This is a Schedule of Special Inspections document detailing the structural steel welding inspection requirements, specifically related to the PALMDALE ARTCC stairways and loading ramp demolition and replacement project. The document outlines mandatory inspection procedures in accordance with 2021 IBC 1705.2.1 and AISC 360-22 standards.
The schedule specifies two categories of inspections: "PERFORM" tasks that must be completed for each weld, fastener, or bolted connection, and "OBSERVE" tasks that require random daily sampling. Key inspection requirements include verification of welding procedures specifications (WPS), manufacturer certifications for consumables, material identification, welder qualifications, and detailed fit-up inspections for both groove and fillet welds. During-welding inspections cover environmental conditions, consumable handling, equipment settings, travel speed, welding materials, and other technical parameters. The document serves as a quality control checklist to ensure proper execution of structural steel welding work on the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF SPECIAL INSPECTIONS
A. STRUCTURAL STEEL – WELDING
ALL OR PORTIONS OF THIS SECTION ARE APPLICABLE IF BOX IS CHECKED: ☒
STEEL INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2021 IBC 1705.2.1, AISC 360-22: Table N5.4-1 and Table C-N5.4-1
TASK INSPECTION TYPE1 DESCRIPTION
1. Verify that the welding procedures specification (WPS) is available
PERFORM
2. Verify manufacturer certifications for welding consumables are available
PERFORM
3. Verify material identification
PERFORM Type and grade.
4. Verify use of qualified welders
PERFORM Welding by welders, welding operators, and tack welders who are qualified in conformance with requirements.
5. Welder Identification System
OBSERVE Fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified.
6. Fit-up of groove welds
(including joint geometry) OBSERVE Joint preparation
Dimensions (alignment, root opening, root face, bevel)
Cleanliness (condition of steel surfaces) Tacking (tack weld quality and location) Backing type and fit (if applicable)
7. Configuration and finish of access holes
OBSERVE
8. Fit-up of fillet welds OBSERVE Dimensions (alignment, gaps at root) Cleanliness (condition of steel surfaces) Tacking (tack weld quality and location)
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2021 IBC 1705.2.1, AISC 360-22: Table N5.4-2 and Table C-N5.4-2
TASK INSPECTION TYPE DESCRIPTION
9. Control and handling of welding consumables OBSERVE Packaging
Electrode atmospheric exposure control
10. No welding over cracked tack welds
OBSERVE
11. Environmental conditions OBSERVE Wind speed within limits Precipitation and temperature
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2021 IBC 1705.2.1, AISC 360-22: Table N5.4-2 and Table C-N5.4-2
TASK INSPECTION TYPE DESCRIPTION
12. Welding Procedures
Specification followed OBSERVE Settings on welding equipment
Travel speed Selected welding materials Shielding gas type/flow rate Preheat applied
1 PERFORM: Perform these tasks for each weld, fastener, or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.
File details come from the government source that posted it. Updated .