About this file

Attachment A is an amendment to Solicitation 697DCK-25-R-00408 for the PHX ARSR HVAC Replacement project, specifically adding the AMS Clause 3.6.4-18 Certification Regarding Steel and Manufactured Goods. The clause requires offerors to certify that the steel and manufactured goods provided are either entirely produced in the United States or that at least 60 percent of the component costs are from U.S. production, with final assembly occurring in the United States.

This certification is part of a broader Federal Aviation Administration (FAA) solicitation for a small business set-aside contract to replace HVAC units at a Phoenix facility. The project involves removing five existing HVAC units, installing two 15-ton packaged HVAC units, two V-PAC wall-mounted systems, and associated ductwork and controls. The estimated project cost ranges from $200,000 to $400,000, with a performance period of approximately 60 calendar days, and proposals are due by August 14, 2025, at 3:00 PM EDT.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

July 28, 2025

Amendment 0001

697DCK-25-R-00408

PHX ARSR HVAC Replacement

AMS Clause - 3.6.4-18

Certification Regarding Steel and Manufactured Goods (APR 2022)

In accordance with 49 USC Section 50101, the offeror/contractor certifies that: (Check one) [ ] The steel and manufactured goods, including components and subcomponents provided in accordance with this contract are entirely produced in United States (or deemed United States produced pursuant to

International Agreement) [ ] The cost of components and subcomponents produced in the United States is more than 60 percent of the cost of all components of the facility or equipment and final assembly of the facility or equipment has occurred in the United States.