The file contains an Excel spreadsheet (PHL ATCT Square Footage.xlsx) detailing room and area measurements for the Philadelphia Air Traffic Control Tower. The spreadsheet provides a comprehensive breakdown of square footage for various rooms and spaces, including tower cab (575 sq ft), elevator areas, stairwells, and a parking lot (40,000 sq ft). Total square footage of the interior spaces is calculated at 7,645 sq ft.
The related federal contract opportunity is a Janitorial Service solicitation (No. 697DCK-25-R-00079) issued by the FAA's Southwestern Region. It is a firm-fixed-price procurement set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), covering janitorial services for the Philadelphia Air Traffic Control Tower and Modular Offices. The contract duration is five years (base year 5/01/2025 - 4/30/2026, with four one-year option periods). Proposal submissions are due via email by the specified date in the solicitation, with all questions to be submitted by March 7, 2025, at 10:00 am EST to specified FAA contacts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK-25-R-00079 Amend 0001.pdf | ||
| PHL ATCT Janitorial Frequency Chart Worksheet.xlsx | XLSX spreadsheet | |
| Janitorial SOW.pdf | ||
| Contractor Staffing.pdf | ||
| WD 2015-4233 Rev 32 dated Dec 23 2024.pdf | ||
| Customer Satisfaction Survey.pdf | ||
| SIR 697DCK-25-R-00079 PHL Janitorial.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 ATCT area square footage approximation
| Room | Sq. footage | Room | Sq. footage | Room | Sq. footage | Room | Sq. footage | Room | Sq. footage | |
| E01 | 120 | E26 | E51 | 240 | N01 | 893 | Tower cab | 575 | ||
| E02 | 192 | E27 | 36 | E52 | 144 | N02 | 362 | |||
| E03 | 256 | E28 | 144 | E53 | 224 | N03 | 2499 | Room | Sq. footage | |
| E04 | 128 | E29 | 144 | E54 | 448 | N04 | 126 | elevator area 1st floor | 224 | |
| E05 | 144 | E30 | E55 | 400 | N05 | 2761 | ||||
| E06 | 192 | E31 | 240 | E56 | 144 | N06 | 126 | |||
| E07 | 96 | E32 | 80 | E57 | 144 | N07 | 2625 | Room | Sq. footage | |
| E08 | 192 | E33 | 480 | E58 | 16 | N07A | 70 | Outside elevator subjunction level | 84 | |
| E09 | 144 | E34 | 480 | E59 | 844 | N08 | 225 | |||
| E10 | 80 | E35 | 336 | E60 | 360 | N09 | 225 | |||
| E11 | 288 | E36 | 100 | E61 | 320 | N10 | 415 | |||
| E12 | 392 | E37 | 224 | E62 | 80 | N11 | 225 | Room | Sq. footage | |
| E13 | 48 | E38 | 220 | E63 | 48 | N12 | 300 | stairwell subjunction to junction level | 61 | |
| E14 | 64 | E39 | 36 | E64 | 192 | N13 | 262 | |||
| E15 | 192 | E40 | 80 | E65 | 256 | N14 | 363 | junction level | 75 | |
| E16 | 100 | E41 | 80 | N15 | 450 | |||||
| E17 | 192 | E42 | 384 | N16 | 75 | Room | Sq. footage | |||
| E18 | 144 | E43 | 96 | Elevator Equip rm | 84 | N17 | 25 | stairwell bottom floor to subjunction level | 366 | |
| E19 | 224 | E44 | 256 | N18 | 450 | |||||
| E20 | 140 | E45 | 400 | Elevator | 40 | N19 | 75 | |||
| E21 | 100 | E46 | 360 | N20 | 1050 | Room | Sq. footage | |||
| E22 (to dbl door) | 524 | E47 | 96 | Tower restrooms | 50 | N21 | 25 | ASDE Room | 292 | |
| E23 | 168 | E48 | 336 | 50 | N22 | 100 | ||||
| E24 | 336 | E49 | 96 | Room | Sq. footage | |||||
| E25 | 220 | E50 | 96 | 4th floor | 220 | Parking Lot | 40,000 | |||
| eq. room | ||||||||||
| total sq. footage= | sq ft. | |||||||||
| formula to change | going with | sq ft. | ||||||||
| 7645 |