Replace the Defective Condenser Water Valves at the New York ARTCC (ZNY) in Ronkonkoma, NY
Solicitation number
697DCK-21-R-00190
Issued by

About this file

This is a solicitation for a construction project to replace defective condenser water valves at an air route traffic control center in Ronkonkoma, New York. The Federal Aviation Administration requires contractors to provide all labor, materials, and supervision for the project, with a price range of $1-4 million. Contractors must be registered in SAM and submit proposals electronically in PDF format by the response date. Payment and performance bonds are required. A site visit will be scheduled to review the project details. The North American Industry Classification System code for this project is 238220.

View the file

Other files

File Type Posted
amendment0004.pdf PDF
697DCK-21-R-00190amendment3.pdf PDF
amendment0002.pdf PDF
Wage Determination 05.07.2021.pdf PDF
amendment0001.pdf PDF
NYWAGERATE.pdf PDF
COVID-19 Contractual Requirement 21-3-17.pdf PDF
19127-portfolio.pdf PDF
ZNY_Final_Valve_Replacement - Specs.pdf.pdf PDF
RFO697DCKR00190.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

ENGINEERING SERVICES

ENROUTE/FSS

ARTCC

PANEL SCHEDULES

CONDENSER WATER VALVE REPLACEMENT

NYNEW YORK CENTERRONKONKOMA

WL

PROJECT ENGINEER MGR: ENGINEERING CENTER

03/31/2021 18061513

ZNY-18061513-E701

02/03/202118061513CONSTRUCTION, DT #19127 (EKS)03/31/2021

z n y -1

-e

.d g

DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

C O

N S

T R

U

IO

-e

/0

/2

:2

A

M P lo tt e d b

V

-C

E

G -E

D

B

F

H

8 7 6 5 4 3 2 1

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

REDLINE

APVD

IS

1 2

E-102-A

E-102-B

E-106-D

E-106-B

PANELBOARD SHEET LOCATION KEY

GENERAL SHEET NOTES

SHEET NOTES

SCHEDULE AND THIS DRAWINGS.

BRANCH CIRCUIT RUNS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY BRANCH CIRCUITS PER PANELBOARD C.

MAINTAIN THE CONTINUITY FOR ALL CIRCUITS SERVING AREAS NOT DESIGNATED FOR DEMOLITION.B.

REFER TO DRAWINGS E001 AND E002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.A.

PROVIDE CONDUIT AND WIRING FROM PANEL TO THE TEMPORARY EQUIPMENT ON SITE. SEE E002 FOR LOCATION.

PLANS FOR FCV LOCATION.

EXISTING CIRCUIT BREAKER AND ASSOCIATED WIRING TO BE RECONNECTED TO THE NEW FCV. REFER TO FLOOR

RATING.

CIRCUIT BREAKER AS REQUIRED. NEW CIRCUIT BREAKER SHALL MATCH EXISTING IN TYPE, MANUFACTURER, AND AIC

CONTRACTOR TO VERIFY CIRCUIT BREAKER SIZE REQUIREMENT PER FINAL EQUIPMENT SELECTED. PROVIDE NEW

TEMPORARY EQUIPMENT LOCATION.

POWER SUPPLY TO TEMPORARY COOLING TOWER, PUMPS, AND ASSOCIATED APPARATUS. REFER TO E002 FOR

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

zny-18061513-e701

2021-04-13T06:12:01-0400

ROBERT L BELTON

2021-04-12T07:28:45-0400

ANDREW G MACDONALD

COVER SHEET

KL

WS

ZNY-18061513-G001

-g

:3 lo tt e

Department of Transportation

Federal Aviation Administration

Condenser Water Valve Replacement

New York Air Route Traffic Control Center

Ronkonkoma, New York

January 2021

FINAL Submission zny-18061513-g001

2021-04-13T06:12:16-0400

ROBERT L BELTON

2021-04-12T07:33:12-0400

ANDREW G MACDONALD

LOCATION MAP & BUILDING CODE ANALYSIS

INDEX OF DRAWINGS, GENERAL NOTES,

ZNY-18061513-G002

lo tt e

GREAT SOUTH BAY

JOHNSON AVE

SUNRISE HWY

LAKELAND AVE

347 MEMORIAL HWY

MacARTHUR

MEMORIAL HWY

VETERAN'S

EXPRESSWAY

LONG ISLAND

MacARTHUR AIRPORT

LONG ISLAND-

LOCATION

PROJECT

ZNY ARTCC

LTR

NUMBER

DRAWING

DRAWING TITLE

BUILDING CODE ANALYSIS

CLASSIFICATION:

OCCUPANCY

AND REGULATIONS:

APPLICABLE CODES

HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.

DOCUMENTS, CODES, AND CRITERIA FOR THE HANDICAPPED ACCESSIBILITY ARE TO BE

MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ADA/ABA

CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN

DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND T.

BE CRITICAL TO THE OPERATION OF THE FACILITY.

ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY

PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE S.

REQUIREMENTS, 29 CFR 1910.146 AND 1926.21(B)(6).

WORK IN CONFINED SPACES OR AREAS SHALL BE DONE IN ACCORDANCE WITH OSHA R.

FOR CIRCUIT BREAKER REPLACEMENT WITH COR.

OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY PANELBOARD

ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER

CASE OF BREAKER OR PIPE VALVE OPERATION. CONTRACTOR SHALL NOT OPEN (DE-

CONTRACTOR SHALL REQUEST PERMISSION IN WRITING OF FAA IN ADVANCE FOR EACH

ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. Q.

CRITICAL FOR THE LIFE SAFETY OF THE FLYING PUBLIC.

ELECTRONIC EQUIPMENT. THIS EQUIPMENT CONTROLS AIR TRAFFIC AND IS DEEMED

SPRINKLER SYSTEM PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE CRITICAL P.

PATCHED AND REPAIRED TO MATCH ADJACENT SURFACES.

COMPLETION OF THE WORK. ANCHORING HOLES IN CONCRETE SURFACES SHALL BE

DEVICES FOR DUSTPROOF CONSTRUCTIONS, INTO CONCRETE, SHALL BE REMOVED UPON

LOCATIONS & SPECIAL REQUIREMENTS WITH COR BEFORE INSTALLATION. ANCHORING

EQUIPMENT. TEMPORARY DP ARE SHOWN SCHEMATICALLY ON DRAWINGS. VERIFY FINAL

PERSONNEL AND NOT RESTRICT ACCESS TO MECH, ELEC, FAA, OR FIRE PROTECTION

INDICATED ON DRAWINGS. TEMPORARY PARTITIONS SHALL BE ACCESSIBLE TO FAA

PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS WHERE O.

FIELD VERIFY EXISTING CONDITION PRIOR TO ANY CONSTRUCTION WORK REQUIRED.

CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA.

EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING N.

COORDINATE WITH COR.

PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND

REMOVE AND REINSTALL, AS REQUIRED, FURNITURE THAT IS AFFECTED BY THE WORK. L.

EQUIPMENT. COORDINATE SIZE & LOCATION WITH MECHANICAL AND ELECTRICAL.

FOR PROVISION OF ARCHITECTURAL, MECHANICAL, ELECTRICAL & FIRE PROTECTION

PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY AND CONCRETE) J.

MECHANICAL

ZNY-18061513-M001 MECHANICAL LEGENDS, NOTES AND ABBREVIATIONS

ZNY-18061513-M101 HVAC AND HVAC PIPING CHILLER ROOM PLAN - DEMOLITION

ZNY-18061513-M102 HVAC AND HVAC PIPING PSB ROOF PLAN - DEMOLITION

ZNY-18061513-M201

ZNY-18061513-M202

HVAC AND HVAC PIPING CHILLER ROOM PLAN

HVAC AND HVAC PIPING PSB ROOF PLAN

ZNY-18061513-M501

ZNY-18061513-M502

ZNY-18061513-M504

ZNY-18061513-M601

HVAC TYPICAL DETAILS

MECHANICAL SCHEDULES

ZNY-18061513-M701

ZNY-18061513-M702

ZNY-18061513-M703

ZNY-18061513-M704

ZNY-18061513-M705

CONDENSER WATER SCHEMATIC DIAGRAM - DEMOLITION

CONDENSER WATER SCHEMATIC DIAGRAM

COOLING TOWER SCHEMATIC DIAGRAM

TEMPORARY COOLING TOWER WATER SCHEMATIC DIAGRAM

GENERAL

ZNY-18061513-S201 TEMPORARY COOLING TOWER SUPPORTS

STRUCTURAL

AND REQUIREMENTS.

OPERATIONS, TYP. ACCOMMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE

PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA

PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO

THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA.

OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK

EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL REMAIN I.

OTHERWISE NOTED.

LINES AND FACE OF MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS

DIMENSION LINES SHOWN ON SHEETS ARE FROM COLUMN CENTER A.

ARE RESOLVED TO SATISFACTION OF COR.

COR OF CONFLICTS. NO DEMOLITION WORK SHALL PROCEED UNTIL CONFLICTS

BUILDING SYSTEMS. COORDINATE DEMOLITION WITH THE WORK AND NOTIFY

FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OFB.

PATCHED AND REPAIRED TO MATCH EXISTING FINISHES.

FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK SHALL BEC.

PROTECTION FOR ITEMS TO BE REMOVED.

ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL, ELECTRICAL AND FIRE

ELECTRICAL SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN

VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL ANDD.

AND THE DIRECTION TO THE NEAREST EXIST.

PROVIDE NECESSARY SIGNAGE WARNING BUILDING OCCUPANTS OF THE CHANGE,

DURING THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES.

CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE

CONTRACTOR MUST MAINTAIN MEANS OF EGRESS DURING DEMOLITION AND

COORDINATE THE WORK WITH COR TO AVOID DISRUPTING FAA OPERATIONS.

THE BUILDING SHALL BE OCCUPIED BY FAA DURING CONSTRUCTION.E.

NOT BE LEFT IN OCCUPIED AREAS.

CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT SHALL F.

ROOFS) BEFORE ANY DEMOLITION OR CONSTRUCTION.

BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND

OF THE FACILITY, COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF

APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON BUILDINGS WHICH ARE PART

AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN

ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES

MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS, G.

DO NOT SCALE DRAWINGS.H.

CONSTRUCTION TYPE:

4.

3.

2.

1.

ZNY-18061513-G001

ZNY-18061513-G002

INDEX OF DRAWINGS GENERAL NOTES

ZNY-18061513-G003

COVER SHEET

ZNY-18061513-G004

ABBREVIATIONS

ZNY-18061513-G005 CONSTRUCTION STAGING PLAN

MECHANICAL SEISMIC DETAILS

MECHANICAL SEISMIC DETAILS

ZNY-18061513-M503 HVAC TYPICAL DETAILS

COOLING TOWER SCHEMATIC DIAGRAM - DEMOLITION

ELECTRICAL

ZNY-18061513-E001

ZNY-18061513-E002

ZNY-18061513-E204

ZNY-18061513-E205

ZNY-18061513-E402

ZNY-18061513-E403

ZNY-18061513-E701

ELECTRICAL ABBREVIATIONS, LEGENDS, AND GENERAL NOTES

TEMPORARY COOLING TOWER ELECTRICAL PLAN

CHILLER ROOM FLOW CONTROL VALVE - DEMOLITION

COOLING TOWER FLOW CONTROL VALVE - DEMOLITION

COOLING TOWER FLOW CONTROL VALVE - NEW WORK

PANEL SCHEDULES

HOW TO PROCEED WITH WORK.

HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN

WORK AREA(S) AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT). IF K.

M.

ADVANCE OF PERFORMANCE OF WORK.

BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN

TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES SHALL

UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES SHALL NOT BE

CHILLER BUILDING

SEISMIC DESIGN CATEGORY:

GENERAL LEGENDS

PRESUMED TO CONTAIN LEAD. REFER TO HAZMAT FOR ADDITIONAL INFORMATION.

PAINT COATINGS ON METAL SURFACES, UNLESS OTHERWISE NOTED, SHOULD BE U.

ZNY-18061513-M002

ZNY-18061513-M003

INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP & BUILDING CODE ANALYSIS

-INTERNATIONAL MECHANICAL CODE, 2018 EDITION

-INTERNATIONAL FIRE CODE, 2018 EDITION

-NFPA 70 (NATIONAL ELECTRICAL CODE (NEC), 2020

(29 CFR 1910 AND 1926 - CURRENT ISSUE)

GENERAL INDUSTRY SAFETY & HEALTH STANDARDS

-OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)

-AMERICAN BARRIERS ACT (ABA) STANDARDS, 2015

-NFPA 101 - LIFE SAFETY CODE, 2018 EDITION

-INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION

CHILLER ROOM FLOW CONTROL VALVE - NEW WORK

TEMPORARY COOLING TOWER MECHANICAL PLAN

MECHANICAL INSTRUMENTATION AND CONSTRUCTION SEQUENCE

PROVIDED DESIGN IN ACCORDANCE WITH SECTION 01 25 00, "SUBSTITUTION PROCEDURES."

DESIRED DESIGN FUNCTIONAL GOAL, AND ANY OTHER NEWLY REQUIRED INCIDENTAL WORK OR CHANGES TO THE

CAPABILITY OF OTHER EQUIPMENT FOR THE FULL INTENDED FUNCTION OF ALL INDIVIDUAL PIECES TOWARDS THE

OF EXPOSED AREAS AS A RESULT OF THE SUBSTITUTION, THE NEED TO COORDINATE WITH THE FUNCTION AND

INCLUDE ANY NECESSARY ADJUSTMENTS OF CONNECTIONS, PIPING OR WIRING, EQUIPMENT PAD RESIZING, FINISHING

TO EXECUTE INCIDENTAL WORK ARISING FROM THE SUBSTITUTION TO COMPLETE FAA DESIGN INTENT. THIS WILL

ANY FAA-APPROVED MATERIAL OR EQUIPMENT "AS EQUAL" SUBSTITUTIONS BY THE CONTRACTOR AND THE COSTS

THE CONTRACTOR BEARS ALL RESPONSIBILITY FOR THE ADJUSTMENT OF AFFECTED DRAWINGS AS A RESULT OF D.

ENGINEERING PRACTICES.

SUBSTITUTION FITS WITHIN THE ALLOCATED SPACE IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND

PROPER EVALUATION OF THE SUBSTITUTION REQUEST MAY BE MADE, INCLUDING ILLUSTRATING HOW THE PROPOSED

TEST DATA OF BOTH THE MATERIALS SPECIFIED AND THE PROPOSED SUBSTITUTION MATERIALS, SO THAT A

CONTRACT DOCUMENTS, MUST SUBMIT THE NECESSARY SCALE DRAWINGS, PRODUCT DATA, AND PERFORMANCE AND

THE CONTRACTOR, WHEN SUBMITTING FOR APPROVAL OF MATERIALS WHICH ARE OTHER THAN THAT CITED IN THE C.

THAT THERE WILL BE NO ADDITIONAL COSTS BORNE BY THE GOVERNMENT AS A RESULT OF THE SUBSTITUTION.

FURNISHING AND INSTALLING THE SUBSTITUTE MATERIAL. THE CONTRACTOR MUST, IN SUCH TRANSMITTALS, STATE

SPECIFIED WILL NOT OBLIGATE THE GOVERNMENT TO PAY ANY ADDITIONAL COSTS THAT MAY BE ASSOCIATED WITH

THE CONTRACTOR'S SUBMITTAL FOR APPROVAL OF MATERIAL OR PRODUCTS OF HIGHER QUALITY THAN THAT B.

SUBMITTED FOR APPROVAL AS A SUBSTITUTION.4.

APPROVED BY THE PRODUCT'S MANUFACTURER.

REQUIRE OTHER RELATED PRODUCTS BE PRODUCED BY THE SAME MANUFACTURER, OR BY A MANUFACTURER

AND FUNCTIONAL) WITHIN THE PROJECT. CERTAIN PRODUCT'S MANUFACTURER WARRANTIES MAY ALSO

OFFICER'S REPRESENTATIVE (COR), IN WRITING, AS MEETING THE SPECIFIED CRITERIA AND FIT (BOTH PHYSICAL

ACCEPTED BY THE ARCHITECT/ENGINEER OF RECORD, CONTRACTING OFFICER (CO) AND CONTRACTING 3.

PRACTICES.

WORK IN THE SPACE ALLOCATED IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND ENGINEERING

OF A SIMILAR PROFILE, SHAPE, SIZE, STYLE, AND CONFIGURATION AND CAN BE INCORPORATED INTO THE 2.

EQUAL OR SUPERIOR IN CONSTRUCTION, EFFICIENCY, UTILITY, OR FUNCTION TO THE PRODUCT(S) SPECIFIED.1.

PRECLUDED PROVIDED THEY ARE:

FOR QUALITY, FUNCTION, AND PERFORMANCE. PRODUCTS OF OTHER MANUFACTURERS ARE NOT AUTOMATICALLY

MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS ARE SPECIFIED FOR ITEMS, THEY SET A STANDARD

MANUFACTURER'S NAME, BRAND NAME, OR MODEL NUMBER STATED IN THE SPECIFICATIONS. WHERE

PROPRIETARY AND THE WORDS "OR EQUAL" ARE IMPLIED IF NOT EXPRESSLY STATED AFTER EVERY

BASIS OF DESIGN IN A SCHEDULE, DETAIL OR IN A LIST OF APPROVED PRODUCTS. THIS IS NOT MEANT TO BE

IN GENERAL, MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS MAY BE SPECIFIED FOR ITEMS AS A A.

ZNY-18061513-M004 TEMPORARY CHILLER ROOM PIPING

LOCATION MAP

BASIS OF DESIGN AND SUBSTITUTIONS

NOT TO SCALE

NFPA 101, EXISTING BUSINESS

IBC, GROUP B

zny-18061513-g002

2021-04-13T06:12:31-0400

ROBERT L BELTON

2021-04-12T07:33:34-0400

ANDREW G MACDONALD

ZNY-18061513-G003

APPROXIMATELY

ARCHITECT(URAL)

AUXILIARY

BOILER

BREAKER

BUILDING

BLOCKING

BENCH MARK OR BEAM

BEARING

BRITISH THERMAL UNIT

CONDUIT

CONT

CONTR CONTRACTOR

PI

PIV POST INDICATOR VALVE

PL PROPERTY LINE OR PLATE

PLF

PNL PANEL

PRV

PSF

PSI

PT

PTVC

PVC POLYVINYL CHLORIDE

PVI

PVT

RA RETURN AIR

RADIUS

REF REFERENCE

REINF REINFORCING

REQ'D REQUIRED

RF

RETURN FAN

RGS

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

RV

SA SUPPLY AIR

SCHEDULE

SD SMOKE DAMPER

SEC SECTION

SF

SHT SHEET

SIG SIGNAL

SM SPRINKLER MAIN

POINT OF TANGENCY

BOTTOM

BELOW

PRESSURE REDUCING VALVE

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POUNDS PER LINEAR FOOT

RIGID GALVANIZED STEEL

BOTTOM OF DUCT

BOTTOM OF PIPE

RISER

REG REGISTER

RAD, R

AMPERE TRIP

REFRIGERANT VENT

BLIND FLANGE

POINT OF VERTICAL TANGENCY

SIM SIMILAR

POINT OF VERTICAL INTERSECTION

POINT OF VERTICAL CURVATURE

CENTER

AIR ROUTE TRAFFIC CONTROL

AUTOMATED RADAR TERMINAL SYSTEM

CP

CT

CTR

CU CONDENSING UNIT

CV

CYD CUBIC YARD

COR

PSM POWER SYSTEMS MODIFICATION

RECEPTACLE

SAN SANITARY

HZ HERTZ

ID INSIDE DIAMETER

IF

INCH

INSUL INSULATION

INT INTERIOR

J JUNCTION

JB JUNCTION BOX

KVA KILOVOLT AMPERE

KW KILOWATTS

LF LINEAR FEET

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LP LOW POINT

LT LIGHT

LTG LIGHTING

M MOTOR

MAS MASONRY

MAT MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MET METAL

MG MOTOR GENERATOR

MO MASONRY OPENING

LCP LOCAL CONTROL PANEL

INV INVERT

KCMIL THOUSAND CIRCULAR MILS

INSIDE FACE OR INTERIAL FILTER

MANUFACTURER

HWS

HWR HOT WATER RETURN

HOT WATER SUPPLY

INST INSTRUMENT

LPS LOW PRESSURE STEAM

POUNDS

DBL DOUBLE

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DISC DISCONNECT

DISP DISPENSER

DIST DISTRIBUTION

DL DEAD LOAD

DN DOWN

DP

FD

FE FIRE EXTINGUISHER

FEC

FIN FINISH

FIXTURE

FLOOR

FM

FEET

GA

GALV GALVANIZED

DGP DATA GATHERING PANEL

FIRE EXTINGUISHER CABINET

DI

DB

DDCP DIRECT DIGITAL CONTROL PANEL

FCV FLOW CONTROL VALVE

FIRE DAMPER OR FLOOR DRAIN

FEPC FRONT END PERSONAL COMPUTER

GEN GENERATOR

GFM

GL GLASS

GND

GPM

GR

GALLONS PER MINUTE

GFE

GOVERNMENT FURNISHED MATERIAL

GOVERNMENT FURNISHED EQUIPMENT

G GAS

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY

FFE FINISHED FLOOR ELEVATION

FLEXIBLE DUCTFLEX

IN,"

FT,'

GRILLE

CS

FHC FIRE HOSE CABINET

FI

FS FLOW SWITCH

FZ FREEZESTAT

LCV LEVEL CONTROL VALVE

LG LEVEL GAUGE

LS LEVEL SWITCH

PRESSURE INDICATOR

POINT OF INTERSECTION,

PS PRESSURE SENSOR

FC FAN COIL UNIT

IEWH

WATER HEATER

INSTANTANEOUS ELECTRIC

AIR SEPARATOR

AIR TERMINAL BOX

AUTOMATIC TRANSFER SWITCH

ACID VENT

AVERAGE

AMERICAN WIRE GUAGE

DAMPER, BLOWDOWN

BOARD, BACK-DRAFT

BATTERY CHARGER

BARE COPPER

BREAKER PROGRAMMING UNIT

BACK FLOW PREVENTER

BUTTERFLY VALVE

BOILER FEED WATER

BRAKE HORSE POWER

BLOWER

BACK WATER PREVENTER

BALANCING VALVE

BRITISH THERMAL UNIT PER HOUR

BALL VALVE

BACK WATER VALVE

CPT CARPET/RAISED FLOOR

CPC CRITICAL POWER CENTER

CPU CENTRAL PROCESSING UNIT

CR

CTS COOLING TOWER WATER SUPPLY

CONTROL SWITCH

CU

CW

CWR

CWS

CWV

CONDENSING UNIT

DOMESTIC COLD WATER

CHILLER WATER RETURN

CHILLER WATER SUPPLY

COMBINATION WASTE AND VENT

DOM DOMESTIC

DC DIRECT CURRENT

DIGITAL INPUT

POSITION INDICATOR,

DROP INLET, DAMPER

DM DEMAND METER

DO DIGITAL OUTPUT

DPDT

DPNL

DPST

DOUBLE POLE DOUBLE THROW

DISTRIBUTION PANEL

DOUBLE POLE SINGLE THROW

FTR FINNED TUBE RADIATION

FRP FIBER GLASS REINFORCED PLASTIC

FEET PER MINUTEFPM

FUEL OIL VENTFOV

FOL FUEL OIL LEVEL

FLG FLANGE

FD/SD

FDR FEEDER

COMBINATION FIRE AND SMOKE DAMPER

FCO FLOOR CLEANOUT

FV FULL VOLTAGE

FPU

FOT

FLA

FIELD PROGRAMMING UNIT

FIBER OPTIC TERMINAL

FO FIBER OPTIC

FLUOR FLUORESCENT

FULL LOAD AMPERES

FA FAN COOLED

GROUND, GROUND CONNECTOR

GPH GALLONS PER HOUR

TERMINAL

CONTROL VALVE, CONSTANT VOLUME

DAMPER

DRAIN, DELTA CONNECTION, DIFFUSER,

PRESSURE SWITCH

DUSTPROOF PARTITION, DIFFERENTIAL

FLANGE INSULATION, FLOW INDICATOR

FIX, FIXT

FL, FLR

GAGE, GAUGE

MFGR, MFG

SMOKE DETECTOR

FAA FEDERAL AVIATION ADMINISTRATION

AND

AT

MOD MODIFICATION

MCC MOTOR CONTROL CENTER

MIL MILLIMETER

REVERSE, REVISION

SUPPLY FAN, SQUARE FEET

SCH, SCHED

LAN LOCAL AREA NETWORK

AUTOMATION WING REHABILITATION

BASEMENT

CABLE TRAY, COOLING TOWER

CONTROL PANEL, CIRCULATING PUMP

FLOW METER, FIRE MAIN

POC POINT OF CONNECTION

FILTER, FIRE LINE

DIRECT BURIAL, DRY BULB

CEILING REGISTER, CONTROL RELAY

CONTRACTING OFFICERS REPRESENTATIVE

SAP SOUND ABSORBING PANEL

PVDS PORTABLE VISUAL DISPLAY SYSTEM

MIN MINIMUM

ASSEMBLY

HWY HIGHWAY

LBS, #

DEG

RCRA

AND RECOVERY ACT

RESOURCE CONSERVATION

DEGREE(S)

ACOUSTICAL WALL PANEL

COMBUSTION AIR

RCP REFLECTED CEILING PLAN

L

K

J

I

COTR

REPRESENTATIVE

CONTRACTING OFFICER TECHNICAL

CRU COMPUTER ROOM UNIT

RPTS

RECEPT

CENTER, COOLING TOWER WATER RETURN

COORD COORDINATE

IMP INSULATED METAL PANEL

STD STANDARD

STE STANDARD TAPERED END

STL STEEL

STOR STORAGE

STR

SUSP SUSPENDED

SW SWITCH

SYM SYMMETRICAL

UH UNIT HEATER

UV UNIT VENTILATOR

V VOLT

VC VERTICAL CURVE

W WATT

W/ WITH

WD WOOD

WG WATER GAGE

W/O WITHOUT

WP WEATHERPROOF

WT WEIGHT

UPS

SUCT SUCTION

UON UNLESS OTHERWISE NOTED

XFMR TRANSFORMER

TRANSFER

UNINTERRUPTIBLE POWER SYSTEM

T&B TOP AND BOTTOM

T&G

TK TANK

TOS TOP OF STEEL

TOW TOP OF WALL

TRANS TRANSVERSE

TONGUE AND GROOVE

YD YARD

YH YARD HYDRANT

Y WYE CONNECTION

VAT VINYL ASBESTOS TILE

VB VINYL BASE

VINYL BASE & TRIM COMPONENTSVBT

TEMP TEMPERATURE

TIC

TC

TI

TEMPERATURE CONTROL SWITCH

TEMPERATURE INDICATOR

TEMPERATURE INDICATING CONTROLLER

TYP TYPICAL

TS

VIBRATION SWITCHVS

VAV VARIABLE VOLUME TERMINAL

THERMOSTAT

TELCO

COMPANY LINE

TELECOMMUNICATION, TELEPHONE

TOC TOP OF CONCRETE

TM&O

UBC UNIFORM BUILDING CODE

UL UNDERWRITER'S LABORATORIES, INC.

XFER, XFR

AND OPERATIONS

TELECOMMUNICATIONS MANAGEMENT

TEMPERATURE SENSOR, TAMPER SWITCH

STGP SIGNAL TRANSPORT GROUND PLANE

TBD TO BE DETERMINED

UTIL UTILITY

STRUCTURAL, STRUCTURE

Y

X

W

STRUCTURAL, STRUCTURESTRUC

SQ SQUARE

SRF

STAINLESS STEEL

STA STATION

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

VF

VPST

VFD VARIABLE FREQUENCY DRIVE

VENTILATION FAN

VERTICAL FEET OR

VACUUM PRODUCER

VELOCITY PRESSURE,

SP

VIF VERIFY IN FIELD

SAFETY RUBBER FLOOR TILE

VGWB

WALL BOARD

VINYL SURFACED GYPSUM

STATIC PRESSURE INDICATOR

SUMP PUMP/SEWAGE PUMP,

STC SOUND TRANSMISSION CLASS

STEAM, STREET

SRG SIGNAL REFERENCE GRID

SPECIFICATIONSSPEC

SSTL, SS

ssdi security systems design and integration

AAV AUTOMATIC AIR VENT

AC

A/C AIR CONDITIONING

AD

ADJ ADJACENT OR ADJUSTABLE

ADR ACCESS DOOR

AFF ABOVE FINISH FLOOR

AIC

AL ALUMINUM

ALT ALTERNATE

CB

CC COOLING COIL

CFM

CFT CUBIC FOOT

CH CHILLER

CI

CIP

CKT CIRCUIT

CENTER LINE

CLG CEILING

CLR CLEAR

CMP

CMU

CO

COL COLUMN

COMB

COMP

CONC CONCRETE

COND

CONN CONNECTION

CONST CONSTRUCTION

CONCRETE MASONRY UNIT

PCF

PHC PREHEAT COIL

CORRUGATED METAL PIPE

CL,

AF

CENT CENTRIFUGAL

PCB POLYCHLORINATED BIPHENYLS

CONC OR AIR COMPRESSOR

ALTERNATING CURRENT, ASPHALT

AMPERES INTERRUPTING CAPACITY

SYSTEM

CENTRAL CONTROL AND MONITORING

POUNDS PER CUBIC FOOT

CAST IRON PIPE, CAST IN PLACE

CIRCUIT BREAKER

PD PRESSURE DIFFERENTIAL

PHASE

HB HOSE BIBB

HC HEATING COIL

HDW HARDWARE

HE HEAT EXCHANGER

HM HOLLOW METAL

HORIZ HORIZONTAL

HP

HPT HIGH POINT

HR HOUR

HS

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC

MTG MOUNTING OR MOUNTED

NOM NOMINAL

NIC NOT IN CONTRACT

NPT

HPS

HTP HOT TAP (W/STOPPLE FITTING)

HERM HERMETIC

HEATING/VENTILATING/AIR CONDITIONING

OA OUTSIDE AIR

OC ON CENTER

OD

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

EF

EG

ELEC ELECTRIC(AL)

EMD ESTIMATED MAXIMUM DEMAND

EHC ELECTRIC HEATING COIL

EMERG EMERGENCY

EMT ELECTRICAL METAL TUBING

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXISTING

EXP EXPOSED

EXPN EXPANSION

EL, ELEV

EXHAUST FAN

HPL HIGH PRESSURE LAMINATE

AMP METERAM

GS GAS SENSOR

HIGH STRENGTH, HUMIDITY SENSOR

MS MOISTURE SENSOR

PC PRESSURE CONTROL SWITCH

PDI

PDS

PRESSURE DIFFERENTIAL INDICATOR

PRESSURE DIFFERENTIAL SENSOR

ACC AIR COOLED LIQUID CHILLER

EH

EWH ELECTRIC WATER HEATER

HUMIDISTAT

HU HUMIDIFIER

COMPRESSED AIR LINE

AMPERE, AIR,

AA AIR COOLED

ACU

ACT ACCESS CONTROL TERMINAL

AIR CONDITIONING UNIT

ACD ADDRESSABLE CONTROL DEVICE

AFMS AIR FLOW MEASURING STATION

AID ADDRESSABLE INTERFACE DEVICE

AIF AIR INTAKE FILTER

AO

AMM AMMETER

ANN ANNUNCIATOR

ANALOG OUTPUT

AP ANNUNCIATOR POINT

CD

CFH CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CG CEILING GRILLE

CIR CIRCULATING

CLF CURRENT LIMITING FUSE

COMBUSTION AIR

COMBINATION, COMBINE,

COMM COMMUNICATIONS

DR DOOR

EAT ENTERING AIR TEMPERATURE

ECP ENGINE CONTROL PANEL

EDAM

AND MONITORING

ELECTRICAL DATA ACQUISITION

ENGINE GENERATOR, EXHAUST GRILLE

EP EXHAUST PIPE

ES EXHAUST SILENCER

ER EXHAUST REGISTER

ERMS

ET ELECTRIC HEAT TRACE

GRV GRAVITY VENT

GV GATE VALVE

GWB GYPSUM WALLBOARD

GW GLYCOL WASTE

HW DOMESTIC HOT WATER

HIGH PRESSURE STEAM

HIGH PRESSURE SODIUM,

HIGH PRESSURE

HORSE POWER, HEAT PUMP

AREA DRAIN, ACCESS DOOR

CURB INLET, CAST IRON

EACH, EXHAUST AIR

ENVIRONMENTAL REMOTE MONITORING

EXIST, EX

PUMP, PHASE OR POLE

HAZMAT HAZARDOUS MATERIALS

DWG(S) DRAWING(S)

EA

GWH GAS WATER HEATER

NARACS

NATIONAL RADIO COMMUNICATIONS

NFPA

OSHA

OSW OPERATIONS SUPPORT WING

ADMINISTRATION

OCCUPATIONAL SAFETY & HEALTH

PRIVATE BRANCH EXCHANGEPBX

HCS HOST COMPUTER SYSTEMS

ADTN

NETWORK

ADMINISTRATIVE DATA TRANSMISSION

CCMS

CONDENSATE DRAIN

CONTROL DAMPER, CEILING DIFFUSER,

COMPRESSIBLE, COMPRESSED

EFF EFFICIENCY

ENTER, ENTRANCEENT, ENTR

AMPERE FRAME, AIR FLOW SENSOR

CONDITION, CONDENSATE

APC

OH OPPOSITE HAND

ELECTRIC HEATER

OUTSIDE DIAMETER, OPEN DRAIN

NO, #

PH

AH/AHU AIR HANDLING UNIT

ELEVATION, ELEVATOR

NATIONAL FIRE PROTECTION ASSOCIATION

NTS NOT TO SCALE

NATIONAL PIPE THREAD

AED AUTOMATED EXTERNAL DEFIBRILLATOR

ACM ASBESTOS CONTAINING MATERIAL

NAM NEGATIVE AIR MACHINE

CLEANOUT, CONDUIT ONLY, CONTRACTING OFFICER

ACOUSTICAL PANEL CEILING CONTINUOUS OR CONTINUATION EXT EXTERIOR HIGH WATER LEVELHWL

APPROX

ARCH

ARTS

ATS

AUX

AWG

AT

AS

ATB

AVG

AV

BAT CHGR

BC

AWR

ASSY

AWP

BD

BKR

BLDG

BLKG

BM

BRG

BTU

BEL

BOD

BOP

BF

BPU

BFP

BFV

BFW

BHP

BLO

BLV

BWP

BWV

BTU/H

BV

BSMT

BOT, BOTT

CABINETCAB

CA

:1

:0 lo tt e zny-18061513-g003

2021-05-04T11:27:18-0400

ROBERT L BELTON

2021-04-29T09:21:41-0400

ANDREW G MACDONALD

GENERAL LEGENDS

ZNY-18061513-G004

FOR CONT

SEE DWG A005

NEW ROOM/AREA NUMBER

DETAIL TITLE REFERENCE

A1

DETAIL NUMBER

IS DRAWN OR SCHEDULED

SHEET ON WHICH DETAIL

DRAWING/DETAIL TITLE

DETAIL DESIGNATION

DETAIL IS DRAWN

SHEET ON WHICH

GENERAL LEGEND

REFERENCE

COLUMN LINE GRID DESIGNATION

CENTER LINES

MATCH LINE SYMBOL

BREAK LINES

ELEVATION SYMBOL

EL 00.00'

SECTION CUT

ELEVATION REFERENCE

SYMBOLS

AND/OR CEILING GRID

RAISED FLOOR PANELS

WALL

(NOT SHOWN)

LIGHT FIXTURE

RECESSED

(NOT SHOWN)

ATC PANEL

DEMOLITION WALL

A101

A001

E1

KEY NORTH

MATERIALS

CONTRACTOR'S ACCESS ROUTE

VEHICULAR TRAFFIC DIRECTION

EXISTING NEW

AIR FLOW PANEL

PERFORATED

FUTURE ATC PANEL

EARTH, ETC

CONCRETE, ETC

METALS

MASONRY

WOOD

GYPSUM

GLASS

INSULATION

EARTH GRAVEL SAND

CONC ASPH

STEEL ALUMINUM OTHER

BRICK TILE

FINISH EL BLKG

ELEV

LOOSE

BATT OR

TER

CMU

RIGID

SMALL SCALELARGE SCALE

PARTITION

STUD

STRUCT, STL

PLYWOOD

EMERGENCY SHOWER AND EYEWASH

FLOOR DRAIN

FLOOR SINK

FLOOR HATCH

STEEL LADDER

SUMP

PARTITION WITH DOOR

TEMPORARY DUSTPROOF

DOOR NUMBER

LOUVER NUMBER

WALL TYPE NUMBER

DP DP

LOCKERS

FIRE EXTINGUISHER

ELECTRICAL PANEL

SUPPLY AIR DUCT

LIGHT FIXTURE

INDIRECT PENDANT

ACOUSTICAL BAFFLES

FE

CABINET

FIRE EXTINGUISHER

FE

SEMI-RECESSED

FS

AREA DESIGNATION

SURFACE MOUNTED

WALL WITH DOOR

TEMPORARY INTERIOR

FINISH SYMBOL

ROOF HATCH

RH

ARCHITECTURAL/STRUCTURAL LEGEND

SYMBOLS

PROJECT NORTH

PLAN NORTH/PROJECT NORTH

REVISED AREA

ENCOMPASS

CLOUD TO

DEMOLITION

REVISION

REVISION DESIGNATION FLOOR MOUNTED WALL MOUNTED

LAVATORY

URINAL

WATER CLOSET

COOLER

ELECTRIC WATER

WATER COOLER

SHEET NOTE NUMBER

0 8' 16'4'

1/8" = 1'-0"

GRAPHIC SCALE

DEMOLITION NOTE

SERVICE SINK

CEILING DIFFUSER

SUPPLY AIR

CEILING REGISTER

RETURN AIR

TRANSFER AIR GRILLE

FOR SPECIFIC INFORMATION.

REFER TO HAZMAT DWGS

HAZMAT NOTE, ASBESTOS

FOR SPECIFIC INFORMATION

REFER TO HAZMAT DWGS

HAZMAT NOTE, LEAD PAINT

1,2,3,41,2,3,4

ROOM NO

B72

L-

:0 lo tt e zny-18061513-g004

2021-05-04T11:27:34-0400

ROBERT L BELTON

2021-04-29T09:22:00-0400

ANDREW G MACDONALD

GUARD HOUSE

LOADING DOCK

STAIR 3

SECURITY GATE

MAIN ENTRANCE

MACARTHUR MEMORIAL HIGHWAY

OLD GUARD HOUSE

CHILLER

ADVANCED

AUTOMATION

ANNEX

POWER SERVICE

FUEL

TANKS

EXISTING BACKFLOW

VAULT

EXISTING BACKFLOW

VAULT

COLD

STORAGE

PREVENTER

PREVENTER

AIR ROUTE TRAFFIC CONTROL CENTER

SECURITY FENCE

PROPERTY LINE

GARAGE & STORAGE BUILDING

PCS &

GENERATOR

UNDERGROUND

SHED

ANTENNA

MWP DISH

ANTENNA

SATELLITE TV

STATION

METERING

ELECTRICAL

NARACS WHIP

GPS

CTS

GPS

WASS

(SPECTRALINK)

REPEATER

TELEPHONE

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X X X

CAFETERIA

LOADING DOCK

CAFETERIA

AREAWAY

CHILLER ROOM

BOILER ROOM AND

STAGING AREA

PROPOSED CONSTRUCTION

COOLING TOWER YARD

PROPOSED TEMPORARY

CONSTRUCTION STAGING PLAN

ZNY-18061513-G005

CONSTRUCTION STAGING PLAN NOTES:

A. CONSTRUCTION ACCESS

B. CONTRACTOR PARKING

E. CONSTRUCTION DEBRIS

G. CONSTRUCTION OFFICE

H. CONSTRUCTION TOILET FACILITIES

I. DEMOLITION AND CONSTRUCTION HOURS

K. ASBESTOS REMOVAL AND DISPOSAL

L. PARKING LOT AND DRIVEWAY REPAIR

M. EQUIPMENT PROTECTION

A.2

A.3

A.4

A.5

E.1

G.1

H.1

I.1

I.2

I.3

I.4

K.1

L.1

L.2

M.4

M.3

M.2

M.1

MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR.

NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING

COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ARTCC.

ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY TO

AND DUST, INCLUDING CORE DRILLING.

FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS

CONTRACTOR MUST PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, INCLUDING STRIPING OF PARKING LOT.

UPON COMPLETION OF WORK, CONTRACTOR MUST REPAIR PAVED SURFACES TO ORIGINAL CONDITION, APPROVED BY COR.

EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OF 11:00 PM TO 6:00 AM OR AS

COORDINATE WORK WITH COR ON CRITICAL EQUIPMENT WITHIN WORK AREA. WORK ON CRITICAL

DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 6:00 AM TO 11:00 PM.

CONTRACTOR MUST NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY.

CONSTRUCTION STAGING AREA.

PORTABLE CHEMICAL TOILETS MUST BE PROVIDED BY CONTRACTOR AS REQUIRED WITHIN

HOOK-UPS MUST BE THE RESPONSIBILITY OF CONTRACTOR.

THE WORK TRAILER. POINT OF CONNECTION MUST BE DETERMINED AT PRECONSTRUCTION CONFERENCE.

TEMPORARY POWER AND WATER IS AVAILABLE AT ARTCC, IF REQUIRED FOR CONSTRUCTION PURPOSES OF

IN CONSTRUCTION STAGING AREA. CONTRACTOR MUST PROVIDE TELEPHONE AND BOTTLED WATER.

CONTRACTOR'S TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE MUST BE LOCATED

DIVISION 1 REQUIREMENTS.

THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE

OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS.

THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY

SECURITY GATE.

CONTRACTOR'S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE MUST BE THROUGH MAIN ENTRANCE

PERSONS NEAR CONSTRUCTION AREAS.

SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT

PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON

ALL TIMES FOR FAA DELIVERIES.

CONTRACTOR MUST KEEP LOADING DOCK, CAFETERIA LOADING DOCK, AND CAFETERIA ACCESSIBLE AT

OFF-LIMITS FOR CONTRACTOR PARKING.

MUST BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT ARTCC ARE

CONTRACTOR'S PARKING BE LIMITED TO CONSTRUCTION STAGING AREA. ADDITIONAL PARKING

8:00 AM AND 2:00 TO 4:00 PM. COORDINATE CONTRACTOR DELIVERIES WITH THE COR.

FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT 6:30 TO

DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN

G.2

A.1

B.1

FINAL LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION CONFERENCE.

BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS.

CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST

C. FAA SECURITY REQUIREMENTS

D.1

SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS.C.2

C.3

C.4

C.5

IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES AND/OR MECHANICAL SERVICES.

SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO EQUIPMENT. CONTRACTOR MUST NOTIFY COR

FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE

CONTRACT. CONTRACTOR MUST BE RESPONSIBLE FOR CONTINUOUS PROTECTION OF THIS EQUIPMENT

EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS

WORK MUST BE COORDINATED WITH COR. DISRUPTION OF THIS FACILITY MUST NOT BE PERMITTED.

CONTRACTOR MUST USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY.

PUBLIC.

LOSS OF THIS EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE SAFETY OF THE FLYING

C.1

C.6

THE BUILDING. CONTRACTORS VEHICLES MUST BE MARKED.

SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL WHILE IN

THE RIGHT TO PROHIBIT WORKERS EMPLOYED BY CONTRACTOR TO WORK AT FACILITY. CONTRACTOR'S

TEMPORARY SECURITY BADGES MUST BE ISSUED TO CONSTRUCTION PERSONNEL. FAA RESERVES

AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR.

WITH SITE NUMBER OF CLEARANCES REQUIRED TO PERFORM WORK.

SECURITY CLEARANCE BADGING IMMEDIATELY FOLLOWING NOTICE OF CONTRACT AWARD. COORDINATE

CONTRACTOR MUST SUBMIT SECURITY PAPERWORK FOR CONTRACTOR PERSONNEL THAT ARE TO OBTAIN

MAY BE REQUIRED. COORDINATE REQUIREMENTS WITH COR.

COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR. ESCORTS OUTSIDE BUILDING

FAA ESCORTS MUST BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE BUILDING.

KEYS TO COR AND SECURITY.

BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. PROVIDE

DISCRETION OF COR. CONTRACTOR MUST DO NO DIGGING WITHOUT PRIOR PERMISSION FROM COR.

BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED BY THE CONTRACTOR AT THE

STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE MUST BE LIMITED TO THE CONSTRUCTION

DEVELOPED TO RESUME WORK IN THAT AREA. COORDINATE WORK IN OTHER AREAS WITH COR.

DURING THE WORK, NOTIFY COR. ISOLATE AREA, AND CEASE WORK IN THAT AREA UNTIL A PLAN HAS BEEN

THE BUILDING HAS BEEN IDENTIFIED AS CONTAINING HAZMAT MATERIALS. IF HAZMAT MATERIALS ARE DISCOVERED

I.5 REFER TO DIVISION 1 AND COR FOR MORATORIUM OF WORK TIME FRAMES.

USE IS PROHIBITED.

COORDINATE WITH COR USE OF MOBILE CELL PHONES AT FACILITY. IN SOME AREAS OF BUILDING CELL PHONE

PLACEMENT.

POSITION AND LOCATION OF DUMPSTERS MUST BE COORDINATED WITH COR PRIOR TO THEIR DELIVERY AND

OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY.

WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND FREE

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY CONTRACTOR

ADVANCE OF PERFORMANCE OF THE WORK.

COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN

NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, BY COR IN WRITING, A MINIMUM OF 10 (TEN) WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.

ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL

CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE

AND CHILLER ROOM AREA WAY; 2) AS DIRECTED BY COR.

CONTRACTOR'S ACCESS TO BUILDING MUST BE LIMITED TO THE FOLLOWING LOCATIONS: 1) BOILER ROOM

D. CONSTRUCTION MATERIAL STORAGE

CONTRACTOR MUST NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.

REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION.

PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR MUST

AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 (TEN) WORKING DAYS NOTICE IN ADVANCE OF

PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE

DURING OFF-HOURS AS INDICATED IN NOTE I.2 THIS SHEET UNDER DEMOLITION AND CONSTRUCTION HOURS.

SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED

H.2 PROVIDE WASH STATIONS IN ADJACENT TO PORTABLE TOILETS IN CONSTRUCTION STAGING AREA.

H.3 TOILETS INSIDE FACILITY BUILDINGS MUST NOT BE USED BY CONTRACTOR.

M.5 TORCH CUTTING IS NOT ALLOWED INSIDE THE CHILLER BUILDING OR ON THE CHILLER BUILDING ROOF.

B8

G005 SCALE: NTS

CONSTRUCTION STAGING PLAN

CONTRACTOR TO THE SATISFACTION OF COR.

DISTURBED LAWNS, LANDSCAPING AND IRRIGATION SYSTEM MUST BE RESTORED TO ORIGINIAL CONDITION BY lo tt e zny-18061513-g005

2021-05-04T11:27:48-0400

ROBERT L BELTON

2021-04-29T09:22:12-0400

ANDREW G MACDONALD

MECHANICAL LEGEND, NOTES AND ABBREVIATIONS

ZNY-18061513-M001

-m

B.

C.

A.

D.

G.

F.

SUPPLY DUCT (DOWN)

DOOR LOUVER

LINED DUCT

FLEXIBLE CONNECTION

VOLUME DAMPER, CONTROL DAMPER

FIRE DAMPER, SMOKE DAMPER

TURNING VANES

FLEXIBLE DUCT

DUCT RISE

DUCT DROP

BACKDRAFT DAMPER

STATIC PRESSURE DAMPER

TRANSITION-RECTANGULAR

TO ROUND

20X10

VD

FD SD

SPD

SIZE

FD/SD

COMBINATION FIRE/SMOKE DAMPER

OUTSIDE AIR UP

OUTSIDE AIR DOWN

AHU

SYMBOL

EQUIPMENT DESIGNATION

SYMBOL ABBREVIATION DESCRIPTION

BDD

HIDDEN DUCTWORK

OUTSIDE AIR INTAKE

SUPPLY DUCT (UP OR OUT)

J.

K.

HVAC LEGEND

PIPING

H.

I.

E.

UNDERCUT DOOR

T THERMOSTAT

ROUND DUCT

(DIAMETER)

RECTANGULAR DUCT

(FIRST FIGURE IS SIDE SHOWN)

CD-1

12X12

CR-1

EG-1

12X12

EXHAUST GRILLE

CEILING RETURN, UNLESS

OTHERWISE NOTED

DIFFUSER, GRILLE, & REGISTER

DESIGNATION

AIR FLOW RATE (CFM)

NECK SIZE (REGISTERS &

GRILLES ONLY)

RETURN OR EXHAUST DUCT

(UP OR OUT)

RETURN OR EXHAUST DUCT

(DOWN)

PIPING (CONT.) ABBREVIATIONSDOUBLE LINE DUCTWORKEQUIPMENT

GALLONS PER HOUR

GENERATOR

GALVANIZED

GALLON

GAUGE

FACE VELOCITY

FINNED TUBE RADIATION

FEET

COMBINATION FIRE AND SMOKE

FIBERGLASS REINFORCED PIPE

FEET PER SECOND

FEET PER MINUTE

FLOOR

FLEXIBLE

FULL LOAD AMPERES

FINISHED FLOOR

FINAL FILTER

FIRE DAMPER

FLEXIBLE CONNECTION

FREE AREA (SQ.FT)

DEGREES FAHREINHEIT

FILTER

EXPANSION

EXHAUST

ENTERING WATER TEMPERATURE

ENTERING WET BULB

EXISTING TO REMAIN

EXPANSION TANK

EXTERNAL STATIC PRESSURE

REGISTER

EXISTING RELOCATED, EXHAUST

ENTERING

ELEVATION

ELECTRIC

ELEVATION

EFFICIENCY

EXHAUST FAN

ENERGY EFFICIENCY RATIO

ENTERING AIR TEMPERATURE

EXHAUST AIR LOUVER

EXHAUST AIR

EXISTING

DIFFERENTIAL PRESSURE

DOWN

DIAMETER

DOMESTIC HOT WATER

DEGREE

DEMOLISH EXISTING

DIRECT DIGITAL CONTROL SYSTEM

DOMESTIC COLD WATER

DRY BULB

DROP, DRAIN

COLD WATER

CONSTANT VOLUME, CONTROL VALVE

CONDENSING UNIT

CONTROL PANEL

CONTRACING OFFICER'S REPRESNTATIVE

CONTINUATION

CONNECTION

CONDENSATE

COMPRESSOR

CEILING

CHILLER

CODE OF FEDERAL REGULATIONS

CUBIC FEET PER MINUTE

CEILING DIFFUSER, CONTROL DAMPER

COOLING COIL

CONSTANT AIR VOLUME

CONDENSER

BTU PER HOUR

BRITISH THERMAL UNIT

BOTTOM THROAT, BUFFER TANK

BOTTOM

BRAKE HORSEPOWER

BACK FLOW PREVENTER

BLIND FLANGE

BACK DRAFT DAMPER

BOILER, BELOW

MANUAL AIR VENT

AIR SEPARATOR

ACCESS PANEL

AIR PRESSURE DROP

AIR HANDLING UNIT

ABOVE FINISHED FLOOR

AFTER FILTER, AIR FOIL

ACCESS DOOR

AIR CONDITIONING UNIT

ASBESTOS CONTAINING MATERIAL

AIR CONDITIONING

AUTOMATIC AIR VENT

AMPERES, ABOVE

GENERAL NOTES

FILTER

LOUVER

BACKDRAFT DAMPER

HEATING COIL

AI_34251

AI_34252

AJ_34256

AJ_34257

AK_34260

AK_34261

MOTORIZED OPPOSED

BLADE DAMPER

AH_34352

ELECTRIC HEATING COIL

FIRE/SMOKE DAMPER

HUMIDIFIER

COOLING COIL

UNIT HEATER

FAN

AIR FLOW MEASURING

STATION/STATIC PRESSURE

MEASURING STATION

MOTORIZED PARALLEL

BLADE DAMPER

SINGLE LINE DUCTWORK

FAN WITH VARIABLE

FREQ. MOTOR CONTROLLER

POINT OF TERMINATION

RECTANGULAR TO ROUND

TRANSITION

SQUARE REDUCER/

INCREASER

TO BE DEMOLISHED

POINT OF CONNECTION OF

NEW TO EXISTING

ID

MISCELLANEOUS

NEW WORK -

DARK LINE WEIGHT

EXISTING -

LIGHT LINE WEIGHT

SIZE (IN)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

FUEL OIL RETURN

FUEL OIL SUPPLY

CWS

CWR

FOR

FOS

STM

RV REFRIGERANT VENT

D DRAIN

CW COLD WATER

DHW DOMESTIC HOT WATER

DCW DOMESTIC COLD WATER

STEAM CONDENSATE RETURN

COOLING TOWER WATER SUPPLY

COOLING TOWER WATER RETURN

HWS HOT WATER SUPPLY

HOT WATER RETURNHWR

SAN SANITARY DRAIN

COND CONDENSATE

STEAM

INDUSTRIAL WATERIW

FLUID FLOW DIRECTION

PIPE TURNING UP

PIPE TURNING DOWN

PLUGGED PIPE/OUTLET

CONCENTRIC REDUCER

ECCENTRIC REDUCER

CAPPED PIPE/OUTLET

GATE VALVE

ANGLE VALVE

GLOBE VALVE

CHECK VALVE

UNION

DIRECTION OF PITCH

GC

PV

GAS COCK

PLUG VALVE

GV

GLV

P/TRV

FLEXIBLE HOSE (FLANGED ENDS)

FLEXIBLE HOSE (SCREWED ENDS)

FLEXIBLE PIPE CONNECTOR

AIR ELIMINATOR

TEST COCK

AUTOMATIC AIR VENT

FLOW CONTROL VALVE

FLOW METER

STRAP-ON SENSOR

WELD CAP

BALANCING VALVE

PRESSURE REGULATING VALVE

THERMOMETER

PUMP

BUTTERFLY VALVEBFV

PRESSURE GAUGE

INLINE PUMP

PRESSURE/TEMPERATURE

RELIEF/SAFETY VALVE

HOT TAP/STOPPLE FITTING

MOTOR OPERATED 2-WAY

CONTROL VALVE

MOTOR OPERATED 3-WAY

STRAINER WITH BLOWDOWN

VALVE

PIPE HEADER WITH BLIND

FLANGE

MANUAL AIR VENTAV

AAV

BALL VALVEBV

TEST AND BALANCE VALVE

WATER METER

FCV FLOW CONTROL VALVE

PETE'S PLUG

VAC VACUUM

WATER PRESSURE DROP

WORKING PRESSURE

WIRE MESH SCREN

WATER HAMMER ARRESTOR

WET BULB

WITHOUT

WITH

WIDTH

VARIABLE FREQUENCY DRIVE

VELOCITY

VACUUM

VOLTS

UNLESS OTHERWISE NOTED

TOILET EXHAUST

TYPICAL

TOTAL STATIC PRESSURE

TOTAL DYNAMIC HEAD

TRANSFER AIR

THROAT

SUPPLY REGISTER

STATIC PRESSURE

SUPPLY GRILLE

SUPPLY FAN

SENSIBLE

SUPPLY AIR, SOUND ATTENUATOR

REMOVE EXISTING

RETURN REGISTER

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

RETURN GRILLE

REQUIRED

RADIATION, RADIANT HEATER

RELOCATED, RISE

PSI ABSOLUTE

PSI GAUGE

PACKAGED FILTER, PREFILTER

PRESSURE DROP

OPENING

OPEN END DUCT

OUTSIDE AIR LOUVER

OUTSIDE AIR

NET POSITIVE SUCTION HEAD

NORMALLY OPEN, NUMBER

NOT IN CONTRACT

CRITERIA

NORMALLY CLOSED, NOISE

MOTOR

PROTECTION

MINIMUM OVERCURRENT

MINIMUM CIRCUIT AMPS

THOUSAND BTU PER HOUR

LEAVING WATER TEMPERATURE

LEAVING WET BULB TEMPERATURE

LINEAR FEET

POUNDS PER HOUR

POUNDS, POUNDS DRY STEAM

LEAVING AIR TEMPERATURE

LENGTH

KILOWATT

WATER SUPPLY

GENERATOR RADIATOR JACKET

WATER RETURN

INDUSTRIAL WATER

INCH OR INCHES

IRON PIPE SIZE

FREQUENCY

HEATING AND VENTILATION

HOT WATER RETURN

HOT WATER PUMP

HOT WATER COIL

HOT TAP/ STOPPLE FITTING

HAND SWITCH

HOUR

HORSEPOWER, HEAT PUMP

HORIZONTAL

HEAD

HEIGHT

GENERAL EXHAUST

GALLONS PER MINUTE

HVAC LEGEND IS THE STANDARD LEGEND WHICH IS USED FOR FAA FACILITIES DESIGN. NOT ALL SYMBOLS

AND ABBREVIATIONS SHOWN MAY BE USED ON THIS PROJECT.

INSTALLATION SHALL PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AIR FILTERS, AND OTHER DEVICES. ACCESS DOORS SHALL BE INSTALLED TO PROVIDE ADEQUATE CLEARANCES FOR DIRECT ACCESS.

DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING AND CUTTING OPERATIONS. PERSON PERFORMING FIRE PROTECTION DUTIES SHALL NOT BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING SHALL BE SCHEDULED IN WRITING WITH COR AND SHALL BE PERFORMED OUTSIDE OF FACILITY OR IN SAFE LOCATION

TO BE DETERMINED BY COR.

FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL MECHANICAL VENTILATION

DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA AND ACGIH.

NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM. CONNECT METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL OR PIPING SHALL NOT BE USED AS A GROUND PATH.

EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.

LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR

APPROVAL, PRIOR TO INSTALLATION.

PROVIDE LOCAL VENTILATION DURING APPLICATION OF PRODUCTS WHICH MAY CAUSE ACUTE OR CHRONIC

HEALTH OR SAFETY EFFECTS TO FACILITY OCCUPANTS IN ACCORDANCE WITH OSHA AND ACGIH

REQUIREMENTS. SUBMIT VENTILATION PLAN TO COR FOR APPROVAL.

FOR CAUTIONS AND SPECIFIC AREAS WHERE HAZARDOUS MATERIALS OCCUR.

PROVIDE A DETAILED SCHEDULE FOR DEMOLITION OF HVAC EQUIPMENT AND INSTALLATION OF NEW HVAC SYSTEMS. COORDINATE WITH COR PRIOR TO REMOVAL OF EQUIPMENT. HVAC SYSTEMS MUST REMAIN IN

OPERATION THROUGHOUT REMOVAL AND REPLACEMENT OF EQUIPMENT.

PRIOR TO THE DEMOLITION OF ITEMS WHICH HAVE UTILITIY CONNECTIONS (WATER, ELECTRICITY, GAS ETC.)

ARRANGE WITH COR TO LOCATE SHUT-OFF VALVES, PANEL BOXES AND OTHER CONTROL ELEMENTS. FAA

PERSONNEL SHALL SHUT OFF, ISOLATE EQUIPMENT AND BRING EQUIPMENT BACK ONLINE.

SOLENOID VALVE

MOTOR OPERATED

BUTTERFLY VALVE

WATER PRESSURE DROP

WORKING PRESSURE

WIRE MESH SCREN

WATER HAMMER ARRESTOR

WET BULB

WITHOUT

WITH

WIDTH

VARIABLE FREQUENCY DRIVE

VELOCITY

VACUUM

VOLTS

UNLESS OTHERWISE NOTED

TOILET EXHAUST

TYPICAL

TOTAL STATIC PRESSURE

TOTAL DYNAMIC HEAD

TRANSFER AIR

THROAT

SUPPLY REGISTER

STATIC PRESSURE

SUPPLY GRILLE

SUPPLY FAN

SENSIBLE

SUPPLY AIR, SOUND ATTENUATOR

REMOVE EXISTING

RETURN REGISTER

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

RETURN GRILLE

REQUIRED

RADIATION, RADIANT HEATER

RELOCATED, RISE

PSI ABSOLUTE

PSI GAUGE

PACKAGED FILTER, PREFILTER

PRESSURE DROP

OPENING

OPEN END DUCT

OUTSIDE AIR LOUVER

OUTSIDE AIR

NET POSITIVE SUCTION HEAD

NORMALLY OPEN, NUMBER

NOT IN CONTRACT

CRITERIA

NORMALLY CLOSED, NOISE

MOTOR

PROTECTION

MINIMUM OVERCURRENT

MINIMUM CIRCUIT AMPS

THOUSAND BTU PER HOUR

LEAVING WATER TEMPERATURE

LEAVING WET BULB TEMPERATURE

LINEAR FEET

POUNDS PER HOUR

POUNDS, POUNDS DRY STEAM

LEAVING AIR TEMPERATURE

LENGTH

KILOWATT

WATER SUPPLY

WATER RETURN

INDUSTRIAL WATER

INCH OR INCHES

IRON PIPE SIZE

FREQUENCY

HEATING AND VENTILATION

HOT WATER RETURN

HOT WATER PUMP

HOT WATER COIL

HOT TAP/ STOPPLE FITTING

HAND SWITCH

HOUR

HORSEPOWER, HEAT PUMP

HORIZONTAL

HEAD

HEIGHT

GENERAL EXHAUST

GALLONS PER MINUTEGPM

GX

H, (H)

HC

HD

HORZ

HP

HR

HTP

HU

HWC

HWP

HWR

HWS

HV

HZ

IPS

IN

IW

JWR

JWS

KW

L, (L)

LAT

LBS

LBS/HR

LIN FT, LF

LWB

LWT

MBH

MCA

MOCP

MOT, MTR

NC

NIC

NO

NPSH

NTS

OA

OAL

OED

OPNG

PD

PF

PH

PRV

PSI

PSIG

PSIA

RA

RAD

REQ

RG

RH

RPM

RR

RX

SA

SEN, SENS

SG

SD

SP

SR

TA

TDH

TSP

TSTAT

TV

TYP

TX

UH

UON

VAC

VEL

VFD

W, (W)

W/

W/O

WB

WHA

WMS

WP

WPD

AAV

AC

ACM

ACU

AD

AF

AFF

APD

AP

BDD

BF

BFP

BHP

BOT

BT

BTU

BTUH

CAV

CC

CFR

CH

CLG

COMPR

COND

CONN

CONT

COR

CU

CW

DB

DCW

DDCS

DE

DEG

DHW

DIAM, DIA

DMPR

DN

E, (E)

EA

EAL

EAT

EER

EFF

EL

ELEC

ELEV

ENT

ER

ESP

ET

ETR

EWB

EWT

EXH

EXP

FA

FC

FF

FIN FL, FF

FLA

FLEX

FLR

FPM

FPS

FRP

FSD, FD/SD

FT

FTR

FV

G, GA

GAL

GALV'D

GEN

GPH

BUILDING CONTAINS HAZARDOUS MATERIALS. REFER TO HAZMAT ABATEMENT SHEETS A101, A102, AND A103 lo tt e zny-18061513-m001

2021-05-04T11:28:01-0400

ROBERT L BELTON

2021-04-29T09:22:23-0400

ANDREW G MACDONALD

AND CONSTRUCTION SEQUENCE

MECHANICAL INSTRUMENTATION

ZNY-18061513-M002

:4 lo tt e

CONTROLS & INSTRUMENTATION

SS

MEASURED VARIABLE OR CONTROLLED DEVICE

INSTRUMENT OR DEVICE IDENTIFICATION NUMBER

IN AN ENCLOSURE

EQUIPMENT INSTRUMENT OR DEVICE NOT LOCATED

MEASURED VARIABLE OR CONTROLLED DEVICE

INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE

CENTRAL FEPC

DDCP DATA INPUT/OUTPUT TO

ELECTRONIC INTERLOCK WIRING

DDC CONTROL SYSTEM WIRING

DIGITAL INPUT TO DDCP

DIGITAL OUTPUT FROM DDCP

ANALOG INPUT TO DDCP

ADDRESSABLE INTERFACE MODULE

CONSTRUCTION SEQUENCE

I. NOTES AND PREPARATION

CONNECTIONS, AUTOMATIC CONTROL WIRING AND ITS COMPONENTS (UON).

REMOVAL OF EQUIPMENT SHALL INCLUDE REMOVAL OF ASSOCIATED PIPING, SUPPORT, INSULATION, MOTORS ELECTRICAL

INFORMATION WITH SHOP DRAWINGS.

VERIFY AND COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT PRIOR TO ORDERING AND SUBMIT THIS

OF THE MANUFACTURER, THE SPECIFICATIONS, AND APPROVED SHOP DRAWINGS.

EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES, THE PRINTED INSTALLATION INSTRUCTIONS

START OF WORK OF THAT STEP.

EQUIPMENT INCLUDING VALVES, PIPING AND ACCESSORIES FOR THE NEXT STEP SEQUENCE MUST BE ON SITE BEFORE

COORDINATE THE INSTALLATION OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.

ELBOWS, AND OFFSETS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL COST TO THE FAA.

DRAWINGS DO NOT SHOW ALL REQUIRED FITTINGS, ELBOWS, AND/OR OFFSETS. FINAL INSTALLATION OF ALL FITTINGS, DIMENSIONS AFFECTING THE WORK.

PHYSICAL SIZES AND LOCATION OF EQUIPMENT AND ASSOCIATED PIPING ARE APPROXIMATE. VERIFY SIZES AND

DEMOLITION

NEW WORK

4.

5.

PREPARATION

CONFLICTS AND "AS IS" CONDITIONS.

COMPLETED AND APPROVED BEFORE START OF WORK. THIS MUST INCLUDE ELEVATIONS AND ANY MODIFICATION DUE TO

SITE. APPROVED CONSTRUCTION PLANS SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT SHALL BE

BEFORE THE START OF DEMOLITION AND CONSTRUCTION, EQUIPMENT PIPING AND ACCESSORIES SHALL BE APPROVED AND ON

VERIFY LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE WORK PRIOR TO THE START OF CONSTRUCTION.

START OF WORK. MECHANICAL AND ELECTRICAL SHUTDOWN FOR WORK SHALL BE ACCOMPLISHED BY FAA PERSONNEL.

DE-ENERGIZING ELECTRICAL SUPPLY. THIS WORK SHALL BE SCHEDULED AND COORDINATED WITH THE COR BEFORE

SHUTDOWN AND REMOVAL OF THE EQUIPMENT AND PIPING SHALL BE ACCOMPLISHED BY CLOSING SHUT-OFF VALVES AND

TEMPORARY WORK MAY NOT BE SHOWN ON DRAWINGS (E.G. SOME BLIND FLANGES).

WHERE WORK IS DESIGNATED TO BE "TEMPORARY", IT WILL EVENTUALLY BE REMOVED IN A SUBSEQUENT STEP. SOME

PROTECT FLOOR DRAINS AND STORM DRAINS FROM DAMAGE AND DEBRIS AT ALL TIMES.D.

ELECTRICAL REQUIREMENTS.

INTERFERE WITH THE WORK. OBTAIN PRIOR APPROVAL FROM COR FOR SUCH WORK. REFER TO ELECTRICAL SPECIFICATIONS FOR

PIPING, ELECTRICAL WIRING AND CONDUITS NOT INDICATED AND NOT RELATED TO THE PIPING REPLACEMENT WHERE THEY

DEMOLITION DRAWINGS INDICATE PIPING AND EQUIPMENT WITHIN THE WORK AREA. REMOVE AND REINSTALL (AS REQUIRED)

SYSTEMS. HEATING HOT WATER SYSTEM MAY HAVE SERVICE INTERRUPTED AS APPROVED AND SCHEDULED BY COR.

SEQUENCE SHALL BE PROVIDED BY THE CONTRACTOR WHICH MINIMIZES THE RISK OF FAILURE TO ANY MECHANICAL OR ELECTRICAL

THE ARTCC IS A 24 HOUR FACILITY AND CAN NOT TOLERATE THE LOSS OF POWER OR CHILLED WATER. A CONSTRUCTION

EXISTING CONTROLS, UNLESS NOTED OTHERWISE, SHALL REMAIN IN OPERATION AND PROTECTED DURING CONSTRUCTION.

III. TURNOVER FROM PERMANENT TO TEMPORARY TOWERS

CONDENSER WATER PIPING.

CHILLERS ARE NOW ISOLATED FROM THE PERMANENT CONDENSER WATER SYSTEM AND ARE RUNNING OFF THE TEMPORARY

CONDENSER WATER SUPPLY OVER TO TEMPORARY TOWERS.

ONCE TEMPORARY TOWER SYSTEM HAS BEEN PROVEN, REPIPE CH-100 AND CH-200 TO TEMPORARY HEADER AND TURN PLANT

FZ

FR

FEPC

FCV

FACP

ED

ECMS

DDCP

DC

CI

AX

AM

AFS

AFMS

FREEZESTAT

FIELD MOUNTED RELAY

FRONT END PERSONAL COMPUTER

FLOW CONTROL VALVE

FIRE ALARM CONTROL PANEL

ENABLE/DISABLE

ENERGY CONTROL AND MONITORING

DI. PRESSURE SWITCH

DAMPER POSITION INDICATOR

DIRECT DIGITAL CONTROL PANEL

DRY CONTACT

CURRENT RELAY

CURRENT INPUT

CONTROL DAMPER

COMMON

AUXILIARY CONTACT

AMPERAGE

AIR FLOW SWITCH

AIR FLOW MEASURING STATION

WD

SW

SL

PDI

PD

N.O.

N.C.

LS

WATER DETECTOR

TEMPERATURE SENSOR

TEMPERATURE INDICATOR

SWITCH

START/STOP

STROBE LIGHT

PRESSURE INDICATOR

PRESSURE DIFFERENTIAL INDICATOR

/POWER DEMAND

PRESSURE DIFFERENTIAL SENSOR

NORMALLY OPEN

NORMALLY CLOSED

MOTOR/ACTUATOR

LEVEL SWITCH

HUMIDITY SENSOR

HUMIDISTAT

HORN

REQUIRED.

COORDINATE ALL WORK WITH THE WORK OF OTHER TRADES. ELECTRICAL WORK SHALL MATCH MECHANICAL PHASING PLAN AS

STEP 1 - TRANSITION

MANUAL OVERRIDE AND SILENCE SWITCHES DURING CONSTRUCTION WORK.

PROTECT REFRIGERANT LEAK DETECTION AND ALARM SYSTEM, REFRIGERANT LEAK SENSING TUBES, HORNS, LIGHT STROBES, DO

AI

AID

IV. PERMANENT CONDENSER WATER PIPING

PROVING PERIOD.

INCIDENT TO BE CONSIDERED "PROVEN". TEMPORARY TOWER YARD SHALL REMAIN PRESSURIZED AND OPERATIONAL DURING

AFTER THE PERMANENT PIPING SYSTEM IS OPERATIONAL, IT MUST BE OPERATED FOR THREE (3) CONSECUTIVE DAYS WITHOUT

A. INSTALL PERMANENT CONDENSER WATER PIPING AND APPURTENANCES ON SITE.

STEP 1 - INSTALLATION OF PERMANENT PIPING

CANNOT BE ACCOMPLISHED IN 8-10 HOURS, PROVIDE TEMPORARY DETECTION/ALARM SYSTEM.

REFRIGERANT LEAK DETECTION PANEL MUST BE PERFORMED TO MINIMIZE THE DURATION OF SYSTEM OUTAGE. IF THE WORK

ALL WORK INVOLVING CHANGEOVER OF CONTROL FUNCTIONS FROM EXISTING REFRIGERANT LEAK DETECTION PANEL TO THE NEW

LOCATION OF SENSING LOCATIONS. KEEP EXISTING SYSTEM IN OPERATION UNTIL NEW SYSTEM IS OPERATIONAL.

PROVIDE CONDUIT AND TUBING ASSOCIATED WITH NEW REFRIGERANT LEAK DETECTION SYSTEM POINTS. SEE DRAWING M201 FOR

V. REFRIGERANT LEAK DETECTION PANEL REPLACEMENT

B. DEMOBILIZE TEMPORARY TOWER YARD AND ASSOCIATED PIPING. REMOVE CHAIN LINK FENCING.

PROVEN AND COMMISSIONED. CLOSE ISOLATION VALVES FOR TEMPORARY TOWER PIPING ON CONDENSER WATER HEADERS.

ONCE WORK WITHIN THE CHILLED WATER PLANT AND PERMANENT TOWER YARD IS COMPLETE AND ALL EQUIPMENT HAS BEEN

VI. TEMPORARY TOWER YARD DEMOBILIZATION

FAN. THE FAN MUST RUN CONTINUOUSLY UNTIL WORK IS COMPLETE.

PRIOR TO DISCONNECTING AND REMOVING REFRIGERANT LEAK DETECTION PANEL, ENERGIZE EXISTING REFRIGERANT VENTILATION

D. DISCONNECT POWER, CONTROL AND INTERLOCK WIRING FROM THE REFRIGERANT LEAK DETECTION PANEL AND REMOVE THE PANEL.

NEW LEAK DETECTION TUBING TO THE NEW PANEL.

INSTALL NEW REFRIGERANT LEAK DETECTION PANEL AND RECONNECT POWER, CONTROL AND INTERLOCK WIRING. ALSO, TERMINATE

F. ENERGIZE PANEL AND PERFORM ACTIVE TESTING OF SEQUENCE DURING THE SCHEDULED OUTAGE.

OPERATIONAL AND ACCEPTED BY COR..

REMOVE EXISTING REFRIGERANT LEAK GAS-MONITORING POINTS AND ASSOCIATED TUBING AND CONDUIT AFTER NEW SYSTEM IS

ANALOG OUTPUT FROM DDCP

A.A.

STEP 1 - TEMPORARY COOLING TOWERS AND PUMPS

II. TEMPORARY COOLING TOWERS AND PUMPS

COOLING TOWER YARD.

THE INTENT OF THIS PHASE IS TO INSTALL TEMPORARY EQUIPMENT TO ALLOW FOR THE COMPLETE SHUTDOWN OF THE

TEMPORARY PIPING WITH COR.

CHILLED WATER PLANT. GROOVED PIPING IS ALLOWED ONLY FOR TEMPORARY PIPING. COORDINATE GROUNDING REQUIREMENT OF

ABOVE GROUND TEMPORARY CONDENSER WATER PIPING SHALL BE ROUTED ON WOODEN CRIBBING SUPPORTS TO THEC.

CONNECTIONS FOR ALL 4 CHILLERS.

INSTALL TEMPORARY CONDENSER WATER HEADER WEST OF EXISTING CHILLERS ON GROUND WITH VALVED BRANCH

FENCING. REFER TO M003 FOR LOCATION OF WORK AREA.

ONCE TEMPORARY TOWER SYSTEM HAS BEEN PLACED ON SITE, PROTECT THE TEMPORARY TOWER SITE WITH CHAIN LINK

A. INSTALL TEMPORARY FOUNDATIONS ON SITE AND ALLOW TO CURE FOR 28 DAYS. INSTALL TEMPORARY EQUIPMENT ON SITE.

THIS OUTLINE AS PART OF THEIR CONSTRUCTION PHASING PLAN.

CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE WHICH ALSO PROVIDES ALL OF THE DETAILS ABSENT FROM

CONSTRUCTION SEQUENCE IS PROVIDED AS AN OUTLINE OF THE SIGNIFICANT STEPS REQUIRED TO COMPLETE THE PROJECT. THE H.

STEP 2 - INSTALLATION OF TEMPORARY EQUIPMENT

AO

CONDENSER WATER SYSTEM.

CONNECT TEMPORARY ELECTRICAL, MAKE-UP WATER, BLOWDOWN, AND TEMPORARY CHEMICAL TREATMENT TO THE…