This document contains questions and answers from a pre-bid meeting for a federal construction project. The scope of work involves reconstructing a parking lot and constructing retaining walls and trails for access to China Beach in San Francisco, California. Utility and landscaping work is also included. The project site includes land owned by both the National Park Service and the City of San Francisco. Only HUBZone small businesses are eligible to bid. The bid due date was extended by one week to January 19th, 2023. The contractor is responsible for design of the soil nail walls to resist lateral earth pressures but not for evaluation of overall slope stability. Clarification was provided on materials, permit requirements, and other technical aspects.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CA NP GOGA 469(1) China Beach Access Road
January 9, 2023
Questions Answers 1 Please clarify and/or specify the location of the Vertical Flute as called out on the Wall Relief Detail and Section A-A for the Soil Nail Typical Wall Sections.
Vertical flute spacing is located on the Wall Plan and Elevation sheets for each wall (refer to the corresponding G sheets in the Plan set). For example:
2 Plan Sheet T26, Fixture (Trail Box Steps) shows the use of Alkaline Copper Quaternary (ACQ). Suppliers are telling us ACQ was discontinued as a preservative treatment and a similar water-borne treatment Copper Azole (CaC) is available and meets the same AWPA specs. Will CaC be acceptable?
An answer for this question will be posted with the next QnA update.
UPDATE: Yes, the alternate preservative treatment that meets AWPA specifications is acceptable. Please refer to Amendment A002.
3 Is there a database, website, or list of “Craftsmen Non-Slip Large Ground Profile” contractors outlined in Section 501?
Shaw Associates is the preferred installer noted by the LS team for the Craftsmen systems.
Here is the web link.
https://urldefense.com/v3/__https://viewer.joomag.com/shaw-associates-reference-guide-digital-https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2F%2Fviewer.joomag.com%2Fshaw-associates-reference-guide-digital-version%2F0247310001653326908%3Fshort%26__%3B!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmNmdBP8y7NlLNTVBuDlFlZBuKTQ2-GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw%24&data=05%7C01%7CLeslie.karsten%40dot.gov%7C3ac5799f2c0c41234c2908dae82032b2%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638077522247549464%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Igr4u7Hud3L9fCH%2BNue8rYDerm0ndd%2B%2BpG2Tz3X%2Fzeg%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2F%2Fviewer.joomag.com%2Fshaw-associates-reference-guide-digital-version%2F0247310001653326908%3Fshort%26__%3B!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmNmdBP8y7NlLNTVBuDlFlZBuKTQ2-GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw%24&data=05%7C01%7CLeslie.karsten%40dot.gov%7C3ac5799f2c0c41234c2908dae82032b2%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638077522247549464%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Igr4u7Hud3L9fCH%2BNue8rYDerm0ndd%2B%2BpG2Tz3X%2Fzeg%3D&reserved=0 version/0247310001653326908?short&__;!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmN mdBP8y7NlLNTVBuDlFlZBuKTQ2- GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw$
4 Can you confirm if this job is a Set Aside for only HUBZONE contractors, or can all contractors place a bid?
As shown on the title page of the Invitation for Bid, only HUBZone Small Businesses are allowed to bid on this project.
5 Please identify what medium should be used for the graphics on the entry sign.
Should letters be raised or screen printed on corten steel?
Please refer to plan sheet T19 Special 633-E Park Entrance Sign Details. . The standard way the park does these signs is a backing being visible through voids cut in the corten steel for the lettering. See below for an example image.
6 Just double-checking the bid due date.
The SF1442 says 1/12/2023, 2 pm local time.
As shown in sam.gov, this will be Mountain Standard Time. “Local time” refers to our main Denver office local time.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2F%2Fviewer.joomag.com%2Fshaw-associates-reference-guide-digital-version%2F0247310001653326908%3Fshort%26__%3B!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmNmdBP8y7NlLNTVBuDlFlZBuKTQ2-GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw%24&data=05%7C01%7CLeslie.karsten%40dot.gov%7C3ac5799f2c0c41234c2908dae82032b2%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638077522247549464%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Igr4u7Hud3L9fCH%2BNue8rYDerm0ndd%2B%2BpG2Tz3X%2Fzeg%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2F%2Fviewer.joomag.com%2Fshaw-associates-reference-guide-digital-version%2F0247310001653326908%3Fshort%26__%3B!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmNmdBP8y7NlLNTVBuDlFlZBuKTQ2-GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw%24&data=05%7C01%7CLeslie.karsten%40dot.gov%7C3ac5799f2c0c41234c2908dae82032b2%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638077522247549464%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Igr4u7Hud3L9fCH%2BNue8rYDerm0ndd%2B%2BpG2Tz3X%2Fzeg%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2F%2Fviewer.joomag.com%2Fshaw-associates-reference-guide-digital-version%2F0247310001653326908%3Fshort%26__%3B!!OepYZ6Q!_8LyvTsn0LGuuYOQlwC0G7GmNmdBP8y7NlLNTVBuDlFlZBuKTQ2-GpnJ4rrfY0ftdFix6uAYCpILVwwxRvgemlOuavi7tw%24&data=05%7C01%7CLeslie.karsten%40dot.gov%7C3ac5799f2c0c41234c2908dae82032b2%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638077522247549464%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Igr4u7Hud3L9fCH%2BNue8rYDerm0ndd%2B%2BpG2Tz3X%2Fzeg%3D&reserved=0
Is that Pacific Standard Time or Mountain Standard Time?
7 IFB Page 4, under Project Overview it indicates the project is within lands owned by the National Park Service (Golden Gate National Recreation Area) and the City of San Francisco.
a. Please clarify which portions of the project are located on land owned by the NPS vs. land owned by the City of San Francisco.
b. Please clarify the permits that will be required as it pertains to portions of the land that are owned by the NPS
vs. the City of San Francisco.
a. The portion of the project in the City of San Francisco are the utility connections/utility trenching and patching on Sheets U2/U3 and asphalt noted on Sheets T8/T9 in Sea Cliff Avenue. The property/ROW line is the delineation between NPS property and City of SF property. The area indicated on sheet D8/U1 in Sea Cliff Avenue between the property line and the heavy black dashed line.
b. Side sewer permit and general excavation permits are through the City of San Francisco for the utility connection and trench backfill and patching in Sea Cliff Avenue. The Side Sewer Permit is for the sanitary connection and the General Excavation Permit is for domestic water, fire protection water, electric and telecommunication connections and associated trench patching.
State Permits include the NPDES permit.
8 On 12/22/2022 there was a document posted on sam.gov titled “QnA 12.22.22 China Beach”. Are we to acknowledge this document as Amendment 0001 on the SF1442?
No, you do not need to acknowledge QnA 12.22.22 as an amendment. Any amendments will be on a Standard Form 30, and will be titled “A00X.” QnA 12.22.22 and any further QnA documents posted are questions and answers for clarification.
9 IFB Page A-3, Item 8 states “Location of Public Bid Opening”. Will there be a public bid opening for this project? If so, please provide information on how bidders can participate.
Yes, you may attend in person at the address listed in Item 8 on the SF1442 (Sheet A-1). The address is:
Central Federal Lands Division Office 12300 W. Dakota Ave.
Lakewood, CO 80228
10 Reference Appendix A, Golden Gate National Recreation Area Fire Management Step-up Plan: Under the “Actions” column it lists Optimal Staffing requirements. Please confirm that firefighter staffing is not the Contractor’s responsibility.
Firefighting staffing is not the responsibility of the Contractor.
11 Can you please provide the chain link fence height for bid item #A1440? The details state that the fabric height is 36” to 96” but I’ll need something a bit more specific than that in order to properly bid the fence (and gate).
Fencing is a standard 6’ height however the height varies with the fence sections being level.
Sheet D26 notes a 6’ fence with the difference between two elevations. Sheet T2 profiles the fence, showing the 6’ height, but the fences remain level along the slope giving a non-standard height along the slopes.
I have a scree clip of the profile below.
12 With several people out of the office during the recent holidays, and with the disruptions caused by the recent and ongoing severe weather, our prospective key subcontractors, such as the soil nails subs, are just starting to look at the bid documents for this project.
We are concerned that we will not be able to obtain good, solid numbers in time for a January 12 bid.
Because of this, we respectfully request an extension of two weeks to enable us and all bidders to put together their best competitive bids for you
We will extend the bid opening date by 1 week. Please refer to Amendment A001.
13 In my attempts to resource a wire mesh product for your project, I’ve found the
The ‘Elite’ System from Omega is what our details were loosely based on (refer to the last page of QnA for the Elite system from Omega). Fence profiles provide a design (refer to three attached premanufactured possibilities (much more cost effective then having to custom fabricate the panels).
Will any of the three attached options suffice for this project?
plan sheet T2 for example). The suggested prefabricated fence panels will require modification to irregular shapes along the slope to maintain a level top of fence. The Contractor will need to provide shop drawings for review prior to construction.
14 Do you have bid form?
Yes, refer to sheets A-7 thru A-14 of the Invitation for Bid for the Bid Schedule.
15 Are we mounting the monument signs on a hard surface or a soft surface?
The Kiosk, Detail Sheet T16 Special 633-B Kiosk, is mounted within concrete hardscape.
The Entrance Sign, Detail Sheet T15 Special 633-A Park Entrance Sign, is mounted in a softscape area.
16 Please clarify the design intent of the soil nail walls. The plans contain the following note:
It is our understanding the soil nails and concrete facing will be used to retrofit and stabilize the existing bin walls. As part of the design process when specifying the use of soil nail walls, it is the Owner’s responsibility to evaluate the overall global stability of the site geometry including slip surfaces that would extend beyond typical soil nail lengths. Please verify it is not the intent of the Contract to require the Contractor to perform the global stability analysis for the site. Based on the Geotech report, (Section 6.2.6) there may be a slope stability evaluation for the report, however we did not see it in the bid documents. Please provide the
The project is to retrofit and stabilize the existing retaining walls. The soil nails are to be designed to resist lateral earth pressures that are currently being resisted by the bin walls.
Neither the existing or nor proposed retaining wall systems are intended to enhance global stability. We are not aware of any evidence of global instability that has impacted the existing retaining walls. The retrofit should not have adverse impacts on global stability. The soil nails should be designed to resist lateral earth pressures only, and the global stability will be no better-no worse than currently exists.
Per Section 6.2 of our report:
6.2 CONTRACTOR DESIGNED SOIL NAIL WALLS
Soil nails will be used to retrofit and stabilize the existing bin walls (Wall Locations 1, 2, 3, and 4) along the access trail to China Beach. The contractor design for the new retaining walls should include the soil nailing and a new reinforced concrete facing and associated work necessary to stabilize the existing metal bin retaining walls and backfill. The retrofit will be designed to support lateral earth pressures from the soil both within and behind the existing bins.
slope stability evaluation and confirm this evaluation has assessed the overall site global stability. It is not the Contractor’s responsibility to evaluate the grading plan, existing slopes, and the stability of the slopes above and below the walls. Please confirm the Contractor’s only design responsibility is to evaluate the internal stability of each individual wall (ie. nail lengths, nail layout, bar sizes, and facing strength), while considering the provided soil strengths and slope geometry. Please confirm it is not the Contract intent to have the soil nail walls be designed to mitigate an overall global stability issue. See below for potential global stability issues that should be evaluated by the project
GEOR.
Elite Double Wire
ELITE Double Wire
Horizontal wire 2 x 4 GA
Vertical wire 1 x 6 GA
Mesh opening 2" x 8“ - c/c nominal
1.77” x 7.60” – average inside wires
Standard height 4', 6', 8'
Standard length 8' 3"
Square post 2“ x 2" or 3“ x 3"
Caps Aluminum Square
Opacity/Openness 13% / 87%
Finish Pre-galvanized & powder coated