AZ FLAP SR261(1) Eagar to Crescent Lake- QnA-11302022.pdf

PDF 189 KB Posted

Attached to
AZ FLAP SR261(1), Eagar to Crescent Lake
Solicitation number
6982AF22B000018
Issued by

About this file

This document provides questions and answers regarding a federal contract opportunity to rehabilitate approximately 11.4 miles of Arizona State Route 261 between Eagar and Crescent Lake. Work includes pulverization and paving of the existing asphalt roadway, as well as drainage improvements such as installing new pipe culverts ranging from 24 to 48 inches in diameter and lining large diameter culverts from 60 to 66 inches. Additional work involves new guardrail installation. Significant quantities include 33,000 tons of asphalt pavement, 1,000 cubic yards of riprap, 1,600 linear feet of pipe culvert, 600 linear feet of culvert lining, and 3,500 linear feet of guardrail. The federal agency is the Department of Transportation Federal Highway Administration. No pre-bid meeting is scheduled, and a construction operations engineer as well as project engineer will be assigned after contract award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ FLAP SR261(1), Eagar to Crescent Lake

November 30, 2022

Questions Answers 1 Will there be a pre-bid/pre-proposal meeting for this project and if so when and where will this take place? No pre-bid is scheduled for the project.

2 There are several locations on the plans that show culvert locations in bold but only call for these to be cleaned and not have a new culvert installed such as at sta 600+73. Is this correct?

Culverts identified to be cleaned will be cleaned under the 60704-0000 CLEANING CULVERT IN PLACE pay item. There will not be a new culvert installed at these locations

3 There is a culvert shown at approximately sta 605+00 that does not indicated what work is being performed please clarify this culvert location scope of work.

Refer to plan sheet C21, where work for this culvert is described. See also Drainage Summary Sheet B07.

4 Please confirm that no drainage culvert improvements are being performed under driveway/road turnouts/aprons as none are currently shown.

Culvert improvements proposed under driveways are show on the Plan Sheets and Drainage Summary Sheets.

5 Does the Government have a water source available for the contractors use?

No.

6 Due to the current volatility in the oil market and duration of project, will the Government add a price adjustment for fuel?

No, fuel price adjustment is not included.

7 Plan Sheet T05 Culvert Invert Liner Crossing Details Table. For the existing 60” Diameter Pipe, either the “X” dimension or the “Y” dimension appear to be incorrect. Please advise.

See Amendment A001

8 Who is the assigned Construction Operations Engineer? A COE will be assigned following contract award.

9 Who is the assigned Project Engineer? A PE will be assigned following contract award.