This document is an amendment to an invitation for bid for construction services related to a new parking area and septic system at Brush Creek Park in Colorado. The bid is being issued by the Federal Highway Administration on behalf of the Department of Transportation, with responses due by September 20th, 2022. The amendment removes and replaces a page in the IFB to provide additional requirements for the design and permitting of the new septic system, including coordinating with Pitkin County on an existing domestic wastewater treatment permit and developing design plans and calculations in accordance with applicable state regulations. The selected contractor will also be responsible for assisting with permit completion and constructing the new septic system to meet all permit conditions.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A001

1 2

10/07/2022 CO FLAP PIT 82(1)

6982AF22B000026

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JOSEPHINE HELMS

09/20/2022

X

0*

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

INVITATION FOR BID- Section E

Remove page E-45 and replace with attached page E-45.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT

IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

X *See Item 14 below

X

X

E-45

CO FLAP PIT 82(1)

Brush Creek Parking Area

316999, Receipt Number 10001602, expires 4/3/2023. Extend well permit as needed to facilitate the work.

Submit proposed irrigation system layout to CO for approval in coordination with the Pitkin County 21 days prior to work beginning. Do not start work until the submittal has been reviewed and approved. The irrigation water source is the existing irrigation pond and pump on site.

Protect in place the existing irrigation system that is not impacted by the project.

Provide irrigation system design based on the irrigation performance notes shown on the landscape plan.

Section 612. — SANITARY SEWER SYSTEMS

Description

612.01 Add the following:

This work consists of designing, assisting in development of required permits and constructing a new septic system with all appurtenances as shown on the plans. Furnish all parts, materials and labor to design and construct at the location shown on the plans.

Construction Requirements

612.03 General. Add the following:

A State CPDS Domestic Wastewater Treatment Plant Permit has been initiated by Pitkin County Public Works Department. Based on initial calculations and a daily ridership of 3,200 people the Maximum Monthly Average Daily Flow (MMADF) is 2,200 gallons per day. Coordinate directly with the County with permitting and provide relevant support information. Assist in completion of the permit and construct new septic system to meet all permit requirements. Final calculations by the Contractor, in coordination with Pitkin County Public Works, will determine whether a State permit and the associated reporting requirements will be needed.

Secure a regional engineering firm that specializes in on-site wastewater treatment system design. Develop the design in accordance with applicable permit requirements and the following Department of Public Health and Environment, Water Quality Control Commission regulations:

Regulation No. 43 – On-Site Wastewater Treatment System Regulation, 5CCR 1002-43 Regulation No. 22 – Site Location and Design Regulations for Domestic Wastewater

Treatment Works, 5CCR 1002-22 Associated Regulations and Policies referenced in the above Regulations

Two formal design submittals (initial and final) are anticipated. Formal design submittal deliverables include: