About this file

This file is a Schedule of Special Inspections detailing welding inspection requirements in compliance with 2021 IBC 1705.2.1 and AISC 360-22 standards. The document outlines specific inspection tasks for steel welding, categorizing them into three types: PERFORM (tasks required for each weld/connection), OBSERVE (random daily sampling), and DOCUMENT (formal reporting requirements).

The schedule details 19 specific inspection points, focusing on welding techniques and post-welding inspections. Key requirements include verification of interpass temperature maintenance, proper positioning, filler metal compatibility, and cleaning procedures. Critical inspection criteria for completed welds include size, length, location verification, and visual acceptance criteria covering crack prohibition, weld/base-metal fusion, crater cross sections, weld profiles, undercut, and porosity. The document emphasizes that all welds must conform to construction drawing requirements and prohibits unauthorized welds without engineer of record approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF SPECIAL INSPECTIONS

Interpass temperature maintained (min./max.)

Proper position (F, V, H, OH) Intermix of filler metals avoided

13. Welding techniques OBSERVE Interpass and final cleaning Each pass within profile limitations Each pass meets quality requirements

STEEL INSPECTION AFTER WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH

2021 IBC 1705.2.1, AISC 360-22: Table N5.4-3 and Table C-N5.4-3

TASK INSPECTION TYPE1 DESCRIPTION

14. Welds cleaned OBSERVE

15. Verify size, length, and location of all welds PERFORM Size, length, and location of all welds conform to the requirements of the construction drawings.

16. Verify welds meet visual acceptance criteria

PERFORM AND

DOCUMENT

Crack prohibition Weld/base-metal fusion Crater cross section Weld profiles Weld size Undercut Porosity

17. Repair activities PERFORM AND

DOCUMENT

18. Acceptance or rejection of welded joint or member

PERFORM AND

DOCUMENT

19. No prohibited welds have been added without the approval of the engineer of record

OBSERVE

END SECTION

1 PERFORM: Perform these tasks for each weld, fastener, or bolted connection, and required verification.

OBSERVE: Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.

DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.