Bid Tabs - OK ERFO SEQU T500(1) Horton Slough Trail.pdf
PDF 664 KB Posted
- Attached to
- OK ERFO SEQU T500(1)Horton Slough Trail
- Solicitation number
- 6982AF21B000012
About this file
This document contains a bid tabulation report for the OK ERFO SEQU T500(1) Horton Slough Trail federal construction project. Four contractors submitted bids by the June 9, 2021 deadline to provide repairs to three sites within the Sequoyah National Wildlife Refuge damaged in 2019 floods, including clearing and grubbing, pedestrian bridge and trail construction, observation deck construction, and pavement patching. The estimated total project cost was $990,000 to $1,500,000. Randy Kinder Excavating, Inc. provided the lowest bid of $1,198,000.75. Higher bids came from Federal Constructors, Inc. at $1,324,920, Steve Beam Construction, Inc. at $1,429,753.79, and Mobley Contractors, Inc. at the highest bid of $2,397,864.92. The engineer's estimate was $990,000. The bid tabulation provides unit pricing and totals for over 50 line items. No award has been made as of the June 10, 2021 tabulation report date.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 06/10/21
1 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Solcitation No:
Division: Central Federal Lands
State: OK County: Sequoyah
Federal Land: Sequoyah National Wildlife Refuge Opened at: Lakewood, CO
Opened by: Jorey Deml
Date: 06/09/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Randy Kinder Excavating, Inc. $1,198,000.75 12965 Carrier Lane Dexter, MO 63841
Federal Constructors, Inc. $1,324,920.00 1900 NE 36th Street Suite 102 Oklahoma City, OK 73111
Steve Beam Construction, Inc. $1,429,753.79 7201 South 28th Street Fort Smith, AR 72908
Mobley Contractors, Inc. $2,397,864.92 952 Hwy 287 Morrilton, AR 72110
Engineer's Estimate $990,000.00
2 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0050 15101-0000 MOBILIZATION
Randy Kinder Excavating, Inc. Lump Sum $186,000.00 Federal Constructors, Inc. Lump Sum $162,900.00 Steve Beam Construction, Inc. Lump Sum $87,360.00 Mobley Contractors, Inc. Lump Sum $335,533.43 Engineer's Estimate ALL LPSM Lump Sum $139,670.00
A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (OBSERVATION DECK)
Randy Kinder Excavating, Inc. Lump Sum $3,948.00 Federal Constructors, Inc. Lump Sum $8,700.00 Steve Beam Construction, Inc. Lump Sum $5,280.00 Mobley Contractors, Inc. Lump Sum $5,113.60 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0150 15201-0000 CONSTRUCTION SURVEY AND STAKING
Randy Kinder Excavating, Inc. Lump Sum $3,290.00 Federal Constructors, Inc. Lump Sum $11,300.00 Steve Beam Construction, Inc. Lump Sum $3,240.00 Mobley Contractors, Inc. Lump Sum $16,464.13 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0200 15214-1000 SURVEY AND STAKING, BRIDGE
Randy Kinder Excavating, Inc. Lump Sum $7,895.00 Federal Constructors, Inc. Lump Sum $12,400.00 Steve Beam Construction, Inc. Lump Sum $7,440.00 Mobley Contractors, Inc. Lump Sum $8,470.95 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0250 15301-0000 CONTRACTOR QUALITY CONTROL
Randy Kinder Excavating, Inc. Lump Sum $57,275.00 Federal Constructors, Inc. Lump Sum $146,400.00 Steve Beam Construction, Inc. Lump Sum $34,090.00 Mobley Contractors, Inc. Lump Sum $334,959.38 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
A0300 15401-0000 CONTRACTOR TESTING
Randy Kinder Excavating, Inc. Lump Sum $26,315.00 Federal Constructors, Inc. Lump Sum $21,000.00 Steve Beam Construction, Inc. Lump Sum $4,820.00 Mobley Contractors, Inc. Lump Sum $56,091.65 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
3 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0350 15501-0000 CONSTRUCTION SCHEDULE
Randy Kinder Excavating, Inc. Lump Sum $6,580.00 Federal Constructors, Inc. Lump Sum $9,000.00 Steve Beam Construction, Inc. Lump Sum $9,590.00 Mobley Contractors, Inc. Lump Sum $12,226.00 Engineer's Estimate ALL LPSM Lump Sum $4,000.00
A0400 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Randy Kinder Excavating, Inc. $3.57 $3,570.00 Federal Constructors, Inc. $8.20 $8,200.00 Steve Beam Construction, Inc. $9.48 $9,480.00 Mobley Contractors, Inc. $9.47 $9,470.00 Engineer's Estimate 1,000 LNFT $5.00 $5,000.00
A0450 15802-0000 WATERING FOR DUST CONTROL
Randy Kinder Excavating, Inc. Lump Sum $10,000.00 Federal Constructors, Inc. Lump Sum $29,000.00 Steve Beam Construction, Inc. Lump Sum $7,050.00 Mobley Contractors, Inc. Lump Sum $4,915.51 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0500 20102-0000 CLEARING AND GRUBBING
Randy Kinder Excavating, Inc. Lump Sum $89,285.00 Federal Constructors, Inc. Lump Sum $42,000.00 Steve Beam Construction, Inc. Lump Sum $20,940.00 Mobley Contractors, Inc. Lump Sum $97,016.70 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0550 20103-0000 CLEARING AND GRUBBING
Randy Kinder Excavating, Inc. $13.00 $9,100.00 Federal Constructors, Inc. $12.00 $8,400.00 Steve Beam Construction, Inc. $20.00 $14,000.00 Mobley Contractors, Inc. $110.53 $77,371.00 Engineer's Estimate 700 SQYD $30.00 $21,000.00
A0600 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Randy Kinder Excavating, Inc. Lump Sum $5,530.00 Federal Constructors, Inc. Lump Sum $46,000.00 Steve Beam Construction, Inc. Lump Sum $6,720.00 Mobley Contractors, Inc. Lump Sum $27,284.06 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
4 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0650 20304-2000 REMOVAL OF BRIDGE
Randy Kinder Excavating, Inc. Lump Sum $8,962.00 Federal Constructors, Inc. Lump Sum $31,000.00 Steve Beam Construction, Inc. Lump Sum $34,370.00 Mobley Contractors, Inc. Lump Sum $41,524.56 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0700 20401-0000 ROADWAY EXCAVATION
Randy Kinder Excavating, Inc. $37.00 $1,295.00 Federal Constructors, Inc. $80.00 $2,800.00 Steve Beam Construction, Inc. $90.00 $3,150.00 Mobley Contractors, Inc. $146.85 $5,139.75 Engineer's Estimate 35 CUYD $80.00 $2,800.00
A0750 20420-0000 EMBANKMENT CONSTRUCTION
Randy Kinder Excavating, Inc. $47.90 $11,017.00 Federal Constructors, Inc. $122.00 $28,060.00 Steve Beam Construction, Inc. $73.50 $16,905.00 Mobley Contractors, Inc. $169.65 $39,019.50 Engineer's Estimate 230 CUYD $90.00 $20,700.00
A0800 20801-0000 STRUCTURE EXCAVATION
Randy Kinder Excavating, Inc. $63.00 $4,410.00 Federal Constructors, Inc. $93.00 $6,510.00 Steve Beam Construction, Inc. $42.50 $2,975.00 Mobley Contractors, Inc. $156.62 $10,963.40 Engineer's Estimate 70 CUYD $100.00 $7,000.00
A0850 20803-0000 STRUCTURAL BACKFILL
Randy Kinder Excavating, Inc. $112.00 $6,384.00 Federal Constructors, Inc. $130.00 $7,410.00 Steve Beam Construction, Inc. $150.00 $8,550.00 Mobley Contractors, Inc. $591.49 $33,714.93 Engineer's Estimate 57 CUYD $100.00 $5,700.00
A0900 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
Randy Kinder Excavating, Inc. $204.20 $4,084.00 Federal Constructors, Inc. $124.00 $2,480.00 Steve Beam Construction, Inc. $217.00 $4,340.00 Mobley Contractors, Inc. $273.34 $5,466.80 Engineer's Estimate 20 CUYD $120.00 $2,400.00
5 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0950 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5
Randy Kinder Excavating, Inc. $84.20 $46,310.00 Federal Constructors, Inc. $149.00 $81,950.00 Steve Beam Construction, Inc. $183.00 $100,650.00 Mobley Contractors, Inc. $146.92 $80,806.00 Engineer's Estimate 550 CUYD $160.00 $88,000.00
A1000 30202-2000 ROADWAY AGGREGATE, METHOD 2
Randy Kinder Excavating, Inc. $35.00 $4,900.00 Federal Constructors, Inc. $43.00 $6,020.00 Steve Beam Construction, Inc. $150.00 $21,000.00 Mobley Contractors, Inc. $76.07 $10,649.80 Engineer's Estimate 140 TON $80.00 $11,200.00
A1050 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2
Randy Kinder Excavating, Inc. $315.80 $37,896.00 Federal Constructors, Inc. $224.00 $26,880.00 Steve Beam Construction, Inc. $416.00 $49,920.00 Mobley Contractors, Inc. $268.75 $32,250.00 Engineer's Estimate 120 TON $400.00 $48,000.00
A1100 41102-1000 PRIME COAT, METHOD 1
Randy Kinder Excavating, Inc. $3.95 $2,844.00 Federal Constructors, Inc. $8.00 $5,760.00 Steve Beam Construction, Inc. $1.63 $1,173.60 Mobley Contractors, Inc. $3.75 $2,700.00 Engineer's Estimate 720 SQYD $2.50 $1,800.00
A1150 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Randy Kinder Excavating, Inc. $1,088.00 $28,288.00 Federal Constructors, Inc. $925.00 $24,050.00 Steve Beam Construction, Inc. $1,200.00 $31,200.00 Mobley Contractors, Inc. $2,017.65 $52,458.90 Engineer's Estimate 26 CUYD $2,000.00 $52,000.00
A1200 55401-1000 REINFORCING STEEL
Randy Kinder Excavating, Inc. $3.32 $9,628.00 Federal Constructors, Inc. $1.50 $4,350.00 Steve Beam Construction, Inc. $3.50 $10,150.00 Mobley Contractors, Inc. $3.66 $10,614.00 Engineer's Estimate 2,900 LB $2.00 $5,800.00
6 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1250 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED
Randy Kinder Excavating, Inc. $23.45 $54,404.00 Federal Constructors, Inc. $13.00 $30,160.00 Steve Beam Construction, Inc. $14.52 $33,686.40 Mobley Contractors, Inc. $20.43 $47,397.60 Engineer's Estimate 2,320 LB $14.00 $32,480.00
A1300 55504-0000 PRE-FABRICATED STEEL BRIDGE (SINGLE SPAN MODULAR STEEL PEDESTRIAN BRIDGE)
Randy Kinder Excavating, Inc. Lump Sum $374,825.00 Federal Constructors, Inc. Lump Sum $431,900.00 Steve Beam Construction, Inc. Lump Sum $700,000.00 Mobley Contractors, Inc. Lump Sum $751,461.18 Engineer's Estimate ALL LPSM Lump Sum $290,000.00
A1350 55601-0900 BRIDGE RAILING, STEEL (BRIDGE)
Randy Kinder Excavating, Inc. $244.00 $8,784.00 Federal Constructors, Inc. $110.00 $3,960.00 Steve Beam Construction, Inc. $600.00 $21,600.00 Mobley Contractors, Inc. $706.11 $25,419.96 Engineer's Estimate 36 LNFT $200.00 $7,200.00
A1400 55601-0900 BRIDGE RAILING, STEEL (OBSERVATION DECK)
Randy Kinder Excavating, Inc. $146.00 $4,672.00 Federal Constructors, Inc. $110.00 $3,520.00 Steve Beam Construction, Inc. $600.00 $19,200.00 Mobley Contractors, Inc. $1,452.95 $46,494.40 Engineer's Estimate 32 LNFT $50.00 $1,600.00
A1450 55701-3000 STRUCTURAL TIMBER AND LUMBER, COMPOSITE
Randy Kinder Excavating, Inc. $21,575.00 $2,804.75 Federal Constructors, Inc. $46,000.00 $5,980.00 Steve Beam Construction, Inc. $25,352.25 $3,295.79 Mobley Contractors, Inc. $85,273.75 $11,085.59 Engineer's Estimate 0.13 MFBM $15,000.00 $1,950.00
A1500 58202-0000 HELICAL PILE, IN PLACE (Observation Decks)
Randy Kinder Excavating, Inc. $3,605.00 $28,840.00 Federal Constructors, Inc. $1,700.00 $13,600.00 Steve Beam Construction, Inc. $4,330.00 $34,640.00 Mobley Contractors, Inc. $2,315.78 $18,526.24 Engineer's Estimate 8 EACH $4,000.00 $32,000.00
7 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1550 58202-0000 HELICAL PILE, IN PLACE (Bridge)
Randy Kinder Excavating, Inc. $10,275.00 $102,750.00 Federal Constructors, Inc. $1,700.00 $17,000.00 Steve Beam Construction, Inc. $6,657.00 $66,570.00 Mobley Contractors, Inc. $4,998.39 $49,983.90 Engineer's Estimate 10 EACH $5,000.00 $50,000.00
A1600 60101-0000 CONCRETE
Randy Kinder Excavating, Inc. $828.50 $6,628.00 Federal Constructors, Inc. $900.00 $7,200.00 Steve Beam Construction, Inc. $1,700.00 $13,600.00 Mobley Contractors, Inc. $2,601.40 $20,811.20 Engineer's Estimate 8 CUYD $2,000.00 $16,000.00
A1650 60801-0400 PAVED WATERWAY, TYPE 4
Randy Kinder Excavating, Inc. $92.00 $1,840.00 Federal Constructors, Inc. $210.00 $4,200.00 Steve Beam Construction, Inc. $181.00 $3,620.00 Mobley Contractors, Inc. $125.00 $2,500.00 Engineer's Estimate 20 SQYD $300.00 $6,000.00
A1700 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY
Randy Kinder Excavating, Inc. $111.00 $2,220.00 Federal Constructors, Inc. $120.00 $2,400.00 Steve Beam Construction, Inc. $114.00 $2,280.00 Mobley Contractors, Inc. $159.23 $3,184.60 Engineer's Estimate 20 HOUR $120.00 $2,400.00
A1750 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
Randy Kinder Excavating, Inc. $91.00 $1,820.00 Federal Constructors, Inc. $100.00 $2,000.00 Steve Beam Construction, Inc. $104.00 $2,080.00 Mobley Contractors, Inc. $45.71 $914.20 Engineer's Estimate 20 HOUR $150.00 $3,000.00
A1800 62301-0000 GENERAL LABOR
Randy Kinder Excavating, Inc. $49.00 $1,960.00 Federal Constructors, Inc. $52.00 $2,080.00 Steve Beam Construction, Inc. $100.00 $4,000.00 Mobley Contractors, Inc. $102.95 $4,118.00 Engineer's Estimate 40 HOUR $30.00 $1,200.00
8 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1850 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Randy Kinder Excavating, Inc. $205.60 $4,112.00 Federal Constructors, Inc. $165.00 $3,300.00 Steve Beam Construction, Inc. $160.00 $3,200.00 Mobley Contractors, Inc. $98.38 $1,967.60 Engineer's Estimate 20 HOUR $125.00 $2,500.00
A1900 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Randy Kinder Excavating, Inc. $275.00 $5,500.00 Federal Constructors, Inc. $180.00 $3,600.00 Steve Beam Construction, Inc. $198.00 $3,960.00 Mobley Contractors, Inc. $1,027.87 $20,557.40 Engineer's Estimate 20 HOUR $180.00 $3,600.00
A1950 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST)
Randy Kinder Excavating, Inc. Lump Sum $3,290.00 Federal Constructors, Inc. Lump Sum $7,200.00 Steve Beam Construction, Inc. Lump Sum $3,600.00 Mobley Contractors, Inc. Lump Sum $1,875.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A2000 62511-2000 SEEDING, HYDRAULIC METHOD
Randy Kinder Excavating, Inc. $0.81 $4,050.00 Federal Constructors, Inc. $1.60 $8,000.00 Steve Beam Construction, Inc. $0.54 $2,700.00 Mobley Contractors, Inc. $1.72 $8,600.00 Engineer's Estimate 5,000 SQYD $1.00 $5,000.00
A2050 62516-2000 MULCHING, HYDRAULIC METHOD
Randy Kinder Excavating, Inc. $0.81 $4,050.00 Federal Constructors, Inc. $0.85 $4,250.00 Steve Beam Construction, Inc. $0.54 $2,700.00 Mobley Contractors, Inc. $1.72 $8,600.00 Engineer's Estimate 5,000 SQYD $1.00 $5,000.00
A2100 63501-0000 TEMPORARY TRAFFIC CONTROL
Randy Kinder Excavating, Inc. Lump Sum $6,575.00 Federal Constructors, Inc. Lump Sum $13,900.00 Steve Beam Construction, Inc. Lump Sum $5,550.00 Mobley Contractors, Inc. Lump Sum $33,231.31 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
9 out of 9Source Selection Information - See FAR 2.101 & 3.104
Project No: OK ERFO SEQU T500(1)
Project Name: Horton Slough Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A2150 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Randy Kinder Excavating, Inc. $4.00 $800.00 Federal Constructors, Inc. $9.00 $1,800.00 Steve Beam Construction, Inc. $9.80 $1,960.00 Mobley Contractors, Inc. $12.50 $2,500.00 Engineer's Estimate 200 LNFT $5.00 $1,000.00
A2200 64620-0000 REMOVE AND RESET (OBSERVATION DECK)
Randy Kinder Excavating, Inc. $3,270.00 $3,270.00 Federal Constructors, Inc. $26,300.00 $26,300.00 Steve Beam Construction, Inc. $7,118.00 $7,118.00 Mobley Contractors, Inc. $28,412.69 $28,412.69 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
Total Schedule - All Items
Randy Kinder Excavating, Inc. $1,198,000.75 Federal Constructors, Inc. $1,324,920.00 Steve Beam Construction, Inc. $1,429,753.79 Mobley Contractors, Inc. $2,397,864.92 Engineer's Estimate $990,000.00
| 2021-06-10T15:25:51-0600 | |
| JOREY M DEML |