This is a bid tabulation report for a federal contract solicitation to construct a parking area and related facilities at Brush Creek Park in Colorado. The report details bids received from Siete Inc. and cost estimates for various construction line items. Major work includes mobilization, surveying, quality control, testing, clearing, excavation, asphalt and concrete paving, drainage, utilities, signage, landscaping, and an optional restroom building. Siete Inc's total bid was $5,469,775 for the base work and additional amounts for option schedules, while total government estimates were lower at $4,359,000 for the base and $2,533,000 for the options. The contract is to be awarded by the Department of Transportation Federal Highway Administration to provide the specified construction services at Brush Creek Park in Pitkin County, Colorado.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/24/22
2 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF22B000026
Division: Central Federal Lands
State: CO County: Pitkin
Federal Land: Brush Creek Parking Area Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/20/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Siete, Inc. Error in bid calculation of total for Schedule X Bid calculated total = $1,657,430.00 System calculated total = $1,857,430.00
$5,469,775.00 8155 Park Road Rye, CO 81069
Engineer's Estimate $4,359,000.00
3 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
Siete, Inc. Lump Sum $560,000.00 Engineer's Estimate ALL LPSM Lump Sum $470,330.00
A0020 15214-3000 SURVEY AND STAKING, PARKING AREA
Siete, Inc. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0030 15301-0000 CONTRACTOR QUALITY CONTROL
Siete, Inc. Lump Sum $530,000.00 Engineer's Estimate ALL LPSM Lump Sum $165,000.00
A0040 15401-0000 CONTRACTOR TESTING
Siete, Inc. Lump Sum $530,000.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00
A0050 15501-0000 CONSTRUCTION SCHEDULE
Siete, Inc. Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
A0060 15701-0000 SOIL EROSION CONTROL
Siete, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0070 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Siete, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0080 15802-0000 WATERING FOR DUST CONTROL
Siete, Inc. Lump Sum $45,000.00 Engineer's Estimate ALL LPSM Lump Sum $67,000.00
4 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0090 20101-0000 CLEARING AND GRUBBING
Siete, Inc. $15,000.00 $58,500.00 Engineer's Estimate 3.9 ACRE $5,000.00 $19,500.00
A0100 20301-1100 REMOVAL OF GATE
Siete, Inc. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $1,200.00 $1,200.00
A0110 20301-1500 REMOVAL OF LIGHT POLE
Siete, Inc. $3,000.00 $54,000.00 Engineer's Estimate 18 EACH $2,000.00 $36,000.00
A0120 20301-2400 REMOVAL OF SIGN
Siete, Inc. $300.00 $5,700.00 Engineer's Estimate 19 EACH $300.00 $5,700.00
A0130 20301-3800 REMOVAL OF ELECTRICAL JUNCTION BOX
Siete, Inc. $2,000.00 $2,000.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
A0140 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
Siete, Inc. $16.00 $34,000.00 Engineer's Estimate 2,125 LNFT $20.00 $42,500.00
A0150 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
Siete, Inc. $6.00 $59,100.00 Engineer's Estimate 9,850 SQYD $12.00 $118,200.00
A0160 20303-2300 REMOVAL OF PAVEMENT, CONCRETE
Siete, Inc. $40.00 $11,600.00 Engineer's Estimate 290 SQYD $35.00 $10,150.00
5 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0170 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
Siete, Inc. $105.00 $4,200.00 Engineer's Estimate 40 SQYD $50.00 $2,000.00
A0180 20401-0000 ROADWAY EXCAVATION
Siete, Inc. $50.00 $72,500.00 Engineer's Estimate 1,450 CUYD $35.00 $50,750.00
A0190 20443-0000 BERMS
Siete, Inc. $23.00 $9,660.00 Engineer's Estimate 420 LNFT $45.00 $18,900.00
A0200 25126-0000 REMOVE AND RESET BOULDER
Siete, Inc. $400.00 $60,000.00 Engineer's Estimate 150 EACH $200.00 $30,000.00
A0210 30202-2000 ROADWAY AGGREGATE, METHOD 2
Siete, Inc. $65.00 $133,250.00 Engineer's Estimate 2,050 TON $65.00 $133,250.00
A0220 30402-5900 FULL DEPTH RECLAMATION, METHOD 2, 12-INCH DEPTH
Siete, Inc. $6.00 $64,800.00 Engineer's Estimate 10,800 SQYD $8.00 $86,400.00
A0230 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Siete, Inc. $170.00 $941,800.00 Engineer's Estimate 5,540 TON $170.00 $941,800.00
A0240 40601-0000 FOG SEAL
Siete, Inc. $900.00 $10,800.00 Engineer's Estimate 12 TON $900.00 $10,800.00
6 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0250 41201-0000 TACK COAT
Siete, Inc. $900.00 $10,800.00 Engineer's Estimate 12 TON $1,000.00 $12,000.00
A0260 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
Siete, Inc. $350.00 $350,000.00 Engineer's Estimate 1,000 SQYD $160.00 $160,000.00
A0270 60405-0000 MANHOLE ADJUSTMENT
Siete, Inc. $1,500.00 $6,000.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00
A0280 60406-0000 INLET ADJUSTMENT
Siete, Inc. $5,000.00 $15,000.00 Engineer's Estimate 3 EACH $1,400.00 $4,200.00
A0290 60412-3000 REMOVE AND RESET INLET
Siete, Inc. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00
A0300 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
Siete, Inc. $65.00 $15,600.00 Engineer's Estimate 240 LNFT $70.00 $16,800.00
A0310 60902-1200 CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
Siete, Inc. $65.00 $325,000.00 Engineer's Estimate 5,000 LNFT $75.00 $375,000.00
A0320 60906-1000 GUTTER, CONCRETE
Siete, Inc. $175.00 $73,500.00 Engineer's Estimate 420 SQYD $150.00 $63,000.00
7 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0330 61110-1000 IRRIGATION SYSTEM
Siete, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0340 61201-0000 SEWER SYSTEM (SERVICE LINES)
Siete, Inc. Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0350 61501-0100 SIDEWALK, CONCRETE
Siete, Inc. $235.00 $7,050.00 Engineer's Estimate 30 SQYD $190.00 $5,700.00
A0360 61505-1000 ACCESSIBILITY RAMP, CONCRETE
Siete, Inc. $2,100.00 $8,400.00 Engineer's Estimate 4 EACH $4,500.00 $18,000.00
A0370 61902-0900 GATE, METAL
Siete, Inc. $23,500.00 $70,500.00 Engineer's Estimate 3 EACH $9,000.00 $27,000.00
A0380 61921-1000 REMOVE AND RESET FENCE
Siete, Inc. $90.00 $4,500.00 Engineer's Estimate 50 LNFT $25.00 $1,250.00
A0390 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Siete, Inc. $80.00 $2,400.00 Engineer's Estimate 30 HOUR $120.00 $3,600.00
A0400 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Siete, Inc. $80.00 $2,400.00 Engineer's Estimate 30 HOUR $190.00 $5,700.00
8 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0410 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Siete, Inc. $80.00 $2,400.00 Engineer's Estimate 30 HOUR $170.00 $5,100.00
A0420 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT
Siete, Inc. $80.00 $2,400.00 Engineer's Estimate 30 HOUR $230.00 $6,900.00
A0430 62301-0000 GENERAL LABOR
Siete, Inc. $63.00 $2,520.00 Engineer's Estimate 40 HOUR $80.00 $3,200.00
A0440 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Siete, Inc. $150.00 $4,500.00 Engineer's Estimate 30 HOUR $180.00 $5,400.00
A0450 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Siete, Inc. $175.00 $5,250.00 Engineer's Estimate 30 HOUR $220.00 $6,600.00
A0460 62632-0000 PLANTINGS (LANDSCAPING)
Siete, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $170,500.00
A0470 63301-0000 SIGN SYSTEM
Siete, Inc. $1,300.00 $32,500.00 Engineer's Estimate 25 EACH $500.00 $12,500.00
A0480 63316-1000 REMOVE AND RESET SIGN
Siete, Inc. $500.00 $10,000.00 Engineer's Estimate 20 EACH $400.00 $8,000.00
9 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0490 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Siete, Inc. $1.25 $22,500.00 Engineer's Estimate 18,000 LNFT $0.50 $9,000.00
A0500 63401-1900 PAVEMENT MARKINGS, TYPE J, SOLID
Siete, Inc. $7.75 $2,945.00 Engineer's Estimate 380 LNFT $6.50 $2,470.00
A0510 63405-0050 PAVEMENT MARKINGS, SYMBOLS (Type J, SHARED LANE MARKING)
Siete, Inc. $750.00 $1,500.00 Engineer's Estimate 2 EACH $850.00 $1,700.00
A0520 63405-4050 PAVEMENT MARKINGS, TYPE J, ACCESSIBILITY SYMBOL
Siete, Inc. $650.00 $6,500.00 Engineer's Estimate 10 EACH $1,000.00 $10,000.00
A0530 63501-0000 TEMPORARY TRAFFIC CONTROL
Siete, Inc. Lump Sum $130,000.00 Engineer's Estimate ALL LPSM Lump Sum $130,000.00
A0540 63601-3000 SYSTEM INSTALLATION, ELECTRICAL
Siete, Inc. Lump Sum $575,000.00 Engineer's Estimate ALL LPSM Lump Sum $615,000.00
A0550 63610-0000 CONDUIT
Siete, Inc. $13.50 $44,550.00 Engineer's Estimate 3,300 LNFT $25.00 $82,500.00
A0560 63622-0000 UTILITY TRENCH
Siete, Inc. $45.00 $12,150.00 Engineer's Estimate 270 LNFT $20.00 $5,400.00
10 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0570 63701-0000 FIELD OFFICE
Siete, Inc. $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $50,000.00 $50,000.00
Total Schedule - All Items
Siete, Inc. $5,469,775.00 Engineer's Estimate $4,359,000.00
11 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF22B000026
Division: Central Federal Lands
State: CO County: Pitkin
Federal Land: Brush Creek Parking Area Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/20/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Siete, Inc. Error in bid calculation of total for Schedule X Bid calculated total = $1,657,430.00 System calculated total = $1,857,430.00
$1,857,430.00 8155 Park Road
Engineer's Estimate $1,328,000.00
12 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0010 15101-0000 MOBILIZATION
Siete, Inc. Lump Sum $120,000.00 Engineer's Estimate ALL LPSM Lump Sum $144,740.00
X0020 15214-3000 SURVEY AND STAKING, PARKING AREA
Siete, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
X0030 15301-0000 CONTRACTOR QUALITY CONTROL
Siete, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
X0040 15401-0000 CONTRACTOR TESTING
Siete, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
X0050 15501-0000 CONSTRUCTION SCHEDULE
Siete, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X0060 15701-0000 SOIL EROSION CONTROL
Siete, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
X0070 15802-0000 WATERING FOR DUST CONTROL
Siete, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
X0080 20101-0000 CLEARING AND GRUBBING
Siete, Inc. $7,000.00 $5,600.00 Engineer's Estimate 0.8 ACRE $5,000.00 $4,000.00
13 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0090 20301-2400 REMOVAL OF SIGN
Siete, Inc. $500.00 $1,000.00 Engineer's Estimate 2 EACH $300.00 $600.00
X0100 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
Siete, Inc. $15.00 $6,300.00 Engineer's Estimate 420 LNFT $20.00 $8,400.00
X0110 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
Siete, Inc. $13.00 $17,680.00 Engineer's Estimate 1,360 SQYD $12.00 $16,320.00
X0120 20401-0000 ROADWAY EXCAVATION
Siete, Inc. $55.00 $46,750.00 Engineer's Estimate 850 CUYD $35.00 $29,750.00
X0130 25126-0000 REMOVE AND RESET BOULDER
Siete, Inc. $500.00 $10,000.00 Engineer's Estimate 20 EACH $200.00 $4,000.00
X0140 30202-2000 ROADWAY AGGREGATE, METHOD 2
Siete, Inc. $65.00 $46,800.00 Engineer's Estimate 720 TON $65.00 $46,800.00
X0150 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Siete, Inc. $170.00 $1,530.00 Engineer's Estimate 9 TON $170.00 $1,530.00
X0160 50101-1100 MINOR CONCRETE PAVEMENT, REINFORCED, 11-INCH DEPTH
Siete, Inc. $337.00 $960,450.00 Engineer's Estimate 2,850 SQYD $220.00 $627,000.00
14 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0170 60902-1200 CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
Siete, Inc. $70.00 $23,100.00 Engineer's Estimate 330 LNFT $75.00 $24,750.00
X0180 61110-1000 IRRIGATION SYSTEM
Siete, Inc. Lump Sum $16,000.00 Engineer's Estimate ALL LPSM Lump Sum $4,500.00
X0190 61501-0100 SIDEWALK, CONCRETE
Siete, Inc. $170.00 $45,900.00 Engineer's Estimate 270 SQYD $190.00 $51,300.00
X0200 61505-1000 ACCESSIBILITY RAMP, CONCRETE
Siete, Inc. $3,500.00 $24,500.00 Engineer's Estimate 7 EACH $4,500.00 $31,500.00
X0210 61902-0900 GATE, METAL
Siete, Inc. $25,000.00 $25,000.00 Engineer's Estimate 1 EACH $9,000.00 $9,000.00
X0220 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Siete, Inc. $80.00 $1,200.00 Engineer's Estimate 15 HOUR $120.00 $1,800.00
X0230 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Siete, Inc. $80.00 $1,200.00 Engineer's Estimate 15 HOUR $190.00 $2,850.00
X0240 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Siete, Inc. $80.00 $1,200.00 Engineer's Estimate 15 HOUR $170.00 $2,550.00
15 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0250 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT
Siete, Inc. $80.00 $1,200.00 Engineer's Estimate 15 HOUR $230.00 $3,450.00
X0260 62301-0000 GENERAL LABOR
Siete, Inc. $63.00 $2,520.00 Engineer's Estimate 40 HOUR $80.00 $3,200.00
X0270 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Siete, Inc. $150.00 $2,250.00 Engineer's Estimate 15 HOUR $180.00 $2,700.00
X0280 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Siete, Inc. $175.00 $2,625.00 Engineer's Estimate 15 HOUR $220.00 $3,300.00
X0290 62632-0000 PLANTINGS (LANDSCAPING)
Siete, Inc. Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,750.00
X0300 63301-0000 SIGN SYSTEM
Siete, Inc. $1,100.00 $2,200.00 Engineer's Estimate 2 EACH $500.00 $1,000.00
X0310 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Siete, Inc. $1.25 $11,275.00 Engineer's Estimate 9,020 LNFT $0.50 $4,510.00
X0320 63401-1900 PAVEMENT MARKINGS, TYPE J, SOLID
Siete, Inc. $7.75 $7,750.00 Engineer's Estimate 1,000 LNFT $6.50 $6,500.00
16 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0330 63405-3850 PAVEMENT MARKINGS, TYPE J, "ONLY" WORD MESSAGE
Siete, Inc. $850.00 $3,400.00 Engineer's Estimate 4 EACH $800.00 $3,200.00
X0340 63501-0000 TEMPORARY TRAFFIC CONTROL
Siete, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
X0350 63601-3000 SYSTEM INSTALLATION, ELECTRICAL
Siete, Inc. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $105,000.00
Total Schedule - All Items
Siete, Inc. $1,857,430.00 Engineer's Estimate $1,328,000.00
17 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF22B000026
Division: Central Federal Lands
State: CO County: Pitkin
Federal Land: Brush Creek Parking Area Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/20/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Siete, Inc. Error in bid calculation of total for Schedule X Bid calculated total = $1,657,430.00 System calculated total = $1,857,430.00
$6,609,945.00 8155 Park Road
Engineer's Estimate $2,533,000.00
18 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0010 15101-0000 MOBILIZATION
Siete, Inc. Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $275,450.00
Y0020 15501-0000 CONSTRUCTION SCHEDULE
Siete, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0030 15701-0000 SOIL EROSION CONTROL
Siete, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
Y0040 30202-2000 ROADWAY AGGREGATE, METHOD 2
Siete, Inc. $65.00 $10,400.00 Engineer's Estimate 160 TON $65.00 $10,400.00
Y0050 60526-0000 DRAINAGE CHASE
Siete, Inc. $750.00 $99,000.00 Engineer's Estimate 132 LNFT $200.00 $26,400.00
Y0060 61101-0000 WATER SYSTEM (WELL)
Siete, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
Y0070 61201-0000 SEWER SYSTEM
Siete, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $165,000.00
Y0080 61501-0100 SIDEWALK, CONCRETE
Siete, Inc. $300.00 $219,000.00 Engineer's Estimate 730 SQYD $190.00 $138,700.00
19 out of 19Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP PIT 82(1)
Project Name: Brush Creek Parking Area
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0090 61904-0000 BOLLARD POST
Siete, Inc. $3,200.00 $25,600.00 Engineer's Estimate 8 EACH $2,000.00 $16,000.00
Y0100 62301-0000 GENERAL LABOR
Siete, Inc. $63.00 $945.00 Engineer's Estimate 15 HOUR $70.00 $1,050.00
Y0110 63501-0000 TEMPORARY TRAFFIC CONTROL
Siete, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0120 63701-0000 FIELD OFFICE
Siete, Inc. $35,000.00 $35,000.00 Engineer's Estimate 1 EACH $15,000.00 $15,000.00
Y0130 64501-0000 LOCATE UTILITIES
Siete, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
Y0140 64602-1000 BUILDING, RESTROOM FACILITY
Siete, Inc. Lump Sum $4,900,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,835,000.00
Total Schedule - All Items
Siete, Inc. $6,609,945.00 Engineer's Estimate $2,533,000.00