Interested Vendor List 5 17 2021.pdf
PDF 212 KB Posted
- Attached to
- OK ERFO SEQU T500(1)Horton Slough Trail
- Solicitation number
- 6982AF21B000012
About this file
This federal contract opportunity solicitation seeks construction services for repairs to trails and infrastructure damaged in 2019 flooding at the Sequoyah National Wildlife Refuge in Oklahoma. The project includes clearing and grubbing, construction of a pedestrian bridge, trail construction, an observation deck, and pavement patching. Significant work items include 250 cubic yards of embankment construction, 425 cubic yards of riprap, 120 tons of asphalt pavement, 30 cubic yards of structural concrete, 2150 pounds of structural steel to be furnished, fabricated and erected, one pre-fabricated steel bridge, and 18 helical piles installed. The estimated total cost of the project is between $1,000,000 to $1,500,000. Interested vendors can obtain the plans and specifications for the OK ERFO SEQU T500(1) Horton Slough Trail project through the Federal Highway Administration.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .