19127-portfolio.pdf
PDF 4 MB Posted
- Attached to
- Replace the Defective Condenser Water Valves at the New York ARTCC (ZNY) in Ronkonkoma, NY
- Solicitation number
- 697DCK-21-R-00190
About this file
This federal solicitation requests proposals to replace defective condenser water valves at the New York Air Route Traffic Control Center in Ronkonkoma, New York. The Federal Aviation Administration Enroute Construction Group in Boston is seeking contractors to provide all labor, materials, and supervision. The work includes replacing valves, with pricing expected to range from $1-4 million. Payment and performance bonds are required. A site visit will be scheduled to review the project, with any amendments posted online rather than distributed. Proposals are due electronically in PDF format by the specified deadline. Contractors must be registered in the System for Award Management to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment0004.pdf | ||
| 697DCK-21-R-00190amendment3.pdf | ||
| amendment0002.pdf | ||
| Wage Determination 05.07.2021.pdf | ||
| amendment0001.pdf | ||
| zny19127-Portfolio.pdf | ||
| NYWAGERATE.pdf | ||
| COVID-19 Contractual Requirement 21-3-17.pdf | ||
| ZNY_Final_Valve_Replacement - Specs.pdf.pdf | ||
| RFO697DCKR00190.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
ENROUTE/FSS
ARTCC
SCHEMATIC DIAGRAM - NEW WORK
COOLING TOWER
CONDENSER WATER VALVE REPLACEMENT
NYNEW YORK CENTERRONKONKOMA
JF
AS
PROJECT ENGINEER MGR: ENGINEERING CENTER
03/31/2021 18061513
ZNY-18061513-M704
02/03/202118061513CONSTRUCTION, DT #19127 (EKS)03/31/2021
z n y -1
-m
.d g
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
/0
/2
:2
:1
A
M P lo tt e d b
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
IS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
SHEET NOTES:
.ABBREVIATIONS, AND GENERAL NOTES
REFER TO SHEETS M001 AND M002 FOR MECHANICAL SYMBOLS,
GENERAL SHEET NOTES:
A.
CONTROL SYSTEM.
CONNECTED TO ACTUATOR, TEST OPERATION THROUGH EXISTING
ACTUATOR. ONCE EXISTING CONTROL SIGNAL WIRES ARE
RECONNECT POWER WIRING AND CONTROL WIRING TO NEW VALVE
VALVE POSITION INDICATOR, AND MANUAL ACTUATOR OVERRIDE.
VALVE ACTUATOR SHALL BE PROVIDED WITH POSITION FEEDBACK,
ACTUATOR SUITABLE FOR 120 VAC SINGLE-PHASE POWER SUPPLY.
PROVIDE BUTTERFLY VALVE ACTUATED BY ON-OFF ELECTRIC
M704
A6
SCALE: NTS
COOLING TOWER SCHEMATIC DIAGRAM - NEW WORK
B.
VALVES.
PROVIDE BUTTERFLY VALVES FOR CONDENSER WATER ISOLATION
8"CTS
8"CTR 8"CTR
8"CTR 8"CTR
14"CTS
2 1/2"ICW2 1/2"ICW
IC
W
3"ICW
2 1/2"ICW 2 1/2"ICW
SAN. DRAIN
3/4" DRAIN
CI
AO
SS
DO
AX
DI
CT-3C FAN VFD
DC
CT-1C FAN VFD
CT-2C FAN VFD
CT-4C FAN VFD
VI CV
AI
1D1D
2C 2C
CVVI
1C 1C
4D 4D
3D3D
CV VI
VICV
2D 2D
VICV
3C 3C
VI CV
4C4C
TS
8" CT EQUALIZATION
8"
8"
8" 8" CT EQUALIZATION
TI
3" OVERFLOW (TYP)
CT
SAN. DRAIN
SAN. DRAINSAN. DRAIN
CT-1C
CONTROL PANEL
CT-3C
CT-4C
CT-2C
2C
FCV
1C
2D
1D
4D
3D
4C
3C
M M
14"CTR
FIPFIP
FIP FIP
12"CTR DN
INSULATE WITH JACKET. COORDINATE WITH HEAT TRACING.
PROVIDE 4 DRAINS WITH 3/4-INCH STEEL BALL VALVES. RE-2
2 2
EACH TOWER. REINSTALL JACKET, INSULATION AND HEAT TRACING,
FLANGED INLET, OUTLET AND EQUALIZATION LINE CONNECTIONS TO
PROVIDE 316 STAINLESS STEEL BOLTS, WASHERS AND NUTS AT 3
(TYP)
" DRAIN(4) 3/4
KEY PLAN
zny-18061513-m704
2021-04-13T06:14:24-0400
ROBERT L BELTON
2021-04-12T07:38:26-0400
ANDREW G MACDONALD
#5 @ 6" O.C., T&B
5 #5 BARS, T&B
13'-5"
4'-8"
10'-6"
CONCRETE SUPPORT PAD
TEMPORARY
3'-0"
CENTERLINE OF SUPPORT
TOWER
COOLING
TEMPORARY
RESERVOIR TANK
SUPPORT PAD
CONCRETE
L
3" CLR
EACH WAY AND T&B
#5 @ 12" O.C., RESERVOIR TANK
AND LEVEL
SURFACE FLAT
MAINTAIN TOP
1'-0" MIN
IN
GRADE
FLAT AND LEVEL
MAINTAIN TOP SURFACE
6" MIN
TENSION AND 4,500 POUNDS SHEAR
FACTORED CAPACITY OF 14,000 POUNDS
ANCHORAGE OF EACH SUPPORT MUST HAVE
TEMPORARY COOLING TOWER SUPPLIER
TOWER SUPPORT W/ANCHORS BY
AND LEVEL
SURFACE FLAT
MAINTAIN TOP
SEE PLAN
OF SUPPORT
CENTERLINE
SUPPORT AND PAD
CENTERLINE OF
21'-1"
3'-0"7'-0"
1'-1"
7'-0"
(4 TOTAL EACH TOWER)
COOLING TOWER SUPPORT LEG
CONCRETE SUPPORT PADCONCRETE SUPPORT PAD
TEMPORARY PUMP (3 TOTAL)
SUPPORT AND PAD
CENTERLINE OF
ANCHORS BY PUMP SUPPLIER
5 #5 BARS, T&B
#5 @ 12" O.C., T&B
TEMPORARY COOLING TOWER SUPPORTS
DR
DR
ZNY-18061513-S201
-s
-s lo tt e
A8
S201
A5
C5
TOWERS AND PUMPS ARE REMOVED. RESTORE SITE TO ORIGINAL CONDITION AFTERWARDS.
DEMOLISH TEMPORARY COOLING TOWER FOUNDATIONS AND PUMP PADS AFTER TEMPORARY COOLING 2.
ACCOMMODATE EQUIPMENT AND UNDERGROUND UTILITIES.
TOWER SUPPORT POSTS. CONCRETE PADS SIZES AND LOCATIONS SHALL BE ADJUSTED AS NEEDED TO COORDINATE CONCRETE PADS WITH ACTUAL EQUIPMENT INSTALLED INCLUDING LOCATIONS OF COOLING 1.
NOTES:
C8 TEMPORARY COOLING TOWER AND PUMP PADS
SCALE: 1/4" = 1'-0"
C5 TEMPORARY COOLING TOWER SUPPORT PAD
SCALE: 3/4" = 1'-0"
NOTES: SEE PLAN FOR LOCATION AND SIZE.
TEMPORARY COOLING TOWER SUPPORT PAD
SCALE: 3/4" = 1'-0"S201
A5
A8 TEMPORARY PUMP SUPPORT PAD
SCALE: 3/4" = 1'-0"
NOTES: SEE PLAN FOR LOCATION AND SIZE.
CONCRETE" 318-14
3. AMERICAN CONCRETE INSTITUTE'S (ACI) "BUILDING CODE REQUIREMENTS FOR STRUCTURAL
STRUCTURES (ASCE 7-16).
2. AMERICAN SOCIETY OF CIVIL ENGINEERS, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
1. 2018 INTERNATIONAL BUILDING CODE (IBC)
B. DESIGN CODES AND STANDARDS
INFORMATION SHALL NOT BE OBTAINED BY MEASURING OFF THE DRAWINGS.
4. SCALES SHOWN ON THE DRAWINGS ARE FOR GENERAL INFORMATION ONLY. DIMENSIONAL
CONTRACTOR-PROPOSED ALTERNATIVES OR SUBSTITUTIONS.
3. COORDINATE ALL REVISIONS TO THE STRUCTURAL SYSTEM AS A RESULT OF ACCEPTANCE OF
SUBMISSION OF SHOP DRAWINGS.
APPROVED MANUFACTURER/VENDOR DRAWINGS THAT AFFECT CONSTRUCTION PRIOR TO
2. REVIEW AND VERIFY ALL AS-BUILT CONDITIONS AND ACTUAL EQUIPMENT DIMENSIONS USING
SAFETY OF WORKERS DURING ALL PHASES OF CONSTRUCTION.
1. TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE INTEGRITY OF ALL STRUCTURES AND
A. GENERAL
C SEISMIC DESIGN CATEGORY
1.5 IMPORTANCE FACTOR
D SITE CLASS (ASSUMED)
0.081D1 S
0.204DS S
0.0501 S
0.191s S
6. SEISMIC LOAD PARAMETERS:
1.2 IMPORTANCE FACTOR
1.2 THERMAL FACTOR
1.0 EXPOSURE FACTOR
30 PSF GROUND SNOW LOAD
5. SNOW LOAD PARAMETERS
C EXPOSURE
140 MPH BASIC WIND SPEED
3. WIND LOAD PARAMETERS:
41,000 LBS EACH (2 TOTAL) TEMPORARY COOLING TOWERS
2. COOLING TOWER MAXIMUM OPERATING WEIGHTS:
IVPARAMETERS)
1. RISK CATEGORY (FOR DETERMINATION OF LOADING
C. DESIGN LOADS
STRUCTURAL GENERAL NOTES
6. NOTIFY THE COR IMMEDIATELY IF ANY UTILITIES ARE LOCATED LESS THAN 3'-0" BELOW GRADE.
5. REFER TO M-003 FOR COORDINATION OF EQUIPMENT WITH EXISTING UTILITIES.
4. DEWATER AS NECESSARY PRIOR TO PLACING CONCRETE.
3. NOTIFY THE COR IMMEDIATELY IF UNUSUAL SOIL CONDITIONS ARE FOUND.
BEARING CONDITION FOR EACH FOUNDATION BEFORE PLACEMENT.
2. AN INDEPENDENT TESTING AGENCY RETAINED BY THE CONTRACTOR SHALL VERIFY THE REQUIRED
1. FOUNDATION DESIGN IS BASED ON AN ALLOWABLE BEARING PRESSURE OF 2,000 PSF.
D. FOUNDATIONS
DESIGN WITHOUT APPROVAL OF THE COR.
WEIGHT PROPORTIONS FOR ALL COMPONENTS OF THE MIX. THE CONTRACTOR SHALL NOT VARY FROM THE MIX
8. THE CONTRACTOR SHALL SUBMIT PROPOSED MIX DESIGNS FOR REVIEW BY THE COR. MIX DESIGNS SHALL SHOW
FOR THE PROPER USE OF ADDITIVES.
CONTRACTOR SUBJECT TO THE APPROVAL OF THE COR. FOLLOW THE RECOMMENDATIONS OF THE MANUFACTURER JOB SITE. THE USE OF PLASTICIZERS, RETARDANTS AND OTHER ADDITIVES SHALL BE AT THE OPTION OF THE SUPPLIER AND PUMPER TO ENSURE A PUMPABLE AND WORKABLE MIX WITHOUT THE ADDITION OF WATER AT THE
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THE REQUIREMENTS OF THE CONCRETE
6. CONCRETE REINFORCEMENT BARS SHALL BE ASTM A 615, GRADE 60, DEFORMED.
1 1/2 INNO. 5 BARS AND SMALLER
2 INNO. 6 BARS AND LARGER
B. EXPOSED TO EARTH OR WEATHER WHERE FORMS ARE USED:
3 INA. CONCRETE CAST AGAINST & PERMANENTLY EXPOSED TO EARTH
SECTION 7.7 REQUIREMENTS SHOWN BELOW UON.
5. MINIMUM CONCRETE COVER PROTECTION FOR REINFORCEMENT BARS SHALL BE IN ACCORDANCE WITH ACI 318,
4. MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL CONFORM TO ACI 301.
PLACING DRAWINGS FOR REINFORCED CONCRETE STRUCTURES" AND CRSI "MANUAL OF STANDARD PRACTICE".
OF REINFORCING BARS SHALL CONFORM TO THE RECOMMENDATIONS OF ACI 315R "MANUAL OF ENGINEERING AND ACI 315 "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT" AND ACI SP-66 "DETAILING MANUAL". PLACING
3. DETAILING OF CONCRETE REINFORCEMENT BARS AND ACCESSORIES SHALL CONFORM TO THE RECOMMENDATIONS OF OR I/II AND CONCRETE SHALL HAVE COMPRESSIVE STRENGTH (F'c) OF 4,500 PSI AT 28 DAYS UON.
2. CONCRETE SHALL HAVE NORMAL WEIGHT COARSE AGGREGATES. CEMENT SHALL CONFORM TO ASTM C150, TYPE II
AMERICAN CONCRETE INSTITUTE (ACI) 318.
1. CONCRETE CONSTRUCTION SHALL CONFORM TO "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE", E. CONCRETE
3. INSPECTIONS AND TESTING OF SOILS INCLUDE FOUNDATIONS AND BACKFILLING UTILITY TRENCHES.
2. PROVIDE CONTINUOUS AND PERIODIC SPECIAL INSPECTIONS AS FOLLOWS BASED ON IBC TABLE 1705.3.
1. THE CONTRACTOR SHALL PROVIDE SPECIAL INSPECTIONS IN ACCORDANCE WITH IBC CHAPTER 17.
F. INSPECTIONS
COMPACTED FILL.
PLACEMENT AND COMPACTION OF
DENSITIES AND LIFT THICKNESSES DURING
11. VERIFY USE OF PROPER MATERIALS,
SITE HAS BEEN PREPARED PROPERLY.
FILL, INSPECT SUBGRADE AND VERIFY THAT
12. PRIOR TO PLACEMENT OF COMPACTED
OF COMPACTED FILL MATERIALS.
10. PERFORM CLASSIFICATION AND TESTING
MATERIAL.
PROPER DEPTH AND HAVE REACHED PROPER
9. VERIFY EXCAVATIONS ARE EXTENDED TO
DESIGN BEARING CAPACITY.
TRENCHES ARE ADEQUATE TO ACHIEVE THE
EQUIPMENT FOUNDATIONS AND AT UTILITY
8. VERIFY MATERIALS BELOW MECHANICAL
BEING FORMED.
AND DIMENSIONS OF THE CONCRETE MEMBER
7. INSPECT FORMWORK FOR SHAPE, LOCATION
CURING TEMPERATURE AND TECHNIQUES.
6. VERIFY MAINTENANCE OF SPECIFIED
PROPER APPLICATION TECHNIQUES.
5. INSPECT CONCRETE PLACEMENT FOR
CONCRETE.
AND DETERMINE THE TEMPERATURE OF THE
FABRICATE SPECIMENS FOR STRENGTH TESTS
4. PRIOR TO CONCRETE PLACEMENT,
3. VERIFY USE OF REQUIRED DESIGN MIX.
SIZE, LOCATION AND ALIGNMENT.
MECHANICAL EQUIPMENT CONNECTIONS FOR
2. INSPECT POST INSTALLED ANCHORS OF
SPACING.
1. INSPECT REINFORCEMENT AND VERIFY
X
XX
TYPE
INSPECTIONS
CONTINUOUS SPECIAL
INSPECTIONS
PERIODIC SPECIAL
0 32"
3/4" = 1'-0"
16"8"
0 4'2' 8'
1/4" = 1'-0" zny-18061513-s201
2021-04-13T06:14:41-0400
ROBERT L BELTON
2021-04-12T07:38:50-0400
ANDREW G MACDONALD
DEMOLITION
COOLING TOWER FLOW CONTROL VALVE
WL
ZNY-18061513-E205
-e lo tt e
MM
UP
A E D CB
20.6
18.3
MOTOR DISCONNECT (TYP.)
HEATER DISCONNECT (TYP.)
E-106-B-42
2D
4D
E-106-B-40
4C 1
3C 1
E-106-B-36
E-106-B-38
3D 1
E-106-B-30
E-106-B-28
E-106-B-32
2C
PNL E-206-A
GENERAL SHEET NOTES
SHEET NOTES
E205
B6
SCALE: 1/8" = 1'-0"
COOLING TOWER FLOW CONTROL VALVE - DEMOLITION
RECONNECTION TO NEW FCV. PROTECT CONDUIT AND WIRING DURING VALVE REPLACEMENT.
DISCONNECT SWITCH. ASSOCIATED DISCONNECT SWITCH, CONDUIT AND WIRING BACK TO SOURCE TO REMAIN FOR
EXISTING FLOW CONTROL VALVE (FCV) TO BE REPLACED. REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO
AND WIRING PRIOR TO ANY WORK.
WITH FAA AND MECHANICAL CONTRACTOR TO VERIFY PIPING PENETRATION LOCATION AND AFFECTED CONDUITS
REROUTE EXISTING 1" CONDUITS IN AREA INDICATED FOR TEMPORARY PIPING ROOF PENETRATION. COORDINATE
OF REPLACEMENT DOES NOT AFFECT FACILITY OPERATION.
COORDINATE WITH MECHANICAL AND CONTROL DRAWINGS FOR SEQUENCE OF REPLACEMENT. ENSURE SEQUENCE D.
SCHEDULE AND THIS DRAWINGS.
BRANCH CIRCUIT RUNS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY BRANCH CIRCUITS PER PANELBOARD C.
MAINTAIN THE CONTINUITY FOR ALL CIRCUITS SERVING AREAS NOT DESIGNATED FOR DEMOLITION.B.
REFER TO DRAWINGS E001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.A.
E-106-B-34
0 8' 16'4'
1/8" = 1'-0"
0 8' 16'4'
1/8" = 1'-0" zny-18061513-e205
2021-04-13T06:11:44-0400
ROBERT L BELTON
2021-04-12T07:28:25-0400
ANDREW G MACDONALD
PANEL SCHEDULES
ZNY-18061513-E701
lo tt e
1 2
E-102-A
E-102-B
E-106-D
E-106-B
PANELBOARD SHEET LOCATION KEY
SCHEDULE AND THIS DRAWINGS.
BRANCH CIRCUIT RUNS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY BRANCH CIRCUITS PER PANELBOARD C.
MAINTAIN THE CONTINUITY FOR ALL CIRCUITS SERVING AREAS NOT DESIGNATED FOR DEMOLITION.B.
REFER TO DRAWINGS E001 AND E002 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.A.
PROVIDE CONDUIT AND WIRING FROM PANEL TO THE TEMPORARY EQUIPMENT ON SITE. SEE E002 FOR LOCATION.
PLANS FOR FCV LOCATION.
EXISTING CIRCUIT BREAKER AND ASSOCIATED WIRING TO BE RECONNECTED TO THE NEW FCV. REFER TO FLOOR
RATING.
CIRCUIT BREAKER AS REQUIRED. NEW CIRCUIT BREAKER SHALL MATCH EXISTING IN TYPE, MANUFACTURER, AND AIC
CONTRACTOR TO VERIFY CIRCUIT BREAKER SIZE REQUIREMENT PER FINAL EQUIPMENT SELECTED. PROVIDE NEW
TEMPORARY EQUIPMENT LOCATION.
POWER SUPPLY TO TEMPORARY COOLING TOWER, PUMPS, AND ASSOCIATED APPARATUS. REFER TO E002 FOR zny-18061513-e701
2021-04-13T06:12:01-0400
ROBERT L BELTON
2021-04-12T07:28:45-0400
ANDREW G MACDONALD
COVER SHEET
KL
WS
ZNY-18061513-G001
-g
:3 lo tt e
Department of Transportation
Federal Aviation Administration
Condenser Water Valve Replacement
New York Air Route Traffic Control Center
Ronkonkoma, New York
January 2021
FINAL Submission zny-18061513-g001
2021-04-13T06:12:16-0400
ROBERT L BELTON
2021-04-12T07:33:12-0400
ANDREW G MACDONALD
LOCATION MAP & BUILDING CODE ANALYSIS
INDEX OF DRAWINGS, GENERAL NOTES,
WS
ZNY-18061513-G002
:3 lo tt e
GREAT SOUTH BAY
JOHNSON AVE
SUNRISE HWY
LAKELAND AVE
347 MEMORIAL HWY
MacARTHUR
MEMORIAL HWY
VETERAN'S
EXPRESSWAY
LONG ISLAND
MacARTHUR AIRPORT
LONG ISLAND-
LOCATION
PROJECT
ZNY ARTCC
LTR
NUMBER
DRAWING
DRAWING TITLE
BUILDING CODE ANALYSIS
CLASSIFICATION:
OCCUPANCY
AND REGULATIONS:
APPLICABLE CODES
HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.
DOCUMENTS, CODES, AND CRITERIA FOR THE HANDICAPPED ACCESSIBILITY ARE TO BE
MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ADA/ABA
CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN
DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND T.
BE CRITICAL TO THE OPERATION OF THE FACILITY.
ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY
PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE S.
REQUIREMENTS, 29 CFR 1910.146 AND 1926.21(B)(6).
WORK IN CONFINED SPACES OR AREAS SHALL BE DONE IN ACCORDANCE WITH OSHA R.
FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY PANELBOARD
ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER
CASE OF BREAKER OR PIPE VALVE OPERATION. CONTRACTOR SHALL NOT OPEN (DE-
CONTRACTOR SHALL REQUEST PERMISSION IN WRITING OF FAA IN ADVANCE FOR EACH
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. Q.
CRITICAL FOR THE LIFE SAFETY OF THE FLYING PUBLIC.
ELECTRONIC EQUIPMENT. THIS EQUIPMENT CONTROLS AIR TRAFFIC AND IS DEEMED
SPRINKLER SYSTEM PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE CRITICAL P.
PATCHED AND REPAIRED TO MATCH ADJACENT SURFACES.
COMPLETION OF THE WORK. ANCHORING HOLES IN CONCRETE SURFACES SHALL BE
DEVICES FOR DUSTPROOF CONSTRUCTIONS, INTO CONCRETE, SHALL BE REMOVED UPON
LOCATIONS & SPECIAL REQUIREMENTS WITH COR BEFORE INSTALLATION. ANCHORING
EQUIPMENT. TEMPORARY DP ARE SHOWN SCHEMATICALLY ON DRAWINGS. VERIFY FINAL
PERSONNEL AND NOT RESTRICT ACCESS TO MECH, ELEC, FAA, OR FIRE PROTECTION
INDICATED ON DRAWINGS. TEMPORARY PARTITIONS SHALL BE ACCESSIBLE TO FAA
PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS WHERE O.
FIELD VERIFY EXISTING CONDITION PRIOR TO ANY CONSTRUCTION WORK REQUIRED.
CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA.
EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING N.
COORDINATE WITH COR.
PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND
REMOVE AND REINSTALL, AS REQUIRED, FURNITURE THAT IS AFFECTED BY THE WORK. L.
EQUIPMENT. COORDINATE SIZE & LOCATION WITH MECHANICAL AND ELECTRICAL.
FOR PROVISION OF ARCHITECTURAL, MECHANICAL, ELECTRICAL & FIRE PROTECTION
PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY AND CONCRETE) J.
MECHANICAL
ZNY-18061513-M001 MECHANICAL LEGENDS, NOTES AND ABBREVIATIONS
ZNY-18061513-M101 HVAC AND HVAC PIPING CHILLER ROOM PLAN - DEMOLITION
ZNY-18061513-M102 HVAC AND HVAC PIPING PSB ROOF PLAN - DEMOLITION
ZNY-18061513-M201
ZNY-18061513-M202
HVAC AND HVAC PIPING CHILLER ROOM PLAN
HVAC AND HVAC PIPING PSB ROOF PLAN
ZNY-18061513-M501
ZNY-18061513-M502
ZNY-18061513-M504
ZNY-18061513-M601
HVAC TYPICAL DETAILS
MECHANICAL SCHEDULES
ZNY-18061513-M701
ZNY-18061513-M702
ZNY-18061513-M703
ZNY-18061513-M704
ZNY-18061513-M705
CONDENSER WATER SCHEMATIC DIAGRAM - DEMOLITION
CONDENSER WATER SCHEMATIC DIAGRAM
COOLING TOWER SCHEMATIC DIAGRAM
TEMPORARY COOLING TOWER WATER SCHEMATIC DIAGRAM
GENERAL
ZNY-18061513-S201 TEMPORARY COOLING TOWER SUPPORTS
STRUCTURAL
AND REQUIREMENTS.
OPERATIONS, TYP. ACCOMMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE
PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA
PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO
THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA.
OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK
EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL REMAIN I.
OTHERWISE NOTED.
LINES AND FACE OF MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS
DIMENSION LINES SHOWN ON SHEETS ARE FROM COLUMN CENTER A.
ARE RESOLVED TO SATISFACTION OF COR.
COR OF CONFLICTS. NO DEMOLITION WORK SHALL PROCEED UNTIL CONFLICTS
BUILDING SYSTEMS. COORDINATE DEMOLITION WITH THE WORK AND NOTIFY
FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OFB.
PATCHED AND REPAIRED TO MATCH EXISTING FINISHES.
FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK SHALL BEC.
PROTECTION FOR ITEMS TO BE REMOVED.
ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL, ELECTRICAL AND FIRE
ELECTRICAL SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN
VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL ANDD.
AND THE DIRECTION TO THE NEAREST EXIST.
PROVIDE NECESSARY SIGNAGE WARNING BUILDING OCCUPANTS OF THE CHANGE,
DURING THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES.
CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE
CONTRACTOR MUST MAINTAIN MEANS OF EGRESS DURING DEMOLITION AND
COORDINATE THE WORK WITH COR TO AVOID DISRUPTING FAA OPERATIONS.
THE BUILDING SHALL BE OCCUPIED BY FAA DURING CONSTRUCTION.E.
NOT BE LEFT IN OCCUPIED AREAS.
CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT SHALL F.
ROOFS) BEFORE ANY DEMOLITION OR CONSTRUCTION.
BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND
OF THE FACILITY, COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF
APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON BUILDINGS WHICH ARE PART
AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN
ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES
MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS, G.
DO NOT SCALE DRAWINGS.H.
CONSTRUCTION TYPE:
4.
3.
2.
1.
ZNY-18061513-G001
ZNY-18061513-G002
INDEX OF DRAWINGS GENERAL NOTES
ZNY-18061513-G003
COVER SHEET
ZNY-18061513-G004
ABBREVIATIONS
ZNY-18061513-G005 CONSTRUCTION STAGING PLAN
MECHANICAL SEISMIC DETAILS
ZNY-18061513-M503 HVAC TYPICAL DETAILS
COOLING TOWER SCHEMATIC DIAGRAM - DEMOLITION
ELECTRICAL
ZNY-18061513-E001
ZNY-18061513-E002
ZNY-18061513-E204
ZNY-18061513-E205
ZNY-18061513-E402
ZNY-18061513-E403
ZNY-18061513-E701
ELECTRICAL ABBREVIATIONS, LEGENDS, AND GENERAL NOTES
TEMPORARY COOLING TOWER ELECTRICAL PLAN
CHILLER ROOM FLOW CONTROL VALVE - DEMOLITION
COOLING TOWER FLOW CONTROL VALVE - DEMOLITION
COOLING TOWER FLOW CONTROL VALVE - NEW WORK
PANEL SCHEDULES
HOW TO PROCEED WITH WORK.
HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN
WORK AREA(S) AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT). IF K.
M.
ADVANCE OF PERFORMANCE OF WORK.
BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN
TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES SHALL
UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES SHALL NOT BE
CHILLER BUILDING
SEISMIC DESIGN CATEGORY:
GENERAL LEGENDS
PRESUMED TO CONTAIN LEAD. REFER TO HAZMAT FOR ADDITIONAL INFORMATION.
PAINT COATINGS ON METAL SURFACES, UNLESS OTHERWISE NOTED, SHOULD BE U.
ZNY-18061513-M002
ZNY-18061513-M003
INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP & BUILDING CODE ANALYSIS
-INTERNATIONAL MECHANICAL CODE, 2018 EDITION
-INTERNATIONAL FIRE CODE, 2018 EDITION
-NFPA 70 (NATIONAL ELECTRICAL CODE (NEC), 2020
(29 CFR 1910 AND 1926 - CURRENT ISSUE)
GENERAL INDUSTRY SAFETY & HEALTH STANDARDS
-OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)
-AMERICAN BARRIERS ACT (ABA) STANDARDS, 2015
-NFPA 101 - LIFE SAFETY CODE, 2018 EDITION
-INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
CHILLER ROOM FLOW CONTROL VALVE - NEW WORK
TEMPORARY COOLING TOWER MECHANICAL PLAN
MECHANICAL INSTRUMENTATION AND CONSTRUCTION SEQUENCE
PROVIDED DESIGN IN ACCORDANCE WITH SECTION 01 25 00, "SUBSTITUTION PROCEDURES."
DESIRED DESIGN FUNCTIONAL GOAL, AND ANY OTHER NEWLY REQUIRED INCIDENTAL WORK OR CHANGES TO THE
CAPABILITY OF OTHER EQUIPMENT FOR THE FULL INTENDED FUNCTION OF ALL INDIVIDUAL PIECES TOWARDS THE
OF EXPOSED AREAS AS A RESULT OF THE SUBSTITUTION, THE NEED TO COORDINATE WITH THE FUNCTION AND
INCLUDE ANY NECESSARY ADJUSTMENTS OF CONNECTIONS, PIPING OR WIRING, EQUIPMENT PAD RESIZING, FINISHING
TO EXECUTE INCIDENTAL WORK ARISING FROM THE SUBSTITUTION TO COMPLETE FAA DESIGN INTENT. THIS WILL
ANY FAA-APPROVED MATERIAL OR EQUIPMENT "AS EQUAL" SUBSTITUTIONS BY THE CONTRACTOR AND THE COSTS
THE CONTRACTOR BEARS ALL RESPONSIBILITY FOR THE ADJUSTMENT OF AFFECTED DRAWINGS AS A RESULT OF D.
ENGINEERING PRACTICES.
SUBSTITUTION FITS WITHIN THE ALLOCATED SPACE IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND
PROPER EVALUATION OF THE SUBSTITUTION REQUEST MAY BE MADE, INCLUDING ILLUSTRATING HOW THE PROPOSED
TEST DATA OF BOTH THE MATERIALS SPECIFIED AND THE PROPOSED SUBSTITUTION MATERIALS, SO THAT A
CONTRACT DOCUMENTS, MUST SUBMIT THE NECESSARY SCALE DRAWINGS, PRODUCT DATA, AND PERFORMANCE AND
THE CONTRACTOR, WHEN SUBMITTING FOR APPROVAL OF MATERIALS WHICH ARE OTHER THAN THAT CITED IN THE C.
THAT THERE WILL BE NO ADDITIONAL COSTS BORNE BY THE GOVERNMENT AS A RESULT OF THE SUBSTITUTION.
FURNISHING AND INSTALLING THE SUBSTITUTE MATERIAL. THE CONTRACTOR MUST, IN SUCH TRANSMITTALS, STATE
SPECIFIED WILL NOT OBLIGATE THE GOVERNMENT TO PAY ANY ADDITIONAL COSTS THAT MAY BE ASSOCIATED WITH
THE CONTRACTOR'S SUBMITTAL FOR APPROVAL OF MATERIAL OR PRODUCTS OF HIGHER QUALITY THAN THAT B.
SUBMITTED FOR APPROVAL AS A SUBSTITUTION.4.
APPROVED BY THE PRODUCT'S MANUFACTURER.
REQUIRE OTHER RELATED PRODUCTS BE PRODUCED BY THE SAME MANUFACTURER, OR BY A MANUFACTURER
AND FUNCTIONAL) WITHIN THE PROJECT. CERTAIN PRODUCT'S MANUFACTURER WARRANTIES MAY ALSO
OFFICER'S REPRESENTATIVE (COR), IN WRITING, AS MEETING THE SPECIFIED CRITERIA AND FIT (BOTH PHYSICAL
ACCEPTED BY THE ARCHITECT/ENGINEER OF RECORD, CONTRACTING OFFICER (CO) AND CONTRACTING 3.
PRACTICES.
WORK IN THE SPACE ALLOCATED IN A REASONABLE MANNER REFLECTIVE OF GOOD DESIGN AND ENGINEERING
OF A SIMILAR PROFILE, SHAPE, SIZE, STYLE, AND CONFIGURATION AND CAN BE INCORPORATED INTO THE 2.
EQUAL OR SUPERIOR IN CONSTRUCTION, EFFICIENCY, UTILITY, OR FUNCTION TO THE PRODUCT(S) SPECIFIED.1.
PRECLUDED PROVIDED THEY ARE:
FOR QUALITY, FUNCTION, AND PERFORMANCE. PRODUCTS OF OTHER MANUFACTURERS ARE NOT AUTOMATICALLY
MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS ARE SPECIFIED FOR ITEMS, THEY SET A STANDARD
MANUFACTURER'S NAME, BRAND NAME, OR MODEL NUMBER STATED IN THE SPECIFICATIONS. WHERE
PROPRIETARY AND THE WORDS "OR EQUAL" ARE IMPLIED IF NOT EXPRESSLY STATED AFTER EVERY
BASIS OF DESIGN IN A SCHEDULE, DETAIL OR IN A LIST OF APPROVED PRODUCTS. THIS IS NOT MEANT TO BE
IN GENERAL, MANUFACTURER'S NAMES, BRAND NAMES, OR MODEL NUMBERS MAY BE SPECIFIED FOR ITEMS AS A A.
ZNY-18061513-M004 TEMPORARY CHILLER ROOM PIPING
LOCATION MAP
BASIS OF DESIGN AND SUBSTITUTIONS
NOT TO SCALE
NFPA 101, EXISTING BUSINESS
IBC, GROUP B
zny-18061513-g002
2021-04-13T06:12:31-0400
ROBERT L BELTON
2021-04-12T07:33:34-0400
ANDREW G MACDONALD
AND CONSTRUCTION SEQUENCE
MECHANICAL INSTRUMENTATION
ZNY-18061513-M002
:4 lo tt e
CONTROLS & INSTRUMENTATION
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE IDENTIFICATION NUMBER
IN AN ENCLOSURE
EQUIPMENT INSTRUMENT OR DEVICE NOT LOCATED
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE
CENTRAL FEPC
DDCP DATA INPUT/OUTPUT TO
ELECTRONIC INTERLOCK WIRING
DDC CONTROL SYSTEM WIRING
DIGITAL INPUT TO DDCP
DIGITAL OUTPUT FROM DDCP
ANALOG INPUT TO DDCP
ADDRESSABLE INTERFACE MODULE
CONSTRUCTION SEQUENCE
I. NOTES AND PREPARATION
CONNECTIONS, AUTOMATIC CONTROL WIRING AND ITS COMPONENTS (UON).
REMOVAL OF EQUIPMENT SHALL INCLUDE REMOVAL OF ASSOCIATED PIPING, SUPPORT, INSULATION, MOTORS ELECTRICAL
INFORMATION WITH SHOP DRAWINGS.
VERIFY AND COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT PRIOR TO ORDERING AND SUBMIT THIS
OF THE MANUFACTURER, THE SPECIFICATIONS, AND APPROVED SHOP DRAWINGS.
EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES, THE PRINTED INSTALLATION INSTRUCTIONS
START OF WORK OF THAT STEP.
EQUIPMENT INCLUDING VALVES, PIPING AND ACCESSORIES FOR THE NEXT STEP SEQUENCE MUST BE ON SITE BEFORE
COORDINATE THE INSTALLATION OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.
ELBOWS, AND OFFSETS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL COST TO THE FAA.
DRAWINGS DO NOT SHOW ALL REQUIRED FITTINGS, ELBOWS, AND/OR OFFSETS. FINAL INSTALLATION OF ALL FITTINGS, DIMENSIONS AFFECTING THE WORK.
PHYSICAL SIZES AND LOCATION OF EQUIPMENT AND ASSOCIATED PIPING ARE APPROXIMATE. VERIFY SIZES AND
DEMOLITION
NEW WORK
4.
5.
C.
PREPARATION
CONFLICTS AND "AS IS" CONDITIONS.
COMPLETED AND APPROVED BEFORE START OF WORK. THIS MUST INCLUDE ELEVATIONS AND ANY MODIFICATION DUE TO
SITE. APPROVED CONSTRUCTION PLANS SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT SHALL BE
BEFORE THE START OF DEMOLITION AND CONSTRUCTION, EQUIPMENT PIPING AND ACCESSORIES SHALL BE APPROVED AND ON
VERIFY LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE WORK PRIOR TO THE START OF CONSTRUCTION.
START OF WORK. MECHANICAL AND ELECTRICAL SHUTDOWN FOR WORK SHALL BE ACCOMPLISHED BY FAA PERSONNEL.
DE-ENERGIZING ELECTRICAL SUPPLY. THIS WORK SHALL BE SCHEDULED AND COORDINATED WITH THE COR BEFORE
SHUTDOWN AND REMOVAL OF THE EQUIPMENT AND PIPING SHALL BE ACCOMPLISHED BY CLOSING SHUT-OFF VALVES AND
TEMPORARY WORK MAY NOT BE SHOWN ON DRAWINGS (E.G. SOME BLIND FLANGES).
WHERE WORK IS DESIGNATED TO BE "TEMPORARY", IT WILL EVENTUALLY BE REMOVED IN A SUBSEQUENT STEP. SOME
PROTECT FLOOR DRAINS AND STORM DRAINS FROM DAMAGE AND DEBRIS AT ALL TIMES.D.
E.
F.
G.
ELECTRICAL REQUIREMENTS.
INTERFERE WITH THE WORK. OBTAIN PRIOR APPROVAL FROM COR FOR SUCH WORK. REFER TO ELECTRICAL SPECIFICATIONS FOR
PIPING, ELECTRICAL WIRING AND CONDUITS NOT INDICATED AND NOT RELATED TO THE PIPING REPLACEMENT WHERE THEY
DEMOLITION DRAWINGS INDICATE PIPING AND EQUIPMENT WITHIN THE WORK AREA. REMOVE AND REINSTALL (AS REQUIRED)
SYSTEMS. HEATING HOT WATER SYSTEM MAY HAVE SERVICE INTERRUPTED AS APPROVED AND SCHEDULED BY COR.
SEQUENCE SHALL BE PROVIDED BY THE CONTRACTOR WHICH MINIMIZES THE RISK OF FAILURE TO ANY MECHANICAL OR ELECTRICAL
THE ARTCC IS A 24 HOUR FACILITY AND CAN NOT TOLERATE THE LOSS OF POWER OR CHILLED WATER. A CONSTRUCTION
EXISTING CONTROLS, UNLESS NOTED OTHERWISE, SHALL REMAIN IN OPERATION AND PROTECTED DURING CONSTRUCTION.
III. TURNOVER FROM PERMANENT TO TEMPORARY TOWERS
CONDENSER WATER PIPING.
CHILLERS ARE NOW ISOLATED FROM THE PERMANENT CONDENSER WATER SYSTEM AND ARE RUNNING OFF THE TEMPORARY
CONDENSER WATER SUPPLY OVER TO TEMPORARY TOWERS.
ONCE TEMPORARY TOWER SYSTEM HAS BEEN PROVEN, REPIPE CH-100 AND CH-200 TO TEMPORARY HEADER AND TURN PLANT
FZ
FR
FEPC
FACP
ED
ECMS
DP
DDCP
CV
CR
CD
AM
AFS
AFMS
FREEZESTAT
FIELD MOUNTED RELAY
FRONT END PERSONAL COMPUTER
FLOW CONTROL VALVE
FIRE ALARM CONTROL PANEL
ENABLE/DISABLE
SYSTEM
ENERGY CONTROL AND MONITORING
DI. PRESSURE SWITCH
DAMPER POSITION INDICATOR
DIRECT DIGITAL CONTROL PANEL
DRY CONTACT
CONTROL VALVE
CURRENT RELAY
CURRENT INPUT
CONTROL DAMPER
COMMON
AUXILIARY CONTACT
AMPERAGE
AIR FLOW SWITCH
AIR FLOW MEASURING STATION
WD
SW
SL
PI
PDI
PD
N.O.
N.C.
LS
HS
WATER DETECTOR
TEMPERATURE SENSOR
TEMPERATURE INDICATOR
THERMOSTAT
SWITCH
START/STOP
STROBE LIGHT
SMOKE DETECTOR
PRESSURE INDICATOR
PRESSURE DIFFERENTIAL INDICATOR
/POWER DEMAND
PRESSURE DIFFERENTIAL SENSOR
NORMALLY OPEN
NORMALLY CLOSED
MOTOR/ACTUATOR
LEVEL SWITCH
HUMIDITY SENSOR
HUMIDISTAT
HORN
REQUIRED.
COORDINATE ALL WORK WITH THE WORK OF OTHER TRADES. ELECTRICAL WORK SHALL MATCH MECHANICAL PHASING PLAN AS
STEP 1 - TRANSITION
MANUAL OVERRIDE AND SILENCE SWITCHES DURING CONSTRUCTION WORK.
PROTECT REFRIGERANT LEAK DETECTION AND ALARM SYSTEM, REFRIGERANT LEAK SENSING TUBES, HORNS, LIGHT STROBES, AID
IV. PERMANENT CONDENSER WATER PIPING
PROVING PERIOD.
INCIDENT TO BE CONSIDERED "PROVEN". TEMPORARY TOWER YARD SHALL REMAIN PRESSURIZED AND OPERATIONAL DURING
AFTER THE PERMANENT PIPING SYSTEM IS OPERATIONAL, IT MUST BE OPERATED FOR THREE (3) CONSECUTIVE DAYS WITHOUT
A. INSTALL PERMANENT CONDENSER WATER PIPING AND APPURTENANCES ON SITE.
STEP 1 - INSTALLATION OF PERMANENT PIPING
CANNOT BE ACCOMPLISHED IN 8-10 HOURS, PROVIDE TEMPORARY DETECTION/ALARM SYSTEM.
REFRIGERANT LEAK DETECTION PANEL MUST BE PERFORMED TO MINIMIZE THE DURATION OF SYSTEM OUTAGE. IF THE WORK
ALL WORK INVOLVING CHANGEOVER OF CONTROL FUNCTIONS FROM EXISTING REFRIGERANT LEAK DETECTION PANEL TO THE NEW
LOCATION OF SENSING LOCATIONS. KEEP EXISTING SYSTEM IN OPERATION UNTIL NEW SYSTEM IS OPERATIONAL.
PROVIDE CONDUIT AND TUBING ASSOCIATED WITH NEW REFRIGERANT LEAK DETECTION SYSTEM POINTS. SEE DRAWING M201 FOR
V. REFRIGERANT LEAK DETECTION PANEL REPLACEMENT
B. DEMOBILIZE TEMPORARY TOWER YARD AND ASSOCIATED PIPING. REMOVE CHAIN LINK FENCING.
PROVEN AND COMMISSIONED. CLOSE ISOLATION VALVES FOR TEMPORARY TOWER PIPING ON CONDENSER WATER HEADERS.
ONCE WORK WITHIN THE CHILLED WATER PLANT AND PERMANENT TOWER YARD IS COMPLETE AND ALL EQUIPMENT HAS BEEN
VI. TEMPORARY TOWER YARD DEMOBILIZATION
FAN. THE FAN MUST RUN CONTINUOUSLY UNTIL WORK IS COMPLETE.
PRIOR TO DISCONNECTING AND REMOVING REFRIGERANT LEAK DETECTION PANEL, ENERGIZE EXISTING REFRIGERANT VENTILATION
D. DISCONNECT POWER, CONTROL AND INTERLOCK WIRING FROM THE REFRIGERANT LEAK DETECTION PANEL AND REMOVE THE PANEL.
NEW LEAK DETECTION TUBING TO THE NEW PANEL.
INSTALL NEW REFRIGERANT LEAK DETECTION PANEL AND RECONNECT POWER, CONTROL AND INTERLOCK WIRING. ALSO, TERMINATE
F. ENERGIZE PANEL AND PERFORM ACTIVE TESTING OF SEQUENCE DURING THE SCHEDULED OUTAGE.
OPERATIONAL AND ACCEPTED BY COR..
REMOVE EXISTING REFRIGERANT LEAK GAS-MONITORING POINTS AND ASSOCIATED TUBING AND CONDUIT AFTER NEW SYSTEM IS
ANALOG OUTPUT FROM DDCP
A.A.
STEP 1 - TEMPORARY COOLING TOWERS AND PUMPS
II. TEMPORARY COOLING TOWERS AND PUMPS
COOLING TOWER YARD.
THE INTENT OF THIS PHASE IS TO INSTALL TEMPORARY EQUIPMENT TO ALLOW FOR THE COMPLETE SHUTDOWN OF THE
TEMPORARY PIPING WITH COR.
CHILLED WATER PLANT. GROOVED PIPING IS ALLOWED ONLY FOR TEMPORARY PIPING. COORDINATE GROUNDING REQUIREMENT OF
ABOVE GROUND TEMPORARY CONDENSER WATER PIPING SHALL BE ROUTED ON WOODEN CRIBBING SUPPORTS TO THEC.
D.
CONNECTIONS FOR ALL 4 CHILLERS.
INSTALL TEMPORARY CONDENSER WATER HEADER WEST OF EXISTING CHILLERS ON GROUND WITH VALVED BRANCH
FENCING. REFER TO M003 FOR LOCATION OF WORK AREA.
ONCE TEMPORARY TOWER SYSTEM HAS BEEN PLACED ON SITE, PROTECT THE TEMPORARY TOWER SITE WITH CHAIN LINK
A. INSTALL TEMPORARY FOUNDATIONS ON SITE AND ALLOW TO CURE FOR 28 DAYS. INSTALL TEMPORARY EQUIPMENT ON SITE.
THIS OUTLINE AS PART OF THEIR CONSTRUCTION PHASING PLAN.
CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE WHICH ALSO PROVIDES ALL OF THE DETAILS ABSENT FROM
CONSTRUCTION SEQUENCE IS PROVIDED AS AN OUTLINE OF THE SIGNIFICANT STEPS REQUIRED TO COMPLETE THE PROJECT. THE H.
STEP 2 - INSTALLATION OF TEMPORARY EQUIPMENT
CONDENSER WATER SYSTEM.
CONNECT TEMPORARY ELECTRICAL, MAKE-UP WATER, BLOWDOWN, AND TEMPORARY CHEMICAL TREATMENT TO THE TEMPORARY E.
RUNTIME PRIOR TO SHUTDOWN OF NEXT CHILLER.
NECESSARY FOR CHILLER OPERATION SHALL ALSO BE INSTALLED AT THIS TIME. EACH CHILLER SHALL BE PROVEN WITH 24 HRS
REPIPE CHILLERS CH-300 AND CH-400 TO TEMPORARY HEADER ONE AT A TIME. ALL TEMPORARY VALVES AND APPURTENANCES F.
(7) DAYS AFTER TAB AND COMMISSIONING IS COMPLETED.
DEMOBILIZATION OF TEMPORARY SYSTEMS SHALL NOT OCCUR UNTIL THE REPLACEMENT SYSTEM HAS OPERATED FOR SEVEN
I.
H. NO DEMOLITION WORK SHALL COMMENCE UNTIL THE TEMPORARY SYSTEM IS PROVEN AND ACCEPTED BY FAA.
PERIOD.
TO BE CONSIDERED "PROVEN". PERMANENT TOWER YARD SHALL REMAIN PRESSURIZED AND OPERATIONAL DURING PROVING
AFTER THE TEMPORARY SYSTEM IS OPERATIONAL, IT MUST BE OPERATED FOR SEVEN (7) CONSECUTIVE DAYS WITHOUT INCIDENT zny-18061513-m002
2021-04-13T06:12:45-0400
ROBERT L BELTON
2021-04-12T07:33:58-0400
ANDREW G MACDONALD
ROOM PLAN - DEMOLITION
HVAC AND HVAC PIPING CHILLER
ST
ZNY-18061513-M101
:4 lo tt e
REFER TO SHEET M-701 FOR CONTROLS DEMOLITION WORK.C.
AREA OF WORK. COORDINATE WITH FAA COR.
PROTECT CONTROLS INCLUDING JUNCTION BOXES AND CONDUIT TO REMAIN IN THE B.
.GENERAL NOTES
REFER TO SHEETS M001 AND M002 FOR MECHANICAL ABBREVIATIONS, SYMBOLS ANDA.
TEMPORARY COOLING TOWER SYSTEM.
2" DOMESTIC WATER WITH VALVE FOR MAKE-UP WATER CONNECTION POINT TO
(TYP OF 3)
REMOVE SECTION OF HEADER PIPING TO ALLOW INSTALLATION OF BUTTERFLY VALVE
CONDENSER WATER PUMPS).
REMOVE 8" BALL ISOLATION VALVES AS NOTED IN DETAIL A8/M504 (TYP OF 4
PUMPS).
REPORT TO COR. REINSTALL COVER WITH NEW GASKETS (TYP OF 4 CONDENSER WATER
REMOVE PUMP COVER AND INSPECT IMPELLER AND BEARINGS. PROVIDE STATUS
TEMPORARY PIPING.
REMOVE LOWER SECTION OF LOUVER AND DAMPERS TO FACILITATE INSTALLATION OF
OVER TO GOVERNMENT.
CONDENSER WATER SYSTEM. AT COMPLETION OF PROJECT, TURN CONTROL PANEL
ASSOCIATED SENSORS. USE CONTROL PANEL AND SENSORS TO SERVE TEMPORARY
SALVAGE WEBMASTERONE CHEMICAL TREATMENT SYSTEM CONTROL PANEL AND
REMOVE EXISTING CONNECTION TO SIDE OF PIPE.
FILTER. SEE NEW WORK.
EXISTING TO REMAIN SECTION OF PIPING TO BE REUSED IN CONNECTION TO NEW SAND
TAP TO REMAIN.
REMOVE SAND FILTER PIPING BACK TO VALVE AS SHOWN. EXISTING VALVE AND SIDE
NEW WORK.
WATER PIPE SUPPORT TO PROVIDE SPACE FOR NEW CONDENSER WATER PIPE. SEE
REMOVE DOMESTIC COLD WATER LINE AS SHOWN. REMOVE AND RECONFIGURE CHILLED
REFRIGERANT MONITORING SYSTEM TO REMAIN.
EXISTING EMERGENCY SWITCHES AND SILENCE SWITCHES ASSOCIATED WITH
MONITORING SYSTEM TO REMAIN.
EXISTING ALARM HORNS AND LIGHT STROBES ASSOCIATED WITH REFRIGERANT
M002 FOR CONSTRUCTION SEQUENCE.
AND CONDUIT. COORDINATE WORK WITH REFRIGERANT MONITOR REMOVAL. REFER TO
DISCONNECT AND REMOVE REFRIGERANT SAMPLING PORTS AND ASSOCIATED TUBING
MONITOR.
WIRING FROM THE MONITOR SO THEY CAN BE RECONNECTED TO NEW REFRIGERANT
REFRIGERANT MONITOR, DISCONNECT POWER WIRING, INTERLOCKS WIRING, AND CONTROL
REMOVE REFRIGERANT MONITOR ASSOCIATED WITH CHILLER PLANT. PRIOR TO REMOVING
WORK PLANS FOR ADDITIONAL INFORMATION.
DISCONNECT PIPING AND REMOVE STRUCTURE MOUNTED COMPRESSION TANK. SEE NEW
ADDITIONAL INFORMATION.
. SEE NEW WORK PLANS FOR SF-2DISCONNECT PIPING AND REMOVE EXISTING
TREATMENT TAPS, AND ENCAPSULATED VALVE. CTS/R HEADERS TO REMAIN.
REMOVE CONDENSER WATER SUPPLY AND RETURN DRAIN VALVE, AIR VENTS, CHEMICAL
COORDINATE WORK WITH MECHANICAL CONTRACTOR AND FAA COR.
PROTECT POWER WIRING AND CONTROL WIRING DURING CONSTRUCTION WORK.
ACTUATOR. TURN OVER VALVE ACTUATOR TO FAA FOR USE AS SPARE PARTS.
PRIOR TO FLOW CONTROL VALVE DEMOLITION, DISCONNECT AND REMOVE VALVE
1 1 1
LEAK MONITOR
REFRIGERANT
SAMPLING PORT
REFRIGERANT
SYSTEM
TREATMENT
ETR CHEMICAL
TK
11 12
13 14
12" CWR
12" CWS
12"CWR
12"CWS
6"RV
14" CTS
14" CTR14"CTR
8 X 14
22 X 14
IL
24X24
Y
18X14
20X16
CH
(TYPICAL)
7 TYP.
8TYP.
EF
3A
3B
1A
1B
AHU
SF
DDCPs
3" CTS/R
1" CWS
1" CWR
3/4" CWS
2B
4B
CHILLER ROOM PLAN - DEMOLITIONA6
M101
4' 8'04'
EDCBA B.5 EDCBA B.5
LSSW
HSWLS
LS H
HSSW
HSW
EDCBA B.5
LSH
zny-18061513-m101
2021-04-13T06:12:59-0400
ROBERT L BELTON
2021-04-12T07:34:34-0400
ANDREW G MACDONALD
ROOM PLAN - NEW WORK
HVAC AND HVAC PIPING CHILLER
ST
ZNY-18061513-M201
:5 lo tt e
EDCBA B.5
LSSW
HSWLS
HSSW
HSW
LSH
CE
2"
CI PN40
SUPPLY AND RETURN FOR DRAIN VALVE, AIR VENTS, AND CHEMICAL TREATMENT TAPS.
PROVIDE SCHEDULE 80 NPIPE NIPPLES AND STEEL BALL VALVES IN CONDENSER WATER
18 CONNECT NEW EXPANSION TANK TO EXISTING CONNECTION FROM OLD TANK.
19 REINSTALL STRAINER IN FCV-6 BYPASS PIPING.
20 PROVIDE BUTTERFLY ISOLATION VALVES IN CONDENSER WATER HEADERS.
21 REPLACE BUTTERFLY ISOLATION VALVES AT ENDS OF CONDENSER WATER HEADERS.
REFER TO SHEET M-703 FOR CONTROLS WORK.C.
AREA OF WORK. COORDINATE WITH FAA COR.
PROTECT CONTROLS INCLUDING JUNCTION BOXES AND CONDUIT TO REMAIN IN THE B.
.GENERAL NOTES
REFER TO SHEETS M001 AND M002 FOR MECHANICAL ABBREVIATIONS, SYMBOLS ANDA.
NEMA 4 ENCLOSURE.
POSITION FEEDBACK, VALVE POSITION INDICATOR, MANUAL ACTUATOR OVERRIDE, AND
120 VAC SINGLE-PHASE POWER SUPPLY. VALVE ACTUATOR SHALL BE PROVIDED WITH
PROVIDE BUTTERFLY VALVE ACTUATED BY MODULATING ELECTRIC ACTUATOR SUITABLE FOR
REFRIGERANT LEAK DETECTION SYSTEM.
POINTS. TEST AND VALIDATE EXISTING SEQUENCE OF OPERATION ASSOCIATED WITH
CONTROL WIRING TO NEW REFRIGERANT MONITOR. ONCE RECONNECTED, VERIFY CONTROL
PROVIDED BY MANUFACTURER. RECONNECT EXISTING POWER WIRING, INTERLOCK WIRING AND
PROVIDE REFRIGERANT MONITOR IN ACCORDANCE WITH REQUIREMENTS AND INSTRUCTIONS
MONITOR.
18"AFF AND 3/8" TUBING IN EMT CONDUIT FROM SAMPLING PORT TO REFRIGERANT
REQUIREMENTS AND INSTRUCTIONS PROVIDED BY MANUFACTURER. PROVIDE SAMPLING PORT
PROVIDE SAMPLING PORT AND CONNECT TO REFRIGERANT MONITOR IN ACCORDANCE WITH 4
AND ASSOCIATED WIRING AND CONDUIT.
TOWER SYSTEM IS REMOVED AT COMPLETION OF WORK, DEMOLISH LIGHT STROBE AND HORN
INSTALL STROBE AND HORN 6'-6" ABOVE THE FINISHED FLOOR. WHEN TEMPORARY COOLING
PROVIDE ALARM LIGHT STROBE AND HORN FOR TEMPORARY COOLING TOWER SYSTEM.
OF THE PIPE. CONNECT TO NEW SF-2.
REPLACE EXISTING 3" SAND FILTER CONNECTION WITH NEW CONNECTION TEE FROM BOTTOM 5
LOCATIONS TO MAXIMIZE MAINTENANCE ACCESS.
MANUFACTURER'S RECOMMENDATIONS. COORDINATE LOCATION WITH PUMP AND LOUVER
PROVIDE SF-2 AND HOUSEKEEPING PAD. CONNECT CTS PIPING TO SAND FILTER PER 6
INFORMATION.
EXISTING CHILLED WATER SYSTEM EXPANSION TANK PIPING. SEE SCHEDULE FOR ADDITIONAL
PROVIDE FLOOR MOUNTED VERTICAL EXPANSION TANK TK-19 AND 1" PIPING FROM TANK TO 7
PROVIDED BY MANUFACTURER.
AND CONNECT FLOW METER IN ACCORDANCE WITH REQUIREMENTS AND INSTRUCTIONS
DIAMETERS DOWNSTREAM FROM BENDS AND OBSTRUCTIONS FOR ACCURATE READING. INSTALL
PIPING. PLACE FLOW METER AT LEAST TEN PIPE DIAMETERS UPSTREAM AND FIVE PIPE
PROVIDE INSERTION TYPE ELECTROMAGNETIC FLOW METER ON CONDENSER WATER SUPPLY 8
TO ALIGN PIPES WITH PIPING ON ROOF.
12" CTS/R PIPING UP THROUGH ROOF. REMOVE OLD EXPANSION TANK SUPPORTS AS NEED
FIELD ROUTE 12" CTS AND 12" CTR TO AVOID CONDUITS, BUS DUCTS AND PIPING. ROUTE
PIPING.
FIELD ROUTE DOM. CW PIPING BELOW NEW CTS/R PIPING. RECONNECT TO EXISTING DOM. CW
11 OFFSET PIPE UP TO AVOID EXISTING BUS DUCTS AND CONDUITS.
WATER PIPE. PROVIDE NEW 1.5" DOM. WATER LINE TO SAND FILTER FOR BLOWDOWN.
RECONFIGURE CHILLED WATER PIPE SUPPORT TO PROVIDE SPACE FOR NEW CONDENSER
SPEED (TYP. OF 4 CONDENSER WATER PUMPS).
POSITION MARKED BY WHITE PAINT IF THE VFD FAILS AND THE PUMP IS OPERATED AT FULL
FULLY OPEN WHEN OPERATING PUMP ON VFD. BUTTERFLY VALVES MAY BE MOVED TO
VALVE AND BALANCE PUMP BY ADJUSTING PUMP VFD SPEED. BUTTERFLY VALVES MUST BE
BALANCE PUMP AND MARK VALVE POSITION WITH WHITE PAINT. OPEN DISCHARGE BUTTERFLY
SET PUMP VFD TO OPERATE AT 60 HERTZ. ADJUST DISCHARGE BUTTERFLY VALVE TO
STEEL BALL VALVE FOR STRAINER BLOWDOWN. RECONFIGURE PIPING PER DETAIL A5/M504.
PROVIDE BUTTERFLY ISOLATION VALVES FOR PUMP. PROVIDE SCHEDULE 80 PIPE NIPPLE AND
WITH FACILITY WATER TREATMENT VENDOR (CHEMTREAT).
PROVIDE WALCHEM W900 CHEMICAL TREATMENT CONTROL PANEL. COORDINATE REQUIREMENTS
AIR VENT OF CTS CONNECTION FROM 14" HEADER TO CHILLER (TYP. OF 4).
PROVIDE SCHEDULE 80 PIPE NIPPLE AND STEEL BALL VALVE WITH HOSE END AND CAP FOR
18X14
DDCPs
TK
12" CWR
12" CWS
AND PUMPS
SYSTEM TANKS
TREATMENT
ETR CHEMICAL
8 X 14 V
D 22 X 14
24X24
IL
S15
3" CTR
3AFCV
3" CTS 2" D
13 14
SF
12"CWS
EF
4 4
1" CWS
DDCP'S
1" CWS 1" CWR AHU
FM
12" CTR
4 4
14" CTR
2B
4B
1A
BT
1 2" D
STANDPIPE BELOW STAIR
ROUTE TO EX. DRAIN
CHILLER ROOM PLAN - NEW WORKA6
M201
6"RV
14" CTR
12" CTS
3"
4' 8'04' zny-18061513-m201
2021-04-13T06:13:25-0400
ROBERT L BELTON
2021-04-12T07:35:03-0400
ANDREW G MACDONALD
ZNY-18061513-M501
:5 lo tt e
"MAXIMUM LENGTH FOR RODS" IS EXCEEDED
"VERTICAL ANGLE" IN THE SCHEDULE IS REQUIRED IN ADDITION THE HANGER ROD ONLY WHEN
1-24
ROD CLIP OR EQUAL
"ELCEN" HANGER
1 MIN
2 MAX
1/8
HANGER MOUNT
VIBRATION ISOLATOR
_F6
ATTACHMENTS
HANGER ROD
PIPE SIZE
4" THRU 6"
40'-0" OC MAXIMUM
20'-0" OC MAXIMUM
40'-0" OC MAXIMUM
20'-0" OC MAXIMUM
INSTALL ONE TRANSVERSE BRACE AND ONE LONGITUDINAL BRACE AT EACH END OF THE TRAPEZE.
LONGITUDINAL BRACE SPACING
THAN OD OF BOLT)
SLEEVE 1/4" LARGER
PIPE SLEEVE (ID OF PIPE
DIRECTLY TO PIPE)
DO NOT CONNECT BRACING OR HANGER
THERMAL INSULATED PIPING IS USED
PIPE (FOR SIZE SEE SCHEDULE) (WHEN
CABLE BRACE
TRANSVERSE
(CABLE TYPE)
BRACE
DIAGONAL (TRANSVERSE) BRACE SPACING
PLACE STANDARD FLAT WASHERS BETWEEN SHEET METAL ANGLE AND NUT.
PROVIDE TRANSVERSE AND LONGITUDINAL BRACES FOR TRAPEZE SUPPORTS AS FOLLOWS:
3-1/2" & SMALLER
TYPICAL TRANSVERSE PIPE BRACING DETAIL
TYP
ATTACHMENT OR EQUAL
"ELCEN" WELDED BEAM
HEAVY TYPE OR EQUAL
"ELCEN" PIPE CLAMP-
3/16
COVER WELD
WASHER TO
SEE SCHEDULE 1
SEE SCHEDULE 1
2 ON THIS SHEET.
TYPE). SEE SCHEDULE
LONGITUDINAL BRACE (ANGLE
THIS SHEET
SCHEDULE 2 ON
(CABLE TYPE). SEE
LONGITUDINAL BRACE
ON THIS SHEET)
(SEE SCHEDULE 2
BOLT TO ANGLE
2 ON THIS SHEET)
ROD (SEE SCHEDULE
(SEE SCHEDULE 2)
LONGITUDINAL
(PER SCHEDULE 1)
FOR PIPE SIZE
ANGLE (SEE SCHEDULE 2)
ROD HANGER AND VERTICAL
LONGITUDINAL BRACE
THREADED STUD BOLT
4'-0"
3'-10"
& LONGITUDINAL
ANGLES
3"x3"x12 GA
SIZE
PIPE
ON TRAPEZE (LBS)
MAX DEAD LOAD
ANGLE
TO
BOLTS
SPAN
TRAPEZE
MAXIMUM
FOR RODS
37"
43"
50"
MAX LENGTH
3/4" DIA
ROD
2-1/2
3-1/2
5/8" DIA
7/8" DIA
3/4" DIA10108 3'-6"
1-5/8" x3-1/4" x16 GA TYPE E
TYPE F
TYPE G
62"
VERTICAL TRANSVERSE
(DOUBLE STRUT CHANNEL)
TRAPEZE SIZE
LONGITUDINAL ANGLE
OF DIAGONAL &
TOP CONNECTION
(1/4" CABLE)
(1/2" CABLE)
4'-0" 5/8" DIA
31"
BOLTS
TO L'S
VERTICAL
FOR RODS
37"
43"
56"
MAX LENGTH
3x3x12 GA
2x2x1/4 IN
TYPE C
OF DIAGONAL &
TOP CONNECTION
2-1/2 3/8" DIA
1/2" DIA
LONGITUDINAL L'S (A)(B)
L'S L'S
8 50" 3/4" DIA
TYPE G
MAX. SPACING (FT)
40 80
40 80
40 40
L'S (C)
TYPE D
TYPE E
SCHEDULE 1 NOTES
SCHEDULE 2 NOTES
TYPICAL LONGITUDINAL PIPE BRACING DETAIL
PARTIAL SECTION
TRAPEZE TYPE PIPE HANGER DETAIL=W/BRACINGCABLE BRACE
PLACE STANDARD FLAT WASHERS BETWEEN SHEET METAL L'S AND NUT
NOTE A)
(SEE
NOTE B)
(SEE (SEE NOTE C)
NOTE A)
NOTE B)
(SEE (SEE NOTE C)
TRANSV LONGIT
DWG)
SCHEDULE 1 THIS
BRACE (PER
SHIELD 12" LONG
(TYP BOTH SIDES)
CABLE BRACING
D6 D5
A6
HANGER SUPPORT
FOR CABLE BRACES.
REFER TO DETAIL D6/M604
THIS SHEET)
LONGITUDINAL ANGLE
THIS SHEET)
TRANSVERSE ANGLE
2-1/2x2-1/2x12 GA 3x3x16 GA
3x3x16 GA
3x3x1/4 IN
2-1/2x2-1/2x12 GA
2-1/2x2-1/2x1/4 IN
1" DIA
1 1/8" DIA
1" DIA2x2x1/4 IN
D. TABLE BASED ON SMACNA TABLE AA-7. RESTRAINT SYSTEMS ENGINEERED BY LICENSED
PROFESSIONAL ENGINEER THAT ARE EQUIVALENT TO SMACNA REQUIREMENTS MAY BE SUBSTITUTED.
PROFESSIONAL ENGINEER THAT ARE EQUIVALENT TO SMACNA REQUIREMENTS MAY BE SUBSTITUTED.
TABLE BASED ON SMACNA TABLE AA-8. RESTRAINT SYSTEMS ENGINEERED BY LICENSEDD.
3"x3"x1/4 IN
1-5/8" x3-1/4" x16 GA
SCHEDULE 1 - BRACING PIPES ON TRAPEZE SCHEDULE 2 - BRACING PIPES
NOTED AND THAT THE MAXIMUM TRAPEZE SPAN AND SIZE AT DIAGONAL BRACES NOTED IN THE SCHEDULE ARE MAINTAINED.
USED IF THE TOTAL COMBINED WEIGHT OF THE PIPES ON A TRAPEZE IS EQUAL TO OR LESS THAN THE "MAX DEAD LOAD"
LIMITS THE NUMBER OF 6" PIPES TO THREE, AND 8" PIPES TO TWO. HOWEVER, ANY COMBINATION OF PIPES CAN BE
THIS SCHEDULE IS BASED ON FOUR EQUAL SIZED PIPE ARRANGEMENT FOR PIPE 5" AND SMALLER. THE SCHEDULE ALSO
M000A
MUST BE CAPABLE OF RESISTING THE FORCE INDUCED BY EXPANSION AND CONTRACTION.
FOR PIPING WITH MANUFACTURED BALL JOINTS, SELECT LENGTH OF PIPING OFFSET
USING "SEISMIC DRIFT IN PLACE OF EXPANSION PER JOINT MANUFACTURER'S
SEE SPECIFICATIONS FOR SEISMIC RESTRAINTS FOR FIRE SPRINKLERS.
BRACINGS AT ANCHOR POINTS. THE LONGITUDINAL BRACES AND THE CONNECTIONS
WHEN THERMAL EXPANSION OR CONTRACTION IS INVOLVED, PROVIDE LONGITUDINAL
LONGITUDINAL BRACINGS SHALL BE AT 40'-0" OC MAXIMUM UNLESS OTHERWISE NOTED.
BE PROVIDED BY EXPANSION LOOPS OR MANUFACTURED FLEXIBLE CONNECTORS.
OF SWING JOINTS. IN WELDED OR SOLDER JOINT PIPING, THE FLEXIBILITY SHALL
FOR THREADED PIPING, THE FLEXIBILITY MAY BE PROVIDED BY THE INSTALLATION
DO NOT USE BRANCH LINES TO BRACE MAIN LINES.
AND A METAL DECK WITH LIGHTWEIGHT CONCRETE FILL.
DURING AN EARTHQUAKE. EXAMPLES: WALL AND A ROOF; SOLID CONCRETE WALL
OR TWO DISSIMILAR BUILDING SYSTEMS THAT MAY RESPOND IN A DIFFERENT MODE
A RIGID PIPING SYSTEM SHALL NOT BE BRACED TO DISSIMILAR PARTS OF A BUILDING
NOTED.
DIAGONAL (TRANSVERSE) BRACINGS SHALL BE AT 40'-0" OC MAXIMUM UNLESS OTHERWISE
EXCEPTIONS:
1. VERTICAL PIPING
2. HORIZONTAL PIPING
OVER 2 STORIES IN HEIGHT, AT EACH FLOOR BY APPROVED METAL FLOOR CLAMPS.
REQUIRED TO HAVE A FIRE RESISTANCE RATING.
THROUGH GYPSUM BOARD OR EQUALLY FRANGIBLE CONSTRUCTION THAT IS NOT
SHALL NOT BE LESS THAN 1 INCH. NO CLEARANCE IS NECESSARY FOR PIPING PASSING
FOR PIPE SLEEVES THROUGH WALLS AND FLOORS, MINIMUM CLEARANCE ON ALL SIDES
RECOMMENDATION. SEISMIC DRIFT = 0.015 FT PER FOOT OF HEIGHT.
SUPPORTED PIPES CONNECT TO EQUIPMENT WITH VIBRATION ISOLATORS.
PASS THROUGH BUILDING SEISMIC OR EXPANSION JOINTS OR WHERE RIGIDLY
TRAPEZE HANGERS MAY BE USED. PROVIDE FLEXIBILITY IN JOINTS WHERE PIPES
SHALL BE THE SAME AS FOR 2 1/2" PIPES.
EQUIPMENT ROOMS. BRACING REQUIREMENTS FOR PIPES LESS THAN 2 1/2" IN DIAMETER
1. BRACE PIPING 1 1/4" AND LARGER LOCATED IN BOILER ROOMS AND MECHANICAL
BY AN INDIVIDUAL HANGER.
OR LESS FROM THE SUPPORTING STRUCTURAL MEMBER AND THE PIPE IS SUSPENDED
2. SEISMIC BRACES MAY BE OMITTED: WHEN THE TOP OF THE PIPE IS SUSPENDED 12"
SYSTEM CONFORMING TO THE FOLLOWING REQUIREMENTS MUST ALSO BE USED.
DETAILS SHOWN PROVIDE A LATERAL BRACING SYSTEM. A TYPICAL VERTICAL SUPPORT
BRACE PIPES 2 1/2" DIAMETER AND LARGER:
P.
K.
EXISTING TO REMAIN PIPING.
SPECIFICATIONS SHALL BE SUBMITTED INDICATING BRACING FOR BOTH NEW AND
SHOP DRAWINGS AND DESIGN CALCULATIONS SATISFYING THE REQUIREMENTS OF THE
BRACING AND CONNECTION SCHEDULES AND DETAILS ARE FOR REFERENCE ONLY.
RISER AND AT INTERMEDIATE POINTS NOT TO EXCEED 30'-0" ON CENTER.
GRAVITY OF THE RISER. PROVIDE LATERAL GUIDES AT THE TOP AND BOTTOM OF THE
SUPPORT THE WEIGHT OF THE RISER AT A POINT OR POINTS ABOVE THE CENTER OF
PROVIDE THROUGH APPROVED SUBMITTAL, AT VERTICAL PIPE RISERS, WHEREVER POSSIBLE,
IN PLACE OF THE BRACES SHOWN IN THESE DETAILS AND SCHEDULES.
TYPE BRACING. PROPRIETARY BRACING SYSTEMS APPROVED BY THE COR MAY BE USED
DETAILS AND SCHEDULES ON THIS SHEET DEPICT BOTH STEEL ANGLE TYPE AND CABLE
PIPE AND CONTENTS. STACKS SHALL BE SUPPORTED AT THEIR BASES AND IF
INTERVALS TO KEEP THE PIPE IN ALIGNMENT AND CARRY THE WEIGHT OF THE
(A) ATTACHMENT - VERTICAL PIPING SHALL BE SECURED AT SUFFICIENTLY CLOSE
NOT LESS THAN EVERY OTHER STORY HEIGHT.
(B) SCREWED PIPE - SCREWED PIPE SHALL BE SUPPORTED AT
THEIR APPROVED INSTALLATION STANDARDS.
(D) PIPES OF OTHER APPROVED MATERIAL SHALL BE SUPPORTED IN ACCORDANCE WITH
FOOT INTERVALS FOR PIPING 1 1/2" AND SMALLER IN DIAMETER.
FOR PIPING 1 1/2" AND LARGER DIAMETER AND AT NOT MORE THAN 6
(C) COPPER TUBING - COPPER TUBING SHALL BE SUPPORTED AT EACH STORY
INTERVALS TO KEEP IT IN ALIGNMENT AND PREVENT SAGGING.
(A) SUPPORTS - HORIZONTAL PIPING SHALL BE SUPPORTED AT SUFFICIENTLY CLOSE
D.
F.
H.
I.
J.
L.
N.
M.
O.
SHALL BE BRACED OR STABILIZED BETWEEN FLOORS.
BRACED ON EACH SIDE OF A CHANGE IN DIRECTION OF 90^ OR MORE. RISER JOINTS
WHERE THE TOP OF THE PIPE IS 12" OR MORE FROM SUPPORTING STRUCTURE, SHALL BE
CAST IRON PIPE OF ALL TYPEs AND PIPES JOINED WITH A SHIELD AND CLAMP ASSEMBLY, THE BRACING IS INSTALLED WITHIN 24" OF THE ELBOW OR TEE OF SIMILAR SIZE.
LONGITUDINAL BRACING FOR THE PIPE SECTION CONNECTED PERPENDICULAR TO IT IF
DIAGONAL (TRANSVERSE) BRACING FOR ONE PIPE SECTION MAY ALSO ACT AS
M501 M501
M501
M501
SEE SCHEDULE 1 ON M502.
M502
1 ON M501)
L'S (SEE SCHEDULE
AND LONGITUDINAL
FOR VERTICAL, DIAGONAL
TO BE THE SAME
SUPPORTING MEMBER
CONNECT TO STRUCTURAL
GENERAL NOTES FOR BRACING PIPES:
SCALE: NTS SCALE: NTS
D8
M501 SCALE: NTS
zny-18061513-m501
2021-04-13T06:13:38-0400
ROBERT L BELTON
2021-04-12T07:35:33-0400
ANDREW G MACDONALD
ZNY-18061513-M502
:0 lo tt e
STEEL BEAM
STEEL BEAM
12'-0" (MAX)
OR EQUIVALENT WELDED CONN)
Q
Q
EQEQ
(TYP EACH END)
CONNECTION TO STEEL BEAMS
CUT WASHER
EQUALEQUAL
3"
OR HARDROCK)
CONCRETE (LT WT
STEEL DECKING
CONCRETE FILL ON
DECKING RIBS
'L' PARALLEL TO
HORIZONTAL LEG OF
(SEE SCHEDULE)
SPREADER CHANNEL
SEE APPLICABLE SCHEDULE)
(FOR SIZE AND BOLTING
VERTICAL AND DIAGONAL L'S
ANGLE ONLY)
(USED FOR VERTICAL
"ELCEN" TYPE OR EQUAL
STEEL BEAM CLAMP
SAME AS DETAIL A
ITEMS NOT NOTED
DETAIL F DETAIL G
AS REQUIRED
FILLER PLATES
(2-5/8" MACHINE BOLTS EACH LEG
AND LONGITUDINAL ANGLES
USE WITH VERTICAL, DIAGONAL
CONNECTIONS TO SPREADERS
1 1/4" TYP
3 3/4"
4 1/2"
3 1/2"
L4 x 3 1/2 x 3/8 x 0'-5 1/2"
APPLICABLE SCHEDULE)
REQUIRED (FOR SIZE SEE
LONGITUDINAL "L" AS
ROPE THIMBLES
HEAVY WIRE
U-BOLT CLAMPS
WITH 5/8" DIA PIN
CHAIN SHACKLE
1/2" (MIN) ROUND PIN
SCHEDULE 1 - TYP CONNECTIONS TO STRUCTURAL SUPPORTING MEMBERS
C4x5.4
C5x6.7
C8x11.5
C4x5.4
POUNDS
CAPACITY
MAX LOAD
SPREADER
2-L4x3x3/8x0'-4" LLH1/2"x2
5/8"x2
3/4"x2
5/8"x4
C6x8.5
4600 C9x13.4
3/4"x47040 C10x15.3
3/8"
3/8"
1/2"
5/8"
3/4"
7/8"
L3-1/2x2-1/2x3/8x0'-3" LLH
L5x3x3/8x0'-3" LLH
2-L5x3x3/8x0'-4" LLH
2-L6x3-1/2x3/8x0'-4" LLH
2-L5x3x3/8x0'-10" LLH
5/8"
2-L6x3-1/2x1/2x0'-11 1/2"LLH
STRUCTURAL MEMBER
SIZE OF ANGLE TO SUPPORTING
1 ON THIS SHEET)
(SEE SCHEDULE
MACHINE BOLT
(SEE SCHEDULE 1
EXPANSION ANCHOR
(SEE SCHEDULE 1
DOUBLE ANGLE
(SEE SCHEDULE 1)
W/1 EXPANSION BOLT
W/3/16 PLATE @ MIDLENGTH
L3 1/2x3 1/2x 1/4x0'-4"
FOR 4 EXP BOLTS USE L LENGTH OF 1'-3"
FOR 2 EXP BOLTS USE L LENGTH OF 0'-7"
MIN TYP
1 1/4"
1/ 4"
CONNECTIONS TO CONCRETE DETAIL
1 ON THIS SHEET)
(SEE SCHEDULE
MACHINE BOLT
DETAIL E
FOR CABLE BRACING
TYPICAL TOP CONNECTION
TYPE A & B
DETAIL A
TYPE C, D & E
DETAIL B
TYPE F & G
DETAIL C
TYPE A & B
DETAIL D
SCHEDULE 1
ANGLE (SEE
NOTE 1)
(DIA&QTY)
TO LT WT CONC
EXPANSION ANCHORS
(DIA)
END OF BRACE
BOLT SIZE AT
(SEE NOTE 2)(SEE NOTE 3)
SWAY BRACING ANCHORAGE
TYPICAL SEISMIC DETAIL FOR
HEX NUT AND ANGLES
WASHER BETWEEN
PLACE STANDARD CUT
NOTE: EXP ANCHORS @ 4" OC TYP
LENGTH SHALL BE DETERMINED FROM MANUFACTURER'S RECOMMENDATIONS ON ANCHOR CAPACITY.
THE DIAMETERS OF EXPANSION ANCHORS ARE INDICATED IN THIS SCHEDULE. ANCHOR EMBEDMENT4.
(LBS)
TABLE 8.2
SMACNA
TEST LOAD
2000 50
2300 80
2000 EACH
2300 EACH
3700 EACH
2300 EACH
3700 EACH
50 EACH
80 EACH
150 EACH
80 EACH
150 EACH
HANGER
SUPPORT
DOUBLE STRUT GALVANIZED STEEL CHANNEL
INSULATION
CLEARANCE
(FOR INSULATED PIPE)
1/4" MIN RADIAL
1/2" STUD NUT
W/ SPRING
HOLD DOWN
CLAMP
GALVANIZED
STEEL SHIELD (360^)
W/1" MIN OVERLAP
MINIMUM 12" LONG
CENTERED ON
SUPPORT W/BAND
CLAMP BOTH ENDS
DOUBLE STRUT
GALVANIZED
STEEL CHANNEL
TRAPEZE TYPE PIPE HANGER DETAIL W/O BRACING PIPE CLAMP ASSEMBLYF8 F6
1. ANCHOR BOLT SIZE AND QUANTITY FOR SPECIFIED SEISMIC FORCES.
ADJUSTABLE
WROUGHT CLEVIS
HANGER
SUPPORT
RIGID PIPE
GALV SHIELD
12" LONG
SINGLE PIPE HANGER DETAIL W/O BRACINGD8
1. MATCH HANGER SUPPORT TO OD OF INSULATION FOR INSULATED LINE,
2. MATCH HANGER SUPPORT TO OD OF PIPE FOR UNINSULATED LINES.
7 1/2"
9"G
1 3/8"
1 3/4"B
1. IN LIEU OF ANGLE, CABLE BRACING MAY BE USED. SEE DETAIL E
ENOUGH TO REMOVE SAG
SIZE. TENSION CABLE ONLY
SCHEDULE 2 ON M000A FOR
7x7 AIRCRAFT CABLE (SEE
INSTALL LEAK DETECTION CABLE
BETWEEN INSULATION AND PVC
JACKET (TYP FOR ALL)
INFORMATION
D FOR ATTACHMENT ANGLE
NOTE: SEE DETAILS A THROUGH
DD D
'D' EA WAY
CONNECTION TO STEEL DETAIL
LISTED ARE FOR WEDGE TYPE ANCHORS.
IMMEDIATELY ADJACENT ANCHORS MUST THEN ALSO BE TESTED. TEST LOAD AND TEST TORQUE VALUES
ARRANGEMENT) SHALL BE PROOF TESTED IN ACCORDANCE W/SMACNA TABLE 8-2. IF ANY ANCHOR FAILS, 100 PERCENT OF EXPANSION TYPE ANCHORS USED FOR SEISMIC BRACING…