697DCK-23-R-00332 Amendment 0003.pdf
PDF 133 KB Posted
- Attached to
- Amendment 0004 to Replace Parking Lot Lighting at Seattle Air Traffic Facility Federal contract opportunity
- Solicitation number
- 697DCK-23-R-00332
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00332 Amendment 0004.pdf | ||
| Attachment 11 - Drawing ZSE-20006240-E204 - Revised 5-24-2023.pdf | ||
| Attachment 10 - Grounding Grid Layout.pdf | ||
| 697DCK-23-R-00332 Amendment 0002.pdf | ||
| 697DCK-23-R-00332 Amendment 0001.pdf | ||
| RFO 697DCK-23-R-00332.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 1(a) - Drawings.pdf | ||
| Attachment 6 - REF FAA Order 3900.19b.pdf | ||
| Attachment 7 - COVID-19 Contractual Requirement.pdf | ||
| Attachment 5 - REF FAA Order 1600.69C.pdf | ||
| Attachment 8 - Customer Satisfaction Survey.doc | DOC document | |
| Attachment 9 - DB WD No. WA20230011 dated 2-3-2023.pdf | ||
| Attachment 2 - REF FAA-C-1217h.pdf | ||
| Attachment 3 - REF FAA-C-1391e.pdf | ||
| Attachment 4 - REF FAA-STD-019f.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 2
2. AMENDMENT/MODIFICATION
NO. 0003 05/17/2023
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
2200 S. 216TH STREET
DES MOINES WA 98198-6547
AAQ530ANM-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
697DCK-23-R-00332
1 copies to the issuing office.
04/18/2023
(x)
Amendment 0003 is to incorporate the questions received and their applicable answers into this RFO and the resultant contract.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cynthia A. Tjelde
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
697DCK-23-R-00332
ZSE Parking Lot Lighting Replacement Project
RFO Questions & Answers
1) Question: Can we use alternate fixtures that meet the specified ones?
Answer: Yes, there are no name brand requirements on this contract, as long as the product meets the contract requirements.
2) Question: Will we have to work around the current paving project taking place at the facility?
Answer: Yes, the proposed start date for this lighting project is July 17, 2023. The plan is for the lighting contractor (contract awardee) to begin in parking lots that have already been paved, then follow behind the paving contractor with both projects finishing about October 6, 2023. The reason for this is to have the lighting project finished before inclement weather sets in. New parking lot striping will have to be protected when equipment, such as scissor lifts, are in use.
3) Question: Is there a site drawing of the grounding grid in place at the facility?
Answer: Yes. See Attachment 10 to the RFO.
4) Question: What is an acceptable method of entering the existing (4) head pole that stays and feeds the new 25’ pole?
Answer: A cored hole through the round concrete base just above grade with an LB fitting would be an acceptable method.
| Amend 003 form |
| Answers |
File details come from the government source that posted it. Updated .