This document contains questions and answers from a pre-bid meeting for a federal highway construction project. The project involves improvements to approximately 17.1 miles of Cima Road in the Mojave National Preserve in California, including full depth reclamation of the existing pavement, widening the roadway, minor realignments, installing low water crossings with riprap and barriers, signage, and other safety features. The document provides clarification on requirements for waste removal, water sources, riprap specifications, topsoil handling, vegetation management, barrier details, quantities, and other construction aspects. Issues addressed will help bidders fully understand project requirements to submit responsive bids to the Federal Highway Administration for the CA FTNP MOJA 12(1) CIMA ROAD solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation Cima Road.pdf | ||
| Bid Opening Summary Cima Road.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| QnA 10.25.22.pdf | ||
| QnA 10.13.22.pdf | ||
| A002 Cima.pdf | ||
| A001 Cima.pdf | ||
| Final Hydraulics Report - CA MOJA 12(1) flat.pdf | ||
| FP-14.pdf | ||
| CA FTNP MOJA 12(1) Cima Road - X Sections-Final.pdf | ||
| Desert-Tortoise-Field-Manual_v2009.pdf | ||
| CA FTNP MOJA 12(1) Cima Road - Final Plans rev.pdf | ||
| MOJA_170_60000-ExistingEntranceSignPlans.pdf | ||
| 6982AF22B000019.pdf | ||
| CA FTNP MOJA 12(1) Cima Road Pavement Report Signed flat.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CA FTNP MOJA 12(1) Cima Road
November 3, 2022
Questions Answers 1 Do you have an area(s) we can permanently take the waste material or do you want it removed from the project?
Remove waste material from the project according to Subsection 204.14 of the FP-14.
2 On past jobs with FHWA, you have specified certain water sources for construction, do you have any water sources for this project?
There are no known water sources within the project limits. The contractor is required to determine the water source.
3 Bid item 25101-2100 shows Method B, Class 1, but on Plan Sheet G4 where this is to be installed it shows Method A, can you please clarify this? It also shows Method A for the Class 4, but the bid item is Method B.
All riprap items will be Method B. Please refer to Amendment A002.
4 Can you please provide a map showing what areas at each location we can stage in as I do not see any on the plans and they will be needed to get off the road?
No locations in the plans have been designated as staging areas. After award, locations will need to be proposed in previously disturbed areas for approval by the CO. See SCR Subsection 105.04.
5 Will a signs matrix be provided for the construction signs on this job? Currently there is no sign matrix in the plans.
No sign matrix will be provided for the temporary traffic control construction signs. The signs that are required are provided in the plans (Sheets T60 thru T64) and the Caltrans Encroachment Permit provided in Amendment A001.
6 Page E-33, paragraph (k), it says Cima Road may be closed during construction and provide a flagger at the closed location(s), each end. What about from the end of shift to the start of the next shift and weekends, if it remains closed as it doesn’t say to reopen?
Provide flaggers during work shifts. Cima Road may remain fully closed with appropriate traffic control/roadway closure devices between shifts.
The Contractor may elect to not provide flaggers between work shifts.
7 Bid item 20101-0000 clear & grub & 62405-0400 place conserved topsoil: placing conserved topsoil amounts to 1,480 SY at 6” depth = 247 CY, but section 204 of the specs indicates striping 3” to 6” topsoil & stockpiling it (that is 27,000 CY at 3”, but you only need 257 CY), why would you do this if you are only placing 257 CY? On the clear & grub item, we basically only need to
It is estimated that only 1480 SY of topsoil is required to be conserved.
The areas will be determined by the Park and CO prior to clearing/grubbing. All other material will become the property of the Contractor and is required to be hauled offsite if not used on the project.
conserve enough to be placed per 62405-0400 correct, the balance hauls offsite?
8 Page E-41 of the specs, paragraph (e) says conserved topsoil stripped from cuts, should be included in roadway excavation, but I do not see anything in the roadway excavation summary taking this from the roadway excavation quantities. The summary says the job has waste, but 3” over 66 acres is over 26,000 cy, you could be short on embankment material if you have to strip this much. This doesn’t include the fill area stripping which will add even more. Can you please review this & help with what you are looking for us to achieve, modify quantities as needed?
Please refer to the answer to question 7 above.
9 Is it possible to allow the contractor to shred, pulverize, mow and etc. the existing vegetation in place, windrow to the clear & grub limits then windrow it back so it is placed between the asphalt safety slope & the clear limits?
If the contractor has to haul the clear & grub materials back to the closest Las Vegas Landfill, you are looking at 125 miles minimum one way, massive dump fees and many truck trips on the highway not to mention the hundreds of thousands of dollars to do this.
Leaving it onsite will save the FHWA a lot of money and will be used onsite so the disturbed areas can re-seed and grow again.
This is acceptable. Salvage biological soils prior to completing this work as directed by the CO. Refer to SCR’s Subsections 201.05 and 204.05 for additional information.
10 Bid Item 61801-0000 Concrete Barrier, Is the Type A NDOT Barrier Rail acceptable to use on this project? Drawings show a 36” high Barrier Rail, Type A is 32” high.
No, please bid according to the plans and specifications. A value engineering proposal may be considered after contract award.
See 52.248-3 Value Engineering -Construction clause
11 Bid Item 61801-0000 Concrete Barrier, Is 32” high precast barrier rail acceptable to use on this project? If so, do the precast units need to be connected?
No, please bid according to the plans and specifications. A value engineering proposal may be considered after contract award.
See 52.248-3 Value Engineering -Construction clause
12 What is the pay item for Rockery wall excavation?
Any excavation required for the installation of the rockery wall is incidental to the rockery wall pay item.
13 Bid item A1460 Temporary Traffic Control, Snow fence. What is the detail for this fence?
The temporary fence is used if the permanent tortoise barrier can not be installed prior to starting construction activities. The temporary fence is a plastic fence that it installed according to the Tortoise Barrier – Type A layout. Refer to Sheet T10 in Amendment A003.
14 Bid item 25101-2100 shows 170 CY of Class 1 Riprap, we are coming up with a lot more based on the details on plan sheet G5, can you please double check your quantities?
Error found in labeling of riprap on G5, some of the riprap should have been labeled as Class 4. Labels and riprap quantities have been corrected;
please refer to Amendment A003.