zny19127-Portfolio.pdf
PDF 9 MB Posted
- Attached to
- Replace the Defective Condenser Water Valves at the New York ARTCC (ZNY) in Ronkonkoma, NY
- Solicitation number
- 697DCK-21-R-00190
About this file
This is a solicitation for a construction project to replace defective condenser water valves at an air route traffic control center in Ronkonkoma, New York. The Federal Aviation Administration requires contractors to provide all labor, materials, and supervision for the project, with a price range of $1-4 million. Contractors must be registered in SAM and submit proposals electronically in PDF format by the response date. Payment and performance bonds are required. A site visit will be scheduled to review the project details. The North American Industry Classification System code for this project is 238220.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment0004.pdf | ||
| 697DCK-21-R-00190amendment3.pdf | ||
| amendment0002.pdf | ||
| Wage Determination 05.07.2021.pdf | ||
| amendment0001.pdf | ||
| NYWAGERATE.pdf | ||
| COVID-19 Contractual Requirement 21-3-17.pdf | ||
| 19127-portfolio.pdf | ||
| ZNY_Final_Valve_Replacement - Specs.pdf.pdf | ||
| RFO697DCKR00190.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
ENROUTE/FSS
ARTCC
PANEL SCHEDULES
CONDENSER WATER VALVE REPLACEMENT
NYNEW YORK CENTERRONKONKOMA
WL
PROJECT ENGINEER MGR: ENGINEERING CENTER
03/31/2021 18061513
ZNY-18061513-E701
02/03/202118061513CONSTRUCTION, DT #19127 (EKS)03/31/2021
z n y -1
-e
.d g
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
-e
/0
/2
:2
A
M P lo tt e d b
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
IS
1 2
E-102-A
E-102-B
E-106-D
E-106-B
PANELBOARD SHEET LOCATION KEY
GENERAL SHEET NOTES
SHEET NOTES
SCHEDULE AND THIS DRAWINGS.
BRANCH CIRCUIT RUNS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY BRANCH CIRCUITS PER PANELBOARD C.
MAINTAIN THE CONTINUITY FOR ALL CIRCUITS SERVING AREAS NOT DESIGNATED FOR DEMOLITION.B.
REFER TO DRAWINGS E001 AND E002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.A.
PROVIDE CONDUIT AND WIRING FROM PANEL TO THE TEMPORARY EQUIPMENT ON SITE. SEE E002 FOR LOCATION.
PLANS FOR FCV LOCATION.
EXISTING CIRCUIT BREAKER AND ASSOCIATED WIRING TO BE RECONNECTED TO THE NEW FCV. REFER TO FLOOR
RATING.
CIRCUIT BREAKER AS REQUIRED. NEW CIRCUIT BREAKER SHALL MATCH EXISTING IN TYPE, MANUFACTURER, AND AIC
CONTRACTOR TO VERIFY CIRCUIT BREAKER SIZE REQUIREMENT PER FINAL EQUIPMENT SELECTED. PROVIDE NEW
TEMPORARY EQUIPMENT LOCATION.
POWER SUPPLY TO TEMPORARY COOLING TOWER, PUMPS, AND ASSOCIATED APPARATUS. REFER TO E002 FOR
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
zny-18061513-e701
2021-04-13T06:12:01-0400
ROBERT L BELTON
2021-04-12T07:28:45-0400
ANDREW G MACDONALD
COVER SHEET
KL
WS
ZNY-18061513-G001
-g
:3 lo tt e
Department of Transportation
Federal Aviation Administration
Condenser Water Valve Replacement
New York Air Route Traffic Control Center
Ronkonkoma, New York
January 2021
FINAL Submission zny-18061513-g001
2021-04-13T06:12:16-0400
ROBERT L BELTON
2021-04-12T07:33:12-0400
ANDREW G MACDONALD
LOCATION MAP & BUILDING CODE ANALYSIS
INDEX OF DRAWINGS, GENERAL NOTES,
ZNY-18061513-G002
lo tt e
GREAT SOUTH BAY
JOHNSON AVE
SUNRISE HWY
LAKELAND AVE
347 MEMORIAL HWY
MacARTHUR
MEMORIAL HWY
VETERAN'S
EXPRESSWAY
LONG ISLAND
MacARTHUR AIRPORT
LONG ISLAND-
LOCATION
PROJECT
ZNY ARTCC
LTR
NUMBER
DRAWING
DRAWING TITLE
BUILDING CODE ANALYSIS
CLASSIFICATION:
OCCUPANCY
AND REGULATIONS:
APPLICABLE CODES
HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.
DOCUMENTS, CODES, AND CRITERIA FOR THE HANDICAPPED ACCESSIBILITY ARE TO BE
MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ADA/ABA
CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN
DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND T.
BE CRITICAL TO THE OPERATION OF THE FACILITY.
ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY
PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE S.
REQUIREMENTS, 29 CFR 1910.146 AND 1926.21(B)(6).
WORK IN CONFINED SPACES OR AREAS SHALL BE DONE IN ACCORDANCE WITH OSHA R.
FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY PANELBOARD
ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER
CASE OF BREAKER OR PIPE VALVE OPERATION. CONTRACTOR SHALL NOT OPEN (DE-
CONTRACTOR SHALL REQUEST PERMISSION IN WRITING OF FAA IN ADVANCE FOR EACH
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. Q.
CRITICAL FOR THE LIFE SAFETY OF THE FLYING PUBLIC.
ELECTRONIC EQUIPMENT. THIS EQUIPMENT CONTROLS AIR TRAFFIC AND IS DEEMED
SPRINKLER SYSTEM PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE CRITICAL P.
PATCHED AND REPAIRED TO MATCH ADJACENT SURFACES.
COMPLETION OF THE WORK. ANCHORING HOLES IN CONCRETE SURFACES SHALL BE
DEVICES FOR DUSTPROOF CONSTRUCTIONS, INTO CONCRETE, SHALL BE REMOVED UPON
LOCATIONS & SPECIAL REQUIREMENTS WITH COR BEFORE INSTALLATION. ANCHORING
EQUIPMENT. TEMPORARY DP ARE SHOWN SCHEMATICALLY ON DRAWINGS. VERIFY FINAL
PERSONNEL AND NOT RESTRICT ACCESS TO MECH, ELEC, FAA, OR FIRE PROTECTION
INDICATED ON DRAWINGS. TEMPORARY PARTITIONS SHALL BE ACCESSIBLE TO FAA
PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS WHERE O.
FIELD VERIFY EXISTING CONDITION PRIOR TO ANY CONSTRUCTION WORK REQUIRED.
CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA.
EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING N.
COORDINATE WITH COR.
PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND
REMOVE AND REINSTALL, AS REQUIRED, FURNITURE THAT IS AFFECTED BY THE WORK. L.
EQUIPMENT. COORDINATE SIZE & LOCATION WITH MECHANICAL AND ELECTRICAL.
FOR PROVISION OF ARCHITECTURAL, MECHANICAL, ELECTRICAL & FIRE PROTECTION
PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY AND CONCRETE) J.
MECHANICAL
ZNY-18061513-M001 MECHANICAL LEGENDS, NOTES AND ABBREVIATIONS
ZNY-18061513-M101 HVAC AND HVAC PIPING CHILLER ROOM PLAN - DEMOLITION
ZNY-18061513-M102 HVAC AND HVAC PIPING PSB ROOF PLAN - DEMOLITION
ZNY-18061513-M201
ZNY-18061513-M202
HVAC AND HVAC PIPING CHILLER ROOM PLAN
HVAC AND HVAC PIPING PSB ROOF PLAN
ZNY-18061513-M501
ZNY-18061513-M502
ZNY-18061513-M504
ZNY-18061513-M601
HVAC TYPICAL DETAILS
MECHANICAL SCHEDULES
ZNY-18061513-M701
ZNY-18061513-M702
ZNY-18061513-M703
ZNY-18061513-M704
ZNY-18061513-M705
CONDENSER WATER SCHEMATIC DIAGRAM - DEMOLITION
CONDENSER WATER SCHEMATIC DIAGRAM
COOLING TOWER SCHEMATIC DIAGRAM
TEMPORARY COOLING TOWER WATER SCHEMATIC DIAGRAM
GENERAL
ZNY-18061513-S201 TEMPORARY COOLING TOWER SUPPORTS
STRUCTURAL
AND REQUIREMENTS.
OPERATIONS, TYP. ACCOMMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE
PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA
PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO
THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA.
OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK
EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL REMAIN I.
OTHERWISE NOTED.
LINES AND FACE OF MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS
DIMENSION LINES SHOWN ON SHEETS ARE FROM COLUMN CENTER A.
ARE RESOLVED TO SATISFACTION OF COR.
COR OF CONFLICTS. NO DEMOLITION WORK SHALL PROCEED UNTIL CONFLICTS
BUILDING SYSTEMS. COORDINATE DEMOLITION WITH THE WORK AND NOTIFY
FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OFB.
PATCHED AND REPAIRED TO MATCH EXISTING FINISHES.
FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK SHALL BEC.
PROTECTION FOR ITEMS TO BE REMOVED.
ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL, ELECTRICAL AND FIRE
ELECTRICAL SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN
VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL ANDD.
AND THE DIRECTION TO THE NEAREST EXIST.
PROVIDE NECESSARY SIGNAGE WARNING BUILDING OCCUPANTS OF THE CHANGE,
DURING THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES.
CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE
CONTRACTOR MUST MAINTAIN MEANS OF EGRESS DURING DEMOLITION AND
COORDINATE THE WORK WITH COR TO AVOID DISRUPTING FAA OPERATIONS.
THE BUILDING SHALL BE OCCUPIED BY FAA DURING CONSTRUCTION.E.
NOT BE LEFT IN OCCUPIED AREAS.
CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT SHALL F.
ROOFS) BEFORE ANY DEMOLITION OR CONSTRUCTION.
BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND
OF THE FACILITY, COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF
APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON BUILDINGS WHICH ARE PART
AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN
ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES
MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS, G.
DO NOT SCALE DRAWINGS.H.
CONSTRUCTION TYPE:
4.
3.
2.
1.
ZNY-18061513-G001
ZNY-18061513-G002
INDEX OF DRAWINGS GENERAL NOTES
ZNY-18061513-G003
COVER SHEET
ZNY-18061513-G004
ABBREVIATIONS
ZNY-18061513-G005 CONSTRUCTION STAGING PLAN
MECHANICAL SEISMIC DETAILS
MECHANICAL SEISMIC DETAILS
ZNY-18061513-M503 HVAC TYPICAL DETAILS
COOLING TOWER SCHEMATIC DIAGRAM - DEMOLITION
ELECTRICAL
ZNY-18061513-E001
ZNY-18061513-E002
ZNY-18061513-E204
ZNY-18061513-E205
ZNY-18061513-E402
ZNY-18061513-E403
ZNY-18061513-E701
ELECTRICAL ABBREVIATIONS, LEGENDS, AND GENERAL NOTES
TEMPORARY COOLING TOWER ELECTRICAL PLAN
CHILLER ROOM FLOW CONTROL VALVE - DEMOLITION
COOLING TOWER FLOW CONTROL VALVE - DEMOLITION
COOLING TOWER FLOW CONTROL VALVE - NEW WORK
PANEL SCHEDULES
HOW TO PROCEED WITH WORK.
HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN
WORK AREA(S) AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT). IF K.
M.
ADVANCE OF PERFORMANCE OF WORK.
BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN
TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES SHALL
UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES SHALL NOT BE
CHILLER BUILDING
SEISMIC DESIGN CATEGORY:
GENERAL LEGENDS
PRESUMED TO CONTAIN LEAD. REFER TO HAZMAT FOR ADDITIONAL INFORMATION.
PAINT COATINGS ON METAL SURFACES, UNLESS OTHERWISE NOTED, SHOULD BE U.
ZNY-18061513-M002
ZNY-18061513-M003
INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP & BUILDING CODE ANALYSIS
-INTERNATIONAL MECHANICAL CODE, 2018 EDITION
-INTERNATIONAL FIRE CODE, 2018 EDITION
-NFPA 70 (NATIONAL ELECTRICAL CODE (NEC), 2020
(29 CFR 1910 AND 1926 - CURRENT ISSUE)
GENERAL INDUSTRY SAFETY & HEALTH STANDARDS
-OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)
-AMERICAN BARRIERS ACT (ABA) STANDARDS, 2015
-NFPA 101 - LIFE SAFETY CODE, 2018 EDITION
-INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
CHILLER ROOM FLOW CONTROL VALVE - NEW WORK
TEMPORARY COOLING TOWER MECHANICAL PLAN
MECHANICAL INSTRUMENTATION AND CONSTRUCTION SEQUENCE
PROVIDED DESIGN IN ACCORDANCE WITH SECTION 01 25 00, "SUBSTITUTION PROCEDURES."
DESIRED DESIGN FUNCTIONAL GOAL, AND ANY OTHER NEWLY REQUIRED INCIDENTAL WORK OR CHANGES TO THE
CAPABILITY OF OTHER EQUIPMENT FOR THE FULL INTENDED FUNCTION OF ALL INDIVIDUAL PIECES TOWARDS THE
OF EXPOSED AREAS AS A RESULT OF THE SUBSTITUTION, THE NEED TO COORDINATE WITH THE FUNCTION AND
INCLUDE ANY NECESSARY ADJUSTMENTS OF CONNECTIONS, PIPING OR WIRING, EQUIPMENT PAD RESIZING, FINISHING
TO EXECUTE INCIDENTAL WORK ARISING FROM THE SUBSTITUTION TO COMPLETE FAA DESIGN INTENT. THIS WILL
ANY FAA-APPROVED MATERIAL OR EQUIPMENT "AS EQUAL" SUBSTITUTIONS BY THE CONTRACTOR AND THE COSTS
THE CONTRACTOR BEARS ALL RESPONSIBILITY FOR THE ADJUSTMENT OF AFFECTED DRAWINGS AS A RESULT OF D.
ENGINEERING PRACTICES.
SUBSTITUTION FITS WITHIN THE ALLOCATED SPACE IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND
PROPER EVALUATION OF THE SUBSTITUTION REQUEST MAY BE MADE, INCLUDING ILLUSTRATING HOW THE PROPOSED
TEST DATA OF BOTH THE MATERIALS SPECIFIED AND THE PROPOSED SUBSTITUTION MATERIALS, SO THAT A
CONTRACT DOCUMENTS, MUST SUBMIT THE NECESSARY SCALE DRAWINGS, PRODUCT DATA, AND PERFORMANCE AND
THE CONTRACTOR, WHEN SUBMITTING FOR APPROVAL OF MATERIALS WHICH ARE OTHER THAN THAT CITED IN THE C.
THAT THERE WILL BE NO ADDITIONAL COSTS BORNE BY THE GOVERNMENT AS A RESULT OF THE SUBSTITUTION.
FURNISHING AND INSTALLING THE SUBSTITUTE MATERIAL. THE CONTRACTOR MUST, IN SUCH TRANSMITTALS, STATE
SPECIFIED WILL NOT OBLIGATE THE GOVERNMENT TO PAY ANY ADDITIONAL COSTS THAT MAY BE ASSOCIATED WITH
THE CONTRACTOR'S SUBMITTAL FOR APPROVAL OF MATERIAL OR PRODUCTS OF HIGHER QUALITY THAN THAT B.
SUBMITTED FOR APPROVAL AS A SUBSTITUTION.4.
APPROVED BY THE PRODUCT'S MANUFACTURER.
REQUIRE OTHER RELATED PRODUCTS BE PRODUCED BY THE SAME MANUFACTURER, OR BY A MANUFACTURER
AND FUNCTIONAL) WITHIN THE PROJECT. CERTAIN PRODUCT'S MANUFACTURER WARRANTIES MAY ALSO
OFFICER'S REPRESENTATIVE (COR), IN WRITING, AS MEETING THE SPECIFIED CRITERIA AND FIT (BOTH PHYSICAL
ACCEPTED BY THE ARCHITECT/ENGINEER OF RECORD, CONTRACTING OFFICER (CO) AND CONTRACTING 3.
PRACTICES.
WORK IN THE SPACE ALLOCATED IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND ENGINEERING
OF A SIMILAR PROFILE, SHAPE, SIZE, STYLE, AND CONFIGURATION AND CAN BE INCORPORATED INTO THE 2.
EQUAL OR SUPERIOR IN CONSTRUCTION, EFFICIENCY, UTILITY, OR FUNCTION TO THE PRODUCT(S) SPECIFIED.1.
PRECLUDED PROVIDED THEY ARE:
FOR QUALITY, FUNCTION, AND PERFORMANCE. PRODUCTS OF OTHER MANUFACTURERS ARE NOT AUTOMATICALLY
MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS ARE SPECIFIED FOR ITEMS, THEY SET A STANDARD
MANUFACTURER'S NAME, BRAND NAME, OR MODEL NUMBER STATED IN THE SPECIFICATIONS. WHERE
PROPRIETARY AND THE WORDS "OR EQUAL" ARE IMPLIED IF NOT EXPRESSLY STATED AFTER EVERY
BASIS OF DESIGN IN A SCHEDULE, DETAIL OR IN A LIST OF APPROVED PRODUCTS. THIS IS NOT MEANT TO BE
IN GENERAL, MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS MAY BE SPECIFIED FOR ITEMS AS A A.
ZNY-18061513-M004 TEMPORARY CHILLER ROOM PIPING
LOCATION MAP
BASIS OF DESIGN AND SUBSTITUTIONS
NOT TO SCALE
NFPA 101, EXISTING BUSINESS
IBC, GROUP B
zny-18061513-g002
2021-04-13T06:12:31-0400
ROBERT L BELTON
2021-04-12T07:33:34-0400
ANDREW G MACDONALD
ZNY-18061513-G003
APPROXIMATELY
ARCHITECT(URAL)
AUXILIARY
BOILER
BREAKER
BUILDING
BLOCKING
BENCH MARK OR BEAM
BEARING
BRITISH THERMAL UNIT
CONDUIT
CONT
CONTR CONTRACTOR
PI
PIV POST INDICATOR VALVE
PL PROPERTY LINE OR PLATE
PLF
PNL PANEL
PRV
PSF
PSI
PT
PTVC
PVC POLYVINYL CHLORIDE
PVI
PVT
RA RETURN AIR
RADIUS
REF REFERENCE
REINF REINFORCING
REQ'D REQUIRED
RF
RETURN FAN
RGS
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV
SA SUPPLY AIR
SCHEDULE
SD SMOKE DAMPER
SEC SECTION
SF
SHT SHEET
SIG SIGNAL
SM SPRINKLER MAIN
POINT OF TANGENCY
BOTTOM
BELOW
PRESSURE REDUCING VALVE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER LINEAR FOOT
RIGID GALVANIZED STEEL
BOTTOM OF DUCT
BOTTOM OF PIPE
RISER
REG REGISTER
RAD, R
AMPERE TRIP
REFRIGERANT VENT
BLIND FLANGE
POINT OF VERTICAL TANGENCY
SIM SIMILAR
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL CURVATURE
CENTER
AIR ROUTE TRAFFIC CONTROL
AUTOMATED RADAR TERMINAL SYSTEM
CP
CT
CTR
CU CONDENSING UNIT
CV
CYD CUBIC YARD
COR
PSM POWER SYSTEMS MODIFICATION
RECEPTACLE
SAN SANITARY
HZ HERTZ
ID INSIDE DIAMETER
IF
INCH
INSUL INSULATION
INT INTERIOR
J JUNCTION
JB JUNCTION BOX
KVA KILOVOLT AMPERE
KW KILOWATTS
LF LINEAR FEET
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LT LIGHT
LTG LIGHTING
M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MET METAL
MG MOTOR GENERATOR
MO MASONRY OPENING
LCP LOCAL CONTROL PANEL
INV INVERT
KCMIL THOUSAND CIRCULAR MILS
INSIDE FACE OR INTERIAL FILTER
MANUFACTURER
HWS
HWR HOT WATER RETURN
HOT WATER SUPPLY
INST INSTRUMENT
LPS LOW PRESSURE STEAM
POUNDS
DBL DOUBLE
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DN DOWN
DP
FD
FE FIRE EXTINGUISHER
FEC
FIN FINISH
FIXTURE
FLOOR
FM
FEET
GA
GALV GALVANIZED
DGP DATA GATHERING PANEL
FIRE EXTINGUISHER CABINET
DI
DB
DDCP DIRECT DIGITAL CONTROL PANEL
FCV FLOW CONTROL VALVE
FIRE DAMPER OR FLOOR DRAIN
FEPC FRONT END PERSONAL COMPUTER
GEN GENERATOR
GFM
GL GLASS
GND
GPM
GR
GALLONS PER MINUTE
GFE
GOVERNMENT FURNISHED MATERIAL
GOVERNMENT FURNISHED EQUIPMENT
G GAS
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FFE FINISHED FLOOR ELEVATION
FLEXIBLE DUCTFLEX
IN,"
FT,'
GRILLE
CS
FHC FIRE HOSE CABINET
FI
FS FLOW SWITCH
FZ FREEZESTAT
LCV LEVEL CONTROL VALVE
LG LEVEL GAUGE
LS LEVEL SWITCH
PRESSURE INDICATOR
POINT OF INTERSECTION,
PS PRESSURE SENSOR
FC FAN COIL UNIT
IEWH
WATER HEATER
INSTANTANEOUS ELECTRIC
AIR SEPARATOR
AIR TERMINAL BOX
AUTOMATIC TRANSFER SWITCH
ACID VENT
AVERAGE
AMERICAN WIRE GUAGE
DAMPER, BLOWDOWN
BOARD, BACK-DRAFT
BATTERY CHARGER
BARE COPPER
BREAKER PROGRAMMING UNIT
BACK FLOW PREVENTER
BUTTERFLY VALVE
BOILER FEED WATER
BRAKE HORSE POWER
BLOWER
BACK WATER PREVENTER
BALANCING VALVE
BRITISH THERMAL UNIT PER HOUR
BALL VALVE
BACK WATER VALVE
CPT CARPET/RAISED FLOOR
CPC CRITICAL POWER CENTER
CPU CENTRAL PROCESSING UNIT
CR
CTS COOLING TOWER WATER SUPPLY
CONTROL SWITCH
CU
CW
CWR
CWS
CWV
CONDENSING UNIT
DOMESTIC COLD WATER
CHILLER WATER RETURN
CHILLER WATER SUPPLY
COMBINATION WASTE AND VENT
DOM DOMESTIC
DC DIRECT CURRENT
DIGITAL INPUT
POSITION INDICATOR,
DROP INLET, DAMPER
DM DEMAND METER
DO DIGITAL OUTPUT
DPDT
DPNL
DPST
DOUBLE POLE DOUBLE THROW
DISTRIBUTION PANEL
DOUBLE POLE SINGLE THROW
FTR FINNED TUBE RADIATION
FRP FIBER GLASS REINFORCED PLASTIC
FEET PER MINUTEFPM
FUEL OIL VENTFOV
FOL FUEL OIL LEVEL
FLG FLANGE
FD/SD
FDR FEEDER
COMBINATION FIRE AND SMOKE DAMPER
FCO FLOOR CLEANOUT
FV FULL VOLTAGE
FPU
FOT
FLA
FIELD PROGRAMMING UNIT
FIBER OPTIC TERMINAL
FO FIBER OPTIC
FLUOR FLUORESCENT
FULL LOAD AMPERES
FA FAN COOLED
GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
TERMINAL
CONTROL VALVE, CONSTANT VOLUME
DAMPER
DRAIN, DELTA CONNECTION, DIFFUSER,
PRESSURE SWITCH
DUSTPROOF PARTITION, DIFFERENTIAL
FLANGE INSULATION, FLOW INDICATOR
FIX, FIXT
FL, FLR
GAGE, GAUGE
MFGR, MFG
SMOKE DETECTOR
FAA FEDERAL AVIATION ADMINISTRATION
AND
AT
MOD MODIFICATION
MCC MOTOR CONTROL CENTER
MIL MILLIMETER
REVERSE, REVISION
SUPPLY FAN, SQUARE FEET
SCH, SCHED
LAN LOCAL AREA NETWORK
AUTOMATION WING REHABILITATION
BASEMENT
CABLE TRAY, COOLING TOWER
CONTROL PANEL, CIRCULATING PUMP
FLOW METER, FIRE MAIN
POC POINT OF CONNECTION
FILTER, FIRE LINE
DIRECT BURIAL, DRY BULB
CEILING REGISTER, CONTROL RELAY
CONTRACTING OFFICERS REPRESENTATIVE
SAP SOUND ABSORBING PANEL
PVDS PORTABLE VISUAL DISPLAY SYSTEM
MIN MINIMUM
ASSEMBLY
HWY HIGHWAY
LBS, #
DEG
RCRA
AND RECOVERY ACT
RESOURCE CONSERVATION
DEGREE(S)
ACOUSTICAL WALL PANEL
COMBUSTION AIR
RCP REFLECTED CEILING PLAN
L
K
J
I
COTR
REPRESENTATIVE
CONTRACTING OFFICER TECHNICAL
CRU COMPUTER ROOM UNIT
RPTS
RECEPT
CENTER, COOLING TOWER WATER RETURN
COORD COORDINATE
IMP INSULATED METAL PANEL
STD STANDARD
STE STANDARD TAPERED END
STL STEEL
STOR STORAGE
STR
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
UH UNIT HEATER
UV UNIT VENTILATOR
V VOLT
VC VERTICAL CURVE
W WATT
W/ WITH
WD WOOD
WG WATER GAGE
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
UPS
SUCT SUCTION
UON UNLESS OTHERWISE NOTED
XFMR TRANSFORMER
TRANSFER
UNINTERRUPTIBLE POWER SYSTEM
T&B TOP AND BOTTOM
T&G
TK TANK
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TONGUE AND GROOVE
YD YARD
YH YARD HYDRANT
Y WYE CONNECTION
VAT VINYL ASBESTOS TILE
VB VINYL BASE
VINYL BASE & TRIM COMPONENTSVBT
TEMP TEMPERATURE
TIC
TC
TI
TEMPERATURE CONTROL SWITCH
TEMPERATURE INDICATOR
TEMPERATURE INDICATING CONTROLLER
TYP TYPICAL
TS
VIBRATION SWITCHVS
VAV VARIABLE VOLUME TERMINAL
THERMOSTAT
TELCO
COMPANY LINE
TELECOMMUNICATION, TELEPHONE
TOC TOP OF CONCRETE
TM&O
UBC UNIFORM BUILDING CODE
UL UNDERWRITER'S LABORATORIES, INC.
XFER, XFR
AND OPERATIONS
TELECOMMUNICATIONS MANAGEMENT
TEMPERATURE SENSOR, TAMPER SWITCH
STGP SIGNAL TRANSPORT GROUND PLANE
TBD TO BE DETERMINED
UTIL UTILITY
STRUCTURAL, STRUCTURE
Y
X
W
STRUCTURAL, STRUCTURESTRUC
SQ SQUARE
SRF
STAINLESS STEEL
STA STATION
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF
VPST
VFD VARIABLE FREQUENCY DRIVE
VENTILATION FAN
VERTICAL FEET OR
VACUUM PRODUCER
VELOCITY PRESSURE,
SP
VIF VERIFY IN FIELD
SAFETY RUBBER FLOOR TILE
VGWB
WALL BOARD
VINYL SURFACED GYPSUM
STATIC PRESSURE INDICATOR
SUMP PUMP/SEWAGE PUMP,
STC SOUND TRANSMISSION CLASS
STEAM, STREET
SRG SIGNAL REFERENCE GRID
SPECIFICATIONSSPEC
SSTL, SS
ssdi security systems design and integration
AAV AUTOMATIC AIR VENT
AC
A/C AIR CONDITIONING
AD
ADJ ADJACENT OR ADJUSTABLE
ADR ACCESS DOOR
AFF ABOVE FINISH FLOOR
AIC
AL ALUMINUM
ALT ALTERNATE
CB
CC COOLING COIL
CFM
CFT CUBIC FOOT
CH CHILLER
CI
CIP
CKT CIRCUIT
CENTER LINE
CLG CEILING
CLR CLEAR
CMP
CMU
CO
COL COLUMN
COMB
COMP
CONC CONCRETE
COND
CONN CONNECTION
CONST CONSTRUCTION
CONCRETE MASONRY UNIT
PCF
PHC PREHEAT COIL
CORRUGATED METAL PIPE
CL,
AF
CENT CENTRIFUGAL
PCB POLYCHLORINATED BIPHENYLS
CONC OR AIR COMPRESSOR
ALTERNATING CURRENT, ASPHALT
AMPERES INTERRUPTING CAPACITY
SYSTEM
CENTRAL CONTROL AND MONITORING
POUNDS PER CUBIC FOOT
CAST IRON PIPE, CAST IN PLACE
CIRCUIT BREAKER
PD PRESSURE DIFFERENTIAL
PHASE
HB HOSE BIBB
HC HEATING COIL
HDW HARDWARE
HE HEAT EXCHANGER
HM HOLLOW METAL
HORIZ HORIZONTAL
HP
HPT HIGH POINT
HR HOUR
HS
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC
MTG MOUNTING OR MOUNTED
NOM NOMINAL
NIC NOT IN CONTRACT
NPT
HPS
HTP HOT TAP (W/STOPPLE FITTING)
HERM HERMETIC
HEATING/VENTILATING/AIR CONDITIONING
OA OUTSIDE AIR
OC ON CENTER
OD
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
EF
EG
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EHC ELECTRIC HEATING COIL
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXISTING
EXP EXPOSED
EXPN EXPANSION
EL, ELEV
EXHAUST FAN
HPL HIGH PRESSURE LAMINATE
AMP METERAM
GS GAS SENSOR
HIGH STRENGTH, HUMIDITY SENSOR
MS MOISTURE SENSOR
PC PRESSURE CONTROL SWITCH
PDI
PDS
PRESSURE DIFFERENTIAL INDICATOR
PRESSURE DIFFERENTIAL SENSOR
ACC AIR COOLED LIQUID CHILLER
EH
EWH ELECTRIC WATER HEATER
HUMIDISTAT
HU HUMIDIFIER
COMPRESSED AIR LINE
AMPERE, AIR,
AA AIR COOLED
ACU
ACT ACCESS CONTROL TERMINAL
AIR CONDITIONING UNIT
ACD ADDRESSABLE CONTROL DEVICE
AFMS AIR FLOW MEASURING STATION
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AO
AMM AMMETER
ANN ANNUNCIATOR
ANALOG OUTPUT
AP ANNUNCIATOR POINT
CD
CFH CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CG CEILING GRILLE
CIR CIRCULATING
CLF CURRENT LIMITING FUSE
COMBUSTION AIR
COMBINATION, COMBINE,
COMM COMMUNICATIONS
DR DOOR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM
AND MONITORING
ELECTRICAL DATA ACQUISITION
ENGINE GENERATOR, EXHAUST GRILLE
EP EXHAUST PIPE
ES EXHAUST SILENCER
ER EXHAUST REGISTER
ERMS
ET ELECTRIC HEAT TRACE
GRV GRAVITY VENT
GV GATE VALVE
GWB GYPSUM WALLBOARD
GW GLYCOL WASTE
HW DOMESTIC HOT WATER
HIGH PRESSURE STEAM
HIGH PRESSURE SODIUM,
HIGH PRESSURE
HORSE POWER, HEAT PUMP
AREA DRAIN, ACCESS DOOR
CURB INLET, CAST IRON
EACH, EXHAUST AIR
ENVIRONMENTAL REMOTE MONITORING
EXIST, EX
PUMP, PHASE OR POLE
HAZMAT HAZARDOUS MATERIALS
DWG(S) DRAWING(S)
EA
GWH GAS WATER HEATER
NARACS
NATIONAL RADIO COMMUNICATIONS
NFPA
OSHA
OSW OPERATIONS SUPPORT WING
ADMINISTRATION
OCCUPATIONAL SAFETY & HEALTH
PRIVATE BRANCH EXCHANGEPBX
HCS HOST COMPUTER SYSTEMS
ADTN
NETWORK
ADMINISTRATIVE DATA TRANSMISSION
CCMS
CONDENSATE DRAIN
CONTROL DAMPER, CEILING DIFFUSER,
COMPRESSIBLE, COMPRESSED
EFF EFFICIENCY
ENTER, ENTRANCEENT, ENTR
AMPERE FRAME, AIR FLOW SENSOR
CONDITION, CONDENSATE
APC
OH OPPOSITE HAND
ELECTRIC HEATER
OUTSIDE DIAMETER, OPEN DRAIN
NO, #
PH
AH/AHU AIR HANDLING UNIT
ELEVATION, ELEVATOR
NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
NATIONAL PIPE THREAD
AED AUTOMATED EXTERNAL DEFIBRILLATOR
ACM ASBESTOS CONTAINING MATERIAL
NAM NEGATIVE AIR MACHINE
CLEANOUT, CONDUIT ONLY, CONTRACTING OFFICER
ACOUSTICAL PANEL CEILING CONTINUOUS OR CONTINUATION EXT EXTERIOR HIGH WATER LEVELHWL
APPROX
ARCH
ARTS
ATS
AUX
AWG
AT
AS
ATB
AVG
AV
BAT CHGR
BC
AWR
ASSY
AWP
BD
BKR
BLDG
BLKG
BM
BRG
BTU
BEL
BOD
BOP
BF
BPU
BFP
BFV
BFW
BHP
BLO
BLV
BWP
BWV
BTU/H
BV
BSMT
BOT, BOTT
CABINETCAB
CA
:1
:0 lo tt e zny-18061513-g003
2021-05-04T11:27:18-0400
ROBERT L BELTON
2021-04-29T09:21:41-0400
ANDREW G MACDONALD
GENERAL LEGENDS
ZNY-18061513-G004
FOR CONT
SEE DWG A005
NEW ROOM/AREA NUMBER
DETAIL TITLE REFERENCE
A1
DETAIL NUMBER
IS DRAWN OR SCHEDULED
SHEET ON WHICH DETAIL
DRAWING/DETAIL TITLE
DETAIL DESIGNATION
DETAIL IS DRAWN
SHEET ON WHICH
GENERAL LEGEND
REFERENCE
COLUMN LINE GRID DESIGNATION
CENTER LINES
MATCH LINE SYMBOL
BREAK LINES
ELEVATION SYMBOL
EL 00.00'
SECTION CUT
ELEVATION REFERENCE
SYMBOLS
AND/OR CEILING GRID
RAISED FLOOR PANELS
WALL
(NOT SHOWN)
LIGHT FIXTURE
RECESSED
(NOT SHOWN)
ATC PANEL
DEMOLITION WALL
A101
A001
E1
KEY NORTH
MATERIALS
CONTRACTOR'S ACCESS ROUTE
VEHICULAR TRAFFIC DIRECTION
EXISTING NEW
AIR FLOW PANEL
PERFORATED
FUTURE ATC PANEL
EARTH, ETC
CONCRETE, ETC
METALS
MASONRY
WOOD
GYPSUM
GLASS
INSULATION
EARTH GRAVEL SAND
CONC ASPH
STEEL ALUMINUM OTHER
BRICK TILE
FINISH EL BLKG
ELEV
LOOSE
BATT OR
TER
CMU
RIGID
SMALL SCALELARGE SCALE
PARTITION
STUD
STRUCT, STL
PLYWOOD
EMERGENCY SHOWER AND EYEWASH
FLOOR DRAIN
FLOOR SINK
FLOOR HATCH
STEEL LADDER
SUMP
PARTITION WITH DOOR
TEMPORARY DUSTPROOF
DOOR NUMBER
LOUVER NUMBER
WALL TYPE NUMBER
DP DP
LOCKERS
FIRE EXTINGUISHER
ELECTRICAL PANEL
SUPPLY AIR DUCT
LIGHT FIXTURE
INDIRECT PENDANT
ACOUSTICAL BAFFLES
FE
CABINET
FIRE EXTINGUISHER
FE
SEMI-RECESSED
FS
AREA DESIGNATION
SURFACE MOUNTED
WALL WITH DOOR
TEMPORARY INTERIOR
FINISH SYMBOL
ROOF HATCH
RH
ARCHITECTURAL/STRUCTURAL LEGEND
SYMBOLS
PROJECT NORTH
PLAN NORTH/PROJECT NORTH
REVISED AREA
ENCOMPASS
CLOUD TO
DEMOLITION
REVISION
REVISION DESIGNATION FLOOR MOUNTED WALL MOUNTED
LAVATORY
URINAL
WATER CLOSET
COOLER
ELECTRIC WATER
WATER COOLER
SHEET NOTE NUMBER
0 8' 16'4'
1/8" = 1'-0"
GRAPHIC SCALE
DEMOLITION NOTE
SERVICE SINK
CEILING DIFFUSER
SUPPLY AIR
CEILING REGISTER
RETURN AIR
TRANSFER AIR GRILLE
FOR SPECIFIC INFORMATION.
REFER TO HAZMAT DWGS
HAZMAT NOTE, ASBESTOS
FOR SPECIFIC INFORMATION
REFER TO HAZMAT DWGS
HAZMAT NOTE, LEAD PAINT
1,2,3,41,2,3,4
ROOM NO
B72
L-
:0 lo tt e zny-18061513-g004
2021-05-04T11:27:34-0400
ROBERT L BELTON
2021-04-29T09:22:00-0400
ANDREW G MACDONALD
GUARD HOUSE
LOADING DOCK
STAIR 3
SECURITY GATE
MAIN ENTRANCE
MACARTHUR MEMORIAL HIGHWAY
OLD GUARD HOUSE
CHILLER
ADVANCED
AUTOMATION
ANNEX
POWER SERVICE
FUEL
TANKS
EXISTING BACKFLOW
VAULT
EXISTING BACKFLOW
VAULT
COLD
STORAGE
PREVENTER
PREVENTER
AIR ROUTE TRAFFIC CONTROL CENTER
SECURITY FENCE
PROPERTY LINE
GARAGE & STORAGE BUILDING
PCS &
GENERATOR
UNDERGROUND
SHED
ANTENNA
MWP DISH
ANTENNA
SATELLITE TV
STATION
METERING
ELECTRICAL
NARACS WHIP
GPS
CTS
GPS
WASS
(SPECTRALINK)
REPEATER
TELEPHONE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X X X
CAFETERIA
LOADING DOCK
CAFETERIA
AREAWAY
CHILLER ROOM
BOILER ROOM AND
STAGING AREA
PROPOSED CONSTRUCTION
COOLING TOWER YARD
PROPOSED TEMPORARY
CONSTRUCTION STAGING PLAN
ZNY-18061513-G005
CONSTRUCTION STAGING PLAN NOTES:
A. CONSTRUCTION ACCESS
B. CONTRACTOR PARKING
E. CONSTRUCTION DEBRIS
G. CONSTRUCTION OFFICE
H. CONSTRUCTION TOILET FACILITIES
I. DEMOLITION AND CONSTRUCTION HOURS
K. ASBESTOS REMOVAL AND DISPOSAL
L. PARKING LOT AND DRIVEWAY REPAIR
M. EQUIPMENT PROTECTION
A.2
A.3
A.4
A.5
E.1
G.1
H.1
I.1
I.2
I.3
I.4
K.1
L.1
L.2
M.4
M.3
M.2
M.1
MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR.
NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING
COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ARTCC.
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY TO
AND DUST, INCLUDING CORE DRILLING.
FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS
CONTRACTOR MUST PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, INCLUDING STRIPING OF PARKING LOT.
UPON COMPLETION OF WORK, CONTRACTOR MUST REPAIR PAVED SURFACES TO ORIGINAL CONDITION, APPROVED BY COR.
EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OF 11:00 PM TO 6:00 AM OR AS
COORDINATE WORK WITH COR ON CRITICAL EQUIPMENT WITHIN WORK AREA. WORK ON CRITICAL
DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 6:00 AM TO 11:00 PM.
CONTRACTOR MUST NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY.
CONSTRUCTION STAGING AREA.
PORTABLE CHEMICAL TOILETS MUST BE PROVIDED BY CONTRACTOR AS REQUIRED WITHIN
HOOK-UPS MUST BE THE RESPONSIBILITY OF CONTRACTOR.
THE WORK TRAILER. POINT OF CONNECTION MUST BE DETERMINED AT PRECONSTRUCTION CONFERENCE.
TEMPORARY POWER AND WATER IS AVAILABLE AT ARTCC, IF REQUIRED FOR CONSTRUCTION PURPOSES OF
IN CONSTRUCTION STAGING AREA. CONTRACTOR MUST PROVIDE TELEPHONE AND BOTTLED WATER.
CONTRACTOR'S TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE MUST BE LOCATED
DIVISION 1 REQUIREMENTS.
THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE
OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS.
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY
SECURITY GATE.
CONTRACTOR'S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE MUST BE THROUGH MAIN ENTRANCE
PERSONS NEAR CONSTRUCTION AREAS.
SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT
PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON
ALL TIMES FOR FAA DELIVERIES.
CONTRACTOR MUST KEEP LOADING DOCK, CAFETERIA LOADING DOCK, AND CAFETERIA ACCESSIBLE AT
OFF-LIMITS FOR CONTRACTOR PARKING.
MUST BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT ARTCC ARE
CONTRACTOR'S PARKING BE LIMITED TO CONSTRUCTION STAGING AREA. ADDITIONAL PARKING
8:00 AM AND 2:00 TO 4:00 PM. COORDINATE CONTRACTOR DELIVERIES WITH THE COR.
FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT 6:30 TO
DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN
G.2
A.1
B.1
FINAL LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION CONFERENCE.
BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS.
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST
C. FAA SECURITY REQUIREMENTS
D.1
SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS.C.2
C.3
C.4
C.5
IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES AND/OR MECHANICAL SERVICES.
SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO EQUIPMENT. CONTRACTOR MUST NOTIFY COR
FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE
CONTRACT. CONTRACTOR MUST BE RESPONSIBLE FOR CONTINUOUS PROTECTION OF THIS EQUIPMENT
EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS
WORK MUST BE COORDINATED WITH COR. DISRUPTION OF THIS FACILITY MUST NOT BE PERMITTED.
CONTRACTOR MUST USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY.
PUBLIC.
LOSS OF THIS EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE SAFETY OF THE FLYING
C.1
C.6
THE BUILDING. CONTRACTORS VEHICLES MUST BE MARKED.
SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL WHILE IN
THE RIGHT TO PROHIBIT WORKERS EMPLOYED BY CONTRACTOR TO WORK AT FACILITY. CONTRACTOR'S
TEMPORARY SECURITY BADGES MUST BE ISSUED TO CONSTRUCTION PERSONNEL. FAA RESERVES
AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR.
WITH SITE NUMBER OF CLEARANCES REQUIRED TO PERFORM WORK.
SECURITY CLEARANCE BADGING IMMEDIATELY FOLLOWING NOTICE OF CONTRACT AWARD. COORDINATE
CONTRACTOR MUST SUBMIT SECURITY PAPERWORK FOR CONTRACTOR PERSONNEL THAT ARE TO OBTAIN
MAY BE REQUIRED. COORDINATE REQUIREMENTS WITH COR.
COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR. ESCORTS OUTSIDE BUILDING
FAA ESCORTS MUST BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE BUILDING.
KEYS TO COR AND SECURITY.
BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. PROVIDE
DISCRETION OF COR. CONTRACTOR MUST DO NO DIGGING WITHOUT PRIOR PERMISSION FROM COR.
BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED BY THE CONTRACTOR AT THE
STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE MUST BE LIMITED TO THE CONSTRUCTION
DEVELOPED TO RESUME WORK IN THAT AREA. COORDINATE WORK IN OTHER AREAS WITH COR.
DURING THE WORK, NOTIFY COR. ISOLATE AREA, AND CEASE WORK IN THAT AREA UNTIL A PLAN HAS BEEN
THE BUILDING HAS BEEN IDENTIFIED AS CONTAINING HAZMAT MATERIALS. IF HAZMAT MATERIALS ARE DISCOVERED
I.5 REFER TO DIVISION 1 AND COR FOR MORATORIUM OF WORK TIME FRAMES.
USE IS PROHIBITED.
COORDINATE WITH COR USE OF MOBILE CELL PHONES AT FACILITY. IN SOME AREAS OF BUILDING CELL PHONE
PLACEMENT.
POSITION AND LOCATION OF DUMPSTERS MUST BE COORDINATED WITH COR PRIOR TO THEIR DELIVERY AND
OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY.
WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND FREE
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY CONTRACTOR
ADVANCE OF PERFORMANCE OF THE WORK.
COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN
NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, BY COR IN WRITING, A MINIMUM OF 10 (TEN) WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE
AND CHILLER ROOM AREA WAY; 2) AS DIRECTED BY COR.
CONTRACTOR'S ACCESS TO BUILDING MUST BE LIMITED TO THE FOLLOWING LOCATIONS: 1) BOILER ROOM
D. CONSTRUCTION MATERIAL STORAGE
CONTRACTOR MUST NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION.
PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR MUST
AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN ADVANCE OF
PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE
DURING OFF-HOURS AS INDICATED IN NOTE I.2 THIS SHEET UNDER DEMOLITION AND CONSTRUCTION HOURS.
SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED
H.2 PROVIDE WASH STATIONS IN ADJACENT TO PORTABLE TOILETS IN CONSTRUCTION STAGING AREA.
H.3 TOILETS INSIDE FACILITY BUILDINGS MUST NOT BE USED BY CONTRACTOR.
M.5 TORCH CUTTING IS NOT ALLOWED INSIDE THE CHILLER BUILDING OR ON THE CHILLER BUILDING ROOF.
B8
G005 SCALE: NTS
CONSTRUCTION STAGING PLAN
CONTRACTOR TO THE SATISFACTION OF COR.
DISTURBED LAWNS, LANDSCAPING AND IRRIGATION SYSTEM MUST BE RESTORED TO ORIGINIAL CONDITION BY lo tt e zny-18061513-g005
2021-05-04T11:27:48-0400
ROBERT L BELTON
2021-04-29T09:22:12-0400
ANDREW G MACDONALD
MECHANICAL LEGEND, NOTES AND ABBREVIATIONS
ZNY-18061513-M001
-m
B.
C.
A.
D.
G.
F.
SUPPLY DUCT (DOWN)
DOOR LOUVER
LINED DUCT
FLEXIBLE CONNECTION
VOLUME DAMPER, CONTROL DAMPER
FIRE DAMPER, SMOKE DAMPER
TURNING VANES
FLEXIBLE DUCT
DUCT RISE
DUCT DROP
BACKDRAFT DAMPER
STATIC PRESSURE DAMPER
TRANSITION-RECTANGULAR
TO ROUND
20X10
VD
FD SD
SPD
SIZE
FD/SD
COMBINATION FIRE/SMOKE DAMPER
OUTSIDE AIR UP
OUTSIDE AIR DOWN
AHU
SYMBOL
EQUIPMENT DESIGNATION
SYMBOL ABBREVIATION DESCRIPTION
BDD
HIDDEN DUCTWORK
OUTSIDE AIR INTAKE
SUPPLY DUCT (UP OR OUT)
J.
K.
HVAC LEGEND
PIPING
H.
I.
E.
UNDERCUT DOOR
T THERMOSTAT
ROUND DUCT
(DIAMETER)
RECTANGULAR DUCT
(FIRST FIGURE IS SIDE SHOWN)
CD-1
12X12
CR-1
EG-1
12X12
EXHAUST GRILLE
CEILING RETURN, UNLESS
OTHERWISE NOTED
DIFFUSER, GRILLE, & REGISTER
DESIGNATION
AIR FLOW RATE (CFM)
NECK SIZE (REGISTERS &
GRILLES ONLY)
RETURN OR EXHAUST DUCT
(UP OR OUT)
RETURN OR EXHAUST DUCT
(DOWN)
PIPING (CONT.) ABBREVIATIONSDOUBLE LINE DUCTWORKEQUIPMENT
GALLONS PER HOUR
GENERATOR
GALVANIZED
GALLON
GAUGE
FACE VELOCITY
FINNED TUBE RADIATION
FEET
COMBINATION FIRE AND SMOKE
FIBERGLASS REINFORCED PIPE
FEET PER SECOND
FEET PER MINUTE
FLOOR
FLEXIBLE
FULL LOAD AMPERES
FINISHED FLOOR
FINAL FILTER
FIRE DAMPER
FLEXIBLE CONNECTION
FREE AREA (SQ.FT)
DEGREES FAHREINHEIT
FILTER
EXPANSION
EXHAUST
ENTERING WATER TEMPERATURE
ENTERING WET BULB
EXISTING TO REMAIN
EXPANSION TANK
EXTERNAL STATIC PRESSURE
REGISTER
EXISTING RELOCATED, EXHAUST
ENTERING
ELEVATION
ELECTRIC
ELEVATION
EFFICIENCY
EXHAUST FAN
ENERGY EFFICIENCY RATIO
ENTERING AIR TEMPERATURE
EXHAUST AIR LOUVER
EXHAUST AIR
EXISTING
DIFFERENTIAL PRESSURE
DOWN
DIAMETER
DOMESTIC HOT WATER
DEGREE
DEMOLISH EXISTING
DIRECT DIGITAL CONTROL SYSTEM
DOMESTIC COLD WATER
DRY BULB
DROP, DRAIN
COLD WATER
CONSTANT VOLUME, CONTROL VALVE
CONDENSING UNIT
CONTROL PANEL
CONTRACING OFFICER'S REPRESNTATIVE
CONTINUATION
CONNECTION
CONDENSATE
COMPRESSOR
CEILING
CHILLER
CODE OF FEDERAL REGULATIONS
CUBIC FEET PER MINUTE
CEILING DIFFUSER, CONTROL DAMPER
COOLING COIL
CONSTANT AIR VOLUME
CONDENSER
BTU PER HOUR
BRITISH THERMAL UNIT
BOTTOM THROAT, BUFFER TANK
BOTTOM
BRAKE HORSEPOWER
BACK FLOW PREVENTER
BLIND FLANGE
BACK DRAFT DAMPER
BOILER, BELOW
MANUAL AIR VENT
AIR SEPARATOR
ACCESS PANEL
AIR PRESSURE DROP
AIR HANDLING UNIT
ABOVE FINISHED FLOOR
AFTER FILTER, AIR FOIL
ACCESS DOOR
AIR CONDITIONING UNIT
ASBESTOS CONTAINING MATERIAL
AIR CONDITIONING
AUTOMATIC AIR VENT
AMPERES, ABOVE
GENERAL NOTES
FILTER
LOUVER
BACKDRAFT DAMPER
HEATING COIL
AI_34251
AI_34252
AJ_34256
AJ_34257
AK_34260
AK_34261
MOTORIZED OPPOSED
BLADE DAMPER
AH_34352
ELECTRIC HEATING COIL
FIRE/SMOKE DAMPER
HUMIDIFIER
COOLING COIL
UNIT HEATER
FAN
AIR FLOW MEASURING
STATION/STATIC PRESSURE
MEASURING STATION
MOTORIZED PARALLEL
BLADE DAMPER
SINGLE LINE DUCTWORK
FAN WITH VARIABLE
FREQ. MOTOR CONTROLLER
POINT OF TERMINATION
RECTANGULAR TO ROUND
TRANSITION
SQUARE REDUCER/
INCREASER
TO BE DEMOLISHED
POINT OF CONNECTION OF
NEW TO EXISTING
ID
MISCELLANEOUS
NEW WORK -
DARK LINE WEIGHT
EXISTING -
LIGHT LINE WEIGHT
SIZE (IN)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
FUEL OIL RETURN
FUEL OIL SUPPLY
CWS
CWR
FOR
FOS
STM
RV REFRIGERANT VENT
D DRAIN
CW COLD WATER
DHW DOMESTIC HOT WATER
DCW DOMESTIC COLD WATER
STEAM CONDENSATE RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
HWS HOT WATER SUPPLY
HOT WATER RETURNHWR
SAN SANITARY DRAIN
COND CONDENSATE
STEAM
INDUSTRIAL WATERIW
FLUID FLOW DIRECTION
PIPE TURNING UP
PIPE TURNING DOWN
PLUGGED PIPE/OUTLET
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
GATE VALVE
ANGLE VALVE
GLOBE VALVE
CHECK VALVE
UNION
DIRECTION OF PITCH
GC
PV
GAS COCK
PLUG VALVE
GV
GLV
P/TRV
FLEXIBLE HOSE (FLANGED ENDS)
FLEXIBLE HOSE (SCREWED ENDS)
FLEXIBLE PIPE CONNECTOR
AIR ELIMINATOR
TEST COCK
AUTOMATIC AIR VENT
FLOW CONTROL VALVE
FLOW METER
STRAP-ON SENSOR
WELD CAP
BALANCING VALVE
PRESSURE REGULATING VALVE
THERMOMETER
PUMP
BUTTERFLY VALVEBFV
PRESSURE GAUGE
INLINE PUMP
PRESSURE/TEMPERATURE
RELIEF/SAFETY VALVE
HOT TAP/STOPPLE FITTING
MOTOR OPERATED 2-WAY
CONTROL VALVE
MOTOR OPERATED 3-WAY
STRAINER WITH BLOWDOWN
VALVE
PIPE HEADER WITH BLIND
FLANGE
MANUAL AIR VENTAV
AAV
BALL VALVEBV
TEST AND BALANCE VALVE
WATER METER
FCV FLOW CONTROL VALVE
PETE'S PLUG
VAC VACUUM
WATER PRESSURE DROP
WORKING PRESSURE
WIRE MESH SCREN
WATER HAMMER ARRESTOR
WET BULB
WITHOUT
WITH
WIDTH
VARIABLE FREQUENCY DRIVE
VELOCITY
VACUUM
VOLTS
UNLESS OTHERWISE NOTED
TOILET EXHAUST
TYPICAL
TOTAL STATIC PRESSURE
TOTAL DYNAMIC HEAD
TRANSFER AIR
THROAT
SUPPLY REGISTER
STATIC PRESSURE
SUPPLY GRILLE
SUPPLY FAN
SENSIBLE
SUPPLY AIR, SOUND ATTENUATOR
REMOVE EXISTING
RETURN REGISTER
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
RETURN GRILLE
REQUIRED
RADIATION, RADIANT HEATER
RELOCATED, RISE
PSI ABSOLUTE
PSI GAUGE
PACKAGED FILTER, PREFILTER
PRESSURE DROP
OPENING
OPEN END DUCT
OUTSIDE AIR LOUVER
OUTSIDE AIR
NET POSITIVE SUCTION HEAD
NORMALLY OPEN, NUMBER
NOT IN CONTRACT
CRITERIA
NORMALLY CLOSED, NOISE
MOTOR
PROTECTION
MINIMUM OVERCURRENT
MINIMUM CIRCUIT AMPS
THOUSAND BTU PER HOUR
LEAVING WATER TEMPERATURE
LEAVING WET BULB TEMPERATURE
LINEAR FEET
POUNDS PER HOUR
POUNDS, POUNDS DRY STEAM
LEAVING AIR TEMPERATURE
LENGTH
KILOWATT
WATER SUPPLY
GENERATOR RADIATOR JACKET
WATER RETURN
INDUSTRIAL WATER
INCH OR INCHES
IRON PIPE SIZE
FREQUENCY
HEATING AND VENTILATION
HOT WATER RETURN
HOT WATER PUMP
HOT WATER COIL
HOT TAP/ STOPPLE FITTING
HAND SWITCH
HOUR
HORSEPOWER, HEAT PUMP
HORIZONTAL
HEAD
HEIGHT
GENERAL EXHAUST
GALLONS PER MINUTE
HVAC LEGEND IS THE STANDARD LEGEND WHICH IS USED FOR FAA FACILITIES DESIGN. NOT ALL SYMBOLS
AND ABBREVIATIONS SHOWN MAY BE USED ON THIS PROJECT.
INSTALLATION SHALL PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AIR FILTERS, AND OTHER DEVICES. ACCESS DOORS SHALL BE INSTALLED TO PROVIDE ADEQUATE CLEARANCES FOR DIRECT ACCESS.
DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING AND CUTTING OPERATIONS. PERSON PERFORMING FIRE PROTECTION DUTIES SHALL NOT BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING SHALL BE SCHEDULED IN WRITING WITH COR AND SHALL BE PERFORMED OUTSIDE OF FACILITY OR IN SAFE LOCATION
TO BE DETERMINED BY COR.
FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL MECHANICAL VENTILATION
DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA AND ACGIH.
NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM. CONNECT METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL OR PIPING SHALL NOT BE USED AS A GROUND PATH.
EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.
LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR
APPROVAL, PRIOR TO INSTALLATION.
PROVIDE LOCAL VENTILATION DURING APPLICATION OF PRODUCTS WHICH MAY CAUSE ACUTE OR CHRONIC
HEALTH OR SAFETY EFFECTS TO FACILITY OCCUPANTS IN ACCORDANCE WITH OSHA AND ACGIH
REQUIREMENTS. SUBMIT VENTILATION PLAN TO COR FOR APPROVAL.
FOR CAUTIONS AND SPECIFIC AREAS WHERE HAZARDOUS MATERIALS OCCUR.
PROVIDE A DETAILED SCHEDULE FOR DEMOLITION OF HVAC EQUIPMENT AND INSTALLATION OF NEW HVAC SYSTEMS. COORDINATE WITH COR PRIOR TO REMOVAL OF EQUIPMENT. HVAC SYSTEMS MUST REMAIN IN
OPERATION THROUGHOUT REMOVAL AND REPLACEMENT OF EQUIPMENT.
PRIOR TO THE DEMOLITION OF ITEMS WHICH HAVE UTILITIY CONNECTIONS (WATER, ELECTRICITY, GAS ETC.)
ARRANGE WITH COR TO LOCATE SHUT-OFF VALVES, PANEL BOXES AND OTHER CONTROL ELEMENTS. FAA
PERSONNEL SHALL SHUT OFF, ISOLATE EQUIPMENT AND BRING EQUIPMENT BACK ONLINE.
SOLENOID VALVE
MOTOR OPERATED
BUTTERFLY VALVE
WATER PRESSURE DROP
WORKING PRESSURE
WIRE MESH SCREN
WATER HAMMER ARRESTOR
WET BULB
WITHOUT
WITH
WIDTH
VARIABLE FREQUENCY DRIVE
VELOCITY
VACUUM
VOLTS
UNLESS OTHERWISE NOTED
TOILET EXHAUST
TYPICAL
TOTAL STATIC PRESSURE
TOTAL DYNAMIC HEAD
TRANSFER AIR
THROAT
SUPPLY REGISTER
STATIC PRESSURE
SUPPLY GRILLE
SUPPLY FAN
SENSIBLE
SUPPLY AIR, SOUND ATTENUATOR
REMOVE EXISTING
RETURN REGISTER
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
RETURN GRILLE
REQUIRED
RADIATION, RADIANT HEATER
RELOCATED, RISE
PSI ABSOLUTE
PSI GAUGE
PACKAGED FILTER, PREFILTER
PRESSURE DROP
OPENING
OPEN END DUCT
OUTSIDE AIR LOUVER
OUTSIDE AIR
NET POSITIVE SUCTION HEAD
NORMALLY OPEN, NUMBER
NOT IN CONTRACT
CRITERIA
NORMALLY CLOSED, NOISE
MOTOR
PROTECTION
MINIMUM OVERCURRENT
MINIMUM CIRCUIT AMPS
THOUSAND BTU PER HOUR
LEAVING WATER TEMPERATURE
LEAVING WET BULB TEMPERATURE
LINEAR FEET
POUNDS PER HOUR
POUNDS, POUNDS DRY STEAM
LEAVING AIR TEMPERATURE
LENGTH
KILOWATT
WATER SUPPLY
WATER RETURN
INDUSTRIAL WATER
INCH OR INCHES
IRON PIPE SIZE
FREQUENCY
HEATING AND VENTILATION
HOT WATER RETURN
HOT WATER PUMP
HOT WATER COIL
HOT TAP/ STOPPLE FITTING
HAND SWITCH
HOUR
HORSEPOWER, HEAT PUMP
HORIZONTAL
HEAD
HEIGHT
GENERAL EXHAUST
GALLONS PER MINUTEGPM
GX
H, (H)
HC
HD
HORZ
HP
HR
HTP
HU
HWC
HWP
HWR
HWS
HV
HZ
IPS
IN
IW
JWR
JWS
KW
L, (L)
LAT
LBS
LBS/HR
LIN FT, LF
LWB
LWT
MBH
MCA
MOCP
MOT, MTR
NC
NIC
NO
NPSH
NTS
OA
OAL
OED
OPNG
PD
PF
PH
PRV
PSI
PSIG
PSIA
RA
RAD
REQ
RG
RH
RPM
RR
RX
SA
SEN, SENS
SG
SD
SP
SR
TA
TDH
TSP
TSTAT
TV
TYP
TX
UH
UON
VAC
VEL
VFD
W, (W)
W/
W/O
WB
WHA
WMS
WP
WPD
AAV
AC
ACM
ACU
AD
AF
AFF
APD
AP
BDD
BF
BFP
BHP
BOT
BT
BTU
BTUH
CAV
CC
CFR
CH
CLG
COMPR
COND
CONN
CONT
COR
CU
CW
DB
DCW
DDCS
DE
DEG
DHW
DIAM, DIA
DMPR
DN
E, (E)
EA
EAL
EAT
EER
EFF
EL
ELEC
ELEV
ENT
ER
ESP
ET
ETR
EWB
EWT
EXH
EXP
FA
FC
FF
FIN FL, FF
FLA
FLEX
FLR
FPM
FPS
FRP
FSD, FD/SD
FT
FTR
FV
G, GA
GAL
GALV'D
GEN
GPH
BUILDING CONTAINS HAZARDOUS MATERIALS. REFER TO HAZMAT ABATEMENT SHEETS A101, A102, AND A103 lo tt e zny-18061513-m001
2021-05-04T11:28:01-0400
ROBERT L BELTON
2021-04-29T09:22:23-0400
ANDREW G MACDONALD
AND CONSTRUCTION SEQUENCE
MECHANICAL INSTRUMENTATION
ZNY-18061513-M002
:4 lo tt e
CONTROLS & INSTRUMENTATION
SS
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE IDENTIFICATION NUMBER
IN AN ENCLOSURE
EQUIPMENT INSTRUMENT OR DEVICE NOT LOCATED
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE
CENTRAL FEPC
DDCP DATA INPUT/OUTPUT TO
ELECTRONIC INTERLOCK WIRING
DDC CONTROL SYSTEM WIRING
DIGITAL INPUT TO DDCP
DIGITAL OUTPUT FROM DDCP
ANALOG INPUT TO DDCP
ADDRESSABLE INTERFACE MODULE
CONSTRUCTION SEQUENCE
I. NOTES AND PREPARATION
CONNECTIONS, AUTOMATIC CONTROL WIRING AND ITS COMPONENTS (UON).
REMOVAL OF EQUIPMENT SHALL INCLUDE REMOVAL OF ASSOCIATED PIPING, SUPPORT, INSULATION, MOTORS ELECTRICAL
INFORMATION WITH SHOP DRAWINGS.
VERIFY AND COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT PRIOR TO ORDERING AND SUBMIT THIS
OF THE MANUFACTURER, THE SPECIFICATIONS, AND APPROVED SHOP DRAWINGS.
EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES, THE PRINTED INSTALLATION INSTRUCTIONS
START OF WORK OF THAT STEP.
EQUIPMENT INCLUDING VALVES, PIPING AND ACCESSORIES FOR THE NEXT STEP SEQUENCE MUST BE ON SITE BEFORE
COORDINATE THE INSTALLATION OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.
ELBOWS, AND OFFSETS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL COST TO THE FAA.
DRAWINGS DO NOT SHOW ALL REQUIRED FITTINGS, ELBOWS, AND/OR OFFSETS. FINAL INSTALLATION OF ALL FITTINGS, DIMENSIONS AFFECTING THE WORK.
PHYSICAL SIZES AND LOCATION OF EQUIPMENT AND ASSOCIATED PIPING ARE APPROXIMATE. VERIFY SIZES AND
DEMOLITION
NEW WORK
4.
5.
PREPARATION
CONFLICTS AND "AS IS" CONDITIONS.
COMPLETED AND APPROVED BEFORE START OF WORK. THIS MUST INCLUDE ELEVATIONS AND ANY MODIFICATION DUE TO
SITE. APPROVED CONSTRUCTION PLANS SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT SHALL BE
BEFORE THE START OF DEMOLITION AND CONSTRUCTION, EQUIPMENT PIPING AND ACCESSORIES SHALL BE APPROVED AND ON
VERIFY LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE WORK PRIOR TO THE START OF CONSTRUCTION.
START OF WORK. MECHANICAL AND ELECTRICAL SHUTDOWN FOR WORK SHALL BE ACCOMPLISHED BY FAA PERSONNEL.
DE-ENERGIZING ELECTRICAL SUPPLY. THIS WORK SHALL BE SCHEDULED AND COORDINATED WITH THE COR BEFORE
SHUTDOWN AND REMOVAL OF THE EQUIPMENT AND PIPING SHALL BE ACCOMPLISHED BY CLOSING SHUT-OFF VALVES AND
TEMPORARY WORK MAY NOT BE SHOWN ON DRAWINGS (E.G. SOME BLIND FLANGES).
WHERE WORK IS DESIGNATED TO BE "TEMPORARY", IT WILL EVENTUALLY BE REMOVED IN A SUBSEQUENT STEP. SOME
PROTECT FLOOR DRAINS AND STORM DRAINS FROM DAMAGE AND DEBRIS AT ALL TIMES.D.
ELECTRICAL REQUIREMENTS.
INTERFERE WITH THE WORK. OBTAIN PRIOR APPROVAL FROM COR FOR SUCH WORK. REFER TO ELECTRICAL SPECIFICATIONS FOR
PIPING, ELECTRICAL WIRING AND CONDUITS NOT INDICATED AND NOT RELATED TO THE PIPING REPLACEMENT WHERE THEY
DEMOLITION DRAWINGS INDICATE PIPING AND EQUIPMENT WITHIN THE WORK AREA. REMOVE AND REINSTALL (AS REQUIRED)
SYSTEMS. HEATING HOT WATER SYSTEM MAY HAVE SERVICE INTERRUPTED AS APPROVED AND SCHEDULED BY COR.
SEQUENCE SHALL BE PROVIDED BY THE CONTRACTOR WHICH MINIMIZES THE RISK OF FAILURE TO ANY MECHANICAL OR ELECTRICAL
THE ARTCC IS A 24 HOUR FACILITY AND CAN NOT TOLERATE THE LOSS OF POWER OR CHILLED WATER. A CONSTRUCTION
EXISTING CONTROLS, UNLESS NOTED OTHERWISE, SHALL REMAIN IN OPERATION AND PROTECTED DURING CONSTRUCTION.
III. TURNOVER FROM PERMANENT TO TEMPORARY TOWERS
CONDENSER WATER PIPING.
CHILLERS ARE NOW ISOLATED FROM THE PERMANENT CONDENSER WATER SYSTEM AND ARE RUNNING OFF THE TEMPORARY
CONDENSER WATER SUPPLY OVER TO TEMPORARY TOWERS.
ONCE TEMPORARY TOWER SYSTEM HAS BEEN PROVEN, REPIPE CH-100 AND CH-200 TO TEMPORARY HEADER AND TURN PLANT
FZ
FR
FEPC
FCV
FACP
ED
ECMS
DDCP
DC
CI
AX
AM
AFS
AFMS
FREEZESTAT
FIELD MOUNTED RELAY
FRONT END PERSONAL COMPUTER
FLOW CONTROL VALVE
FIRE ALARM CONTROL PANEL
ENABLE/DISABLE
ENERGY CONTROL AND MONITORING
DI. PRESSURE SWITCH
DAMPER POSITION INDICATOR
DIRECT DIGITAL CONTROL PANEL
DRY CONTACT
CURRENT RELAY
CURRENT INPUT
CONTROL DAMPER
COMMON
AUXILIARY CONTACT
AMPERAGE
AIR FLOW SWITCH
AIR FLOW MEASURING STATION
WD
SW
SL
PDI
PD
N.O.
N.C.
LS
WATER DETECTOR
TEMPERATURE SENSOR
TEMPERATURE INDICATOR
SWITCH
START/STOP
STROBE LIGHT
PRESSURE INDICATOR
PRESSURE DIFFERENTIAL INDICATOR
/POWER DEMAND
PRESSURE DIFFERENTIAL SENSOR
NORMALLY OPEN
NORMALLY CLOSED
MOTOR/ACTUATOR
LEVEL SWITCH
HUMIDITY SENSOR
HUMIDISTAT
HORN
REQUIRED.
COORDINATE ALL WORK WITH THE WORK OF OTHER TRADES. ELECTRICAL WORK SHALL MATCH MECHANICAL PHASING PLAN AS
STEP 1 - TRANSITION
MANUAL OVERRIDE AND SILENCE SWITCHES DURING CONSTRUCTION WORK.
PROTECT REFRIGERANT LEAK DETECTION AND ALARM SYSTEM, REFRIGERANT LEAK SENSING TUBES, HORNS, LIGHT STROBES, DO
AI
AID
IV. PERMANENT CONDENSER WATER PIPING
PROVING PERIOD.
INCIDENT TO BE CONSIDERED "PROVEN". TEMPORARY TOWER YARD SHALL REMAIN PRESSURIZED AND OPERATIONAL DURING
AFTER THE PERMANENT PIPING SYSTEM IS OPERATIONAL, IT MUST BE OPERATED FOR THREE (3) CONSECUTIVE DAYS WITHOUT
A. INSTALL PERMANENT CONDENSER WATER PIPING AND APPURTENANCES ON SITE.
STEP 1 - INSTALLATION OF PERMANENT PIPING
CANNOT BE ACCOMPLISHED IN 8-10 HOURS, PROVIDE TEMPORARY DETECTION/ALARM SYSTEM.
REFRIGERANT LEAK DETECTION PANEL MUST BE PERFORMED TO MINIMIZE THE DURATION OF SYSTEM OUTAGE. IF THE WORK
ALL WORK INVOLVING CHANGEOVER OF CONTROL FUNCTIONS FROM EXISTING REFRIGERANT LEAK DETECTION PANEL TO THE NEW
LOCATION OF SENSING LOCATIONS. KEEP EXISTING SYSTEM IN OPERATION UNTIL NEW SYSTEM IS OPERATIONAL.
PROVIDE CONDUIT AND TUBING ASSOCIATED WITH NEW REFRIGERANT LEAK DETECTION SYSTEM POINTS. SEE DRAWING M201 FOR
V. REFRIGERANT LEAK DETECTION PANEL REPLACEMENT
B. DEMOBILIZE TEMPORARY TOWER YARD AND ASSOCIATED PIPING. REMOVE CHAIN LINK FENCING.
PROVEN AND COMMISSIONED. CLOSE ISOLATION VALVES FOR TEMPORARY TOWER PIPING ON CONDENSER WATER HEADERS.
ONCE WORK WITHIN THE CHILLED WATER PLANT AND PERMANENT TOWER YARD IS COMPLETE AND ALL EQUIPMENT HAS BEEN
VI. TEMPORARY TOWER YARD DEMOBILIZATION
FAN. THE FAN MUST RUN CONTINUOUSLY UNTIL WORK IS COMPLETE.
PRIOR TO DISCONNECTING AND REMOVING REFRIGERANT LEAK DETECTION PANEL, ENERGIZE EXISTING REFRIGERANT VENTILATION
D. DISCONNECT POWER, CONTROL AND INTERLOCK WIRING FROM THE REFRIGERANT LEAK DETECTION PANEL AND REMOVE THE PANEL.
NEW LEAK DETECTION TUBING TO THE NEW PANEL.
INSTALL NEW REFRIGERANT LEAK DETECTION PANEL AND RECONNECT POWER, CONTROL AND INTERLOCK WIRING. ALSO, TERMINATE
F. ENERGIZE PANEL AND PERFORM ACTIVE TESTING OF SEQUENCE DURING THE SCHEDULED OUTAGE.
OPERATIONAL AND ACCEPTED BY COR..
REMOVE EXISTING REFRIGERANT LEAK GAS-MONITORING POINTS AND ASSOCIATED TUBING AND CONDUIT AFTER NEW SYSTEM IS
ANALOG OUTPUT FROM DDCP
A.A.
STEP 1 - TEMPORARY COOLING TOWERS AND PUMPS
II. TEMPORARY COOLING TOWERS AND PUMPS
COOLING TOWER YARD.
THE INTENT OF THIS PHASE IS TO INSTALL TEMPORARY EQUIPMENT TO ALLOW FOR THE COMPLETE SHUTDOWN OF THE
TEMPORARY PIPING WITH COR.
CHILLED WATER PLANT. GROOVED PIPING IS ALLOWED ONLY FOR TEMPORARY PIPING. COORDINATE GROUNDING REQUIREMENT OF
ABOVE GROUND TEMPORARY CONDENSER WATER PIPING SHALL BE ROUTED ON WOODEN CRIBBING SUPPORTS TO THEC.
CONNECTIONS FOR ALL 4 CHILLERS.
INSTALL TEMPORARY CONDENSER WATER HEADER WEST OF EXISTING CHILLERS ON GROUND WITH VALVED BRANCH
FENCING. REFER TO M003 FOR LOCATION OF WORK AREA.
ONCE TEMPORARY TOWER SYSTEM HAS BEEN PLACED ON SITE, PROTECT THE TEMPORARY TOWER SITE WITH CHAIN LINK
A. INSTALL TEMPORARY FOUNDATIONS ON SITE AND ALLOW TO CURE FOR 28 DAYS. INSTALL TEMPORARY EQUIPMENT ON SITE.
THIS OUTLINE AS PART OF THEIR CONSTRUCTION PHASING PLAN.
CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE WHICH ALSO PROVIDES ALL OF THE DETAILS ABSENT FROM
CONSTRUCTION SEQUENCE IS PROVIDED AS AN OUTLINE OF THE SIGNIFICANT STEPS REQUIRED TO COMPLETE THE PROJECT. THE H.
STEP 2 - INSTALLATION OF TEMPORARY EQUIPMENT
AO
CONDENSER WATER SYSTEM.
CONNECT TEMPORARY ELECTRICAL, MAKE-UP WATER, BLOWDOWN, AND TEMPORARY CHEMICAL TREATMENT TO THE…