QnA 10.13.22.pdf
PDF 91 KB Posted
- Attached to
- CA FTNP MOJA 12(1) CIMA ROAD Federal contract opportunity
- Solicitation number
- 6982AF22B000019
About this file
This document provides questions and answers from an advertisement for the CA FTNP MOJA 12(1) Cima Road federal contract opportunity. The opportunity involves improvements to approximately 17.1 miles of Cima Road in San Bernardino County, California, including full depth reclamation of the existing pavement, increasing the roadway width, minor roadway realignments, reinforcing low water crossings, and improving safety features. Low water crossings will typically consist of buried concrete barriers with rip rap revetment. Additional work includes shoulder stabilization areas and patching on Kelbaker Road, and low water crossings and a slope stabilization area on Lanfair and Cedar Canyon Roads. Construction is estimated to take 12-18 months. The document answers questions on waste removal procedures, potential water sources, clarification of riprap installation methods, requesting proposed staging areas, and confirmation that no sign matrix will be provided for temporary traffic control signs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation Cima Road.pdf | ||
| Bid Opening Summary Cima Road.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| QnA 11.3.22.pdf | ||
| QnA 10.25.22.pdf | ||
| A002 Cima.pdf | ||
| A001 Cima.pdf | ||
| Final Hydraulics Report - CA MOJA 12(1) flat.pdf | ||
| FP-14.pdf | ||
| CA FTNP MOJA 12(1) Cima Road - Final Plans rev.pdf | ||
| MOJA_170_60000-ExistingEntranceSignPlans.pdf | ||
| 6982AF22B000019.pdf | ||
| CA FTNP MOJA 12(1) Cima Road Pavement Report Signed flat.pdf | ||
| CA FTNP MOJA 12(1) Cima Road - X Sections-Final.pdf | ||
| Desert-Tortoise-Field-Manual_v2009.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CA FTNP MOJA 12(1) Cima Road
October 13, 2022
Questions Answers 1 Do you have an area(s) we can permanently take the waste material or do you want it removed from the project?
Remove waste material from the project according to Subsection 204.14 of the FP-14.
2 On past jobs with FHWA, you have specified certain water sources for construction, do you have any water sources for this project?
There are no known water sources within the project limits. The contractor is required to determine the water source.
3 Bid item 25101-2100 shows Method B, Class 1, but on Plan Sheet G4 where this is to be installed it shows Method A, can you please clarify this? It also shows Method A for the Class 4, but the bid item is Method B.
All riprap items will be Method B. Please refer to Amendment A002.
4 Can you please provide a map showing what areas at each location we can stage in as I do not see any on the plans and they will be needed to get off the road?
No locations in the plans have been designated as staging areas. After award, locations will need to be proposed in previously disturbed areas for approval by the CO. See SCR Subsection 105.04.
5 Will a signs matrix be provided for the construction signs on this job? Currently there is no sign matrix in the plans.
No sign matrix will be provided for the temporary traffic control construction signs. The signs that are required are provided in the plans (Sheets T60 thru T64) and the Caltrans Encroachment Permit provided in Amendment A001.