RFI Set 2 - Forensic Scheduler IDIQ.pdf

PDF 272 KB Posted

Attached to
BIL Funded - Program and Project Schedule Analysis (Forensic Scheduler)
Solicitation number
697DCK-25-R-00037
Issued by

About this file

This is a Questions and Answers (Q&A) document dated January 23, 2025, for RFI Set 2 regarding Notice ID 697DCK-25-R-00037 "BIL Funded – Program and Project Schedule Analysis (Forensic Scheduler)."

The document addresses a single question about insufficient detail in Section 5 Task Order Detail regarding the PIH ATCT (Pocatello, Idaho) project scope. The FAA's response provides additional background on Task Order 0001, detailing plans for a new Airport Traffic Control Tower at Pocatello Regional Airport. The project specifications include: a 155-foot tower height, 13,743 square feet distributed across eleven building levels, a 62' x 62' tower footprint, and a 1.3-acre site with employee parking, backup generator, and trash enclosure. The tower will be constructed following International Building Code Section 412.2 and FAA standards. The response references Items 2.3 and 2.4 in the SOW for Forensic Scheduler Analyst services supporting construction and electronic systems installation, directing offerors to www.faa.gov/tower-design for additional information. The response maintains the original proposal due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers (Q&A) for Notice ID: 697DCK-25-R-00037 “BIL Funded – Program and Project Schedule Analysis (Forensic Scheduler)”

RFI Set 2

January 23, 2025

1. The information contained in “Section 5. TASK ORDER DETAIL” doesn’t seem to provide enough detail about the scope of the “PIH ATCT (Pocatello, Idaho)” project for a reasonable estimate to be developed about the level of effort required to effectively support the project.

a. Can additional scope and requirements information be provided for the task order?

b. If the FAA can’t provide additional scope information at this time, will the FAA waive the task order effort estimate requirement for the proposal and allow offerors to propose just the bill rates for each labor category without labor hours and then, provide a true effort estimate after contract award and the official release of the task order that includes a detailed SOW?

FAA Response: General Background on TO 0001 – Replace PIH ATCT (Pocatello, Idaho)

The FAA will commence on a design-build project to construct a new Airport Traffic Control Tower (ATCT) at Pocatello Regional Airport (PIH) in Pocatello, Idaho. The ATCT shall be constructed in accordance with Section 412.2 of International Building Code (IBC), among other national codes and FAA standards. The new ATCT at PIH is planned to reach an approximate height of 155 feet above finished grade. The approximate gross square footage of the ATCT is 13,743 sf, distributed through eleven building levels. The approximate footprint of the tower structure is a 62’ x 62’ The proposed site for the new ATCT is a 1.3-acre rectangular parcel of land, which includes employee parking spaces, backup generator, and trash enclosure. Underground utilities and communication duct banks will be established and/or extended where necessary. Items 2.3 and

2.4 in the scope-of-work (SOW) describe the services required of the FS Analyst to support the construction and electronic systems installation efforts at the new PIH ATCT. For additional information, please visit https://www.faa.gov/tower-design.

This response does NOT change proposal due date.