Bid Opening Summary 01052023.pdf
PDF 116 KB Posted
- Attached to
- AZ FLAP SR261(1), Eagar to Crescent Lake Federal contract opportunity
- Solicitation number
- 6982AF22B000018
About this file
This bid opening summary documents the results of a solicitation for the Eagar to Crescent Lake project. The Arizona Department of Transportation Federal Highway Administration issued a solicitation for the rehabilitation of approximately 11.4 miles of Arizona State Route 261 between the Town of Eagar and the intersection of State Route 273 in Apache County. The project scope includes pulverization and paving of the existing asphalt roadway, drainage improvements such as new pipe culverts ranging from 24 to 48 inches in diameter, lining of large diameter culverts from 60 to 66 inches, and new guardrail installation. Three bids were received by the January 5, 2023 deadline from KE&G, Hatch Construction & Paving, and SWP Contracting & Paving with bid totals ranging from $13.3 to $16.4 million. The engineer's estimate was $10.6 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AZ FLAP SR261(1) Tabulation of Bids.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-01042023.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-12202022.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-11302022.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-11222022.pdf | ||
| Interested Vendors List 11.04.22.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-11032022.pdf | ||
| Interested Vendors List 11.03.22.pdf | ||
| 6982AF22B000018.pdf | ||
| AZ FLAP SR261(1) Eagar to Crescent Lake Pavement Report Signed.pdf | ||
| FP-14_Eng.pdf | ||
| AZ FLAP SR261(1) Plans_Final.pdf | ||
| AZ FLAP 261(1) Eagar to Crescent Lake_Final Hydraulics Report_07282021.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: Eagar to Crescent Lake Project Number: AZ FLAP 261(1) Bid Opening Date: 01/05/2023 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Laura Vallejos
Amendments: (1)__11/30/22 _ (2)_12/02/22_________(3) (4)
Bidder’s Name Schedule A BID TOTAL
1. KE&G
Tucson, AZ
$19,506,062.00 $19,506,062.00
2. Hatch Construction & Paving, INC Taylor, AZ
$13,354.920.00 $13,354,920.00
3. SWP Contracting & Paving Glendale, AZ
$16,462,700.00 $16,462,700.00
4.
5.
6.
7.
Engineer’s Estimate
$10,649,937.00 $10,649,937.00
*All bids are subject to verification.
| Bid Opening Summary |
| Bid Opening Date: 01/05/2023 Time: 2:00 p.m. MST |
| *All bids are subject to verification. |
File details come from the government source that posted it. Updated .