AZ FLAP SR261(1) Tabulation of Bids.pdf

PDF 669 KB Posted

Attached to
AZ FLAP SR261(1), Eagar to Crescent Lake Federal contract opportunity
Solicitation number
6982AF22B000018
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a bid tabulation report for a federal highway rehabilitation project in Arizona. The project consists of pulverizing and paving approximately 11.4 miles of State Route 261 between Eagar and Crescent Lake. It includes drainage improvements, pipe and large culvert installation, and new guardrail. Significant work includes 33,000 tons of asphalt pavement, 11.4 miles of full depth reclamation, 1,000 cubic yards of riprap, 1,600 feet of pipe culvert, 600 feet of culvert lining, and 3,500 feet of guardrail. The solicitation was issued by the Federal Highway Administration under number 6982AF22B000018. Three bids were received with values ranging from $13.3 million to $19.5 million. Hatch Construction & Paving Inc. provided the lowest bid of $13.3 million. The engineer's estimate was $10.6 million. Award has not yet been made.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 01/10/23

1 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF22B000018

Division: Central Federal Lands

State: AZ County: Apache

Federal Land: Apache Sitgreaves NF Opened at: Lakewood

Opened by:

Date: 01/05/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Hatch Construction & Paving Inc. $13,354,920.00

Stormwater Plans, LLC dba SWP Contracting and Paving $16,462,700.00 5624 N. 54th Avenue Glendale, AZ 85301

KE&G Construction, Inc. $19,515,962.00 1601 Paseo San Luis Sierra Vista, AZ 85635

Engineer's Estimate $10,649,937.00

2 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Hatch Construction & Paving Inc. Lump Sum $1,600,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $3,498,000.00 KE&G Construction, Inc. Lump Sum $1,647,846.85 Engineer's Estimate ALL LPSM Lump Sum $1,029,622.00

A0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Hatch Construction & Paving Inc. $5,000.00 $57,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $228,400.00 KE&G Construction, Inc. $59,191.00 $675,961.22 Engineer's Estimate 11.420 MILE $5,000.00 $57,100.00

A0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD

Hatch Construction & Paving Inc. $1,300.00 $20,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,000.00 $32,000.00 KE&G Construction, Inc. $5,957.00 $95,312.00 Engineer's Estimate 16 EACH $1,400.00 $22,400.00

A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Hatch Construction & Paving Inc. $1,000.00 $23,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $69,000.00 KE&G Construction, Inc. $4,144.00 $95,312.00 Engineer's Estimate 23 EACH $1,500.00 $34,500.00

A0100 15301-0000 CONTRACTOR QUALITY CONTROL

Hatch Construction & Paving Inc. Lump Sum $330,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $800,000.00 KE&G Construction, Inc. Lump Sum $699,298.00 Engineer's Estimate ALL LPSM Lump Sum $283,000.00

A0120 15401-0000 CONTRACTOR TESTING

Hatch Construction & Paving Inc. Lump Sum $535,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,200,000.00 KE&G Construction, Inc. Lump Sum $1,929,057.00 Engineer's Estimate ALL LPSM Lump Sum $283,000.00

3 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15501-0000 CONSTRUCTION SCHEDULE

Hatch Construction & Paving Inc. Lump Sum $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $20,000.00 KE&G Construction, Inc. Lump Sum $37,444.00 Engineer's Estimate ALL LPSM Lump Sum $47,200.00

A0160 15701-0000 SOIL EROSION CONTROL

Hatch Construction & Paving Inc. Lump Sum $312,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 KE&G Construction, Inc. Lump Sum $169,354.00 Engineer's Estimate ALL LPSM Lump Sum $56,000.00

A0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Hatch Construction & Paving Inc. Lump Sum $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $5,000.00 KE&G Construction, Inc. Lump Sum $8,581.00 Engineer's Estimate ALL LPSM Lump Sum $56,000.00

A0200 15802-0000 WATERING FOR DUST CONTROL

Hatch Construction & Paving Inc. Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $600,000.00 KE&G Construction, Inc. Lump Sum $536,809.00 Engineer's Estimate ALL LPSM Lump Sum $56,000.00

A0220 20101-0000 CLEARING AND GRUBBING

Hatch Construction & Paving Inc. $3,000.00 $45,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,000.00 $60,000.00 KE&G Construction, Inc. $2,006.00 $30,090.00 Engineer's Estimate 15.0 ACRE $3,200.00 $48,000.00

A0240 20301-0600 REMOVAL OF CATTLE GUARD

Hatch Construction & Paving Inc. $7,500.00 $22,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $8,000.00 $24,000.00 KE&G Construction, Inc. $1,242.00 $3,726.00 Engineer's Estimate 3 EACH $2,600.00 $7,800.00

4 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 20301-0700 REMOVAL OF DELINEATOR

Hatch Construction & Paving Inc. $75.00 $9,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $90.00 $10,800.00 KE&G Construction, Inc. $12.25 $1,470.00 Engineer's Estimate 120 EACH $40.00 $4,800.00

A0280 20301-1900 REMOVAL OF PIPE CULVERT

Hatch Construction & Paving Inc. $3,000.00 $90,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,000.00 $60,000.00 KE&G Construction, Inc. $602.00 $18,060.00 Engineer's Estimate 30 EACH $3,500.00 $105,000.00

A0300 20301-2400 REMOVAL OF SIGN

Hatch Construction & Paving Inc. $100.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $15,000.00 KE&G Construction, Inc. $92.35 $9,235.00 Engineer's Estimate 100 EACH $200.00 $20,000.00

A0320 20302-1200 REMOVAL OF GUARDRAIL

Hatch Construction & Paving Inc. $8.25 $35,475.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $15,050.00 KE&G Construction, Inc. $1.75 $7,525.00 Engineer's Estimate 4,300 LNFT $7.00 $30,100.00

A0340 20402-0000 SUBEXCAVATION

Hatch Construction & Paving Inc. $152.00 $152,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $130.00 $130,000.00 KE&G Construction, Inc. $152.60 $152,600.00 Engineer's Estimate 1,000 CUYD $100.00 $100,000.00

A0360 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

Hatch Construction & Paving Inc. $160.00 $4,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $550.00 $16,500.00 KE&G Construction, Inc. $165.90 $4,977.00 Engineer's Estimate 30 CUYD $195.00 $5,850.00

5 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Hatch Construction & Paving Inc. $160.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $350.00 $35,000.00 KE&G Construction, Inc. $156.30 $15,630.00 Engineer's Estimate 100 CUYD $200.00 $20,000.00

A0400 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4

Hatch Construction & Paving Inc. $160.00 $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $300.00 $75,000.00 KE&G Construction, Inc. $139.10 $34,775.00 Engineer's Estimate 250 CUYD $210.00 $52,500.00

A0420 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2

Hatch Construction & Paving Inc. $160.00 $11,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $435.00 $30,450.00 KE&G Construction, Inc. $152.25 $10,657.50 Engineer's Estimate 70 CUYD $198.00 $13,860.00

A0440 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

Hatch Construction & Paving Inc. $160.00 $6,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $390.00 $15,600.00 KE&G Construction, Inc. $177.90 $7,116.00 Engineer's Estimate 40 CUYD $200.00 $8,000.00

A0460 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

Hatch Construction & Paving Inc. $160.00 $92,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $116,000.00 KE&G Construction, Inc. $134.55 $78,039.00 Engineer's Estimate 580 CUYD $205.00 $118,900.00

A0480 25201-0000 SPECIAL ROCK EMBANKMENT

Hatch Construction & Paving Inc. $180.00 $9,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $360.00 $19,800.00 KE&G Construction, Inc. $134.55 $7,400.25 Engineer's Estimate 55 CUYD $205.00 $11,275.00

6 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2

Hatch Construction & Paving Inc. $60.00 $126,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $120.00 $252,000.00 KE&G Construction, Inc. $66.60 $139,860.00 Engineer's Estimate 2,100 TON $55.00 $115,500.00

A0520 30302-1000 DITCH RECONDITIONING

Hatch Construction & Paving Inc. $15.00 $12,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $47,300.00 KE&G Construction, Inc. $8.85 $7,611.00 Engineer's Estimate 860 LNFT $25.00 $21,500.00

A0540 30302-2000 SHOULDER RECONDITIONING

Hatch Construction & Paving Inc. $15.00 $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5.00 $10,000.00 KE&G Construction, Inc. $5.05 $10,100.00 Engineer's Estimate 2,000 LNFT $8.00 $16,000.00

A0560 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH

Hatch Construction & Paving Inc. $125,000.00 $1,427,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $100,000.00 $1,142,000.00 KE&G Construction, Inc. $59,439.00 $678,793.38 Engineer's Estimate 11.420 MILE $70,500.00 $805,110.00

A0600 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL

Hatch Construction & Paving Inc. $135.00 $4,482,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $127.25 $4,224,700.00 KE&G Construction, Inc. $201.30 $6,683,160.00 Engineer's Estimate 33,200 TON $125.00 $4,150,000.00

A0620 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Hatch Construction & Paving Inc. $250.00 $82,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $350.00 $115,500.00 KE&G Construction, Inc. $273.00 $90,090.00 Engineer's Estimate 330 TON $275.00 $90,750.00

7 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0660 40601-0000 FOG SEAL

Hatch Construction & Paving Inc. $1,000.00 $90,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $800.00 $72,000.00 KE&G Construction, Inc. $1,578.25 $142,042.50 Engineer's Estimate 90 TON $830.00 $74,700.00

A0680 41102-1000 PRIME COAT, METHOD 1

Hatch Construction & Paving Inc. $2.75 $568,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.50 $310,200.00 KE&G Construction, Inc. $1.90 $392,920.00 Engineer's Estimate 206,800 SQYD $0.65 $134,420.00

A0700 41105-0000 BLOTTER

Hatch Construction & Paving Inc. $40.00 $12,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $66,000.00 KE&G Construction, Inc. $50.25 $15,075.00 Engineer's Estimate 300 TON $30.00 $9,000.00

A0720 41201-0000 TACK COAT

Hatch Construction & Paving Inc. $1,500.00 $135,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,100.00 $99,000.00 KE&G Construction, Inc. $1,578.25 $142,042.50 Engineer's Estimate 90 TON $900.00 $81,000.00

A0740 60201-0800 24-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $160.00 $64,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $390.00 $156,000.00 KE&G Construction, Inc. $165.50 $66,200.00 Engineer's Estimate 400 LNFT $200.00 $80,000.00

A0760 60201-0900 30-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $200.00 $38,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $450.00 $85,500.00 KE&G Construction, Inc. $185.15 $35,178.50 Engineer's Estimate 190 LNFT $245.00 $46,550.00

8 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0780 60201-1000 36-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $320.00 $38,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $60,000.00 KE&G Construction, Inc. $265.35 $31,842.00 Engineer's Estimate 120 LNFT $295.00 $35,400.00

A0800 60201-1100 42-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $320.00 $112,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $365.00 $127,750.00 KE&G Construction, Inc. $284.48 $99,568.00 Engineer's Estimate 350 LNFT $360.00 $126,000.00

A0820 60201-1200 48-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $350.00 $35,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $430.00 $43,000.00 KE&G Construction, Inc. $329.29 $32,929.00 Engineer's Estimate 100 LNFT $370.00 $37,000.00

A0840 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $320.00 $20,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $460.00 $29,900.00 KE&G Construction, Inc. $247.06 $16,058.90 Engineer's Estimate 65 LNFT $320.00 $20,800.00

A0860 60202-0700 42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $350.00 $84,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $510.00 $122,400.00 KE&G Construction, Inc. $292.46 $70,190.40 Engineer's Estimate 240 LNFT $380.00 $91,200.00

A0880 60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $360.00 $21,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $565.00 $33,900.00 KE&G Construction, Inc. $487.80 $29,268.00 Engineer's Estimate 60 LNFT $450.00 $27,000.00

9 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0900 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $800.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,000.00 $40,000.00 KE&G Construction, Inc. $861.30 $17,226.00 Engineer's Estimate 20 EACH $1,025.00 $20,500.00

A0920 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $1,200.00 $12,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $25,000.00 KE&G Construction, Inc. $1,520.30 $15,203.00 Engineer's Estimate 10 EACH $1,150.00 $11,500.00

A0940 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $1,600.00 $12,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,100.00 $24,800.00 KE&G Construction, Inc. $1,754.00 $14,032.00 Engineer's Estimate 8 EACH $1,250.00 $10,000.00

A0960 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $2,200.00 $17,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,600.00 $20,800.00 KE&G Construction, Inc. $2,758.40 $22,067.20 Engineer's Estimate 8 EACH $1,910.00 $15,280.00

A0980 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $2,600.00 $5,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $10,000.00 KE&G Construction, Inc. $2,696.75 $5,393.50 Engineer's Estimate 2 EACH $2,250.00 $4,500.00

A1000 60211-0900 END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $2,600.00 $5,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $10,000.00 KE&G Construction, Inc. $1,661.80 $3,323.60 Engineer's Estimate 2 EACH $2,150.00 $4,300.00

10 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1020 60211-1100 END SECTION FOR 42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $2,200.00 $17,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6,000.00 $48,000.00 KE&G Construction, Inc. $3,061.05 $24,488.40 Engineer's Estimate 8 EACH $2,300.00 $18,400.00

A1040 60211-1200 END SECTION FOR 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Hatch Construction & Paving Inc. $2,800.00 $5,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6,000.00 $12,000.00 KE&G Construction, Inc. $3,201.50 $6,403.00 Engineer's Estimate 2 EACH $2,600.00 $5,200.00

A1060 60704-0000 CLEANING CULVERT IN PLACE

Hatch Construction & Paving Inc. $2,000.00 $100,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $150,000.00 KE&G Construction, Inc. $24,533.25 $1,226,662.50 Engineer's Estimate 50 EACH $1,700.00 $85,000.00

A1080 60707-1100 LINING 60-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $400.00 $76,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $385.00 $73,150.00 KE&G Construction, Inc. $552.70 $105,013.00 Engineer's Estimate 190 LNFT $1,300.00 $247,000.00

A1100 60707-1200 LINING 66-INCH PIPE CULVERT

Hatch Construction & Paving Inc. $400.00 $168,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $210,000.00 KE&G Construction, Inc. $555.75 $233,415.00 Engineer's Estimate 420 LNFT $1,600.00 $672,000.00

A1120 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS

Hatch Construction & Paving Inc. $53.00 $189,475.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $196,625.00 KE&G Construction, Inc. $84.80 $303,160.00 Engineer's Estimate 3,575.0 LNFT $50.00 $178,750.00

11 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1140 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Hatch Construction & Paving Inc. $10,400.00 $208,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,500.00 $110,000.00 KE&G Construction, Inc. $13,596.00 $271,920.00 Engineer's Estimate 20 EACH $5,600.00 $112,000.00

A1160 61702-1600 TERMINAL SECTION, TYPE MGS FLARED

Hatch Construction & Paving Inc. $9,500.00 $66,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,500.00 $38,500.00 KE&G Construction, Inc. $10,746.30 $75,224.10 Engineer's Estimate 7 EACH $5,000.00 $35,000.00

A1180 61901-0800 FENCE, BARBED WIRE, 3 STRAND

Hatch Construction & Paving Inc. $20.00 $1,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $4,950.00 KE&G Construction, Inc. $168.95 $15,205.50 Engineer's Estimate 90 LNFT $14.00 $1,260.00

A1200 61902-0900 GATE, METAL (8 FOOT)

Hatch Construction & Paving Inc. $5,000.00 $15,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $15,000.00 KE&G Construction, Inc. $31,202.70 $93,608.10 Engineer's Estimate 3 EACH $3,800.00 $11,400.00

A1220 61903-1100 CATTLE GUARD, 32 FEET

Hatch Construction & Paving Inc. $56,000.00 $168,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50,000.00 $150,000.00 KE&G Construction, Inc. $69,771.15 $209,313.45 Engineer's Estimate 3 EACH $30,150.00 $90,450.00

A1240 61920-2000 REMOVE AND RESET GATE

Hatch Construction & Paving Inc. $5,000.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $40,000.00 $40,000.00 KE&G Construction, Inc. $1,760.70 $1,760.70 Engineer's Estimate 1 EACH $1,800.00 $1,800.00

12 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1260 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Hatch Construction & Paving Inc. $140.00 $5,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $5,600.00 KE&G Construction, Inc. $304.45 $12,178.00 Engineer's Estimate 40 HOUR $135.00 $5,400.00

A1280 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Hatch Construction & Paving Inc. $85.00 $3,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $135.00 $5,400.00 KE&G Construction, Inc. $186.90 $7,476.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

A1300 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Hatch Construction & Paving Inc. $110.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $5,600.00 KE&G Construction, Inc. $212.60 $8,504.00 Engineer's Estimate 40 HOUR $145.00 $5,800.00

A1320 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER

Hatch Construction & Paving Inc. $400.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $2,250.00 KE&G Construction, Inc. $409.35 $4,093.50 Engineer's Estimate 10 HOUR $280.00 $2,800.00

A1340 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Hatch Construction & Paving Inc. $165.00 $33,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $30,000.00 KE&G Construction, Inc. $201.85 $40,370.00 Engineer's Estimate 200 HOUR $180.00 $36,000.00

A1360 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

Hatch Construction & Paving Inc. $150.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00 KE&G Construction, Inc. $265.80 $10,632.00 Engineer's Estimate 40 HOUR $155.00 $6,200.00

13 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1380 62301-0000 GENERAL LABOR

Hatch Construction & Paving Inc. $50.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $2,400.00 KE&G Construction, Inc. $43.30 $1,732.00 Engineer's Estimate 40 HOUR $50.00 $2,000.00

A1400 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Hatch Construction & Paving Inc. $75.00 $3,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00 KE&G Construction, Inc. $390.05 $15,602.00 Engineer's Estimate 40 HOUR $230.00 $9,200.00

A1420 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Hatch Construction & Paving Inc. $300.00 $24,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $17,600.00 KE&G Construction, Inc. $468.05 $37,444.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

A1440 62510-1000 SEEDING, DRY METHOD

Hatch Construction & Paving Inc. $1,750.00 $26,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $37,500.00 KE&G Construction, Inc. $1,482.15 $22,232.25 Engineer's Estimate 15.0 ACRE $2,500.00 $37,500.00

A1460 62515-1000 MULCHING, DRY METHOD

Hatch Construction & Paving Inc. $2,200.00 $33,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,700.00 $25,500.00 KE&G Construction, Inc. $36,273.15 $544,097.25 Engineer's Estimate 15.0 ACRE $2,200.00 $33,000.00

A1480 63301-0000 SIGN SYSTEM

Hatch Construction & Paving Inc. $680.00 $81,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,000.00 $120,000.00 KE&G Construction, Inc. $312.05 $37,446.00 Engineer's Estimate 120 EACH $650.00 $78,000.00

14 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1500 63308-3000 OBJECT MARKER, TYPE 3

Hatch Construction & Paving Inc. $250.00 $6,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $550.00 $13,750.00 KE&G Construction, Inc. $15.60 $390.00 Engineer's Estimate 25 EACH $300.00 $7,500.00

A1520 63309-0100 DELINEATOR, TYPE 1

Hatch Construction & Paving Inc. $250.00 $187,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $112,500.00 KE&G Construction, Inc. $15.60 $11,700.00 Engineer's Estimate 750 EACH $80.00 $60,000.00

A1540 63309-0200 DELINEATOR, TYPE 2

Hatch Construction & Paving Inc. $244.00 $46,360.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $28,500.00 KE&G Construction, Inc. $15.60 $2,964.00 Engineer's Estimate 190 EACH $90.00 $17,100.00

A1560 63316-1000 REMOVE AND RESET SIGN

Hatch Construction & Paving Inc. $250.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,250.00 $25,000.00 KE&G Construction, Inc. $312.05 $6,241.00 Engineer's Estimate 20 EACH $300.00 $6,000.00

A1580 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Hatch Construction & Paving Inc. $1,980.00 $146,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $950.00 $70,300.00 KE&G Construction, Inc. $1,746.50 $129,241.00 Engineer's Estimate 74.0 MILE $790.00 $58,460.00

A1600 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Hatch Construction & Paving Inc. $740.00 $11,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $11,250.00 KE&G Construction, Inc. $1,386.90 $20,803.50 Engineer's Estimate 15.0 MILE $650.00 $9,750.00

15 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1620 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Hatch Construction & Paving Inc. Lump Sum $100,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $250,000.00 KE&G Construction, Inc. Lump Sum $198,878.45 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

A1640 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Hatch Construction & Paving Inc. $290.00 $43,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $35.00 $5,250.00 KE&G Construction, Inc. $217.05 $32,557.50 Engineer's Estimate 150 EACH $30.00 $4,500.00

A1660 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Hatch Construction & Paving Inc. $290.00 $43,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $30.00 $4,500.00 KE&G Construction, Inc. $584.30 $87,645.00 Engineer's Estimate 150 EACH $50.00 $7,500.00

A1680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Hatch Construction & Paving Inc. $290.00 $43,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $9,750.00 KE&G Construction, Inc. $918.15 $137,722.50 Engineer's Estimate 150 EACH $90.00 $13,500.00

A1700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Hatch Construction & Paving Inc. $150.00 $80,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $24,075.00 KE&G Construction, Inc. $31.20 $16,692.00 Engineer's Estimate 535 SQFT $50.00 $26,750.00

A1720 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Hatch Construction & Paving Inc. $1,140.00 $52,440.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,000.00 $46,000.00 KE&G Construction, Inc. $1,952.00 $89,792.00 Engineer's Estimate 46.0 MILE $700.00 $32,200.00

16 out of 16

Project No: AZ FLAP SR261(1)

Project Name: Eagar to Crescent Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1740 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Hatch Construction & Paving Inc. $55.00 $88,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $104,000.00 KE&G Construction, Inc. $202.85 $324,560.00 Engineer's Estimate 1,600 HOUR $70.00 $112,000.00

A1760 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Hatch Construction & Paving Inc. $95.00 $45,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $38,400.00 KE&G Construction, Inc. $234.05 $112,344.00 Engineer's Estimate 480 HOUR $85.00 $40,800.00

Total Schedule - All Items

Hatch Construction & Paving Inc. $13,354,920.00 Stormwater Plans, LLC dba SWP Contracting and Paving $16,462,700.00 KE&G Construction, Inc. $19,515,962.00 Engineer's Estimate $10,649,937.00

2023-01-10T10:28:40-0700
LAURA ANN VALLEJOS

File details come from the government source that posted it. Updated .