Amendment A002.pdf

PDF 3 MB Posted

Attached to
OK ERFO SEQU T500(1)Horton Slough Trail
Solicitation number
6982AF21B000012
Issued by

About this file

This document package includes plans and specifications for a federal construction project along with the related solicitation. The project will provide repairs to three sites within the Sequoyah National Wildlife Refuge in Oklahoma damaged during 2019 flood events, including clearing and grubbing, pedestrian bridge construction, trail construction, and observation deck construction. Significant construction quantities include 250 cubic yards of embankment, 425 cubic yards of riprap, 120 tons of asphalt pavement, 30 cubic yards of structural concrete, 2,150 pounds of structural steel, and 18 helical piles. The estimated total cost of the project ranges from $1,000,000 to $1,500,000. The solicitation was issued by the Federal Highway Administration within the Department of Transportation to repair damage from flooding at locations within the Sequoyah National Wildlife Refuge in Sequoyah County, Oklahoma.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80'40'0

Scale in Feet

SAND TOWN WOODS AREA

Sheet 1 of 3

OK C1

trail realignment

To Deck #4 and

Approximate area of embankment to be repaired

Do not disturb.

Deck #2

Class 5 riprap

Geotextile

RIPRAP DETAIL

30'

85'

Tie into existing riprap

1:

m ax

Approx. 20'

Concrete approach.

See S sheets for details.

Concrete approach.

See S sheets for details.

OHWM

See riprap detail above.

20'x85'x4' of riprap.

asphalt approach and approx.

Replace embankment and

See Sheets S17-S22.

existing deck on new foundation.

Rebuild foundation and reset

Observation Deck #3

See asphalt typical section on C2.

See riprap detail above.

(subsidiary to asphalt pay item).

Stripe to match existing parking lot asphalt approach to deck.

Replace embankment, riprap, and

See sheets S11-S16.

deck on new foundation.

Rebuild foundation and install new

Observation Deck #1

Approx. final grade existing grade

Approx.

material embankment

Replace lost to be repaired

Approx. area of embankment

Staging Area

1 5/24/21 Change pay item to 25101-0500, Placed Riprap, Method A, Class 5

AMENDMENT A001

REVISED: MAY 24,2021

STATE PROJECT

P

M N O

K e r fo

T R o a d w a y C

A D

D S h e e ts C

M L P

P C .d g n

U s e r k e ll y .t e r r e ll

NUMBER

SHEET

Horton Slough Trail

OK ERFO SEQU T500(1)

OK

A002 05/25/2021

Sheet and Description

B3 B3 B3 S2 S12 S18

Sand Town Woods

Fishing Bridge Parking

Horton Slough Trail

Horton Slough Pedestrian

Bridge

Observation Deck #1

Observation Deck #3 Allowance Bid

Schedule

A0050 15101-0000 MOBILIZATION LPSM ALL

A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (OBSERVATION DECK) LPSM All All ALL

A0150 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM All All All ALL

A0200 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL

A0250 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0300 15401-0000 CONTRACTOR TESTING LPSM ALL

A0350 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0400 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 600 120 213 67 1,000

A0450 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0500 20102-0000 CLEARING AND GRUBBING LPSM All ALL

A0550 20103-0000 CLEARING AND GRUBBING SQYD 471 171 58 700

A0600 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM All All ALL

A0650 20304-2000 REMOVAL OF BRIDGE LPSM All ALL

A0700 20401-0000 ROADWAY EXCAVATION CUYD 33 2 35

A0750 20420-0000 EMBANKMENT CONSTRUCTION CUYD 200 20 10 230

A0800 20801-0000 STRUCTURE EXCAVATION CUYD 70 70 Contract Quantity

A0850 20803-0000 STRUCTURAL BACKFILL CUYD 57 57 Contract Quantity

A0900 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 16 4 20

A0950 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 CUYD 519 31 550

A1000 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 67 31 13 29 140

A1050 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 70 33 14 3 120

A1100 41102-1000 PRIME COAT, METHOD 1 SQYD 428 200 83 9 720

A1150 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 26 26 Contract Quantity

A1200 55401-1000 REINFORCING STEEL LB 2,300 300 300 2,900 Contract Quantity

A1250 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED LB 2,100 220 2,320 Contract Quantity

A1300 55504-0000 PRE-FABRICATED STEEL BRIDGE (SINGLE SPAN MODULAR STEEL

PEDESTRIAN BRIDGE) LPSM All ALL

A1350 55601-0900 BRIDGE RAILING, STEEL (BRIDGE) LNFT 36 36 Contract Quantity

A1400 55601-0900 BRIDGE RAILING, STEEL (OBSERVATION DECK) LNFT 32 32 Contract Quantity

A1450 55701-3000 STRUCTURAL TIMBER AND LUMBER, COMPOSITE MFBM 0.13 0.13 Contract Quantity

A1500 58202-0000 HELICAL PILE, IN PLACE (Observation Decks) EACH 4 4 8 Contract Quantity

A1550 58202-0000 HELICAL PILE, IN PLACE (Bridge) EACH 10 10 Contract Quantity

A1600 60101-0000 CONCRETE CUYD 4 4 8 Contract Quantity

A1650 60801-0400 PAVED WATERWAY, TYPE 4 SQYD 20 20

A1700 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY HOUR 20

A1750 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY

BUCKET, 18-INCH WIDTH HOUR 20

A1800 62301-0000 GENERAL LABOR HOUR 40

A1850 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20

A1900 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20

MileStone: 100% Date Completed: 05/25/21 Report Date: 05/25/21

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-M ay

-2

5:

A

M

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

N

O K \e rf oT

0(

1) \R oa dw ay \C

A D

D _S he et s\ B -S um m

\S pr ea ds he et s\ [S

O Q

.x ls m ]S he et

STATE PROJECT

B1ERFO SEQU T500(1)

Horton Slough TrailOK

SHEET

NUMBER

AMENDMENT A001 1 5/24/24 Change pay item to 25101-0500, Placed Riprap, Method A, Class 5

Composite timber decking

Observation deck steel framing

" gap2

16'-0"

Railing post, (typ.)

Arkansas River

Concrete approach

20'-0"

2'-0" 2'-0"

0%

N

8"

6" chamfer with turndown

Concrete approach

4'-0"

Steel deck framing (below)

Helical pile, (typ.)

Helical pile, (typ.)

2:

MAX

9" 9"

See RG3185-P for details.

Deck attachment, (typ.)

See RG3185-P for details.

Deck attachment pavement elevation

Match existing

E =2855580.397

N = 174134.123*

8'-0" 8'-0" with CO prior to helical pile installation.

* Verify location and orientation of observation deck

K11

UNLESS NOTED

"= 1'-0"8

D. MICNHIMERN. MARSHALLN. MARSHALL

S11

PLAN & ELEVATION

OBSERVATION DECK #1

PLAN

OBSERVATION DECK #1 WORK

Chainlink fencing (typ.)

TYPICAL SECTION

Lifting eyebolt (typ.)

m in e m b e d m e n t

See Sheet C1 for details.

Placed riprap, method A, class 5 m in e m b e d m e n t of Observation Deck #1.

Place riprap. Place prefabricated observation deck. See Sheet C1 for location pile and riprap installation. Install helical pile and concrete approach.

Remove existing deck foundations in water as needed to facilitate helical

8'-0" chainlink fencing

Steel bridge railing with

5'-0"

P o s t

S p a c in g

5'-10" 4'-0"

Line

Layout

5'-10" 2"

Post Spacing 2"

1" thick x 6" wide (nominal)

Composite timber decking

1 5/24/21 Riprap class modification NM

SHEET

NO.

PROJECTSTATE

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS

BY

DATENO.

REVISIONS

/2

/2

N

O

K \e rf o

T

(1

B ri d g e \R

G

\C

A D

D F il e s \D

G N

F il e s \r g o b s e rv a ti o n d e c k

.d g n

RG3185-

OK

U.S. DEPARTMENT OF TRANSPORTATION

HORTON SLOUGH PEDESTRIAN BRIDGE

SEQUOYAH NATIONAL WILDLIFE REFUGE

SEQUOYAH COUNTY, OKLAHOMA

BONNIE KLAMERUS

ERFO T500(1)

of 22 MAY 2021

Composite timber decking

Observation deck steel framing

" gap2

16'-0"

Composite timber decking

Railing post, (typ.)

Arkansas River

Concrete approach

20'-0"

2'-0" 2'-0"

N

0%

4'-0"

Steel deck framing (below)

Helical pile, (typ.)

See RG3185-V for details.

Deck attachment, (typ.)

See RG3185-V for details.

Deck attachment

See RG3185-V for details.

with turndown

Concrete approach

E =2855572.344

N = 173712.733* with CO prior to helical pile installation.

* Verify location and orientation of observation deck

Layout Line trail elevation

Match existing

Q17

UNLESS NOTED

"= 1'-0"8

D. MICNHIMERN. MARSHALLN. MARSHALL

S17

PLAN & ELEVATION

OBSERVATION DECK #3

PLAN

OBSERVATION DECK #3 WORK

Bring discrepancies to the attention of the CO immediately.

Verify actual dimensions in the field.

Dimensions shown for existing elements are rough measurements.

8"

Helical pile, (typ.)

2:

MAX

See Sheet C1 for details.

Placed riprap, method A, class 5

8'-0" 8'-0"

TYPICAL SECTION

m in e m b e d m e n t m in e m b e d m e n t

5'-0"

See Sheet C1 for location of Observation Deck #3.

Reset existing observation deck on new foundations.

Install helical pile and concrete approach. Place riprap.

Remove existing deck foundations and approaches in the water.

Remove and set aside existing observation deck.

1 5/24/21 NM Riprap class modification

SHEET

NO.

PROJECTSTATE

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS

REVISIONS

/2

/2

N

O

K \e rf o

T

(1

B ri d g e \R

G

\C

A D

D F il e s \D

G N

F il e s \r g o b s e rv a ti o n d e c k

.d g n

RG3185-

OK

U.S. DEPARTMENT OF TRANSPORTATION

HORTON SLOUGH PEDESTRIAN BRIDGE

SEQUOYAH NATIONAL WILDLIFE REFUGE

SEQUOYAH COUNTY, OKLAHOMA

BONNIE KLAMERUS

ERFO T500(1)

of 22 MAY 2021

File details come from the government source that posted it. Updated .