QnA 5 10 2021.pdf
PDF 353 KB Posted
- Attached to
- OK ERFO SEQU T500(1)Horton Slough Trail
- Solicitation number
- 6982AF21B000012
About this file
This document contains questions and answers from a pre-solicitation conference call for a federal construction contract. The Oklahoma Ecological Services Field Office is seeking bids to repair three sites on the Horton Slough Trail within the Sequoyah National Wildlife Refuge that were damaged in 2019 floods. Work will include clearing, grubbing, construction of a pedestrian bridge, trail repairs, an observation deck, and asphalt patching. Significant line items include 250 cubic yards of embankment construction, 425 cubic yards of riprap, 120 tons of asphalt pavement, 30 cubic yards of structural concrete, 2,150 pounds of structural steel, one pre-fabricated steel bridge, and 18 helical piles. The estimated total cost range provided is $1,000,000 to $1,500,000. Interested bidders can access the project site independently as the refuge is open daily from 5:00 am to one hour after sunset.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for OK ERO SEQU T500(1), Horton Slough Trail
May 10, 2021
Questions Answers 1 Is there currently a site-visit scheduled or can we go on our own to inspect the project site?
There is no organized site visit. The site is accessible to interested bidders.
The refuge is open from 5am until 1 hour after sunset.