This is a Pre-Demolition Asbestos and Lead-Based Paint Survey Report for a shed structure located at 10264 East Main Street in Houma, Louisiana, prepared by Partner Engineering and Science, Inc. for the Federal Aviation Administration. The survey was conducted on August 22, 2025, in accordance with National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations and State of Louisiana requirements.
The survey included sampling and laboratory analysis of suspect asbestos-containing materials (ACM) and lead-based paint (LBP). Six bulk samples were collected and analyzed using Polarized Light Microscopy (PLM) by Eurofins Built Environment Testing East, LLC, an AIHA and NVLAP-accredited laboratory. Results indicate no asbestos was detected in any of the six samples (concrete slabs, ceiling tile debris, and caulk materials). One paint chip sample was collected from exterior door paint and submitted to EHS Laboratories, accredited by ELLAP, for analysis using EPA SW-846 Method 7000B. The lead concentration was determined to be 0.072% by weight, below the EPA action level of 0.5%, and therefore does not constitute lead-based paint. The report recommends filing Form AAC-2(b) with the Louisiana Department of Environmental Quality prior to demolition activities. Should any uncharacterized suspect materials be encountered during demolition, all work must cease pending additional sampling and analysis. Employers must comply with OSHA regulations (29 CFR 1926.62) regarding lead exposure, and waste materials must be properly characterized and disposed of in accordance with federal, state, and local requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-DEMOLITION ASBESTOS
AND LEAD-BASED PAINT
SURVEY REPORT
Federal Aviation Administration –
Houma, LA 10264 East Main Street
Houma, Louisiana 70363
Report Date September 5, 2025
Partner Project No.
25-504452.1
Prepared for:
Federal Aviation Administration
Fort Worth, Texas 76177
(800) 419-4923 www.PARTNEResi.com
September 5, 2025
Mr. Chi Phan
Federal Aviation Administration
Fort Worth, Texas 76177
Subject: Pre-Demolition Asbestos and Lead-Based Paint Survey Report
Federal Aviation Administration – Houma, LA
10264 East Main Street
Houma, Louisiana 70363
Partner Project No. 25-504452.1
Dear Mr. Phan:
Partner Engineering and Science, Inc. (Partner) is pleased to provide the findings of the pre-demolition asbestos-containing materials and lead-based paint survey conducted at the above-referenced address (the
“subject property”).
The purpose of this survey was to assess the condition and sample accessible suspect asbestos and lead-based paint in the building that will be impacted by scheduled demolition. This survey included a site reconnaissance, material sampling, and laboratory analysis. This assessment was performed utilizing methods and procedures consistent with good commercial or customary practices designed to conform to acceptable industry standards. The independent conclusions presented herein are based upon existing conditions and the information and data available to us during the course of this assignment.
We appreciate the opportunity to provide industrial hygiene services to the Federal Aviation Administration.
If you have any questions concerning this report, or if we can assist you in any other matter, please contact me at (980) 301-0134.
Sincerely, Partner Engineering and Science, Inc.
Elizabeth Romano
Relationship Manager
Pre-Demolition Asbestos and Lead-Based Paint Survey Report
Project No. 25-504452.1
September 5, 2025
Page i
EXECUTIVE SUMMARY
Partner Engineering and Science, Inc. conducted a Pre-Demolition Asbestos Containing Material (ACM) and
Lead-Based Paint (LBP) Survey of the Shed at Houma Airport located at 10264 East Main Street in Houma, Louisiana. The survey was conducted in anticipated demolition of the shed structure in general conformance with National Emission Standards for Hazardous Air Pollutants (NESHAP).
Federal and State of Louisiana regulations define asbestos-containing material (ACM) as any material containing more than one percent (1%) asbestos. Asbestos was not detected in the materials sampled. If any suspect ACMs not characterized in this report are encountered during demolition activities, all work that could potentially disturb the materials must stop. Uncharacterized suspect ACM must be assumed to be ACM and handled accordingly, pending the completion of additional sampling and laboratory analysis.
The following building materials are not suspected to be asbestos-containing; therefore, the materials were not sampled: metal walls, metal roof, and styrofoam insulation in wall/ceiling joints.
Lead-based paint LBP) is defined by the Environmental Protection Agency (EPA) as paint or other surface coating with lead content equal to or greater than 1.0 milligrams per square centimeter (mg/cm2) of surface area by X-Ray Fluorescence (XRF) analysis or 0.5% by weight (5,000 parts per million (ppm)) by paint chip analysis. LBP was not detected at or above the EPA action level in the paint chip sample collected and submitted for laboratory analysis.
When conducting construction or demolition activities which disturb lead in any amount or create an exposure to workers, the employer is required to provide worker protection and conduct exposure assessments. Employers should consult Federal Occupational Safety and Health Administration (OSHA)
Regulations at 29 CFR 1926.62, Lead in Construction standards for complete requirements.
September 5, 2025
Page ii
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Property Description
1.2 Purpose and Scope
2.0 METHODOLOGY
2.1 Asbestos
2.1.1 Visual Evaluation
2.1.2 Classification
2.1.3 Evaluation of Condition
2.1.4 Homogenous Areas
2.1.5 Asbestos Sampling and Laboratory Analysis
2.2 Lead-Based Paint
2.2.1 Lead-Based Paint Sampling and Laboratory Analysis
3.0 ANALYTICAL RESULTS
3.1 Asbestos Results
3.2 Lead-Based Paint Results
4.0 CONCLUSIONS/RECOMMENDATIONS
4.1 Conclusions
4.2 Recommendations
5.0 LIMITATIONS AND RELIANCE
6.0 SIGNATURES OF PROFESSIONALS
APPENDICES
Appendix A: Laboratory Analysis and Chain of Custody
Appendix B: Sample Location Diagram
Appendix C: Certifications
Appendix D: Photographic Documentation
Appendix E: Asbestos Notification Of Renovation and/or Demolition Form AAC-2(b)
September 5, 2025
1.0 INTRODUCTION
1.1 Property Description
Property Data
Property Name: Houma-Terrebonne International Airport
Address: 10264 East Main Steet, Houma, Louisiana 70636
Property Use: Airport
Number of Buildings: One (1) surveyed
Number of Floors: One (1)
Date of Construction: Unknown
Gross Building Area (SF) 50
Surveyed by: Phillip Bellan, J.D., CIH, CSP – LA DEQ Inspector 187169
Survey date: August 22, 2025
1.2 Purpose and Scope
The pre-demolition asbestos-containing materials (ACM) and lead-based paint (LBP) survey was conducted in accordance with the United States Environmental Protection Agency (USEPA) regulation, 40 CFR Part 61, Subpart M, National Emissions Standard for Hazardous Air Pollutants (NESHAP) and additional requirements of the USEPA and State of Louisiana. The purpose of this survey was to identify, sample and analyze suspect
ACM and LBP on a shed, which is scheduled for demolition. The suspect materials sampled during the survey were limited to accessible areas within the interior and exterior of the building.
Asbestos and lead-based paint may be present in materials not sampled, and additional sampling may be warranted in the event of future disturbance of suspect materials. All suspect materials should be managed in accordance with applicable regulations.
Additional services, such as the interview of property management, maintenance personnel, or tenants, review of prior reports, regulatory records, evaluation of compliance, risk assessment, or the development of abatement specifications were excluded from the scope of services, along with all other activities not expressly identified herein. No demolition, destructive testing, or product research was performed in attempts to reveal material compositions.
September 5, 2025
2.0 METHODOLOGY
2.1 Asbestos
2.1.1 Visual Evaluation
Building materials were observed to identify, classify and evaluate the condition of homogenous areas of suspect ACM. The building stood on a concrete slab as a slab-on-grade structure. The building was a sheet metal style shed with sheet metal attached via screws to a metal frame. The size of the shed structure was approximately 50 square feet.
2.1.2 Classification
Asbestos containing building materials are typically classified as surfacing, thermal systems insulation, or miscellaneous ACM.
Surfacing - Material that is sprayed, troweled-on or otherwise applied to surfaces. Examples include acoustical plaster on ceilings, fireproofing on structural members, or similar applications for acoustical, fireproofing, and other purposes.
Thermal Systems Insulation – Materials applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain.
Miscellaneous – All other ACM including taping mud, floor tile mastic, stucco, leveling compound, etc…
2.1.3 Evaluation of Condition
An assessment of the condition of ACM can be useful in deciding how to management materials. The ACM most likely to release asbestos fibers are those which are in a friable state. The definition of friable is any material, when dry, that is capable of being crumbled, pulverized or reduced to powder by hand pressure
(40 CFR 763). Non-friable sources of asbestos are materials containing cement or asphaltic binder which may become friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing, or hammering. Non-friable sources of asbestos do not typically pose a significant exposure risk if they remain in good condition and are not disturbed. During renovation or demolition activities, or when subject to abrasive action, non-friable sources may become friable, and may pose an exposure risk.
EPA protocols have been used in the evaluation of the condition of observed materials.
Good – Little or no visible damage or deterioration.
Damaged – Some insulation jackets are missing; water staining; crushing, gouges, punctures, or marring is evenly distributed.
Significantly Damaged – Damaged materials where the damage is extensive or severe. More than
10% of insulation jackets are missing; material is crushed, heavily gouged or punctured more than
10% of pipe runs, risers, boilers, tanks, ducts, etc..
The condition of materials is based upon observations at the time of the assessment, and is independent of the friable or non-friable nature of the materials.
September 5, 2025
2.1.4 Homogenous Areas
The US EPA defines a homogeneous area as “an area of surfacing material, thermal system insulation material, or miscellaneous material that is uniform in color and texture” (40 CFR 763). The collection of a minimum number of representative samples from each homogeneous area is generally required for compliance with federal regulations. If asbestos is identified in any sample from a homogeneous area, then the entire homogeneous area is considered to contain asbestos.
2.1.5 Asbestos Sampling and Laboratory Analysis
A total of six (6) bulk samples of suspect asbestos containing materials were collected for analysis. Selected materials were submitted to Eurofins Built Environment Testing East, LLC for analysis by Polarized Light
Microscopy (PLM) in accordance with EPA Method 600/R-93/116, Method for the Determination of
Asbestos in Bulk Building Materials. Eurofins Built Environment Testing East, LLC is accredited by the
American Industrial Hygiene Association (AIHA) and the National Volunteer Laboratory Accreditation
Program (NVLAP).
2.2 Lead-Based Paint
2.2.1 Lead-Based Paint Sampling and Laboratory Analysis
The exterior and interior of the shed were assessed to evaluate for the presence of presumed LBP. Suspect painted surfaces observed at the time of the inspection were sampled and analyzed for lead content. One
(1) paint chip sample was collected and submitted to EHS Laboratories, a certified laboratory accredited with the Environmental Lead Laboratory Accreditation Program (ELLAP), for analysis by EPA SW-846 Method
7000B: Flame Atomic Absorption Spectrophotometry for Determination of Lead Content in Paint Chip
Samples.
September 5, 2025
3.0 ANALYTICAL RESULTS
3.1 Asbestos Results
Federal and State of Louisiana regulations define ACM as any material containing more than one percent
(1%) asbestos as determined using PLM. No asbestos was detected in the samples submitted for analysis.
The analytical results are summarized in Table 1 below. The laboratory results and chain of custody are contained in Appendix A. Sample locations are depicted on the diagram contained in Appendix B.
Table 1. Asbestos Sample Results
Sample No.
Material
Category
Type of
Material Condition Location ACM %
25-504452.1-1 Misc.
Gray Concrete
Slab Intact Floor / Slab of Shed
None
Detected
25-504452.1-2 Misc.
Gray Concrete
Slab Intact Floor / Slab of Shed
None
Detected
25-504452.1-3 Misc.
Brown Ceiling Tile
Debris Damaged Floor / Slab of Shed
None
Detected
25-504452.1-4 Misc.
Brown Ceiling Tile
Debris Damaged Floor / Slab of Shed
None
Detected
25-504452.1-5 Misc. White Caulk Intact Exterior of Shed Around
Roof/ Wall Joint
None
Detected
25-504452.1-6 Misc. White Caulk Intact Exterior of Shed Around
Roof/ Wall Joint
None
Detected
Documentation of the laboratory results should be retained as a reference for future renovation and/or demolition activities.
The following building materials are not suspected to be asbestos-containing; therefore, the materials were not sampled: metal walls, metal roof, and styrofoam insulation in wall/ceiling joints.
3.2 Lead-Based Paint Results
Lead-based paint LBP) is defined by the Environmental Protection Agency (EPA) as paint or other surface coating with lead content equal to or greater than 1.0 milligrams per square centimeter (mg/cm2) of surface area by X-Ray Fluorescence (XRF) analysis or 0.5% by weight (5,000 parts per million (ppm)) by paint chip analysis. LBP was not detected at or above the EPA action level as summarized in Table 2 below.
The lead concentration of the sample submitted for analysis was below the regulatory level and is considered negative for LBP. The laboratory results are contained in Appendix A. Sample locations are depicted on the diagram contained in Appendix B.
Table 2. Lead-Based Paint Results
Sample No. Location Description Results (% by weight)
25-504452.1-LB1 Exterior Door Grey Paint (Exterior /
Interior )
0.072 %
Documentation of the laboratory results should be retained as a reference for future renovation/ demolition activities.
September 5, 2025
4.0 CONCLUSIONS/RECOMMENDATIONS
4.1 Conclusions
Asbestos was not detected in the materials sampled.
LBP was not detected at or above the EPA action level in the paint chip sample collected and submitted for laboratory analysis.
4.2 Recommendations
Based on the observations made, the noted limitations and the analytical results, Partner recommends the following: File Form AAC-2(b) with the Louisiana Department of Environmental Quality prior to beginning demolition activity.
If any suspect ACMs not characterized in this report are encountered during demolition activities, all work that could potentially disturb the materials must stop. Uncharacterized suspect ACM must be assumed to be ACM and handled accordingly, pending the completion of additional sampling and laboratory analysis.
All construction work where an employee may be occupationally exposed to lead must comply with
Occupational Safety and Health Administration (OSHA) requirements set forth in 29 CFR 1926.62. This regulation requires initial employee exposure monitoring to evaluate worker exposure during work that disturbs lead-containing materials (lead present in detectable levels). Partner suggests that engineering controls, respiratory protection and personal protective equipment be employed at the start of a project in the presence of lead-containing materials.
Waste items generated during an abatement or demolition project should be properly sampled and profiled to determine the final disposition of the waste. Characterization and disposal of lead-containing waste materials (LCWM) must comply with federal, state and local authorities. Contractors must maintain current licenses as required by applicable state or local jurisdictions for the removal, transport, disposal of LCWM, or other regulated lead-based paint activities.
The potential exists for additional suspect lead-containing materials to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for lead content prior to any renovation and/or demolition activities that could impact these materials.
September 5, 2025
5.0 LIMITATIONS AND RELIANCE
This pre-demolition ACM and LBP survey was performed utilizing methods and procedures consistent with good commercial or customary practices designed to conform to acceptable industry standards. The independent conclusions presented herein are based upon existing conditions and the information and data available to us during the course of this assignment. No warranties, expressed or implied, are made by Partner, its subcontractors or employees. Professional services completed in connection with the work have been completed in with accordance with generally accepted engineering principles and practices.
Partner was engaged by the Client, or their authorized representative, to perform this assessment. The engagement agreement specifically states the scope and purpose of the assessment, as well as the contractual obligations and limitations of both parties. This report and the information therein, are for the exclusive use of the Addressee. This report has no other purpose and may not be relied upon, or used, by any other person or entity without the written consent of Partner. Third parties that obtain this report, or the information therein, shall have no rights of recourse or recovery against Partner, its officers, employees, vendors, successors or assigns. Any such unauthorized user shall be responsible to protect, indemnify and hold Partner, the Addressee and their respective officers, employees, vendors, successors and assigns harmless from any and all claims, damages, losses, liabilities, expenses (including reasonable attorneys’ fees) and costs attributable to such use. Unauthorized use of this report shall constitute acceptance of, and commitment to, these responsibilities, which shall be irrevocable and shall apply regardless of the cause of action or legal theory pled or asserted.
This report has been completed under specific Terms and Conditions relating to scope, relying parties, limitations of liability, indemnification, dispute resolution, and other factors relevant to any reliance on this report. Any parties relying on this report do so having accepted the Terms and Conditions for which this report was completed.
Partner and its subcontractor, Eurofins Built Environment Testing East, LLC, and their employees/representatives bear no responsibility for the actual condition of the structure or safety of this site pertaining to asbestos and/or asbestos contamination regardless of the actions taken by the survey team or the client.
September 5, 2025
6.0 SIGNATURES OF PROFESSIONALS
Partner has performed a pre-demolition asbestos-containing materials and lead-based paint survey of the shed located at the property at 10264 East Main Steet, Houma, Louisiana 70636, in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report. Exceptions to or deletions from this protocol are discussed earlier in this report.
Prepared By:
Partner Engineering and Science, Inc.
Phillip Bellan, J.D., CIH, CSP
Inspector – LA DEQ DI187169
Audre A. Puskorius
Senior Author
Aaron Vogt
Senior Project Manager
APPENDIX A: LABORATORY ANALYSIS & CHAIN OF CUSTODY
CLIENT PROJECT:
LAB CODE:
August 28, 2025
Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217
FAA - Houma, LA 684998-1
Dear Aaron, Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on August 25, 2025.
The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600/R-93/116:
Method for the Determination of Asbestos in Bulk Building Materials and EPA 40 CFR Appendix E to Subpart E of Part 763: Interim Method of the Determination of Asbestos in Bulk Insulation Samples.
Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% by calibrated visual estimate.
Thank you for your business and we look forward to continuing good relations.
Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director
NVLAP 101768-0
730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413
ASBESTOS ANALYTICAL REPORT
By: Polarized Light Microscopy
Prepared for
Partner Engineering and Science (NC)
CLIENT PROJECT: FAA - Houma, LA
LAB CODE: 684998-1
TEST METHOD:
EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763
REPORT DATE: 08/28/25
TOTAL SAMPLES ANALYZED: 6
# SAMPLES >1% ASBESTOS: 0
TOTAL LAYERS ANALYZED: 6
Project: FAA - Houma, LA
Method:
Asbestos Report Summary By: Polarized Light Microscopy
684998-1Lab Code:
EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763
Client IDClient IDClient IDClient ID Lab IDLab IDLab IDLab ID LayerLayerLayerLayer Sample DescriptionSample DescriptionSample DescriptionSample Description Asbestos %Asbestos %Asbestos %Asbestos %
25-504452.1-1 3668107 Gray concrete None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-2 3668108 Gray concrete None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-3 3668109 Brown ceiling tile debris None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-4 3668110 Brown ceiling tile debris None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-5 3668111 White caulk None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-6 3668112 White caulk None DetectedNone DetectedNone DetectedNone Detected
Project: FAA - Houma, LA
Method:
Asbestos Report Summary By: Polarized Light Microscopy
684998-1Lab Code:
EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763
730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 1 of 1
Client IDClient IDClient IDClient ID LabLabLabLab LabLabLabLab NON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTS ASBESTOSASBESTOSASBESTOSASBESTOS Lab IDLab IDLab IDLab ID DescriptionDescriptionDescriptionDescription AttributesAttributesAttributesAttributes FibrousFibrousFibrousFibrous Non-FibrousNon-FibrousNon-FibrousNon-Fibrous %%%%
25-504452.1-125-504452.1-125-504452.1-125-504452.1-1 3668107
Concrete Homogeneous Gray Non-Fibrous Bound
65% 35%
Silica Binder
None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-225-504452.1-225-504452.1-225-504452.1-2 3668108
Concrete Homogeneous Gray Non-Fibrous Bound
65% 35%
Silica Binder
None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-325-504452.1-325-504452.1-325-504452.1-3 3668109
Ceiling Tile Debris Heterogeneous Brown Fibrous Loosely Bound
95% Cellulose 5% <1%
Cork Paint
None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-425-504452.1-425-504452.1-425-504452.1-4 3668110
Ceiling Tile Debris Heterogeneous Brown Fibrous Loosely Bound
95% Cellulose 5% <1%
Cork Paint
None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-525-504452.1-525-504452.1-525-504452.1-5 3668111
Caulk Heterogeneous White Non-Fibrous Bound
95% 5%
Caulk Paint
None DetectedNone DetectedNone DetectedNone Detected
25-504452.1-625-504452.1-625-504452.1-625-504452.1-6 3668112
Caulk Heterogeneous White Non-Fibrous Bound
95% 5%
Caulk Paint
None DetectedNone DetectedNone DetectedNone Detected
Client: Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217
Project:
Method:
ASBESTOS BULK ANALYSIS
By: Polarized Light Microscopy
684998-1 08/25/25 08/28/25 08/28/25
Lab Code:
Date Received:
Date Analyzed:
Date Reported:
FAA - Houma, LA
ASBESTOS BULK PLM, EPA 600 METHOD
730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 1 of 2
LEGEND:LEGEND:LEGEND:LEGEND:
Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate
METHOD:METHOD:METHOD:METHOD: EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763
REPORTING LIMIT:REPORTING LIMIT:REPORTING LIMIT:REPORTING LIMIT: 1% by calibrated visual estimation
REGULATORY LIMIT:REGULATORY LIMIT:REGULATORY LIMIT:REGULATORY LIMIT: 1%
Due to the limitations of the EPA 600 / R93 / 116 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request.
Eurofins Built Environment Testing East, LLC makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. Interpretation of the analytical results is the sole responsibility of the client. This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins Built Environment Testing East, LLC. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government.
Information provided by customer includes customer sample ID and sample description.
Khrista Petry Analyst
DATA QA:
Samantha Webster 8/28/2025
APPROVED BY:
Tianbao Bai, Ph.D., CIH Laboratory Director
730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 2 of 2
SUBMITTED BY INVOICE TO
Client Sample ID Number
RES Job #: 684998
CONTACT INFORMATION SERIES
ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
CHEMISTRY LABORATORY
MICROBIOLOGY LABORATORY
**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**
Laboratory Analysis Instructions
(Sample ID's must be unique)
Company: Partner Engineering and Science (NC) Company: Partner Engineering and Science (NC)
Address: 8720 Red Oak Blvd Address: 8720 Red Oak Blvd
Charlotte, NC 28217 Charlotte, NC 28217
Project Number and/or P.O. #: 25-504452.1 Project Zip Code:
Project Description/Location: FAA - Houma, LA
Contact: Aaron Vogt -1 PLM Standard 3 Phone: (813) 545-6151
Fax:
Cell: (813) 545-6151
Final Data Deliverable Email Address:
avogt@partneresi.com (+ 2 ADDNL. CONTACTS)
PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B LA
Dust = D Food = F
Paint = P Soil = S
Dust RUSH PRIORITY STANDARD
*PRIOR NOTICE REQUIRED FOR SAME DAY TAT
Surface = SU Swab = SW
Tape = T Wipe = W
Metals RUSH PRIORITY STANDARD Drinking Water = DW
Waste Water = WW
Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**
Viable Analysis** PRIORITY STANDARD
**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH
Medical Device Analysis RUSH STANDARD
Mold Analysis RUSH PRIORITY STANDARD
Special Instructions:
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
1 25-504452.1-1 X B
2 25-504452.1-2 X B
3 25-504452.1-3 X B
4 25-504452.1-4 X B
5 25-504452.1-5 X B
6 25-504452.1-6 X B
P L
M
P L
M S h o rt R ep o rt (E
PA
/6
/R
-9 3/
6)
T E
M
P C
M
D U
S T
M E
TA
L
S
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Built Environment Testing East, LLC establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.
Eurofins Built Environment Testing East, LLC will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.
Relinquished By:
Date/Time: 08/25/2025 16:47:49 Sample Condition: Acceptable
Received By:
Michard Eli Date/Time: 08/25/2025 16:47:49 Carrier: Fed-Ex
Eurofins Built Environment Testing East, LLC Effective
(919) 481-1413 https://www.eurofinsus.com/builtenv730 SE Maynard Rd, Cary, NC 27511
CLIENT PROJECT:
LAB CODE:
August 28, 2025
Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217
FAA - Houma, LA 684954-1
Dear Aaron, Enclosed are lead analysis results for chemistry samples received at our laboratory on August 25, 2025. The samples were analyzed for lead using flame atomic absorption spectrophotometry.
Thank you for your business and we look forward to continuing good relations.
Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director
AIHA LAP 103025
Analysis Report
Client:
Project/Test Address:
Eurofins Built Environment Testing East
684954-1
Client Number:
34-1445
Fax Number:
919-481-1442Laboratory Results
Analyzed Date:
Client Sample Number
Lab Sample Number
Pb (ug/g) ppm
Lead Paint Chip
08/28/2025
08/26/2025
25-08-05211
Reported Date:
Received Date:
Report Number:
730 S.E. Maynard Road Cary, NC 27511
Narrative
ID
08/27/2025
Collection Location % Pb by Wt.
08/22/2025Collection Date:
7469 Whitepine Rd
Telephone: 800.347.4010
North Chesterfield, VA 23237
25-504452.1-
LB1
25-08-05211-001 L0425-504452.1-LB1 720 0.072
Melissa Kanode
QA/QC Clerk
Analysis Method: EPA SW846 7000B
The Reporting Limit (RL) for samples prepared by ASTM E-1979-17 is 10.0 ug Total Pb. The RL for samples prepared by EPA SW846 3050B is 25.0 ug Total Pb. Paint chip area and results are calculated based on area measurements determined by the client. All internal quality control requirements associated with this batch were met, unless otherwise noted.
LEGEND Pb= lead ug = microgram ppm = parts per million ug/g = micrograms per gram Wt. = weight
Reviewed By Authorized Signatory:
L04: Sample contains substantial amounts of substrate which may affect the calculated results with units of ppm and % by weight.
Sample Narratives:
Preparation Method: ASTM E-1979-17
The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Results represent the analysis of samples submitted by the client. Sample location, description, area, etc., was provided by the client. Results reported above in mg/cm3 are calculated based on area supplied by client. This report shall not be reproduced except in full, without the written consent of Environmental Hazards Services, L.L.C.
ELLAP Accredtitation through AIHA LAP, LLC (100420), NY ELAP #11714.
Page 1of1
ENVI RSN ftll E NTAI- HAEARD$ SERVIeES- Lhe Lead Chain of CustodY Form Page 1 or 1
34-1445Eurofins CEI - Cary
Cary, North Carolina 2751 1730 SE Maynard Road, Cary, NC 27511 bu i ltsupport. sc@et.eu rofi nsus. com919-481-1413
954-1
Vogt
QSoay QSoay OZoay Oroay QSame Day lWeekend-MustCallAhead
Do Submitted Dust Wipe Samples Meet ASTM 81792 Requirernents? tT yes fNo
FLFloorBath BAFront FAir A
NEW YORK CITY Pb DUST WIPE PROJECTS: Please take floor dust wipe a 2 ftz wipe area.
Carpet CPRearSSoil
KTKitchenLeftCW*ir*iair.,.' ':'1" ii- | conrposite vvipe x" tU6 E3 Z m J
XPC 1-LB1W;il44s2.'t 25-504452.1-LB1 08t2212025
X ql
A2
XA3
X3lA1
X
=l
X3lrj
X I
=l
Xf,l*lI
XillI
X10
X*l11
XA12
x3l#t13
X,I*l14
5:00pmE./ Eurofins
Signature:
LAB USE ONLY - BELOW THIS LINE
Received By:
Date: Time:
Portal Contact Added
& T4lgwHrrEprNE RD, RrcHMoND, vA z3z?7 (800)-3 47-4oLo
RESULTS VIA CLIENT PORTAL AVAILABLE @ www.leadlab.corn
1"U tc 11* F- 25-08-0521 1
Due Date:
08/28 12025 (Thursday)
AE
fl pnr
3:00Ph/
Co:mpa ny ,Addres$, Phon,* Email
Project
SURFACH TYPE
,Roor?, rr}r t\
Dining DR 1.,..,. iitildif;l1"$' ', ::Den Lf l Rigrrt i ot
Location if results
,mglcmJ, Air"
Released By:
SUBMITTED BY INVOICE TO
Client Sample ID Number
RES Job #: 684954
CONTACT INFORMATION SERIES
ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
CHEMISTRY LABORATORY
MICROBIOLOGY LABORATORY
**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**
Laboratory Analysis Instructions
(Sample ID's must be unique)
Company: Partner Engineering and Science (NC) Company: Partner Engineering and Science (NC)
Address: 8720 Red Oak Blvd Address: 8720 Red Oak Blvd
Charlotte, NC 28217 Charlotte, NC 28217
Project Number and/or P.O. #: 25-504452.1 Project Zip Code:
Project Description/Location: FAA - Houma, LA
Contact: Aaron Vogt -1 Chem Standard 3 Phone: (813) 545-6151
Fax:
Cell: (813) 545-6151
Final Data Deliverable Email Address:
avogt@partneresi.com (+ 1 ADDNL. CONTACTS)
PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B LA
Dust = D Food = F
Paint = P Soil = S
Dust RUSH PRIORITY STANDARD
*PRIOR NOTICE REQUIRED FOR SAME DAY TAT
Surface = SU Swab = SW
Tape = T Wipe = W
Metals RUSH PRIORITY STANDARD Drinking Water = DW
Waste Water = WW
Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**
Viable Analysis** PRIORITY STANDARD
**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH
Medical Device Analysis RUSH STANDARD
Mold Analysis RUSH PRIORITY STANDARD
Special Instructions:
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
1 25-504452.1-LB1 X 50ft² P
P L
M
T E
M
P C
M
D U
S T
M E
TA
L
S
A n al yt e( s)
P b
L ea d b y F la m e A
A (U
S E
PA
S
W
6)
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Built Environment Testing East, LLC establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.
Eurofins Built Environment Testing East, LLC will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.
Relinquished By:
Date/Time: 08/25/2025 15:39:03 Sample Condition: Acceptable
Received By:
Michard Eli Date/Time: 08/25/2025 15:39:03 Carrier: Fed-Ex
Eurofins Built Environment Testing East, LLC Effective
(919) 481-1413 https://www.eurofinsus.com/builtenv730 SE Maynard Rd, Cary, NC 27511
Client Sample ID Sample Location
25-504452.1-LB1 grey door paint
Partner Engineering and Science (NC) Sample Locations
RES #: 684954
Project Number and/or P.O. #: 25-504452.1
Project Description/Location: FAA - Houma, LA
APPENDIX B: SAMPLE LOCATON DIAGRAM
Appendix B: Sample Location Diagram
X-6 X- L01 X-2 X-5 X – 1
*Sample numbers abbreviated from sample number 25-50445.1 – XX
X- 3 X-4
APPENDIX C: CERTIFICATIONS
STATE OF LOUISIANA
DEPARTMENT OF ENVIRONMENTAL QUALITY
certifies that
Phillip Bellan
Has complied with all requirements of the Louisiana Department of Environmental Quality and is authorized to perform the duties of
Asbestos Inspector
Accreditation No. DI187169 AI No. 187169
Date of Issuance October 23, 2024 Expiration December 20, 2025
Failure to comply with all applicable provisions of La. R.S. 2025.E. (1)(a) and La. R.S. 2025.F. (2)(a) may result in civil and/or criminal enforcement actions by the State.
Permit Support Services Division
Office of Environmental Services
APPENDIX D: PHOTOGRAPHIC DOCUMENTATION
Appendix D: Site Photographs
1. View of street entrance to airport 2. View of shed scheduled for demolition
3. View of sample 25-504452.1-1, concrete pad 4. View of sample 25-504452.1-2, concrete pad
5. View of sample 25-504452.1-3, debris on ground 6. View of sample 25-504452.1-4, debris on ground
Appendix D: Site Photographs
7. View of sample 25-504452.1-5, building caulk 8. View of sample 25-504452.1-6, building caulk
9. View of sample 25-504452.1-L1, grey paint on door 10. View of shed contents
11. View of side of shed 12. View of rear of shed
APPENDIX E: ASBESTOS NOTIFICATION OF RENOVATION AND/OR
DEMOLITION FORM AAC-2(B)
form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 1 of 3
ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION
NEGATIVE DECLARATION FORM AAC-2(b)
Do not use this form for Asbestos Disposal Verification Forms (ADVF) requests
Louisiana Department of Environmental Quality Office of Environmental Services
Public Participation and Permit Support Division Notifications and Accreditations Section
Phone (225) 219-3244
Please type and complete all required sections.
For LDEQ Use Only
A.I. No.
Ck./Voucher No.
N/A
Amount Received
N/A
Postmark Date
ADVF No. N/A
NOTE: This form is to be used only for renovations and demolitions when lab analysis of properly sampled material indicates:
that no Asbestos- Containing Material (ACM) is present; that the ACM present is not Regulated Asbestos-Containing
Material (RACM), and will not be made RACM by the renovation or demolition; or that RACM, including any ACM that will be made RACM by the renovation or demolition, is less than the thresholds below (See Section I). For all other renovations, demolitions, or asbestos-contaminated debris activities, request ADVFs using the Notification of Demolition and Renovation and Asbestos Contaminated Debris Activity Form AAC-2(a).
Emergency
NOTE: Emergency notification is allowable only for a sudden, unexpected event that would cause an unsafe condition (or health hazard), equipment damage, or would pose an unreasonable financial burden, per LAC 33:III.5151.F.2.d.xvi.
I. Type of Notification
No ACM present
Established Thresholds per LAC 33:III.5151.F.1.
Combined amount of RACM is less than:
• 60 linear feet on pipes;
• 64 square feet on other facility components; or
• 1 cubic yard off facility components where length or area could not be measured previously.
ACM present is not RACM and will not be made RACM by the renovation or demolition
RACM, or ACM that will be made RACM, is less than the established thresholds (see right)
II. Type of Operation
Demolition Allowable only if structure contains no RACM or contains RACM below established thresholds (see Section I, above)
Renovation Allowable only if ACM will not be made RACM or RACM created is below established thresholds (see Section I, above)
Renovation and Subsequent Demolition Allowable only if during renovation ACM will not be made RACM or RACM created is below established thresholds AND allowable only if structure being demolished contains no RACM or contains RACM below established thresholds (see Section I, above)
III. Facility Description
IV.
Project Designer La. Accreditation No.
(schools & state bldgs, only)
Facility Name Parish
Physical Address
Building Size (sq. ft.)
City State Zip
No. Floors Age of Building (Yrs)
Owner Name
Location on site (Bldg, Floor, Room, etc.) where work is done
Contact Information:
Present
Use
School
State Bldg.
Public/Commercial
Contact Name
Residential
Industrial
Mailing Address
Other
City State Zip Prior Use
School State Bldg. Public/Commercial
Phone ( )
Residential
Industrial
Email form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 2 of 3
IV. Determination of One of the Following:
• No ACM Present;
• ACM Present is Not RACM and Will Not be Made RACM by the Renovation or Demolition; or
• RACM, or ACM that Will be Made RACM, is Less than the Established Thresholds (See Section I)
Inspection Date (mm/dd/yyyy) Lab Analysis Date (mm/dd/yyyy)
Inspector’s Name Accredited Lab Name
Inspector’s Accred. No. LELAP* Lab ID No.
Lab Agency Interest (AI) No.
Procedure, including analytical method, if appropriate, used to detect the presence of asbestos material
NOTE: Laboratory analysis performed by commercial laboratories for this determination must have been conducted in accordance with the requirements set forth under LAC 33:I.Subpart 3, Chapters 49-55.
Laboratory data generated by commercial laboratories that are not accredited by the *Louisiana Environmental Laboratory Accreditation Program (LELAP) under LAC 33:I.Subpart 3, Chapters 47-59, will not be accepted by the LDEQ; retesting of analysis will be required by a commercial laboratory accredited by LELAP.
Attach the following copies:
• Signature page of inspection report for inspection date indicated (above)
• Lab Analysis Report for analysis date indicated (above)
NOTE: The Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) will not be processed without these attachments.
V. Approximate Amount of Asbestos
Material to be Removed Material Not to be Removed (if ACM is present)
RACM
(below established threshold)
Non-regulated
ACM
RACM
(below established threshold)
Non-regulated
ACM
Type of Asbestos Material
TSI
Ceiling Tile
Fireproofing
VAT
Mastic
Asphalt Roofing
Other
TSI
Ceiling Tile
Fireproofing
Other
VAT
Mastic
Asphalt Roofing
Amount of Asbestos Material linear feet linear feet linear feet linear feet square feet square feet square feet square feet cubic yards cubic yards cubic yards cubic yards
VI. Renovation and/or Demolition Contractor
Contractor Name Contact Name
Mailing Address Contact Email
City State Zip Contact Phone ( )
VII. Scheduled Renovation and/or Demolition Dates (enter dates for applicable activity or N/A if not applicable)
Renovation Start Date (mm/dd/yyyy) Renovation Completion Date (mm/dd/yyyy)
Demolition Start Date (mm/dd/yyyy) Demolition Completion Date (mm/dd/yyyy) form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 3 of 3
VIII. Emergency Renovation and/or Demolition
Explain how event would cause an unsafe condition (health hazard), equipment damage, or pose an unreasonable financial burden per LAC 33:III.5151.F.2.d.xvi.
IX. Planned Non-RACM Renovation and/or Demolition
Describe planned non-RACM renovation and/or demolition and methods to be used
Describe procedures to be followed in the event unexpected RACM is found or CAT II becomes RACM (per LAC 33:III.5151.F.2.d.xvii)
X. Comments
Provide any additional comments/information relevant to the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b).
XI. Certification Sign this section only if RACM is absent or amount of RACM present is below established thresholds (See Section I)
I certify that the above information is correct and that under penalty of law, with regard to the structure being demolished, RACM is determined to be absent or the amount of RACM present is below established thresholds per LAC 33:III.5151.F.1. I understand that:
• the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) is incomplete without the required analysis and supporting documentation from a commercial laboratory accredited under LAC 33: Subpart 3, Chapters 47-59; this constitutes a failure to notify the LDEQ (See Section IV);
• the LDEQ will not accept laboratory data generated by a commercial laboratory that is not accredited under LAC 33: Subpart 3, Chapters 47-59; the LDEQ will require retesting if the laboratory performing the analysis is not accredited under this regulation.
• the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) will not be processed without the required analysis and supporting documentation from a commercial laboratory accredited under LAC 33: Subpart 3, Chapters 47-59.
Printed Name of Owner or Operator/Contractor Signature of Owner or Operator/Contractor Date (mm/dd/yyyy)
Submittal Information
• There is no fee associated with the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b).
• For Emergencies- Information MAY NOT BE FAXED. Information may be submitted by: phone (225-219-3244); email (DEQ.ASBESTOSNOTIFICATIONS@LA.GOV); or hand-delivery. NOTE: If phoned or emailed, a follow-up form with original signature must be submitted to the LDEQ by one of the methods of delivery (below) WITHIN 5 WORKING DAYS.
• For Non-emergencies-Information MAY NOT BE FAXED. Forms may be submitted by email (DEQ.ASBESTOSNOTIFICATIONS@LA.GOV) with a follow-up form submitted at least 5 working days before demolition begins in accordance with LAC 33:III.5151.F.2.c. The form with an original signature must be submitted to the LDEQ by one of the following methods of delivery:
By Mail:
or or
By Overnight or Hand-delivery:
LDEQ Office of Environmental Services Public Participation and Permit Support Division Notifications & Accreditations Section P. O. Box 4313 Baton Rouge, LA 70821-4313
LDEQ Office of Environmental Services Public Participation and Permit Support Division Notifications & Accreditations Section 602 North 5th Street Baton Rouge, LA 70802
| Appendix A Asbestos and Lead Paint Chip Analytical Results and COCs |
| EXECUTIVE SUMMARY |
| Table of Contents |
| 1.0 INTRODUCTION |
| 1.1 Property Description |
| 1.2 Purpose and Scope |
| 1.3 Methodology |
| 1.3.1 Visual Evaluation |
| 1.3.2 Sampling and Laboratory Analysis |
| 1.3.3 Limiting Conditions |
| 2.0 analytical results |
| 3.0 CONCLUSIONs/recommendations |
| 3.1 Recommendations |
| 4.0 rELIANCE |
| 5.0 SIGNATURE OF PROFESSIONALS |
| Appendix A: LABORATORY ANALYSIS & CHAIN OF CUSTODY |
| Appendix B: SAMPLE LOCATON DIAGRAM(S) |
| Appendix C: CERTIFICAtiONS |
| Appendix D: PHOTOGRAPHIC DOCUMENTATION |
| Appendix E: CALIFORNIA DPH FORM 8552 |
| Appendix B Sample Location Diagram Houma Airport |
| Appendix C Certifications |
| EXECUTIVE SUMMARY |
| Table of Contents |
| 1.0 INTRODUCTION |
| 1.1 Property Description |
| 1.2 Purpose and Scope |
| 1.3 Methodology |
| 1.3.1 Visual Evaluation |
| 1.3.2 Sampling and Laboratory Analysis |
| 1.3.3 Limiting Conditions |
| 2.0 analytical results |
| 3.0 CONCLUSIONs/recommendations |
| 3.1 Recommendations |
| 4.0 rELIANCE |
| 5.0 SIGNATURE OF PROFESSIONALS |
| Appendix A: LABORATORY ANALYSIS & CHAIN OF CUSTODY |
| Appendix B: SAMPLE LOCATON DIAGRAM(S) |
| Appendix C: CERTIFICAtiONS |
| Appendix D: PHOTOGRAPHIC DOCUMENTATION |
| Appendix E: CALIFORNIA DPH FORM 8552 |
| Appendix D Partner Photos Houma Airport v2 |
| Appendix E AAC-2b_form_7369_r04 |
File details come from the government source that posted it. Updated .