies that the design storm for inlets is the 10-year event.
The roadside ditches from approximately station 129+73 to 132+04 south and 120+50 to 130+67 north drain to culverts at Station 132+06 and 131+44, respectively. Culverts at Station 132+06 and 131+45 are proposed to connect directly to a 60-inch storm drain manhole at station 132+08.76 just north of Joe Tank Road. Roadway drainage past the culverts at stations 132+06 and 131+45 will be accommodated with the proposed curb-and-gutter inlet design.
Central Federal Lands
WSP
December 2022
The curb-and-gutter inlet design includes Catch Basin Type “E” inlets on both the south and north of the proposed Joe Tank Road (See Appendix E for the referenced standard detail).
5.6 STORM SEWER DESIGN
The proposed 24-inch trunkline begins at a catch basin at station 132+08.76 and runs along the northwest side of
Joe Tank Road at a 4.68% slope to a manhole at station 133+96.50 and then to another manhole at a 4.01% slope at station 135+30.42. The slope of the trunkline in this area must be less than 5% to ensure velocities are below 15 feet per second. Storm drain inlets at the east end of Joe Tank Road (at approximately station 135+30) will drain via 18-inch reinforced concrete pipes (RCPs) with a slope between 0.96% to 1.00% to the manhole at station 135+30.42. These 18-inch RCP’s must have a maximum slope of 11%. From there, stormwater will flow through a 30-inch RCP at a slope of 0.50% to the outfall at 135+91.96.
5.7 STORM SEWER OUTLET PROTECTION
Outlet protection for the storm drain system was designed using the FHWA table presented in Section 5.3. A proposed riprap apron has the riprap class and dimensions summarized in Table 14.
Table 14: Storm Sewer Proposed Riprap Apron at Outlet
FHWA RIPRAP CLASS
APRON LENGTH
(FT) APRON THICKNESS (FT)
Class 3 16 2
6 CONCLUSIONS AND
RECOMMENDATIONS
As part of the 100 percent design submittal, WSP has the following recommendations:
1. All cross culverts should be replaced with CMPs. All culverts not directly connecting to the storm drain system shall have riprap aprons at the outlet.
2. Triangular roadside ditches will line most of the proposed roadway. A curb-and-gutter system is proposed for the approximately 300-feet length of section nearest State Route 260.
3. A new storm sewer trunkline is proposed through the curb-and-gutter section of the proposed roadway.
Stormwater will be routed to the trunkline via two manholes and on-grade inlets.
4. The outlet of the storm drain system where the pipe daylights is proposed to have a riprap apron consisting of FHWA Class 3 riprap with a length of 16 feet and thickness of two feet.
5. Refer to Table 8 and Table 9 for recommended culvert sizes and Table 12 for riprap recommendations.
7 REFERENCES
ADOT. (2014). Highway Drainage Design Manual, Volume 2: Hydrology Second Edition. Phoenix, AZ:
Arizona Department of Transportation.
Bentley Systems, Inc. (2009). FlowMaster V8i (SELECTseries1). Watertown, CT: Bentley.
FHWA. (2006). Hydraulic Engineering Circular No. 14 – Hydraulic Design of Energy Dissipators for
Culverts and Channels, Chapter 10: Riprap Basins and Aprons. U.S. Department of
Transportation.
FHWA. (2021). FP-14 Standard Specifications: Table 705-1 Gradation Requirements for Riprap. U.S.
Department of Transportation, Federal Lands Highway.
Central Federal Lands
WSP
December 2022
FHWA. (2021). HY-8 7.60. Environmental Modeling Research Laboratory: Aquaveo LLC.
FLH. (2012). Project Development and Design Manual, Chapter 7 Hydrology and Hydraulics. Federal
Highway Administration.
NOAA. (2017). NOAA Atlas 14, Volume 6, Version 2: Point Precipitation Frequency Server. Silver Spring, MD: National Weather Service.
Quantum Spatial, Inc. (2019). 3DEP Prozessing AZ LiDAR Quality Level 1 (QL1) Standards. USFS.
USGS. (2021). USGS 1/3 Arc Second n35w111 20210811. U.S. Geological Survey.
APPENDIX
Appendix A: FIRMette – Portion of Map
Number 04017C4488F
Appendix A - FIRMette - Portion of Map Number 04017C4488F A-1
Appendix B: Peak Flow ADOT Rational
Method Results
ADOT RATIONAL METHOD PROGRAM
Compution Date and Time: 05/24/2022 14:49:47
Project Name: Joe Tank Road Project Location: Navajo County, Arizona Company: Wood PLC Project Notes:
Prepared by: CAF Prepared by date: 5/19/2022
Checked by: JAH Checked by date: 5/19/2022
Summary Table for 2-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 22.4 0.40 3.02 18.59 5.8 10.0* South 2 5.0 0.40 3.02 4.14 4.7 10.0* South 3 1.9 0.30 3.02 2.14 6.1 10.0* South 4 4.5 0.40 3.02 3.74 7.8 10.0* South 5 2.4 0.48 3.02 1.64 4.8 10.0* South 6 0.6 0.79 3.02 0.25 4.5 10.0* South 7 0.5 0.79 3.02 0.19 3.5 10.0* South 8 0.6 0.79 3.02 0.27 3.0 10.0* North 1 0.7 0.30 3.02 0.73 7.3 10.0* North 2 0.3 0.30 3.02 0.30 4.0 10.0* North 3 0.3 0.30 3.02 0.31 3.2 10.0* *Some computed Tc values reduced to a maximum value of 1 hour
Summary Table for 5-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 35.8 0.48 4.01 18.59 5.1 10.0* South 2 8.0 0.48 4.01 4.14 4.2 10.0* South 3 3.5 0.41 4.01 2.14 5.4 10.0* South 4 7.2 0.48 4.01 3.74 6.9 10.0* South 5 3.7 0.56 4.01 1.64 4.3 10.0*
South 6 0.8 0.84 4.01 0.25 4.0 10.0* South 7 0.6 0.84 4.01 0.19 3.2 10.0* South 8 0.9 0.84 4.01 0.27 2.7 10.0* North 1 1.2 0.41 4.01 0.73 6.4 10.0* North 2 0.5 0.41 4.01 0.30 3.6 10.0* North 3 0.5 0.41 4.01 0.31 2.9 10.0* *Some computed Tc values reduced to a maximum value of 1 hour
Summary Table for 10-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 46.9 0.53 4.76 18.59 4.8 10.0* South 2 10.5 0.53 4.76 4.14 3.9 10.0* South 3 4.7 0.46 4.76 2.14 5.0 10.0* South 4 9.4 0.53 4.76 3.74 6.4 10.0* South 5 4.8 0.61 4.76 1.64 4.0 10.0* South 6 1.0 0.87 4.76 0.25 3.7 10.0* South 7 0.8 0.87 4.76 0.19 2.9 10.0* South 8 1.1 0.87 4.76 0.27 2.5 10.0* North 1 1.6 0.46 4.76 0.73 5.9 10.0* North 2 0.7 0.46 4.76 0.30 3.3 10.0* North 3 0.7 0.46 4.76 0.31 2.7 10.0* *Some computed Tc values reduced to a maximum value of 1 hour
Summary Table for 25-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 63.5 0.59 5.79 18.59 4.4 10.0* South 2 14.1 0.59 5.79 4.14 3.6 10.0* South 3 6.4 0.52 5.79 2.14 4.6 10.0* South 4 12.8 0.59 5.79 3.74 5.8 10.0* South 5 6.4 0.67 5.79 1.64 3.7 10.0* South 6 1.3 0.91 5.79 0.25 3.4 10.0* South 7 1.0 0.91 5.79 0.19 2.7 10.0* South 8 1.4 0.91 5.79 0.27 2.3 10.0* North 1 2.2 0.52 5.79 0.73 5.4 10.0* North 2 0.9 0.52 5.79 0.30 3.1 10.0* North 3 0.9 0.52 5.79 0.31 2.5 10.0*
*Some computed Tc values reduced to a maximum value of 1 hour
Summary Table for 50-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 76.0 0.62 6.59 18.59 4.2 10.0* South 2 16.9 0.62 6.60 4.14 3.4 10.0* South 3 7.9 0.56 6.60 2.14 4.4 10.0* South 4 15.3 0.62 6.60 3.74 5.5 10.0* South 5 7.6 0.70 6.60 1.64 3.5 10.0* South 6 1.5 0.93 6.60 0.25 3.3 10.0* South 7 1.2 0.93 6.60 0.19 2.6 10.0* South 8 1.6 0.93 6.60 0.27 2.2 10.0* North 1 2.7 0.56 6.60 0.73 5.2 10.0* North 2 1.1 0.56 6.60 0.30 2.9 10.0* North 3 1.2 0.56 6.60 0.31 2.4 10.0* *Some computed Tc values reduced to a maximum value of 1 hour
Summary Table for 100-Year event:
Rational Rainfall Time of Time of Subbasin ID Discharge Coeff. Intensity Area Concentration Concentration Q C i A Computed Tc Applied Tc (cfs) (inches/hour) (acres) (minutes) (minutes) South 1 90.0 0.65 7.45 18.59 3.9 10.0* South 2 20.0 0.65 7.44 4.14 3.2 10.0* South 3 9.4 0.59 7.44 2.14 4.1 10.0* South 4 18.1 0.65 7.44 3.74 5.2 10.0* South 5 8.9 0.73 7.44 1.64 3.3 10.0* South 6 1.7 0.94 7.44 0.25 3.1 10.0* South 7 1.3 0.94 7.44 0.19 2.5 10.0* South 8 1.9 0.94 7.44 0.27 2.1 10.0* North 1 3.2 0.59 7.44 0.73 4.9 10.0* North 2 1.3 0.59 7.44 0.30 2.8 10.0* North 3 1.4 0.59 7.44 0.31 2.3 10.0* *Some computed Tc values reduced to a maximum value of 1 hour
Appendix C: Existing Conditions Modeling
Results
Existing Conditions HY-8 Culvert Analysis Report
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 27.40 cfs
Design Flow: 77.60 cfs
Maximum Flow: 110.00 cfs
Table 1 - Summary of Culvert Flows at Crossing: Existing 107+83 (SC2)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing SC2 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6349.05 27.40 11.35 15.87 9
6349.10 35.66 11.46 24.00 4
6349.14 43.92 11.56 32.26 4
6349.17 52.18 11.65 40.48 4
6349.21 60.44 11.73 48.52 3
6349.24 68.70 11.81 56.76 3
6349.27 77.60 11.89 65.63 3
6349.30 85.22 11.95 73.23 3
6349.33 93.48 12.02 81.44 3
6349.35 101.74 12.08 89.42 2
6349.38 110.00 12.15 97.56 2
6348.91 10.97 10.97 0.00 Overtopping
Culvert Data: Existing SC2
Table 2 - Culvert Summary Table: Existing SC2
Total Disch arge (cfs)
Culve rt Disch arge (cfs)
Head water Elevat ion (ft)
Inle t Con trol Dep th (ft)
Outl et Con trol Dep th (ft)
Fl ow Ty pe
Nor mal Dep th (ft)
Crit ical Dep th (ft)
Out let De pth (ft)
Tailw ater Dept h (ft)
Outl et Velo city (ft/s
Tailw ater Veloc ity (ft/s)
27.40 cfs
11.35 cfs
6349.0
3.14 2.88
7- M2 c
1.50 1.29 1.2
0.58 7.04 4.74
35.66 cfs
11.46 cfs
6349.1
3.19 2.94
7- M2 c
1.50 1.29 1.2
0.68 7.08 5.23
43.92 cfs
11.56 cfs
6349.1
3.23 3.00
7- M2 c
1.50 1.30 1.3
0.78 7.12 5.65
52.18 cfs
11.65 cfs
6349.1
3.26 3.05
7- M2 c
1.50 1.30 1.3
0.87 7.16 6.01
60.44 cfs
11.73 cfs
6349.2
3.30 3.10
7- M2 c
1.50 1.30 1.3
0.95 7.20 6.34
68.70 cfs
11.81 cfs
6349.2
3.33 3.14
7- M2 c
1.50 1.31 1.3
1.03 7.23 6.64
77.60 cfs
11.89 cfs
6349.2
3.36 3.18
7- M2 c
1.50 1.31 1.3
1.12 7.26 6.93
85.22 cfs
11.95 cfs
6349.3
3.39 3.22
7- M2 c
1.50 1.31 1.3
1.19 7.29 7.16
93.48 cfs
12.02 cfs
6349.3
3.42 3.25
7- M2 c
1.50 1.31 1.3
1.26 7.32 7.40
101.7 4 cfs
12.08 cfs
6349.3
3.44 3.28
7- M2 t
1.50 1.32 1.3
1.34 7.27 7.62
110.0 0 cfs
12.15 cfs
6349.3
3.47 3.34
7- M2 t
1.50 1.32 1.4
1.41 7.06 7.82
Culvert Barrel Data
Culvert Barrel Type Straight Culvert
Inlet Elevation (invert): 6345.91 ft, Outlet Elevation (invert): 6344.85 ft
Culvert Length: 35.02 ft, Culvert Slope: 0.0303
Site Data - Existing SC2
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 6345.91 ft
Outlet Station: 35.00 ft
Outlet Elevation: 6344.85 ft
Number of Barrels: 1
Culvert Data Summary - Existing SC2
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Tailwater Data for Crossing: Existing 107+83 (SC2)
Table 3 - Downstream Channel Rating Curve (Crossing: Existing 107+83 (SC2))
Flow (cfs) Water Surface Elev (ft)
Velocity (ft/s)
Depth (ft) Shear (psf) Froude Number
27.40 6345.43 0.58 4.74 1.08 1.10
35.66 6345.53 0.68 5.23 1.28 1.12
43.92 6345.63 0.78 5.65 1.46 1.13
52.18 6345.72 0.87 6.01 1.62 1.14
60.44 6345.80 0.95 6.34 1.78 1.14
68.70 6345.88 1.03 6.64 1.94 1.15
77.60 6345.97 1.12 6.93 2.10 1.15
85.22 6346.04 1.19 7.16 2.23 1.16
93.48 6346.11 1.26 7.40 2.37 1.16
101.74 6346.19 1.34 7.62 2.50 1.16
110.00 6346.26 1.41 7.82 2.63 1.16
Tailwater Channel Data - Existing 107+83 (SC2)
Tailwater Channel Option: Rectangular Channel
Bottom Width: 10.00 ft
Channel Slope: 0.0300
Channel Manning's n: 0.0350
Channel Invert Elevation: 6344.85 ft
Roadway Data for Crossing: Existing 107+83 (SC2)
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 6348.91 ft
Roadway Surface: Paved
Roadway Top Width: 26.00 ft
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 10.50 cfs
Design Flow: 14.10 cfs
Maximum Flow: 20.00 cfs
Table 4 - Summary of Culvert Flows at Crossing: Existing 109+53 (SD4)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing SD4 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6351.00 10.50 2.39 8.05 8
6351.01 11.45 2.42 9.01 3
6351.01 12.40 2.44 9.94 3
6351.02 13.35 2.47 10.76 2
6351.03 14.10 2.49 11.59 3
6351.03 15.25 2.52 12.62 2
6351.04 16.20 2.54 13.50 2
6351.04 17.15 2.57 14.57 3
6351.05 18.10 2.60 15.46 2
6351.06 19.05 2.62 16.36 2
6351.06 20.00 2.64 17.29 2
6350.91 2.01 2.01 0.00 Overtopping
Culvert Data: Existing SD4
Table 5 - Culvert Summary Table: Existing SD4
Total Disch arge (cfs)
Culve rt Disch arge (cfs)
Head water Elevat ion (ft)
Inle t Con trol Dep th (ft)
Outl et Con trol Dep th (ft)
Fl ow Ty pe
Nor mal Dep th (ft)
Crit ical Dep th (ft)
Out let De pth (ft)
Tailw ater Dept h (ft)
Outl et Velo city (ft/s
Tailw ater Veloc ity (ft/s)
10.50
2.39 cfs
6351.0
0.82 1.02
2- M2 c
1.21 0.58 0.5
0.32 3.74 3.29
11.45 cfs
2.42 cfs
6351.0
0.82 1.02
2- M2 c
1.23 0.59 0.5
0.34 3.76 3.40
12.40 cfs
2.44 cfs
6351.0
0.83 1.03
2- M2 c
1.24 0.59 0.5
0.35 3.77 3.51
13.35 cfs
2.47 cfs
6351.0
0.83 1.04
2- M2 c
1.26 0.59 0.5
0.37 3.78 3.61
14.10 cfs
2.49 cfs
6351.0
0.84 1.04
2- M2 c
1.27 0.60 0.6
0.38 3.79 3.69
15.25 cfs
2.52 cfs
6351.0
0.84 1.05
2- M2 c
1.30 0.60 0.6
0.40 3.81 3.80
16.20 cfs
2.54 cfs
6351.0
0.85 1.05
2- M2 c
1.31 0.60 0.6
0.42 3.82 3.89
17.15 cfs
2.57 cfs
6351.0
0.85 1.06
2- M2 c
1.35 0.61 0.6
0.43 3.83 3.97
18.10 cfs
2.60 cfs
6351.0
0.86 1.07
2- M2 c
1.50 0.61 0.6
0.45 3.84 4.06
19.05 cfs
2.62 cfs
6351.0
0.86 1.07
2- M2 c
1.50 0.61 0.6
0.46 3.85 4.14
20.00 cfs
2.64 cfs
6351.0
0.87 1.08
2- M2 c
1.50 0.62 0.6
0.47 3.86 4.21
Culvert Barrel Data
Culvert Barrel Type Straight Culvert
Inlet Elevation (invert): 6349.98 ft, Outlet Elevation (invert): 6349.89 ft
Culvert Length: 50.00 ft, Culvert Slope: 0.0018
Site Data - Existing SD4
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 6349.98 ft
Outlet Station: 50.00 ft
Outlet Elevation: 6349.89 ft
Number of Barrels: 1
Culvert Data Summary - Existing SD4
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Square Edge with Headwall
Inlet Depression: None
Tailwater Data for Crossing: Existing 109+53 (SD4)
Table 6 - Downstream Channel Rating Curve (Crossing: Existing 109+53 (SD4))
Flow (cfs) Water Surface Elev (ft)
Velocity (ft/s)
Depth (ft) Shear (psf) Froude Number
10.50 6350.21 0.32 3.29 0.60 1.03
11.45 6350.23 0.34 3.40 0.63 1.03
12.40 6350.24 0.35 3.51 0.66 1.04
13.35 6350.26 0.37 3.61 0.69 1.05
14.10 6350.27 0.38 3.69 0.72 1.05
15.25 6350.29 0.40 3.80 0.75 1.06
16.20 6350.31 0.42 3.89 0.78 1.06
17.15 6350.32 0.43 3.97 0.81 1.07
18.10 6350.34 0.45 4.06 0.84 1.07
19.05 6350.35 0.46 4.14 0.86 1.07
20.00 6350.36 0.47 4.21 0.89 1.08
Tailwater Channel Data - Existing 109+53 (SD4)
Tailwater Channel Option: Rectangular Channel
Bottom Width: 10.00 ft
Channel Slope: 0.0300
Channel Invert Elevation: 6349.89 ft
Roadway Data for Crossing: Existing 109+53 (SD4)
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 6350.91 ft
Roadway Surface: Paved
Roadway Top Width: 13.00 ft
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 4.70 cfs
Design Flow: 6.40 cfs
Maximum Flow: 9.40 cfs
Table 7 - Summary of Culvert Flows at Crossing: Existing 112+53 (SC5)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing SC5 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6365.93 4.70 2.51 2.17 9
6365.93 5.17 2.53 2.61 3
6365.94 5.64 2.54 3.08 3
6365.94 6.11 2.55 3.54 3
6365.94 6.40 2.55 3.78 2
6365.95 7.05 2.57 4.46 3
6365.96 7.52 2.58 4.87 2
6365.96 7.99 2.59 5.39 3
6365.96 8.46 2.60 5.81 2
6365.97 8.93 2.60 6.25 2
6365.97 9.40 2.61 6.69 2
6365.89 2.42 2.42 0.00 Overtopping
Culvert Data: Existing SC5
Table 8 - Culvert Summary Table: Existing SC5
Total Disch arge (cfs)
Culve rt Disch
Head water Elevat
Inle t Con trol
Outl et Con trol
Fl ow Ty pe
Nor mal Dep
Crit ical Dep
Out let De
Tailw ater Dept h (ft)
Outl et Velo city
Tailw ater Veloc arge (cfs) ion (ft)
Dep th (ft)
Dep th (ft) th (ft) th (ft) pth (ft)
(ft/s ity (ft/s)
4.70 cfs
2.51 cfs
6365.9
1.17 0.0* 5- S2 n
0.48 0.68 0.4
0.19 6.81 2.41
5.17 cfs
2.53 cfs
6365.9
1.17 0.0* 5- S2 n
0.48 0.68 0.4
0.21 6.82 2.50
5.64 cfs
2.54 cfs
6365.9
1.18 0.0* 5- S2 n
0.48 0.68 0.4
0.22 6.82 2.59
6.11 cfs
2.55 cfs
6365.9
1.18 0.0* 5- S2 n
0.48 0.68 0.4
0.23 6.83 2.67
6.40 cfs
2.55 cfs
6365.9
1.18 0.0* 5- S2 n
0.48 0.68 0.4
0.24 6.84 2.72
7.05 cfs
2.57 cfs
6365.9
1.19 0.0* 5- S2 n
0.48 0.69 0.4
0.25 6.85 2.82
7.52 cfs
2.58 cfs
6365.9
1.20 0.0* 5- S2 n
0.48 0.69 0.4
0.26 6.85 2.89
7.99 cfs
2.59 cfs
6365.9
1.20 0.0* 5- S2 n
0.48 0.69 0.4
0.27 6.86 2.96
8.46 cfs
2.60 cfs
6365.9
1.20 0.0* 5- S2 n
0.49 0.69 0.4
0.28 6.86 3.03
8.93 cfs
2.60 cfs
6365.9
1.21 0.0* 5- S2 n
0.49 0.69 0.4
0.29 6.87 3.09
9.40 cfs
2.61 cfs
6365.9
1.21 0.0* 5- S2 n
0.49 0.69 0.4
0.30 6.87 3.16
* Full Flow Headwater elevation is below inlet invert.
Culvert Barrel Data
Culvert Barrel Type Straight Culvert
Inlet Elevation (invert): 6364.76 ft, Outlet Elevation (invert): 6362.29 ft
Culvert Length: 31.10 ft, Culvert Slope: 0.0797
Site Data - Existing SC5
Inlet Station: 0.00 ft
Inlet Elevation: 6364.76 ft
Outlet Station: 31.00 ft
Outlet Elevation: 6362.29 ft
Number of Barrels: 1
Culvert Data Summary - Existing SC5
Barrel Shape: Circular
Barrel Diameter: 1.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Tailwater Data for Crossing: Existing 112+53 (SC5)
Table 9 - Downstream Channel Rating Curve (Crossing: Existing 112+53 (SC5))
Flow (cfs) Water Surface Elev (ft)
Velocity (ft/s)
Depth (ft) Shear (psf) Froude Number
4.70 6362.48 0.19 2.41 0.36 0.96
5.17 6362.50 0.21 2.50 0.39 0.97
5.64 6362.51 0.22 2.59 0.41 0.98
6.11 6362.52 0.23 2.67 0.43 0.98
6.40 6362.53 0.24 2.72 0.44 0.99
7.05 6362.54 0.25 2.82 0.47 1.00
7.52 6362.55 0.26 2.89 0.49 1.00
7.99 6362.56 0.27 2.96 0.50 1.01
8.46 6362.57 0.28 3.03 0.52 1.01
8.93 6362.58 0.29 3.09 0.54 1.01
9.40 6362.59 0.30 3.16 0.56 1.02
Tailwater Channel Data - Existing 112+53 (SC5)
Tailwater Channel Option: Rectangular Channel
Bottom Width: 10.00 ft
Channel Slope: 0.0300
Channel Manning's n: 0.0350
Channel Invert Elevation: 6362.29 ft
Roadway Data for Crossing: Existing 112+53 (SC5)
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 6365.89 ft
Roadway Surface: Paved
Roadway Top Width: 26.00 ft
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 9.40 cfs
Design Flow: 12.80 cfs
Maximum Flow: 18.10 cfs
Table 10 - Summary of Culvert Flows at Crossing: Existing 122+20 (NC1)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing NC1 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6363.93 9.40 9.40 0.00 1
6364.38 10.27 10.27 0.00 1
6364.84 11.14 11.14 0.00 1
6365.34 12.01 12.01 0.00 1
6365.82 12.80 12.80 0.00 1
6366.43 13.75 13.75 0.00 1
6367.02 14.62 14.62 0.00 1
6367.22 15.49 14.91 0.50 26
6367.24 16.36 14.93 1.32 4
6367.25 17.23 14.94 2.22 4
6367.26 18.10 14.96 3.03 3
6367.21 14.89 14.89 0.00 Overtopping
Culvert Data: Existing NC1
Table 11 - Culvert Summary Table: Existing NC1
Total Disch arge (cfs)
Culve rt Disch arge (cfs)
Head water Elevat ion (ft)
Inle t Con trol Dep th (ft)
Outl et Con trol Dep th (ft)
Fl ow Ty pe
Nor mal Dep th (ft)
Crit ical Dep th (ft)
Out let De pth (ft)
Tailw ater Dept h (ft)
Outl et Velo city (ft/s
Tailw ater Veloc ity (ft/s)
9.40 cfs
9.40 cfs
6363.9
2.47 2.85
7- M2 c
1.50 1.18 1.1
0.30 6.28 3.16
10.27 cfs
10.27 cfs
6364.3
2.76 3.29
7- M2 c
1.50 1.23 1.2
0.31 6.61 3.27
11.14 cfs
11.14 cfs
6364.8
3.08 3.76
7- M2 c
1.50 1.28 1.2
0.33 6.95 3.37
12.01 cfs
12.01 cfs
6365.3
3.43 4.25
7- M2 c
1.50 1.31 1.3
0.35 7.32 3.47
12.80 cfs
12.80 cfs
6365.8
3.77 4.73
7- M2 c
1.50 1.34 1.3
0.36 7.67 3.55
13.75 cfs
13.75 cfs
6366.4
4.23 5.34
7- M2 c
1.50 1.37 1.3
0.38 8.11 3.65
14.62 cfs
14.62 cfs
6367.0
4.68 5.93
7- M2 c
1.50 1.40 1.4
0.39 8.53 3.74
15.49 cfs
14.91 cfs
6367.2
4.83 6.14
7- M2 c
1.50 1.40 1.4
0.41 8.67 3.82
16.36 cfs
14.93 cfs
6367.2
4.85 6.15
7- M2 c
1.50 1.40 1.4
0.42 8.68 3.90
17.23 cfs
14.94 cfs
6367.2
4.85 6.17
7- M2 c
1.50 1.40 1.4
0.43 8.69 3.98
18.10 cfs
14.96 cfs
6367.2
4.86 6.17
7- M2 c
1.50 1.40 1.4
0.45 8.70 4.06
Culvert Barrel Data
Culvert Barrel Type Straight Culvert
Inlet Elevation (invert): 6361.08 ft, Outlet Elevation (invert): 6360.52 ft
Culvert Length: 46.00 ft, Culvert Slope: 0.0122
Site Data - Existing NC1
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 6361.08 ft
Outlet Station: 46.00 ft
Outlet Elevation: 6360.52 ft
Number of Barrels: 1
Culvert Data Summary - Existing NC1
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Tailwater Data for Crossing: Existing 122+20 (NC1)
Table 12 - Downstream Channel Rating Curve (Crossing: Existing 122+20 (NC1))
Flow (cfs) Water Surface Elev (ft)
Velocity (ft/s)
Depth (ft) Shear (psf) Froude Number
9.40 6360.82 0.30 3.16 0.56 1.02
10.27 6360.83 0.31 3.27 0.59 1.03
11.14 6360.85 0.33 3.37 0.62 1.03
12.01 6360.87 0.35 3.47 0.65 1.04
12.80 6360.88 0.36 3.55 0.67 1.04
13.75 6360.90 0.38 3.65 0.70 1.05
14.62 6360.91 0.39 3.74 0.73 1.05
15.49 6360.93 0.41 3.82 0.76 1.06
16.36 6360.94 0.42 3.90 0.78 1.06
17.23 6360.95 0.43 3.98 0.81 1.07
18.10 6360.97 0.45 4.06 0.84 1.07
Tailwater Channel Data - Existing 122+20 (NC1)
Tailwater Channel Option: Rectangular Channel
Bottom Width: 10.00 ft
Channel Slope: 0.0300
Channel Manning's n: 0.0350
Channel Invert Elevation: 6360.52 ft
Roadway Data for Crossing: Existing 122+20 (NC1)
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 6367.21 ft
Roadway Surface: Paved
Roadway Top Width: 26.00 ft
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 4.80 cfs
Design Flow: 6.40 cfs
Maximum Flow: 8.90 cfs
Table 13 - Summary of Culvert Flows at Crossing: Existing 126+46 (NC2)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing NC2 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6349.90 4.80 4.80 0.00 1
6349.99 5.21 5.21 0.00 1
6350.10 5.62 5.62 0.00 1
6350.22 6.03 6.03 0.00 1
6350.39 6.40 6.40 0.00 1
6350.56 6.85 6.85 0.00 1
6350.75 7.26 7.26 0.00 1
6350.93 7.67 7.67 0.00 1
6351.13 8.08 8.08 0.00 1
6351.24 8.49 8.29 0.11 26
6351.24 8.90 8.31 0.51 4
6351.23 8.28 8.28 0.00 Overtopping
Culvert Data: Existing NC2
Table 14 - Culvert Summary Table: Existing NC2
Total Disch arge (cfs)
Culve rt Disch arge (cfs)
Head water Elevat ion (ft)
Inle t Con trol Dep th (ft)
Outl et Con trol Dep th (ft)
Fl ow Ty pe
Nor mal Dep th (ft)
Crit ical Dep th (ft)
Out let De pth (ft)
Tailw ater Dept h (ft)
Outl et Velo city (ft/s
Tailw ater Veloc ity (ft/s)
4.80 cfs
4.80 cfs
6349.9
1.36 1.51
7- M2 c
1.50 0.84 0.8
0.20 4.70 2.43
5.21 cfs
5.21 cfs
6349.9
1.44 1.61
7- M2 c
1.50 0.88 0.8
0.21 4.84 2.51
5.62 cfs
5.62 cfs
6350.1
1.52 1.71
7- M2 c
1.50 0.91 0.9
0.22 4.98 2.58
6.03 cfs
6.03 cfs
6350.2
1.61 1.84
7- M2 c
1.50 0.95 0.9
0.23 5.12 2.66
6.40 cfs
6.40 cfs
6350.3
1.69 2.01
7- M2 c
1.50 0.98 0.9
0.24 5.24 2.72
6.85 cfs
6.85 cfs
6350.5
1.79 2.18
7- M2 c
1.50 1.01 1.0
0.25 5.40 2.79
7.26 cfs
7.26 cfs
6350.7
1.89 2.36
7- M2 c
1.50 1.04 1.0
0.25 5.53 2.86
7.67 cfs
7.67 cfs
6350.9
1.99 2.55
7- M2 c
1.50 1.07 1.0
0.26 5.67 2.92
8.08 cfs
8.08 cfs
6351.1
2.09 2.75
7- M2 c
1.50 1.10 1.1
0.27 5.81 2.98
8.49 cfs
8.29 cfs
6351.2
2.15 2.85
7- M2 c
1.50 1.12 1.1
0.28 5.89 3.03
8.90 cfs
8.31 cfs
6351.2
2.16 2.86
7- M2 c
1.50 1.12 1.1
0.29 5.89 3.09
Culvert Barrel Data
Inlet Elevation (invert): 6348.38 ft, Outlet Elevation (invert): 6348.07 ft
Culvert Length: 58.00 ft, Culvert Slope: 0.0053
Site Data - Existing NC2
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 6348.38 ft
Outlet Station: 58.00 ft
Outlet Elevation: 6348.07 ft
Number of Barrels: 1
Culvert Data Summary - Existing NC2
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Tailwater Data for Crossing: Existing 126+46 (NC2)
Table 15 - Downstream Channel Rating Curve (Crossing: Existing 126+46 (NC2))
Flow (cfs) Water Surface Elev (ft)
Velocity (ft/s)
Depth (ft) Shear (psf) Froude Number
4.80 6348.27 0.20 2.43 0.37 0.96
5.21 6348.28 0.21 2.51 0.39 0.97
5.62 6348.29 0.22 2.58 0.41 0.98
6.03 6348.30 0.23 2.66 0.42 0.98
6.40 6348.31 0.24 2.72 0.44 0.99
6.85 6348.32 0.25 2.79 0.46 0.99
7.26 6348.32 0.25 2.86 0.48 1.00
7.67 6348.33 0.26 2.92 0.49 1.00
8.08 6348.34 0.27 2.98 0.51 1.01
8.49 6348.35 0.28 3.03 0.52 1.01
8.90 6348.36 0.29 3.09 0.54 1.01
Tailwater Channel Data - Existing 126+46 (NC2)
Tailwater Channel Option: Rectangular Channel
Bottom Width: 10.00 ft
Channel Slope: 0.0300
Channel Manning's n: 0.0350
Channel Invert Elevation: 6348.07 ft
Roadway Data for Crossing: Existing 126+46 (NC2)
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 6351.23 ft
Roadway Surface: Paved
Roadway Top Width: 26.00 ft
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 1.00 cfs
Design Flow: 1.30 cfs
Maximum Flow: 1.70 cfs
Table 16 - Summary of Culvert Flows at Crossing: Existing 129+85 (NC4)
Headwater Elevation (ft)
Total Discharge (cfs)
Existing NC4 Discharge (cfs)
Roadway Discharge (cfs)
Iterations
6343.00 1.00 1.00 0.00 1
6343.02 1.07 1.07 0.00 1
6343.04 1.14 1.14 0.00 1
6343.06 1.21 1.21 0.00 1
6343.09 1.30 1.30 0.00 1
6343.10 1.35 1.35 0.00 1
6343.12 1.42 1.42 0.00 1
6343.14 1.49 1.49 0.00 1
6343.16 1.56 1.56 0.00 1
6343.18 1.63 1.63 0.00 1
6343.19 1.70 1.70 0.00 1
6346.39 10.64 10.64 0.00 Overtopping
Culvert Data: Existing NC4
Table 17 - Culvert Summary Table: Existing NC4
Total Disch arge (cfs)
Culve rt Disch arge (cfs)
Head water Elevat ion (ft)
Inle t Con trol Dep th (ft)
Outl et Con trol Dep th (ft)
Fl ow Ty pe
Nor mal Dep th (ft)
Crit ical Dep th (ft)
Out let De pth (ft)
Tailw ater Dept h (ft)
Outl et Velo city (ft/s
Tailw ater Veloc ity (ft/s)
1.00 cfs
1.00 cfs
6343.0
0.55 0.60
2- M2 c
0.48 0.37 0.3
0.08 2.92 1.31
1.07 cfs
1.07 cfs
6343.0
0.57 0.62
2- M2 c
0.50 0.39 0.3
0.08 2.97 1.35
1.14 cfs
1.14 cfs
6343.0
0.59 0.64
2- M2 c
0.52 0.40 0.4
0.08 3.03 1.38
1.21 cfs
1.21 cfs
6343.0
0.61 0.66
2- M2 c
0.53 0.41 0.4
0.09 3.08 1.41
1.30 cfs
1.30 cfs
6343.0
0.63 0.69
2- M2 c
0.55 0.43 0.4
0.09 3.14 1.45
1.35 cfs
1.35 cfs
6343.1
0.64 0.71
2- M2 c
0.57 0.44 0.4
0.09 3.17 1.48
1.42 cfs
1.42 cfs
6343.1
0.66 0.73
2- M2 c
0.58 0.45 0.4
0.09 3.22 1.51
1.49 cfs
1.49 cfs
6343.1
0.68 0.75
2- M2 c
0.60 0.46 0.4
0.10 3.26 1.54
1.56 cfs
1.56 cfs
6343.1
0.69 0.76
2- M2 c
0.61 0.47 0.4
0.10 3.31 1.56
1.63
1.63 cfs
6343.1
0.71 0.78
2- M2 c
0.63 0.48 0.4
0.10 3.35 1.59
1.70 cfs
1.70 cfs
6343.1
0.73 0.80
2- M2 c
0.64 0.49 0.4
0.11 3.39 1.62
Culvert Barrel Data