BUFFALO SNOW REMOVAL STATEMENT OF WORK 06_25_2024.docx
DOCX document 1 MB Posted
- Attached to
- Buffalo Air Traffic Control Tower Snow Removal
- Solicitation number
- 697DCK-24-R-00412
About this file
This document is a Statement of Work (SOW) for snow removal services at the Buffalo Air Traffic Control Tower in New York. The SOW details the requirements for clearing the 42,986 square foot parking lot, 900 feet of sidewalk, and access gates around the control tower, which is staffed 24/7. Snow is to be removed as needed, generally when accumulation reaches 2 inches or more, and the contractor is expected to respond within one hour of any request for service. The control tower has specific shift change times that must be accommodated. The related federal contract opportunity is a firm-fixed price procurement set aside for small businesses under NAICS code 561790. The performance period is a base year plus four option years starting on 10/1/2024. The solicitation includes a site visit on 6/17, with questions due by 6/19 and proposals due by 6/28.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK SNOW REMOVAL SERVICE
FOR BUFFALO AIR TRAFFIC CONTROL TOWER
1. The control tower is located at 165 Holtz Road, Cheektowaga, NY 14225. The work includes a parking lot that measures 42,986 square feet which accommodates approximately 150 cars, and 900 feet of sidewalk to be cleared and or salted. The area also includes 2 access gates, which require a clearance area behind gates to be kept clear to keep snow from interfering with gate operations. All seven building exterior doors will be kept clear of snow and ice for use in emergencies.
2. In general, snow is to be removed as needed to keep the parking lot and sidewalks open and safe, generally 2” or more. At times it may be necessary to salt the parking lots and sidewalks due to formation of ice or freezing rain. The contractor is expected to respond promptly (within one hour) to any request from the FAA for snow removal operations.
3. The control tower is manned 24 hours a day, 7 days per week. It is imperative that snow removal is completed to accommodate shift changes which are as follows:
5:30 AM to 8 AM each day 2 PM to 4 PM each day 11 PM each day It is expected that the contractor will plow as needed without waiting for a call out.
4. If snow must be removed from the premises when directed by the site POC, due to accumulation exceeds what can be pushed off the roads and parking areas without blocking driveways, walkways, parking areas, islands, handicapped parking areas, and loading dock (if dock onsite). If snow is directed to be removed offsite, contractor will be instructed to invoice for payment via purchase card with site directly and not submit through DELPHI as per normal invoicing.
5. At the current time, there is no mandate for type of ice treatment (ie. Salt vs Calcium), however that may change in the future if parking lots/walkways are re-done.