Amendment 002.pdf
PDF 755 KB Posted
- Attached to
- Construction Inspection IDIQ Federal contract opportunity
- Solicitation number
- 6982AF20R000005
About this file
This document provides details on a federal contract opportunity for construction inspection services. The solicitation is being issued by the Federal Highway Administration Central Federal Lands Highway Division to establish multiple Indefinite Delivery Indefinite Quantity contracts for on-site construction inspection and contract administration architectural and engineering services. Interested firms are required to submit qualifications by November 17-19, 2020 or December 1-3, 2020 to be evaluated based on experience, past performance, organizational structure, and key personnel. Selection will occur in two stages, with an initial evaluation of submitted qualifications leading to interviews of shortlisted firms. The opportunity includes a partial small business set-aside, covers project locations across the 14-state CFLHD region, and requires capability to provide qualified staff on short notice for assignments ranging from 3-24 months.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA 10.15.2020.pdf | ||
| Amendment A004.pdf | ||
| QnA 10.9.2020.pdf | ||
| Amendment 003.pdf | ||
| QnA 10.2.2020.pdf | ||
| Amendment 001.pdf | ||
| RFQ 6982AF20R000005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGE OF PAGES
6982AF20R000005
Construction Inspection
9/22/2020
This requirement is being advertised on a full and open basis with a partial small business set-aside.
SELECTION PROCESS
This RFQ is the only notification that is required or that will be made for this Brooks Act acquisition. The A-E Firm as used in this RFQ means an individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the profession of architecture or engineering that will have contractual responsibility for construction management and other services identified in the Statement of Work. The A-E selection will be completed in two stages as follows: In the first stage, represented by this request for qualifications, the interested A-E firms will submit portfolios of accomplishments and qualifications in response to the submission requirements and Evaluation Factors 1-5 identified below. The government will evaluate submissions and develop a short-list of the highest qualified firms.
In the second stage, the short-listed firms and representatives from their teams will be invited either virtually or in-person at Central Federal Lands Highway Division located in Lakewood, Colorado for the presentation and interview process that will occur November 17-19, 2020 and December 1-3, 2020. Evaluations from both stages will be used by the government to select the highest qualified firm(s) for negotiations. Offerors should be prepared to discuss all aspects of the evaluation factors and demonstrate their ability to fulfill all project requirements. Key representative staff from the offeror’s team (prime and subconsultants) should attend the interview. Emphasis will be placed on the firm’s understanding of the unique aspects of CFLHD projects, providing qualified personnel, personnel management process, and internal quality assurance processes.
SUBMISSION REQUIREMENTS AND EVALUATIONS:
Firms that have the qualifications to perform the services described above and wish to be considered for these contracts shall submit a qualifications package to include a Standard Form (SF) 330 Architect-Engineer Qualifications, parts I and II, as well as a response to the evaluation factors 1-5 outlined below. Provide one (1) original and five (5) copies of each qualifications package. The SF 330 may be obtained from http://www.gsa.gov/forms/far.htm. Failure to submit a package with all required documentation outlined in this synopsis may result in disqualification of the firm. All documentation will be in an 8.5 x 11inch format using a minimum 10 pt. Times New Roman Font when responding to evaluation factors. It should also be spiral bound, and developed and assembled in a manner that chronologically corresponds to and addresses the technical Evaluation Factors. The entire qualification package should not exceed 35 double-sided pages for a total of 70 pages. Only page numbers 1-70 will be considered during evaluations.
Cover letter, tabs and back cover will not be counted toward the page limit. SF 330’s will be
Amendment A002 September 28, 2020
| topmostSubform[0]: |
| Page1[0]: |
| ContractIDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 2 |
| AmendmentNo[0]: A002 |
| EffectiveDate[0]: 10/02/2020 |
| ReqNumber[0]: |
| ProjectNo[0]: Construction Inspection IDIQ |
| IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: CRAIG HOLSOPPLE
| Code[0]: 6905001 |
| AdministeredBy[0]: |
| Code[2]: |
| NameandAddress[0]: |
| Code[1]: |
| FacilityCode[0]: |
| CheckBox9[0]: 1 |
| AmendmentNo[1]: 6982AF20R000005 |
| Dated9B[0]: 2/22/2020 |
| CheckBox10[0]: Off |
| ModificationNo[0]: |
| Dated10B[0]: |
| CheckBox11[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| Copies[0]: 0* |
| AccountingData[0]: |
| CheckBox13A[0]: Off |
| A13[0]: |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| C13[0]: |
| CheckBox13D[0]: Off |
| D13[0]: |
| IsNot[0]: Off |
| Is[0]: 1 |
| CopiesReturned[0]: *See Item 14 |
| Description[0]: |
Remove and replace page 11 of the RFQ with the attached corresponding page.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| NameandTitleSigner[0]: |
| DateSigned[0]: |
| NameandTitleOfficer[0]: |
| DateSigned[1]: |
File details come from the government source that posted it. Updated .