25-504452.1_Pre-Demolition_Asbestos_and_Lead-Based_Paint_Survey_-_FAA,_Houma,_LA_090425.pdf

PDF 2 MB Posted

Attached to
HUM MALSR Demo and Replacement
Solicitation number
6973GH-26-R-00111
Issued by

About this file

This is a Pre-Demolition Asbestos and Lead-Based Paint Survey Report for a shed structure located at 10264 East Main Street in Houma, Louisiana, prepared by Partner Engineering and Science, Inc. for the Federal Aviation Administration. The survey was conducted on August 22, 2025, in accordance with National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations and State of Louisiana requirements.

The survey included sampling and laboratory analysis of suspect asbestos-containing materials (ACM) and lead-based paint (LBP). Six bulk samples were collected and analyzed using Polarized Light Microscopy (PLM) by Eurofins Built Environment Testing East, LLC, an AIHA and NVLAP-accredited laboratory. Results indicate no asbestos was detected in any of the six samples (concrete slabs, ceiling tile debris, and caulk materials). One paint chip sample was collected from exterior door paint and submitted to EHS Laboratories, accredited by ELLAP, for analysis using EPA SW-846 Method 7000B. The lead concentration was determined to be 0.072% by weight, below the EPA action level of 0.5%, and therefore does not constitute lead-based paint. The report recommends filing Form AAC-2(b) with the Louisiana Department of Environmental Quality prior to demolition activities. Should any uncharacterized suspect materials be encountered during demolition, all work must cease pending additional sampling and analysis. Employers must comply with OSHA regulations (29 CFR 1926.62) regarding lead exposure, and waste materials must be properly characterized and disposed of in accordance with federal, state, and local requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-DEMOLITION ASBESTOS

AND LEAD-BASED PAINT

SURVEY REPORT

Federal Aviation Administration –

Houma, LA 10264 East Main Street

Houma, Louisiana 70363

Report Date September 5, 2025

Partner Project No.

25-504452.1

Prepared for:

Federal Aviation Administration

Fort Worth, Texas 76177

(800) 419-4923 www.PARTNEResi.com

September 5, 2025

Mr. Chi Phan

Federal Aviation Administration

Fort Worth, Texas 76177

Subject: Pre-Demolition Asbestos and Lead-Based Paint Survey Report

Federal Aviation Administration – Houma, LA

10264 East Main Street

Houma, Louisiana 70363

Partner Project No. 25-504452.1

Dear Mr. Phan:

Partner Engineering and Science, Inc. (Partner) is pleased to provide the findings of the pre-demolition asbestos-containing materials and lead-based paint survey conducted at the above-referenced address (the

“subject property”).

The purpose of this survey was to assess the condition and sample accessible suspect asbestos and lead-based paint in the building that will be impacted by scheduled demolition. This survey included a site reconnaissance, material sampling, and laboratory analysis. This assessment was performed utilizing methods and procedures consistent with good commercial or customary practices designed to conform to acceptable industry standards. The independent conclusions presented herein are based upon existing conditions and the information and data available to us during the course of this assignment.

We appreciate the opportunity to provide industrial hygiene services to the Federal Aviation Administration.

If you have any questions concerning this report, or if we can assist you in any other matter, please contact me at (980) 301-0134.

Sincerely, Partner Engineering and Science, Inc.

Elizabeth Romano

Relationship Manager

Pre-Demolition Asbestos and Lead-Based Paint Survey Report

Project No. 25-504452.1

September 5, 2025

Page i

EXECUTIVE SUMMARY

Partner Engineering and Science, Inc. conducted a Pre-Demolition Asbestos Containing Material (ACM) and

Lead-Based Paint (LBP) Survey of the Shed at Houma Airport located at 10264 East Main Street in Houma, Louisiana. The survey was conducted in anticipated demolition of the shed structure in general conformance with National Emission Standards for Hazardous Air Pollutants (NESHAP).

Federal and State of Louisiana regulations define asbestos-containing material (ACM) as any material containing more than one percent (1%) asbestos. Asbestos was not detected in the materials sampled. If any suspect ACMs not characterized in this report are encountered during demolition activities, all work that could potentially disturb the materials must stop. Uncharacterized suspect ACM must be assumed to be ACM and handled accordingly, pending the completion of additional sampling and laboratory analysis.

The following building materials are not suspected to be asbestos-containing; therefore, the materials were not sampled: metal walls, metal roof, and styrofoam insulation in wall/ceiling joints.

Lead-based paint LBP) is defined by the Environmental Protection Agency (EPA) as paint or other surface coating with lead content equal to or greater than 1.0 milligrams per square centimeter (mg/cm2) of surface area by X-Ray Fluorescence (XRF) analysis or 0.5% by weight (5,000 parts per million (ppm)) by paint chip analysis. LBP was not detected at or above the EPA action level in the paint chip sample collected and submitted for laboratory analysis.

When conducting construction or demolition activities which disturb lead in any amount or create an exposure to workers, the employer is required to provide worker protection and conduct exposure assessments. Employers should consult Federal Occupational Safety and Health Administration (OSHA)

Regulations at 29 CFR 1926.62, Lead in Construction standards for complete requirements.

September 5, 2025

Page ii

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Property Description

1.2 Purpose and Scope

2.0 METHODOLOGY

2.1 Asbestos

2.1.1 Visual Evaluation

2.1.2 Classification

2.1.3 Evaluation of Condition

2.1.4 Homogenous Areas

2.1.5 Asbestos Sampling and Laboratory Analysis

2.2 Lead-Based Paint

2.2.1 Lead-Based Paint Sampling and Laboratory Analysis

3.0 ANALYTICAL RESULTS

3.1 Asbestos Results

3.2 Lead-Based Paint Results

4.0 CONCLUSIONS/RECOMMENDATIONS

4.1 Conclusions

4.2 Recommendations

5.0 LIMITATIONS AND RELIANCE

6.0 SIGNATURES OF PROFESSIONALS

APPENDICES

Appendix A: Laboratory Analysis and Chain of Custody

Appendix B: Sample Location Diagram

Appendix C: Certifications

Appendix D: Photographic Documentation

Appendix E: Asbestos Notification Of Renovation and/or Demolition Form AAC-2(b)

September 5, 2025

1.0 INTRODUCTION

1.1 Property Description

Property Data

Property Name: Houma-Terrebonne International Airport

Address: 10264 East Main Steet, Houma, Louisiana 70636

Property Use: Airport

Number of Buildings: One (1) surveyed

Number of Floors: One (1)

Date of Construction: Unknown

Gross Building Area (SF) 50

Surveyed by: Phillip Bellan, J.D., CIH, CSP – LA DEQ Inspector 187169

Survey date: August 22, 2025

1.2 Purpose and Scope

The pre-demolition asbestos-containing materials (ACM) and lead-based paint (LBP) survey was conducted in accordance with the United States Environmental Protection Agency (USEPA) regulation, 40 CFR Part 61, Subpart M, National Emissions Standard for Hazardous Air Pollutants (NESHAP) and additional requirements of the USEPA and State of Louisiana. The purpose of this survey was to identify, sample and analyze suspect

ACM and LBP on a shed, which is scheduled for demolition. The suspect materials sampled during the survey were limited to accessible areas within the interior and exterior of the building.

Asbestos and lead-based paint may be present in materials not sampled, and additional sampling may be warranted in the event of future disturbance of suspect materials. All suspect materials should be managed in accordance with applicable regulations.

Additional services, such as the interview of property management, maintenance personnel, or tenants, review of prior reports, regulatory records, evaluation of compliance, risk assessment, or the development of abatement specifications were excluded from the scope of services, along with all other activities not expressly identified herein. No demolition, destructive testing, or product research was performed in attempts to reveal material compositions.

September 5, 2025

2.0 METHODOLOGY

2.1 Asbestos

2.1.1 Visual Evaluation

Building materials were observed to identify, classify and evaluate the condition of homogenous areas of suspect ACM. The building stood on a concrete slab as a slab-on-grade structure. The building was a sheet metal style shed with sheet metal attached via screws to a metal frame. The size of the shed structure was approximately 50 square feet.

2.1.2 Classification

Asbestos containing building materials are typically classified as surfacing, thermal systems insulation, or miscellaneous ACM.

Surfacing - Material that is sprayed, troweled-on or otherwise applied to surfaces. Examples include acoustical plaster on ceilings, fireproofing on structural members, or similar applications for acoustical, fireproofing, and other purposes.

Thermal Systems Insulation – Materials applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain.

Miscellaneous – All other ACM including taping mud, floor tile mastic, stucco, leveling compound, etc…

2.1.3 Evaluation of Condition

An assessment of the condition of ACM can be useful in deciding how to management materials. The ACM most likely to release asbestos fibers are those which are in a friable state. The definition of friable is any material, when dry, that is capable of being crumbled, pulverized or reduced to powder by hand pressure

(40 CFR 763). Non-friable sources of asbestos are materials containing cement or asphaltic binder which may become friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing, or hammering. Non-friable sources of asbestos do not typically pose a significant exposure risk if they remain in good condition and are not disturbed. During renovation or demolition activities, or when subject to abrasive action, non-friable sources may become friable, and may pose an exposure risk.

EPA protocols have been used in the evaluation of the condition of observed materials.

Good – Little or no visible damage or deterioration.

Damaged – Some insulation jackets are missing; water staining; crushing, gouges, punctures, or marring is evenly distributed.

Significantly Damaged – Damaged materials where the damage is extensive or severe. More than

10% of insulation jackets are missing; material is crushed, heavily gouged or punctured more than

10% of pipe runs, risers, boilers, tanks, ducts, etc..

The condition of materials is based upon observations at the time of the assessment, and is independent of the friable or non-friable nature of the materials.

September 5, 2025

2.1.4 Homogenous Areas

The US EPA defines a homogeneous area as “an area of surfacing material, thermal system insulation material, or miscellaneous material that is uniform in color and texture” (40 CFR 763). The collection of a minimum number of representative samples from each homogeneous area is generally required for compliance with federal regulations. If asbestos is identified in any sample from a homogeneous area, then the entire homogeneous area is considered to contain asbestos.

2.1.5 Asbestos Sampling and Laboratory Analysis

A total of six (6) bulk samples of suspect asbestos containing materials were collected for analysis. Selected materials were submitted to Eurofins Built Environment Testing East, LLC for analysis by Polarized Light

Microscopy (PLM) in accordance with EPA Method 600/R-93/116, Method for the Determination of

Asbestos in Bulk Building Materials. Eurofins Built Environment Testing East, LLC is accredited by the

American Industrial Hygiene Association (AIHA) and the National Volunteer Laboratory Accreditation

Program (NVLAP).

2.2 Lead-Based Paint

2.2.1 Lead-Based Paint Sampling and Laboratory Analysis

The exterior and interior of the shed were assessed to evaluate for the presence of presumed LBP. Suspect painted surfaces observed at the time of the inspection were sampled and analyzed for lead content. One

(1) paint chip sample was collected and submitted to EHS Laboratories, a certified laboratory accredited with the Environmental Lead Laboratory Accreditation Program (ELLAP), for analysis by EPA SW-846 Method

7000B: Flame Atomic Absorption Spectrophotometry for Determination of Lead Content in Paint Chip

Samples.

September 5, 2025

3.0 ANALYTICAL RESULTS

3.1 Asbestos Results

Federal and State of Louisiana regulations define ACM as any material containing more than one percent

(1%) asbestos as determined using PLM. No asbestos was detected in the samples submitted for analysis.

The analytical results are summarized in Table 1 below. The laboratory results and chain of custody are contained in Appendix A. Sample locations are depicted on the diagram contained in Appendix B.

Table 1. Asbestos Sample Results

Sample No.

Material

Category

Type of

Material Condition Location ACM %

25-504452.1-1 Misc.

Gray Concrete

Slab Intact Floor / Slab of Shed

None

Detected

25-504452.1-2 Misc.

Gray Concrete

Slab Intact Floor / Slab of Shed

None

Detected

25-504452.1-3 Misc.

Brown Ceiling Tile

Debris Damaged Floor / Slab of Shed

None

Detected

25-504452.1-4 Misc.

Brown Ceiling Tile

Debris Damaged Floor / Slab of Shed

None

Detected

25-504452.1-5 Misc. White Caulk Intact Exterior of Shed Around

Roof/ Wall Joint

None

Detected

25-504452.1-6 Misc. White Caulk Intact Exterior of Shed Around

Roof/ Wall Joint

None

Detected

Documentation of the laboratory results should be retained as a reference for future renovation and/or demolition activities.

The following building materials are not suspected to be asbestos-containing; therefore, the materials were not sampled: metal walls, metal roof, and styrofoam insulation in wall/ceiling joints.

3.2 Lead-Based Paint Results

Lead-based paint LBP) is defined by the Environmental Protection Agency (EPA) as paint or other surface coating with lead content equal to or greater than 1.0 milligrams per square centimeter (mg/cm2) of surface area by X-Ray Fluorescence (XRF) analysis or 0.5% by weight (5,000 parts per million (ppm)) by paint chip analysis. LBP was not detected at or above the EPA action level as summarized in Table 2 below.

The lead concentration of the sample submitted for analysis was below the regulatory level and is considered negative for LBP. The laboratory results are contained in Appendix A. Sample locations are depicted on the diagram contained in Appendix B.

Table 2. Lead-Based Paint Results

Sample No. Location Description Results (% by weight)

25-504452.1-LB1 Exterior Door Grey Paint (Exterior /

Interior )

0.072 %

Documentation of the laboratory results should be retained as a reference for future renovation/ demolition activities.

September 5, 2025

4.0 CONCLUSIONS/RECOMMENDATIONS

4.1 Conclusions

Asbestos was not detected in the materials sampled.

LBP was not detected at or above the EPA action level in the paint chip sample collected and submitted for laboratory analysis.

4.2 Recommendations

Based on the observations made, the noted limitations and the analytical results, Partner recommends the following: File Form AAC-2(b) with the Louisiana Department of Environmental Quality prior to beginning demolition activity.

If any suspect ACMs not characterized in this report are encountered during demolition activities, all work that could potentially disturb the materials must stop. Uncharacterized suspect ACM must be assumed to be ACM and handled accordingly, pending the completion of additional sampling and laboratory analysis.

All construction work where an employee may be occupationally exposed to lead must comply with

Occupational Safety and Health Administration (OSHA) requirements set forth in 29 CFR 1926.62. This regulation requires initial employee exposure monitoring to evaluate worker exposure during work that disturbs lead-containing materials (lead present in detectable levels). Partner suggests that engineering controls, respiratory protection and personal protective equipment be employed at the start of a project in the presence of lead-containing materials.

Waste items generated during an abatement or demolition project should be properly sampled and profiled to determine the final disposition of the waste. Characterization and disposal of lead-containing waste materials (LCWM) must comply with federal, state and local authorities. Contractors must maintain current licenses as required by applicable state or local jurisdictions for the removal, transport, disposal of LCWM, or other regulated lead-based paint activities.

The potential exists for additional suspect lead-containing materials to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for lead content prior to any renovation and/or demolition activities that could impact these materials.

September 5, 2025

5.0 LIMITATIONS AND RELIANCE

This pre-demolition ACM and LBP survey was performed utilizing methods and procedures consistent with good commercial or customary practices designed to conform to acceptable industry standards. The independent conclusions presented herein are based upon existing conditions and the information and data available to us during the course of this assignment. No warranties, expressed or implied, are made by Partner, its subcontractors or employees. Professional services completed in connection with the work have been completed in with accordance with generally accepted engineering principles and practices.

Partner was engaged by the Client, or their authorized representative, to perform this assessment. The engagement agreement specifically states the scope and purpose of the assessment, as well as the contractual obligations and limitations of both parties. This report and the information therein, are for the exclusive use of the Addressee. This report has no other purpose and may not be relied upon, or used, by any other person or entity without the written consent of Partner. Third parties that obtain this report, or the information therein, shall have no rights of recourse or recovery against Partner, its officers, employees, vendors, successors or assigns. Any such unauthorized user shall be responsible to protect, indemnify and hold Partner, the Addressee and their respective officers, employees, vendors, successors and assigns harmless from any and all claims, damages, losses, liabilities, expenses (including reasonable attorneys’ fees) and costs attributable to such use. Unauthorized use of this report shall constitute acceptance of, and commitment to, these responsibilities, which shall be irrevocable and shall apply regardless of the cause of action or legal theory pled or asserted.

This report has been completed under specific Terms and Conditions relating to scope, relying parties, limitations of liability, indemnification, dispute resolution, and other factors relevant to any reliance on this report. Any parties relying on this report do so having accepted the Terms and Conditions for which this report was completed.

Partner and its subcontractor, Eurofins Built Environment Testing East, LLC, and their employees/representatives bear no responsibility for the actual condition of the structure or safety of this site pertaining to asbestos and/or asbestos contamination regardless of the actions taken by the survey team or the client.

September 5, 2025

6.0 SIGNATURES OF PROFESSIONALS

Partner has performed a pre-demolition asbestos-containing materials and lead-based paint survey of the shed located at the property at 10264 East Main Steet, Houma, Louisiana 70636, in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report. Exceptions to or deletions from this protocol are discussed earlier in this report.

Prepared By:

Partner Engineering and Science, Inc.

Phillip Bellan, J.D., CIH, CSP

Inspector – LA DEQ DI187169

Audre A. Puskorius

Senior Author

Aaron Vogt

Senior Project Manager

APPENDIX A: LABORATORY ANALYSIS & CHAIN OF CUSTODY

CLIENT PROJECT:

LAB CODE:

August 28, 2025

Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217

FAA - Houma, LA 684998-1

Dear Aaron, Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on August 25, 2025.

The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600/R-93/116:

Method for the Determination of Asbestos in Bulk Building Materials and EPA 40 CFR Appendix E to Subpart E of Part 763: Interim Method of the Determination of Asbestos in Bulk Insulation Samples.

Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% by calibrated visual estimate.

Thank you for your business and we look forward to continuing good relations.

Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director

NVLAP 101768-0

730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413

ASBESTOS ANALYTICAL REPORT

By: Polarized Light Microscopy

Prepared for

Partner Engineering and Science (NC)

CLIENT PROJECT: FAA - Houma, LA

LAB CODE: 684998-1

TEST METHOD:

EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763

REPORT DATE: 08/28/25

TOTAL SAMPLES ANALYZED: 6

# SAMPLES >1% ASBESTOS: 0

TOTAL LAYERS ANALYZED: 6

Project: FAA - Houma, LA

Method:

Asbestos Report Summary By: Polarized Light Microscopy

684998-1Lab Code:

EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763

Client IDClient IDClient IDClient ID Lab IDLab IDLab IDLab ID LayerLayerLayerLayer Sample DescriptionSample DescriptionSample DescriptionSample Description Asbestos %Asbestos %Asbestos %Asbestos %

25-504452.1-1 3668107 Gray concrete None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-2 3668108 Gray concrete None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-3 3668109 Brown ceiling tile debris None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-4 3668110 Brown ceiling tile debris None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-5 3668111 White caulk None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-6 3668112 White caulk None DetectedNone DetectedNone DetectedNone Detected

Project: FAA - Houma, LA

Method:

Asbestos Report Summary By: Polarized Light Microscopy

684998-1Lab Code:

EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763

730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 1 of 1

Client IDClient IDClient IDClient ID LabLabLabLab LabLabLabLab NON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTSNON-ASBESTOS COMPONENTS ASBESTOSASBESTOSASBESTOSASBESTOS Lab IDLab IDLab IDLab ID DescriptionDescriptionDescriptionDescription AttributesAttributesAttributesAttributes FibrousFibrousFibrousFibrous Non-FibrousNon-FibrousNon-FibrousNon-Fibrous %%%%

25-504452.1-125-504452.1-125-504452.1-125-504452.1-1 3668107

Concrete Homogeneous Gray Non-Fibrous Bound

65% 35%

Silica Binder

None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-225-504452.1-225-504452.1-225-504452.1-2 3668108

Concrete Homogeneous Gray Non-Fibrous Bound

65% 35%

Silica Binder

None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-325-504452.1-325-504452.1-325-504452.1-3 3668109

Ceiling Tile Debris Heterogeneous Brown Fibrous Loosely Bound

95% Cellulose 5% <1%

Cork Paint

None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-425-504452.1-425-504452.1-425-504452.1-4 3668110

Ceiling Tile Debris Heterogeneous Brown Fibrous Loosely Bound

95% Cellulose 5% <1%

Cork Paint

None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-525-504452.1-525-504452.1-525-504452.1-5 3668111

Caulk Heterogeneous White Non-Fibrous Bound

95% 5%

Caulk Paint

None DetectedNone DetectedNone DetectedNone Detected

25-504452.1-625-504452.1-625-504452.1-625-504452.1-6 3668112

Caulk Heterogeneous White Non-Fibrous Bound

95% 5%

Caulk Paint

None DetectedNone DetectedNone DetectedNone Detected

Client: Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217

Project:

Method:

ASBESTOS BULK ANALYSIS

By: Polarized Light Microscopy

684998-1 08/25/25 08/28/25 08/28/25

Lab Code:

Date Received:

Date Analyzed:

Date Reported:

FAA - Houma, LA

ASBESTOS BULK PLM, EPA 600 METHOD

730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 1 of 2

LEGEND:LEGEND:LEGEND:LEGEND:

Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate

METHOD:METHOD:METHOD:METHOD: EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763

REPORTING LIMIT:REPORTING LIMIT:REPORTING LIMIT:REPORTING LIMIT: 1% by calibrated visual estimation

REGULATORY LIMIT:REGULATORY LIMIT:REGULATORY LIMIT:REGULATORY LIMIT: 1%

Due to the limitations of the EPA 600 / R93 / 116 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request.

Eurofins Built Environment Testing East, LLC makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. Interpretation of the analytical results is the sole responsibility of the client. This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins Built Environment Testing East, LLC. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government.

Information provided by customer includes customer sample ID and sample description.

Khrista Petry Analyst

DATA QA:

Samantha Webster 8/28/2025

APPROVED BY:

Tianbao Bai, Ph.D., CIH Laboratory Director

730 SE Maynard Rd • Cary, NC 27511 • (919) 481-1413 Page 2 of 2

SUBMITTED BY INVOICE TO

Client Sample ID Number

RES Job #: 684998

CONTACT INFORMATION SERIES

ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES

CHEMISTRY LABORATORY

MICROBIOLOGY LABORATORY

**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**

Laboratory Analysis Instructions

(Sample ID's must be unique)

Company: Partner Engineering and Science (NC) Company: Partner Engineering and Science (NC)

Address: 8720 Red Oak Blvd Address: 8720 Red Oak Blvd

Charlotte, NC 28217 Charlotte, NC 28217

Project Number and/or P.O. #: 25-504452.1 Project Zip Code:

Project Description/Location: FAA - Houma, LA

Contact: Aaron Vogt -1 PLM Standard 3 Phone: (813) 545-6151

Fax:

Cell: (813) 545-6151

Final Data Deliverable Email Address:

avogt@partneresi.com (+ 2 ADDNL. CONTACTS)

PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B LA

Dust = D Food = F

Paint = P Soil = S

Dust RUSH PRIORITY STANDARD

*PRIOR NOTICE REQUIRED FOR SAME DAY TAT

Surface = SU Swab = SW

Tape = T Wipe = W

Metals RUSH PRIORITY STANDARD Drinking Water = DW

Waste Water = WW

Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**

Viable Analysis** PRIORITY STANDARD

**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH

Medical Device Analysis RUSH STANDARD

Mold Analysis RUSH PRIORITY STANDARD

Special Instructions:

ASBESTOS CHEMISTRY MICROBIOLOGY ICO

1 25-504452.1-1 X B

2 25-504452.1-2 X B

3 25-504452.1-3 X B

4 25-504452.1-4 X B

5 25-504452.1-5 X B

6 25-504452.1-6 X B

P L

M

P L

M S h o rt R ep o rt (E

PA

/6

/R

-9 3/

6)

T E

M

P C

M

D U

S T

M E

TA

L

S

O R

G A

N

IC

S

V

IA

B L

E S

M E

D

IC

A L

M O

L D

S am pl e

V ol um e

(L

A re a

S am pl e

Te m pe ra tu re

C

Le ng th (o r A liq uo ts

) x W id th

(o r A re a/

A liq uo t)

M at rix C od e of

C on ta in er s

D at e C ol le ct ed m m

/d d/ yy

T im e C ol le ct ed hh :m m

Eurofins Built Environment Testing East, LLC establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.

Eurofins Built Environment Testing East, LLC will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.

Relinquished By:

Date/Time: 08/25/2025 16:47:49 Sample Condition: Acceptable

Received By:

Michard Eli Date/Time: 08/25/2025 16:47:49 Carrier: Fed-Ex

Eurofins Built Environment Testing East, LLC Effective

(919) 481-1413 https://www.eurofinsus.com/builtenv730 SE Maynard Rd, Cary, NC 27511

CLIENT PROJECT:

LAB CODE:

August 28, 2025

Partner Engineering and Science (NC) 8720 Red Oak Blvd Charlotte, NC 28217

FAA - Houma, LA 684954-1

Dear Aaron, Enclosed are lead analysis results for chemistry samples received at our laboratory on August 25, 2025. The samples were analyzed for lead using flame atomic absorption spectrophotometry.

Thank you for your business and we look forward to continuing good relations.

Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director

AIHA LAP 103025

Analysis Report

Client:

Project/Test Address:

Eurofins Built Environment Testing East

684954-1

Client Number:

34-1445

Fax Number:

919-481-1442Laboratory Results

Analyzed Date:

Client Sample Number

Lab Sample Number

Pb (ug/g) ppm

Lead Paint Chip

08/28/2025

08/26/2025

25-08-05211

Reported Date:

Received Date:

Report Number:

730 S.E. Maynard Road Cary, NC 27511

Narrative

ID

08/27/2025

Collection Location % Pb by Wt.

08/22/2025Collection Date:

7469 Whitepine Rd

Telephone: 800.347.4010

North Chesterfield, VA 23237

25-504452.1-

LB1

25-08-05211-001 L0425-504452.1-LB1 720 0.072

Melissa Kanode

QA/QC Clerk

Analysis Method: EPA SW846 7000B

The Reporting Limit (RL) for samples prepared by ASTM E-1979-17 is 10.0 ug Total Pb. The RL for samples prepared by EPA SW846 3050B is 25.0 ug Total Pb. Paint chip area and results are calculated based on area measurements determined by the client. All internal quality control requirements associated with this batch were met, unless otherwise noted.

LEGEND Pb= lead ug = microgram ppm = parts per million ug/g = micrograms per gram Wt. = weight

Reviewed By Authorized Signatory:

L04: Sample contains substantial amounts of substrate which may affect the calculated results with units of ppm and % by weight.

Sample Narratives:

Preparation Method: ASTM E-1979-17

The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Results represent the analysis of samples submitted by the client. Sample location, description, area, etc., was provided by the client. Results reported above in mg/cm3 are calculated based on area supplied by client. This report shall not be reproduced except in full, without the written consent of Environmental Hazards Services, L.L.C.

ELLAP Accredtitation through AIHA LAP, LLC (100420), NY ELAP #11714.

Page 1of1

ENVI RSN ftll E NTAI- HAEARD$ SERVIeES- Lhe Lead Chain of CustodY Form Page 1 or 1

34-1445Eurofins CEI - Cary

Cary, North Carolina 2751 1730 SE Maynard Road, Cary, NC 27511 bu i ltsupport. sc@et.eu rofi nsus. com919-481-1413

954-1

Vogt

QSoay QSoay OZoay Oroay QSame Day lWeekend-MustCallAhead

Do Submitted Dust Wipe Samples Meet ASTM 81792 Requirernents? tT yes fNo

FLFloorBath BAFront FAir A

NEW YORK CITY Pb DUST WIPE PROJECTS: Please take floor dust wipe a 2 ftz wipe area.

Carpet CPRearSSoil

KTKitchenLeftCW*ir*iair.,.' ':'1" ii- | conrposite vvipe x" tU6 E3 Z m J

XPC 1-LB1W;il44s2.'t 25-504452.1-LB1 08t2212025

X ql

A2

XA3

X3lA1

X

=l

X3lrj

X I

=l

Xf,l*lI

XillI

X10

X*l11

XA12

x3l#t13

X,I*l14

5:00pmE./ Eurofins

Signature:

LAB USE ONLY - BELOW THIS LINE

Received By:

Date: Time:

Portal Contact Added

& T4lgwHrrEprNE RD, RrcHMoND, vA z3z?7 (800)-3 47-4oLo

RESULTS VIA CLIENT PORTAL AVAILABLE @ www.leadlab.corn

1"U tc 11* F- 25-08-0521 1

Due Date:

08/28 12025 (Thursday)

AE

fl pnr

3:00Ph/

Co:mpa ny ,Addres$, Phon,* Email

Project

SURFACH TYPE

,Roor?, rr}r t\

Dining DR 1.,..,. iitildif;l1"$' ', ::Den Lf l Rigrrt i ot

Location if results

,mglcmJ, Air"

Released By:

SUBMITTED BY INVOICE TO

Client Sample ID Number

RES Job #: 684954

CONTACT INFORMATION SERIES

ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES

CHEMISTRY LABORATORY

MICROBIOLOGY LABORATORY

**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**

Laboratory Analysis Instructions

(Sample ID's must be unique)

Company: Partner Engineering and Science (NC) Company: Partner Engineering and Science (NC)

Address: 8720 Red Oak Blvd Address: 8720 Red Oak Blvd

Charlotte, NC 28217 Charlotte, NC 28217

Project Number and/or P.O. #: 25-504452.1 Project Zip Code:

Project Description/Location: FAA - Houma, LA

Contact: Aaron Vogt -1 Chem Standard 3 Phone: (813) 545-6151

Fax:

Cell: (813) 545-6151

Final Data Deliverable Email Address:

avogt@partneresi.com (+ 1 ADDNL. CONTACTS)

PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B LA

Dust = D Food = F

Paint = P Soil = S

Dust RUSH PRIORITY STANDARD

*PRIOR NOTICE REQUIRED FOR SAME DAY TAT

Surface = SU Swab = SW

Tape = T Wipe = W

Metals RUSH PRIORITY STANDARD Drinking Water = DW

Waste Water = WW

Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**

Viable Analysis** PRIORITY STANDARD

**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH

Medical Device Analysis RUSH STANDARD

Mold Analysis RUSH PRIORITY STANDARD

Special Instructions:

ASBESTOS CHEMISTRY MICROBIOLOGY ICO

1 25-504452.1-LB1 X 50ft² P

P L

M

T E

M

P C

M

D U

S T

M E

TA

L

S

A n al yt e( s)

P b

L ea d b y F la m e A

A (U

S E

PA

S

W

6)

O R

G A

N

IC

S

V

IA

B L

E S

M E

D

IC

A L

M O

L D

S am pl e

V ol um e

(L

A re a

S am pl e

Te m pe ra tu re

C

Le ng th (o r A liq uo ts

) x W id th

(o r A re a/

A liq uo t)

M at rix C od e of

C on ta in er s

D at e C ol le ct ed m m

/d d/ yy

T im e C ol le ct ed hh :m m

Eurofins Built Environment Testing East, LLC establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.

Eurofins Built Environment Testing East, LLC will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.

Relinquished By:

Date/Time: 08/25/2025 15:39:03 Sample Condition: Acceptable

Received By:

Michard Eli Date/Time: 08/25/2025 15:39:03 Carrier: Fed-Ex

Eurofins Built Environment Testing East, LLC Effective

(919) 481-1413 https://www.eurofinsus.com/builtenv730 SE Maynard Rd, Cary, NC 27511

Client Sample ID Sample Location

25-504452.1-LB1 grey door paint

Partner Engineering and Science (NC) Sample Locations

RES #: 684954

Project Number and/or P.O. #: 25-504452.1

Project Description/Location: FAA - Houma, LA

APPENDIX B: SAMPLE LOCATON DIAGRAM

Appendix B: Sample Location Diagram

X-6 X- L01 X-2 X-5 X – 1

*Sample numbers abbreviated from sample number 25-50445.1 – XX

X- 3 X-4

APPENDIX C: CERTIFICATIONS

STATE OF LOUISIANA

DEPARTMENT OF ENVIRONMENTAL QUALITY

certifies that

Phillip Bellan

Has complied with all requirements of the Louisiana Department of Environmental Quality and is authorized to perform the duties of

Asbestos Inspector

Accreditation No. DI187169 AI No. 187169

Date of Issuance October 23, 2024 Expiration December 20, 2025

Failure to comply with all applicable provisions of La. R.S. 2025.E. (1)(a) and La. R.S. 2025.F. (2)(a) may result in civil and/or criminal enforcement actions by the State.

Permit Support Services Division

Office of Environmental Services

APPENDIX D: PHOTOGRAPHIC DOCUMENTATION

Appendix D: Site Photographs

1. View of street entrance to airport 2. View of shed scheduled for demolition

3. View of sample 25-504452.1-1, concrete pad 4. View of sample 25-504452.1-2, concrete pad

5. View of sample 25-504452.1-3, debris on ground 6. View of sample 25-504452.1-4, debris on ground

Appendix D: Site Photographs

7. View of sample 25-504452.1-5, building caulk 8. View of sample 25-504452.1-6, building caulk

9. View of sample 25-504452.1-L1, grey paint on door 10. View of shed contents

11. View of side of shed 12. View of rear of shed

APPENDIX E: ASBESTOS NOTIFICATION OF RENOVATION AND/OR

DEMOLITION FORM AAC-2(B)

form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 1 of 3

ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION

NEGATIVE DECLARATION FORM AAC-2(b)

Do not use this form for Asbestos Disposal Verification Forms (ADVF) requests

Louisiana Department of Environmental Quality Office of Environmental Services

Public Participation and Permit Support Division Notifications and Accreditations Section

Phone (225) 219-3244

Please type and complete all required sections.

For LDEQ Use Only

A.I. No.

Ck./Voucher No.

N/A

Amount Received

N/A

Postmark Date

ADVF No. N/A

NOTE: This form is to be used only for renovations and demolitions when lab analysis of properly sampled material indicates:

that no Asbestos- Containing Material (ACM) is present; that the ACM present is not Regulated Asbestos-Containing

Material (RACM), and will not be made RACM by the renovation or demolition; or that RACM, including any ACM that will be made RACM by the renovation or demolition, is less than the thresholds below (See Section I). For all other renovations, demolitions, or asbestos-contaminated debris activities, request ADVFs using the Notification of Demolition and Renovation and Asbestos Contaminated Debris Activity Form AAC-2(a).

Emergency

NOTE: Emergency notification is allowable only for a sudden, unexpected event that would cause an unsafe condition (or health hazard), equipment damage, or would pose an unreasonable financial burden, per LAC 33:III.5151.F.2.d.xvi.

I. Type of Notification

No ACM present

Established Thresholds per LAC 33:III.5151.F.1.

Combined amount of RACM is less than:

• 60 linear feet on pipes;

• 64 square feet on other facility components; or

• 1 cubic yard off facility components where length or area could not be measured previously.

ACM present is not RACM and will not be made RACM by the renovation or demolition

RACM, or ACM that will be made RACM, is less than the established thresholds (see right)

II. Type of Operation

Demolition Allowable only if structure contains no RACM or contains RACM below established thresholds (see Section I, above)

Renovation Allowable only if ACM will not be made RACM or RACM created is below established thresholds (see Section I, above)

Renovation and Subsequent Demolition Allowable only if during renovation ACM will not be made RACM or RACM created is below established thresholds AND allowable only if structure being demolished contains no RACM or contains RACM below established thresholds (see Section I, above)

III. Facility Description

IV.

Project Designer La. Accreditation No.

(schools & state bldgs, only)

Facility Name Parish

Physical Address

Building Size (sq. ft.)

City State Zip

No. Floors Age of Building (Yrs)

Owner Name

Location on site (Bldg, Floor, Room, etc.) where work is done

Contact Information:

Present

Use

School

State Bldg.

Public/Commercial

Contact Name

Residential

Industrial

Mailing Address

Other

City State Zip Prior Use

School State Bldg. Public/Commercial

Phone ( )

Residential

Industrial

Email form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 2 of 3

IV. Determination of One of the Following:

• No ACM Present;

• ACM Present is Not RACM and Will Not be Made RACM by the Renovation or Demolition; or

• RACM, or ACM that Will be Made RACM, is Less than the Established Thresholds (See Section I)

Inspection Date (mm/dd/yyyy) Lab Analysis Date (mm/dd/yyyy)

Inspector’s Name Accredited Lab Name

Inspector’s Accred. No. LELAP* Lab ID No.

Lab Agency Interest (AI) No.

Procedure, including analytical method, if appropriate, used to detect the presence of asbestos material

NOTE: Laboratory analysis performed by commercial laboratories for this determination must have been conducted in accordance with the requirements set forth under LAC 33:I.Subpart 3, Chapters 49-55.

Laboratory data generated by commercial laboratories that are not accredited by the *Louisiana Environmental Laboratory Accreditation Program (LELAP) under LAC 33:I.Subpart 3, Chapters 47-59, will not be accepted by the LDEQ; retesting of analysis will be required by a commercial laboratory accredited by LELAP.

Attach the following copies:

• Signature page of inspection report for inspection date indicated (above)

• Lab Analysis Report for analysis date indicated (above)

NOTE: The Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) will not be processed without these attachments.

V. Approximate Amount of Asbestos

Material to be Removed Material Not to be Removed (if ACM is present)

RACM

(below established threshold)

Non-regulated

ACM

RACM

(below established threshold)

Non-regulated

ACM

Type of Asbestos Material

TSI

Ceiling Tile

Fireproofing

VAT

Mastic

Asphalt Roofing

Other

TSI

Ceiling Tile

Fireproofing

Other

VAT

Mastic

Asphalt Roofing

Amount of Asbestos Material linear feet linear feet linear feet linear feet square feet square feet square feet square feet cubic yards cubic yards cubic yards cubic yards

VI. Renovation and/or Demolition Contractor

Contractor Name Contact Name

Mailing Address Contact Email

City State Zip Contact Phone ( )

VII. Scheduled Renovation and/or Demolition Dates (enter dates for applicable activity or N/A if not applicable)

Renovation Start Date (mm/dd/yyyy) Renovation Completion Date (mm/dd/yyyy)

Demolition Start Date (mm/dd/yyyy) Demolition Completion Date (mm/dd/yyyy) form_7369_r04 ASBESTOS NOTIFICATION OF RENOVATION AND/OR DEMOLITION NEGATIVE DECLARATION FORM AAC-2(b) 11/17/2020 Page 3 of 3

VIII. Emergency Renovation and/or Demolition

Explain how event would cause an unsafe condition (health hazard), equipment damage, or pose an unreasonable financial burden per LAC 33:III.5151.F.2.d.xvi.

IX. Planned Non-RACM Renovation and/or Demolition

Describe planned non-RACM renovation and/or demolition and methods to be used

Describe procedures to be followed in the event unexpected RACM is found or CAT II becomes RACM (per LAC 33:III.5151.F.2.d.xvii)

X. Comments

Provide any additional comments/information relevant to the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b).

XI. Certification Sign this section only if RACM is absent or amount of RACM present is below established thresholds (See Section I)

I certify that the above information is correct and that under penalty of law, with regard to the structure being demolished, RACM is determined to be absent or the amount of RACM present is below established thresholds per LAC 33:III.5151.F.1. I understand that:

• the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) is incomplete without the required analysis and supporting documentation from a commercial laboratory accredited under LAC 33: Subpart 3, Chapters 47-59; this constitutes a failure to notify the LDEQ (See Section IV);

• the LDEQ will not accept laboratory data generated by a commercial laboratory that is not accredited under LAC 33: Subpart 3, Chapters 47-59; the LDEQ will require retesting if the laboratory performing the analysis is not accredited under this regulation.

• the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b) will not be processed without the required analysis and supporting documentation from a commercial laboratory accredited under LAC 33: Subpart 3, Chapters 47-59.

Printed Name of Owner or Operator/Contractor Signature of Owner or Operator/Contractor Date (mm/dd/yyyy)

Submittal Information

• There is no fee associated with the Asbestos Notification of Renovation and/or Demolition Negative Declaration Form AAC-2(b).

• For Emergencies- Information MAY NOT BE FAXED. Information may be submitted by: phone (225-219-3244); email (DEQ.ASBESTOSNOTIFICATIONS@LA.GOV); or hand-delivery. NOTE: If phoned or emailed, a follow-up form with original signature must be submitted to the LDEQ by one of the methods of delivery (below) WITHIN 5 WORKING DAYS.

• For Non-emergencies-Information MAY NOT BE FAXED. Forms may be submitted by email (DEQ.ASBESTOSNOTIFICATIONS@LA.GOV) with a follow-up form submitted at least 5 working days before demolition begins in accordance with LAC 33:III.5151.F.2.c. The form with an original signature must be submitted to the LDEQ by one of the following methods of delivery:

By Mail:

or or

By Overnight or Hand-delivery:

LDEQ Office of Environmental Services Public Participation and Permit Support Division Notifications & Accreditations Section P. O. Box 4313 Baton Rouge, LA 70821-4313

LDEQ Office of Environmental Services Public Participation and Permit Support Division Notifications & Accreditations Section 602 North 5th Street Baton Rouge, LA 70802

Appendix A Asbestos and Lead Paint Chip Analytical Results and COCs
EXECUTIVE SUMMARY
Table of Contents
1.0 INTRODUCTION
1.1 Property Description
1.2 Purpose and Scope
1.3 Methodology
1.3.1 Visual Evaluation
1.3.2 Sampling and Laboratory Analysis
1.3.3 Limiting Conditions
2.0 analytical results
3.0 CONCLUSIONs/recommendations
3.1 Recommendations
4.0 rELIANCE
5.0 SIGNATURE OF PROFESSIONALS
Appendix A: LABORATORY ANALYSIS & CHAIN OF CUSTODY
Appendix B: SAMPLE LOCATON DIAGRAM(S)
Appendix C: CERTIFICAtiONS
Appendix D: PHOTOGRAPHIC DOCUMENTATION
Appendix E: CALIFORNIA DPH FORM 8552
Appendix B Sample Location Diagram Houma Airport
Appendix C Certifications
EXECUTIVE SUMMARY
Table of Contents
1.0 INTRODUCTION
1.1 Property Description
1.2 Purpose and Scope
1.3 Methodology
1.3.1 Visual Evaluation
1.3.2 Sampling and Laboratory Analysis
1.3.3 Limiting Conditions
2.0 analytical results
3.0 CONCLUSIONs/recommendations
3.1 Recommendations
4.0 rELIANCE
5.0 SIGNATURE OF PROFESSIONALS
Appendix A: LABORATORY ANALYSIS & CHAIN OF CUSTODY
Appendix B: SAMPLE LOCATON DIAGRAM(S)
Appendix C: CERTIFICAtiONS
Appendix D: PHOTOGRAPHIC DOCUMENTATION
Appendix E: CALIFORNIA DPH FORM 8552
Appendix D Partner Photos Houma Airport v2
Appendix E AAC-2b_form_7369_r04

File details come from the government source that posted it. Updated .