This document includes questions and answers regarding a federal contract solicitation for reconstruction of the China Beach Access Road in San Francisco, California. The solicitation seeks bids to reconstruct the parking lot for access to China Beach, construct new retaining walls along the trail from the parking lot to the beach, complete sewer and water utility work, and perform landscaping. Vertical flute spacing on retaining wall details is specified on the wall plan and elevation sheets for each wall. The National Park Service within the Department of Transportation is the contracting agency.

View the file

Other files

File Type Posted
Tabulation of Bids CA NP GOGA 469 China Beach Access.pdf PDF
Bid Opening Summary China Beach.pdf PDF
A004 China Beach.pdf PDF
QnA 1.17.23.pdf PDF
Amendment A003 China Beach.pdf PDF
QnA 1.9.23.pdf PDF
A002 China Beach.pdf PDF
A001 China Beach.pdf PDF
QnA 1.5.23.pdf PDF
CA NP GOGA 469 - 100_ Hydraulics.pdf PDF
FP-14.pdf PDF
CA NP GOGA 469(1) - 100 Geotech Memo.pdf PDF
CA NP GOGA 469(1) China Beach JOFOC (rev).pdf PDF
CA NP GOGA 469(1) - Plans FINAL.pdf PDF
6982AF23B000002.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CA NP GOGA 469(1) China Beach Access Road

December 22, 2022

Questions Answers 1 Please clarify and/or specify the location of the Vertical Flute as called out on the Wall Relief Detail and Section A-A for the Soil Nail Typical Wall Sections.

Vertical flute spacing is located on the Wall Plan and Elevation sheets for each wall (refer to the corresponding G sheets in the Plan set). For example: