This document package includes construction drawings and general notes for a fire alarm and sprinkler system upgrade project at the Mike Monroney Aeronautical Center Air Navigation Facility No. 2 building in Oklahoma City.
The project scope involves replacing the existing main fire alarm panel and installing a new addressable fire alarm system throughout the second floor, including new devices, wiring, and conduit. A new Tyco/Simplex 4100ES panel will be installed to replace the existing panel. The scope also includes connecting the new fire alarm system to an upgraded Vive lighting control system.
For fire suppression, the second floor wet pipe sprinkler system will be demolished back to an elbow above the chase supplying the feed main. A new control valve assembly will be installed past the elbow along with a new wet pipe sprinkler system for the second floor. The drawings provide design criteria, sprinkler types and locations, general notes on compliance with NFPA 13 and permit requirements. Water flow test data from December 2022 is included.
The solicitation number for this opportunity is 6973GH-23-R-00185 for the Air Navigation Facility No. 2 2nd Floor Academy Buildout. The contracting agency is the Department of Transportation Federal Aviation Administration Franchise Acquisition Services. The deadline to respond and anticipated award date are not specified.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL DESCRIPTION
SMOKE DETECTOR - PHOTOELECTRIC
ADDRESSABLE INPUT MODULE
ADDRESSABLE OUTPUT MODULE
DUCT SMOKE DETECTOR; XX INDICATES
ASSOCIATED UNIT; R=RETURN, S=SUPPLY
CEILING MOUNTED FIRE ALARM STROBE,
XX INDICATES CD RATING
SYMBOL DESCRIPTION
MANUAL PULL STATION
WALL MOUNTED FIRE ALARM STROBE, XX
INDICATES CD RATING
C
XX
XX
XX
R
P
AIM
AOM
F
C
H C
CEILING MOUNTED HORN/STROBE, XX
INDICATES CANDELA RATING
WALL MOUNTED HORN/STROBE, XX
INDICATES CANDELA RATING
CEILING MOUNTED HORN
WALL MOUNTED HORNH
SPD SURGE PROTECTION DEVICE
FIRE ALARM / MNS SYMBOLS LEGEND
XX
WF
VS
FI
WATERFLOW SWITCH
VALVE SUPERVISORY SWITCH
END OF LINE RESISTOR
FIBER INTERFACE
XX
HEAT DETECTOR
FACU
FAA
FIRE ALARM CONTROL UNIT
FIRE ALARM ANNUNCIATOR
LCP LIGHTING CONTROL PANEL
FACU - FIRE ALARM CONTROL UNIT
FAA - FIRE ALARM ANNUNCIATOR
FSCP - FIRE ALARM SMOKE CONTROL PANEL
FAPS - FIRE ALARM POWER SUPPLY
TRANS - TRANSCEIVER
FSGV - FEDERAL SIGNAL GIANT VOICE TRANSCEIVER WITH ANTENNA
BATT - BATTERY CABINET
LOC - LOCAL OPERATORS CONSOLE
AASD - AIR ASPRIATING SMOKE DETECTOR
SFAP - SPARE FIRE ALARM PARTS METAL CABINET
PRN - PRINTER
ABBREVIATIONS
BFP BACKFLOW PREVENTER
NAC NOTIFICAITON APPLIANCE CIRCUIT
PA PUBLIC ADDRESS
SLC SIGNALING LINE CIRCUIT
TS TAMPER SWITCH
WF WATERFLOW
PANEL ABBREVIATIONS
WP WEATHER PROOF
NOTE: NOT ALL ABBREVIATIONS ARE USED
FA FIRE ALARM
FDC FIRE DEPARTMENT CONNECTION
FIRE ALARM GENERAL NOTES:
1. PROJECT SCOPE INCLUDES DELEGATED DESIGN AND INSTALLATION OF A UPGRADED FIRE ALARM SYSTEM FOR THE MMAC AN2 FACILITY. EXISTING MAIN FIRE ALARM PANEL TO BE REPLACED. FIRST FLOOR SCOPE LIMITED TO
NOTIFICATION DEVICE REPLACEMENT ONLY. SECOND FLOOR SCOPE TO DEMOLISH AND INSTALL ALL NEW DEVICES, WIRING AND CONDUIT. NEW DEVICES TO BE COMPATIBLE WITH NEW ADDRESSABLE TYCO/SIMPLEX 4100ES PANEL.
NEW PANEL TO REPLACE EXISTING LOCATED IN SYSTEMS ROOM 116 ON THE FIRST FLOOR. UPGRADE TRUE SITE WORKSTATION (TSW) SYSTEM TO REFLECT NEW DEVICE GRAPHICS FOR SECOND FLOOR DEVICE LAYOUT.
2. CONTRACTOR TO BE JCI, ANY REFERENCE TO CONTRACTOR WITHIN FA SERIES DRAWINGS SHALL BE REFERENCING JCI.
3. CONTRACTOR TO PROVIDE ALL MATERIALS AND LABOR FOR THE DETAILED DESIGN AND INSTALLATION REQUIRED FOR A COMPLETE AND FUNCTIONAL FIRE ALARM SYSTEM. CONTRACTOR IS RESPONSIBLE FOR ALL APPLICABLE FEES, TAXES AND PERMIT COSTS. ALL FIRE ALARM SYSTEM MATERIALS AND DESIGN SHALL COMPLY WITH CONTRACT DRAWINGS, CONTRACT SCOPE OF WORK, AND THE APPLICABLE CODES AND STANDARDS INDICATED ON THIS SHEET.
4. CONTRACTOR SHALL FIELD VERIFY ALL SITE CONDITIONS AND INFORMATION CONTAINED IN CONTRACT DRAWINGS. CONTRACT DRAWINGS MAY NOT SHOW ALL INFORMATION NECESSARY FOR INSTALLATION OF THE SYSTEM BUT
ARE INTENDED TO ASSIST THE CONTRACTOR IN PROVIDING A VISUAL REPRESENTATION OF THE PROPOSED SCOPE OF WORK.
5. THE CONTRACTOR SHALL SUBMIT ALL REQUIRED DOCUMENTS AND MATERIALS TO CREATE A COMPLETE SHOP DRAWING PACKAGE IN ACCORDANCE WITH NFPA 72 CHAPTER 7 WHICH INCLUDES, BUT IS NOT LIMITED TO, SHOP
DRAWINGS, BATTERY CALCULATIONS, VOLTAGE DROP CALCULATIONS, AND MATERIAL DATA SHEETS. THE SHOP DRAWING PACKAGE SHALL BE SUBMITTED FOR REVIEW BY HASKELL FIRE PROTECTION ENGINEER AND MUST BE APPROVED BEFORE THE PACKAGE CAN BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION FOR PERMIT. INSTALLATION OF THE FIRE ALARM SYSTEM IS NOT PERMITTED UNTIL THE PACKAGE IS APPROVED BY THE HASKELL
FIRE PROTECTION ENGINEER AND A PERMIT HAS BEEN ISSUED.
6. ALL WIRING ON FIRST FLOOR TO REMAIN EXISTING WIRING PATHWAY CLASS FOR DEVICE REPLACEMENT. JCI SHALL FIELD VERIFY.
7. ALL WIRING ON SECOND FLOOR SHALL BE CLASS "B" AND INSTALLED IN SIMILAR FASHION AS EXISTING WIRING IN ACCORDANCE WITH NFPA 70 AND NFPA 72. CONDUIT SHALL BE SECURELY ATTACHED TO THE BUILDING STRUCTURE.
8. FA PANELS SHALL BE FED WITH EMERGENCY POWER CIRCUITS.
9. WIRING SHALL NOT EXCEED 80% OF ITS RATED OUTPUT. ALL SLC SHALL BE SOLID OR STRANDED COPPER. ALL SLC AND NAC CIRCUITS SHALL BE MINIMUM 16 GAUGE.
10. PULL ALL CONDUCTORS SPLICE FREE; CONDUCTORS MUST BE CONTINUOUS FROM DEVICE TO DEVICE. THE USE OF WIRE NUTS, CRIMPED CONNECTORS, OR TWISTING OF CONDUCTORS IS PROHIBITED.
11. RUN ALL WIRING TO AND WITHIN CONTROL PANELS IN THE VERTICAL OR HORIZONTAL PLANE, MAKE ALL TURNS AT 90-DEGREE ANGLES, AND TIGHTLY BUNDLE, WRAP, AND IDENTIFY ALL CONDUCTORS INDIVIDUALLY WITH
PERMANENT MARKINGS. CONDUCTOR MARKINGS MUST BE PRINTED LABELS, PERMANENTLY AFFIXED TO THE CONDUCTOR VIA SHRINK WRAP.
12. ALL DEVICES MUST HAVE SCREW TERMINALS. WHERE DEVICES ARE ONLY PROVIDED WITH PIGTAILS FROM THE MANUFACTURER, PIGTAILS MUST BE LANDED ON TERMINAL STRIPS MOUNTED WITHIN THE JUNCTION BOX.
13. ALL TERMINATIONS MUST BE AT A TERMINAL STRIP OR THE DEVICE SCREW TERMINALS. TERMINAL STRIPS ARE ONLY PERMITTED WHERE DIRECT CONNECTION TO A DEVICE IS NOT POSSIBLE. (E.G., PIGTAILS OFF A RATE-
COMPENSATING HEAT DETECTOR).
14. THE LOCATION OF NOTIFICATION DEVICES SHOWN IS SUGGESTED. ACTUAL LOCATIONS TO BE DETERMINED BY CONTRACTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE CODES. NOTIFICATION APPLIANCES
SHALL BE COORDINATED WITH ARCHITECTURAL, STRUCTURAL, PROCESS, MECHANICAL, AND ELECTRICAL FIXTURES AND FEATURES.
15. STROBES SHALL BE RED WITH A CLEAR LENS AND MARKED "FIRE" IN WHITE LETTERS. MINIMUM STROBE CANDELA SHOWN FOR REFERENCE ONLY. ACTUAL CANDELA SHALL BE DETERMINED BY CONTRACTOR BASED ON LAYOUT.
ENSURE STROBES IN THE SAME FIELD OF VIEW FLASH IN SYNCHRONIZATION.
16. MANUAL PULL STATIONS SHALL BE PROVIDED THROUGHOUT THE FACILITY IN ACCORDANCE WITH NFPA 72. MANUAL PULL STATIONS SHALL BE ADDRESSABLE DOUBLE ACTION TYPE WITH MECHANICAL KEY RESET. THE KEY
REQUIRED SHALL BE THE SAME KEY AS REQUIRED FOR THE MAIN FIRE ALARM CONTROL PANEL.
17. A SINGLE MANUAL PULL STATION ON A SEPARATE CIRCUIT SHALL ALSO BE PROVIDED IN THE VICINITY OF THE SPRINKLER RISER. THE MANUAL PULL STATION SHALL BE CONNECTED TO A SEPARATE CIRCUIT THAT IS NOT PLACED “ON
TEST” WHEN THE DETECTION DEVICES OR SPRINKLER SYSTEM IS PLACED “ON TEST”. THE MANUAL PULL STATION REQUIRED BY NFPA 72 §23.8.5.1.2 IS INTENDED TO PROVIDE A BACKUP MEANS TO MANUALLY ACTIVATE THE FIRE ALARM SYSTEM WHEN THE AUTOMATIC FIRE DETECTION SYSTEM OR WATER-FLOW DEVICES ARE OUT OF SERVICE DUE TO MAINTENANCE OR TESTING.
18. SMOKE DETECTORS SHALL BE LOCATED A MINIMUM OF THREE FEET FROM ANY VAC DIFFUSER OR RETURN GRILLE.
19. DUCT SMOKE DETECTORS SHALL BE PROVIDED IN ALL HVAC DUCTS WHERE REQUIRED BY THE INTERNATIONAL MECHANCIAL CODE AND SHALL HAVE AUXILIARY CONTACTS TO PROVIDE CONTROL, INTERLOCK, AND SHUTDOWN
FUNCTIONS OF THE HVAC SYSTEMS. DETECTORS SHALL BE POWERED BY THE FIRE ALARM CONTROL UNIT.
20. THE FIRE ALARM SYSTEM SHALL MONITOR THE SPRINKLER SYSTEM WATERFLOW AND TAMPER SWITCHES.
21. SURGE PROTECTION DEVICES (SPD) SHALL BE PROVIDED ON ALL 120 VAC CIRCUITS TO CONTROL PANELS, SUBPANELS, TRANSMITTERS, AMPLIFIER PANELS, AND BOOSTER PANELS. SPD SHALL HAVE BOTH A UL 1449 AND UL 1283
LISTING AND SHALL BE LOCATED IN AN ADJACENT HINGED TERMINAL BOX.
22. PAINT ALL FIRE ALARM CONDUITS, JUNCTION BOXES AND COVERS WITH ONE COAT OF RED ALKYD GLOSS ENAMEL PAINT. IN FINISHED AREAS WITH EXPOSED CONDUIT PAINT ALL FIRE ALARM CONDUIT, JUNCTION BOXES AND
COVERS TO MATCH THE ROOM FINISH, IDENTIFY “FIRE ALARM” ON THE INSIDE COVER OF ALL JUNCTION BOXES AND THE CONDUIT SHALL HAVE PAINTED RED BANDS ¾-INCH WIDE AT 10 FOOT INTERVALS AND AT EACH SIDE OF A
FLOOR, WALL AND CEILING PENETRATION. ANODIZED RED CONDUIT IS ALSO ACCEPTABLE.
23. NEITHER THIS DRAWING NOR THE ASSOCIATED FA SERIES DRAWINGS IN THIS PACKAGE ARE INTENDED TO BE USED AS SHOP DRAWINGS. THE FIRE ALARM CONTRACTOR IS TO SUBMIT THEIR OWN SHOP DRAWINGS IN ACCORDANCE WITH NFPA 72. IT IS THE CONTRACTORS DUTY TO FULLY COMPLY WITH THE REQUIREMENTS SPECIFIED HEREIN. CONTRACTOR SHALL COORDINATE INSTALLATION WITH ALL OTHER TRADES.
24. SUPERVISOR QUALIFICATIONS SHALL BE LEVEL III FIRE ALARM TECHNICIAN TO SUPERVISE THE INSTALLATION OF THE FIRE ALARM SYSTEM. THE FIRE ALARM TECHNICIAN SUPERVISING THE INSTALLATION OF EQUIPMENT MUST BE FACTORY TRAINED IN THE INSTALLATION, ADJUSTMENT, TESTING, AND OPERATION OF THE EQUIPMENT HEREIN AND ON THE DRAWINGS.
25. INSTALLER SHALL BE NICET LEVEL II TECHNICIAN TO ASSIST IN THE INSTALLATION OF FIRE ALARM DEVICES, CABINETS AND CONTROL UNITS. A LICENSED ELECTRICIAN MUST BE ALLOWED TO INSTALL WIRE, CABLE, CONDUIT AND BACKBOXES FOR THE FIRE ALARM SYSTEM. THE FIRE ALARM INSTALLER MUST BE FACTORY TRAINED IN THE INSTALLATION, ADJUSTMENT, TESTING, AND OPERATION OF THE EQUIPMENT SPECIFIED HEREIN AND ON THE DRAWINGS.
26. FIRE ALARM TEST TECHNICIANS SHALL HAVE A MINIMUM OF EIGHT YEARS OF EXPERIENCE AND MINIMUM NICET LEVEL III UTILIZED IN TESTING AND CERTIFICATION OF THE INSTALLATION OF THE FIRE ALARM/MASS NOTIFICATION DEVICES, CABINETS AND CONTROL UNITS. THE FIRE ALARM TECHNICIANS TESTING THE EQUIPMENT MUST BE FACTORY TRAINED IN THE INSTALLATION, ADJUSTMENT, TESTING, AND OPERATION OF THE EQUIPMENT INSTALLEDAS
PART OF THIS PROJECT.
27. CONNECT FA SYSTEM TO THE NEW VIVE LIGHTING CONTROL SYSTEM.
28. CONTRACTOR TO TEST AND CERTIFY THE UPGRADED SYSTEM, INCLUDING UPDATES TO THE NEW TSW GRAPHICS AND PROGRAMMING.
APPLICABLE CODES AND STANDARDS:
• IBC - INTERNATIONAL BUILDING CODE, 2015 (WITH OKC SUPPLEMENTS)
• IMC - INTERNATIONAL MECHANICAL CODE, 2015
• IEBC - INTERNATIONAL EXISTING BUILDING CODE, 2015
• NFPA 70 – NATIONAL ELECTRICAL CODE – 2020 EDITION
• NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION
NOTES:
A. VERIFY EXACT MOUNTING HEIGHTS WITH PROJECT REQUIREMENTS. DEVICES MAY OR MAY NOT APPLY TO THIS PROJECT. REFER
TO PLANS.
B. ALL NEW DEVICES SHALL BE INSTALLED ACCORDING TO THE MOUNTING HEIGHTS INDICATED U.N.O.
C. FACU / FMCU TOP OF CABINET AT 72" OR CENTER THE CABINET AT 60", WHICHEVER IS LOWER.
D. 4" MINIMUM SPACE BETWEEN CEILING AND TOP OF DETECTOR DOES NOT APPLY FOR THE SMOKE DETECTOR.
AUDIBLE /
VISUAL UNIT
VISUAL
ONLY UNIT
AUDIBLE
ONLY UNIT
4" MIN 36" MIN AIR SUPPLY DIFUSER
OR RETURN AIR OPENING 4
M
IN
M A
X
HEAT/SMOKE
DETECTOR
HEAT/SMOKE
DETECTOR
CONDUIT
INSTALL PER NATIONAL
ELECTRIC CODE
MOUNT ON
AN APPROVED
BOX
FACU /
FMCU
M A
XPULL DOWN
FIRE ALARM
MANUAL
PULL
STATION
TOP OF
PULL
STATION
HANDLE
FINISHED FLOOR
M A
X
M
IN
M
IN
60" MAX
Drawing No. AMP - 400 - 1550005 lead or pm designed
WORK ORDER NO. 6973gh−22−f−01570
FEDERAL AVIATION ADMINISTRATION (FAA)
MIKE MONRONEY AERONAUTICAL CENTER − OKLAHOMA CITY, OKLAHOMA
drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
FINAL SUBMITTAL - NOT FOR CONSTRUCTION
Air Navigation Facility #2 (AN2), Building #12
AN2 2nd Floor Academy Buildout
SEAL:
/3
/2 :4
:2
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r
B u il d o u t R /1 F
IR
E .r v t
/3
/2 :4
:2
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r B u il d o u t R /1 F
IR
E .r v t
KDC
CME
FIRE ALARM GENERAL NOTES AND LEGEND
KDCTCV
04/20/23
FA001
NONE
FIRE ALARM MOUNTING HEIGHT DETAIL
No. Date Description Issued by
Issued to
0 04/20/23 FINAL SUBMITTAL TV MT
1 08/03/23 AMENDMENT 001 TV MT
AMENDMENT 001
LIGHT HAZARD
DESIGN: 0.10 GPM/SQ. FT. OVER MOST REMOTE 1,500 SQ.FT.
SPRINKLERS: K-FACTOR 5.6, STANDARD OR QUICK RESPONSE
WITH CHROME OR WHITE POLYESTER FINISH
LINEAR SPACING: 6 FT. MIN, 15 FT. MAX.
AREA: 225 SQ. FT. MAX
HOSE STREAM ALLOWANCE: 100 GPM
HAZARD CLASSIFICATION AND SCOPE LEGEND
ORDINARY HAZARD GROUP 1
DESIGN: 0.15 GPM/SQ. FT. OVER MOST REMOTE 1,500 SQ.FT.
SPRINKLERS: K-FACTOR 8.0, STANDARD OR QUICK RESPONSE
WITH CHROME OR WHITE POLYESTER FINISH
LINEAR SPACING: 6 FT. MIN, 15 FT. MAX.
AREA: 130 SQ. FT. MAX
HOSE STREAM ALLOWANCE: 250 GPM
SCOPE OF WORK BOUNDARY LINE, SPRINKLER SYSTEM
COMPONENTS WITHIN BOUNDARY LINE TO BE DEMOLISHED
BACK TO SECOND FLOOR ENTRANCE FEED MAIN ELBOW.
REFER TO FX110 FOR BOUNDARY LINE.
EXISTING SPRINKLER SYSTEM COMPONENTS TO REMAIN AND
BE TIED INTO NEW FEED MAIN, SPRINKLER HEADS TO BE
REPLACED AND SHALL MATCH NEW SPRINKLER HEADS
THROUGHOUT. REFER TO FX110 FOR AREAS.
FIRE SUPPRESSION GENERAL NOTES:
1. PROJECT SCOPE INCLUDES DELEGATED DESIGN AND INSTALLATION OF A MODIFIED SPRINKLER SYSTEM FOR THE MMAC AN2 BUILDING. SECOND FLOOR WET PIPE SPRINKLER
SYSTEM TO BE DEMOLISHED WHERE INDICATED BY BOUNDARY LINE BACK TO ELBOW ABOVE CHASE SUPPLYING FEED MAIN. NEW CONTROL VALVE ASSEMBLY TO BE INSTALLED
PAST ELBOW AND NEW WET PIPE SPRINKLER SYSTEM TO BE PROVIDED FOR SECOND FLOOR.
2. CONTRACTOR TO PROVIDE ALL MATERIALS AND LABOR FOR THE DETAILED DESIGN AND INSTALLATION REQUIRED FOR COMPLETE AND FUNCTIONAL SPRINKLER SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR ALL APPLICABLE FEES, TAXES AND PERMIT COSTS. ALL FIRE SUPPRESSION SYSTEM MATERIALS AND DESIGN SHALL COMPLY WITH CONTRACT
DRAWINGS, CONTRACT SCOPE OF WORK, AND APPLICABLE CODES AND STANDARDS.
3. CONTRACTOR SHALL FIELD VERIFY ALL SITE CONDITIONS AND INFORMATION CONTAINED IN CONTRACT DRAWINGS. CONTRACT DRAWINGS MAY NOT SHOW ALL INFORMATION NECESSARY FOR INSTALLTION OF THE SYSTEM BUT ARE INTENDED TO ASSIST THE CONTRACTOR IN PROVIDING A VISUAL REPRESENTATION OF THE PROPOSED SCOPE OF WORK.
4. THE CONTRACTOR SHALL SUBMIT ALL REQUIRED DOCUMENTS AND MATERIALS TO CREATE A COMPLETE SHOP DRAWING PACKAGE IN ACCORDANCE WITH NFPA 13 CHAPTER 28 WHICH INCLUDES BUT IS NOT LIMITED TO SHOP DRAWINGS, WATER SUPPLY INFORMATION, HYDRAULIC CALCULATIONS AND MATERIAL DATA SHEETS. THESE SHALL BE APPROVED BY THE HASKELL FIRE PROTECTION ENGINEER PRIOR TO SUBMITTAL TO THE AUTHORITY HAVING JURISDICTION (AHJ) FOR PERMIT AND INSTALLATION.
5. THE HYDRAULIC CALCULATIONS SHALL BE BASED ON A NEW FLOW TEST PERFORMED BY THE INSTALLING CONTRACTOR.
6. ALL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL NOT BE USED FOR EXACT MEASUREMENT OR FABRICATION. THE EXACT LOCATIONS OF FEED MAIN AND BRANCH LINES
SHALL BE DETERMINED BY A LICENSED FIRE SPRINKLER CONTRACTOR WHEN SHOP DRAWINGS ARE DEVELOPED. COORDINATE INSTALLATION OF SYSTEM PIPING AND OTHER
COMPONENTS WITH ALL OTHER DISCIPLINES.
7. ALL AREAS IN THIS BUILDING SHALL BE SPRINKLERED. THIS INCLUDES, BUT IS NOT LIMITED TO, ELECTRICAL EQUIPMENT ROOMS, BOILER ROOMS, AND OTHER ELECTRICAL AND
MECHANICAL SPACES.
8. MATERIALS AND EQUIPMENT SHALL BE STANDARD PRODUCTS OF A MANUFACTURER REGULARLY ENGAGED IN THE MANUFACTURE OF SUCH PRODUCTS AND SHALL ESSENTIALLY DUPLICATE ITEMS THAT HAVE BEEN IN SATISFACTORY USE FOR AT LEAST 2 YEARS PRIOR TO BID OPENING.
9. INSTALL SPRINKLER SYSTEM COMPONENTS THAT ARE UL LISTED, AND ENSURE THEIR APPLICATION IS CONSISTENT WITH THEIR LISTING AS WELL AS THE MANUFACTURER’S
INSTALLATION INSTRUCTIONS, AND ANY SPECIFIC JURISDICTIONAL REQUIREMENTS.
10. PROVIDE LISTED AND APPROVED SPRINKLER GUARDS FOR SPRINKLERS THAT ARE LESS THAN 7 FEET ABOVE FINISHED FLOOR, SUBJECT TO MECHANICAL DAMAGE AND/OR
LOCATED WITHIN RACKS.
11. SPRINKLER CONTRACTOR TO COMPLY WITH ALL REQUIREMENTS OF NFPA 13 §9.5.5 WITH REGARD TO OBSTRUCTIONS TO SPRINKLER DISCHARGE.
12. A STOCK OF SPARE SPRINKLERS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13 §16.2.7.
13. ALL PIPING SHALL BE BLACK STEEL.
14. SPRINKLER SYSTEM PIPING SUPPORTS SHALL COMPLY WITH THE MOST RESTRICTIVE REQUIREMENTS OF NFPA 13.
15. THE SPRINKLER SYSTEM SHALL BE ARRANGED FOR FLUSHING. READILY REMOVABLE FITTINGS SHALL BE PROVIDED AT THE END OF ALL CROSS MAINS AND ALL CROSS MAINS
SHALL TERMINATE IN 1 ¼ INCH OR LARGER PIPE (NFPA 13 §16.6.3)
16. A SINGLE AIR VENT SHALL BE LOCATED NEAR A HIGH POINT IN THE SYSTEM TO ALLOW AIR TO BE REMOVED FROM THAT PORTION OF THE SYSTEM BY ONE OF THE FOLLOWING
METHODS (NFPA 13 §16.7): (1) MANUAL VALVE, MINIMUM 1∕2 INCH SIZE, (2) AUTOMATIC AIR VENT, (3) REMOTE INSPECTOR’S TEST VALVE, OR (4) OTHER APPROVED MEANS.
17. AUXILIARY DRAINS MUST BE PROVIDED WHERE A CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF SYSTEM PIPING THROUGH THE MAIN DRAIN VALVE (NFPA 13 §16.10.5.1).
18. WET SPRINKLER PIPING IS PERMITTED TO BE INSTALLED LEVEL. AUXILIARY DRAINS MUST BE PROVIDED WHERE A CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF SYSTEM
PIPING THROUGH THE MAIN DRAIN VALVE (NFPA 13 §16.10.5.1).
19. WHERE THE CAPACITY OF TRAPPED SECTIONS OF PIPES IN WET SYSTEMS IS LESS THAN 5 GAL, ONE OF THE FOLLOWING ARRANGEMENTS SHALL BE PROVIDED (NFPA 13 §
16.10.5.2.3): (1) AN AUXILIARY DRAIN SHALL CONSIST OF A NIPPLE AND CAP OR PLUG NOT LESS THAN 1∕2 INCH IN SIZE, (2) AN AUXILIARY DRAIN SHALL NOT BE REQUIRED FOR TRAPPED SECTIONS LESS THAN 5 GAL WHERE THE SYSTEM PIPING CAN BE DRAINED BY REMOVING A SINGLE PENDENT SPRINKLER, (3) WHERE FLEXIBLE COUPLINGS OR OTHER EASILY SEPARATED CONNECTIONS ARE USED, THE NIPPLE AND CAP OR PLUG SHALL BE PERMITTED TO BE OMITTED.
20. WHERE THE CAPACITY OF ISOLATED TRAPPED SECTIONS OF PIPE IS MORE THAN 5 GAL AND LESS THAN 50 GAL, THE AUXILIARY DRAIN SHALL CONSIST OF A VALVE 3∕4 INCH OR
LARGER AND A PLUG OR A NIPPLE AND CAP (NFPA 13 §16.10.5.2.2).
21. WHERE THE CAPACITY OF ISOLATED TRAPPED SECTIONS OF PIPE IS 50 GAL OR MORE, THE AUXILIARY DRAIN SHALL CONSIST OF A VALVE NOT SMALLER THAN 1 INCH, PIPED TO
AN ACCESSIBLE LOCATION (NFPA 13 §16.10.5.2.1).
22. TERMINATE ALL MAIN DRAINS, AUXILARY DRAINS AND INSPECTOR'S TEST CONNECTIONS PIPING TO THE EXTERIOR OF THE FACILITY SO IT WILL NOT CAUSE DAMAGE. DISCHARGE TO THE EXTERIOR MUST NOT INTERFERE WITH EXITING FROM THE FACILITY. WATER DISCHARGE OR RUNOFF MUST NOT CROSS AN EXIT OR EXIT DISCHARGE PATH. PROVIDE 2 FT BY 2 FT CONCRETE SPLASH BLOCKS AT ALL DRAIN AND INSPECTOR'S TEST CONNECTION DISCHARGE LOCATIONS IF NOT DISCHARGING TO A CONCRETE SURFACE. SPLASH BLOCKS MUST BE LARGE ENOUGH TO MITIGATE EROSION AND MUST NOT BECOME DISLODGED DURING A FULL FLOW OF THE MAIN DRAIN. WHERE DRAINS CANNOT BE ROUTED TO THE EXTERIOR, THEY MAY BE ROUTED TO AN INTERIOR FLOOR DRAIN COORDINATED WITH THE PLUMBING CONTRACTOR AND INSTALLED SO THEY DO NOT CREATE A TRIPPING
HAZARD.
23. ALL MAIN SPRINKLER LINES SHALL BE MARKED IN ACCORDANCE WITH ASME 13.1.
24. ALL FIRE SUPPRESSION VALVES SHALL BE MARKED WITH PERMANENT TAGS INDICATING NORMALLY OPEN OR NORMALLY CLOSED. PROVIDE AND INSTALL VALVE SUPERVISORY
TAMPER DEVICES ON ALL FIRE PROTECTION CONTROL VALVES FOR MONITORING BY THE FIRE ALARM CONTROL PANEL.
25. ALL CONTROL VALVES SHALL BE LOCATED WHERE ACCESSIBLE AND FREE OF OBSTRUCTIONS. IDENTIFICATION SIGNS SHALL BE PROVIDED AT EACH VALVE TO INDICATE ITS
FUNCTION AND WHAT IT CONTROLS.
26. ALL CONTROL, DRAIN, VENTING, AND TEST CONNECTION VALVES SHALL BE PROVIDED WITH PERMANENTLY MARKED WEATHERPROOF METAL OR RIGID PLASTIC IDENTIFICATION
SIGNS IN ACCORDANCE WITH NFPA 13 §16.9.11.1. THE IDENTIFICATION SIGN SHALL BE SECURED WITH CORROSION-RESISTANT WIRE, CHAIN, OR OTHER APPROVED MEANS. THE CONTROL VALVE SIGN SHALL IDENTIFY THE PORTION OF THE BUILDING SERVED. SYSTEMS THAT HAVE MORE THAN ONE CONTROL VALVE THAT MUST BE CLOSED TO WORK ON A SYSTEM OR SPACE SHALL HAVE A SIGN REFERRING TO EXISTENCE AND LOCATION OF OTHER VALVES.
27. THE INSTALLING CONTRACTOR SHALL IDENTIFY EACH HYDRAULICALLY DESIGNED SPRINKLER SYSTEM WITH A PERMANENTLY MARKED WEATHERPROOF METAL OR RIGID PLASTIC SIGN SECURED WITH CORROSION-RESISTANT WIRE, CHAIN, OR OTHER APPROVED MEANS IN ACCORDANCE WITH NFPA 13 §29.4.1. SUCH SIGNS SHALL BE PLACED AT THE ALARM VALVE SUPPLYING THE CORRESPONDING HYDRAULICALLY DESIGNED AREA. THE SIGN SHALL INCLUDE THE FOLLOWING INFORMATION:
A. LOCATION OF THE DESIGN AREA OR AREAS
B. SIZE (AREA) OF OR NUMBER OF SPRINKLERS IN THE DESIGN AREA
C. DISCHARGE DENSITIES OVER THE DESIGN AREA OR AREAS
D. REQUIRED FLOW AND RESIDUAL PRESSURE DEMAND AT THE BASE OF THE RISER OR FIRE PUMP WHERE APPLICABLE E. OCCUPANCY CLASSIFICATION OR COMMODITY CLASSIFICATION AND MAXIMUM PERMITTED STORAGE HEIGHT AND CONFIGURATION
F. HOSE STREAM ALLOWANCE INCLUDED IN ADDITION TO THE SPRINKLER DEMAND
G. NAME OF THE INSTALLING CONTRACTOR
28. THE INSTALLING CONTRACTOR SHALL PROVIDE A GENERAL INFORMATION SIGN USED TO DETERMINE SYSTEM DESIGN BASIS AND INFORMATION RELEVANT TO THE INSPECTION, TESTING, AND MAINTENANCE REQUIREMENTS REQUIRED BY NFPA 29 IN ACCORDANCE WITH NFPA 13 §29.6.1.1. SUCH GENERAL INFORMATION SHALL BE PROVIDED WITH A PERMANENTLY MARKED WEATHERPROOF METAL OR RIGID PLASTIC SIGN, SECURED WITH CORROSION-RESISTANT WIRE, CHAIN, OR OTHER ACCEPTABLE MEANS. SUCH SIGNS SHALL BE PLACED AT EACH SYSTEM CONTROL RISER AND AUXILIARY SYSTEM CONTROL VALVE. THE SIGN SHALL INCLUDE THE FOLLOWING INFORMATION:
A. NAME AND LOCATION OF THE FACILITY PROTECTED
B. OCCUPANCY CLASSIFICATION
C. COMMODITY CLASSIFICATION
D. PRESENCE OF HIGH-PILED AND/OR RACK STORAGE
E. MAXIMUM HEIGHT OF STORAGE PLANNED
F. AISLE WIDTH PLANNED
G. ENCAPSULATION OF PALLET LOADS
H. PRESENCE OF SOLID SHELVING
I. FLOW TEST DATA
J. PRESENCE OF FLAMMABLE/COMBUSTIBLE LIQUIDS
K. PRESENCE OF HAZARDOUS MATERIALS
L. PRESENCE OF OTHER SPECIAL STORAGE
M. LOCATION OF VENTING VALVE
N. ORIGINAL RESULTS OF MAIN DRAIN FLOW TEST
O. NAME OF INSTALLING CONTRACTOR OR DESIGNER
29. ALL SPRINKLER PIPING AND ATTACHED APPURTENANCES WILL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13 §29.2.1. THE SPRINKLER SYSTEMS SHALL COMPLY
WITH THE ACCEPTANCE TEST REQUIREMENTS OF NFPA 13 CHAPTER 29.
30. UPON COMPLETION OF WORK, CONTRACTOR SHALL PROVIDE OWNER WITH THE FOLLOWING:
A. COMPLETE INFORMATION AND “AS-BUILT” RECORD DRAWINGS DESCRIBING AND DEPICTING THE ENTIRE SYSTEM AS INSTALLED, INCLUDING ALL INFORMATION NECESSARY FOR
MAINTAINING, TROUBLESHOOTING, AND/OR EXPANDING THE SYSTEM AT A FUTURE DATE.
B. COMPLETE DOCUMENTATION OF SYSTEM(S) TESTING AND AUTHORITY HAVING JURISDICTION (AHJ) ACCEPTANCE.
C. CERTIFICATION THAT CONTRACTOR’S WORK HAS BEEN INSPECTED AND TESTED, IS INSTALLED ENTIRELY IN ACCORDANCE WITH THE APPLICABLE CODES, STANDARDS, MANUFACTURERS’ RECOMMENDATIONS AND FM APPROVALS, AND IS IN PROPER WORKING ORDER. CONTRACTOR SHALL USE "FM GLOBAL CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE(S)" AS REQUIRED BY THE APPLICABLE CODES LISTED ON THIS DRAWING.
APPLICABLE CODES AND STANDARDS:
• IBC - INTERNATIONAL BUILDING CODE, 2015 (WITH OKC SUPPLEMENTS)
• IMC - INTERNATIONAL MECHANICAL CODE, 2015
• IEBC - INTERNATIONAL EXISTING BUILDING CODE, 2015
• NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION
Drawing No. AMP - 400 - 1550005 lead or pm designed
WORK ORDER NO. 6973gh−22−f−01570
FEDERAL AVIATION ADMINISTRATION (FAA)
MIKE MONRONEY AERONAUTICAL CENTER − OKLAHOMA CITY, OKLAHOMA
drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
FINAL SUBMITTAL - NOT FOR CONSTRUCTION
Air Navigation Facility #2 (AN2), Building #12
AN2 2nd Floor Academy Buildout
SEAL:
/3
/2 :4
:2
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r
B u il d o u t R /1 F
IR
E .r v t
/3
/2 :4
:2
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r B u il d o u t R /1 F
IR
E .r v t
KDC
CME
FIRE SUPPRESSION GENERAL NOTES AND LEGEND
KDCTCV
4/20/2023
FX001
WATER FLOW TEST DATA:
DATE: 12/28/2022
TIME: 9:30 A.M.
PRESSURE HYDRANT:
STATIC: 63 PSI
RESIDUAL: 60 PSI
FLOW HYDRANT:
OUTLET DIAMETER: 2.50"
FLOW: 1,186.5 GPM
No. Date Description Issued by
Issued to
0 04/20/23 FINAL SUBMITTAL TV MT
1 08/03/23 AMENDMENT 001 TV MT
1 1
4" FIRE MAIN TO
REMAIN AND CONTINUE
SUPPLYING SECOND
FLOOR
LAB
RPO SUPERVISORS
SUPPLY/PROPERTY
ROOM PERSONNEL
IT SUPPORT
COMP
SUPPORT/SCAN
RPO LAB
SAIC INSTRUCTORS
INSTRUCTOR
BREAKROOM
STORAGE
TERMINALS TESTING/
IT SERVICE AREA
BREAKOUT SPACE
BREAKOUT SPACE
BREAKOUT SPACE
BREAKOUT SPACE
BREAKOUT SPACE
LAB TESTING
FAA INSTRUCTORS
VENDING
CONFERENCE ROOM
LACTATION ROOM
IT ROOM
CLO.
TELE
ELEC
WOMEN
MEN
231 TELE
ELEC
LEAD TECH
202C AMA-500
SUPERVISOR
202B
AMA-500
SUPERVISOR
202A
JAN.
AMA CONF.
STUDENT LOUNGE
STAIR 1
STAIR 4
STAIR 3
STAIR 2
RPO BREAKROOM
SAIC TRAINING
SAIC SUPERVISORS
CORRIDOR C
201C
CORRIDOR A
201A
CORRIDOR B
201B
CORRIDOR D
201D
BREAK
204A
ROOM
NEW FLOOR CONTROL
VALVE ASSEMBLY FOR
SECOND FLOOR
SPRINKLER SYSTEM
FF
EAEA
EE
DD
CACA
CC
BB
AA
BA
109B
9B
CLASSROOM
Drawing No. AMP - 400 - 1550005 lead or pm designed
WORK ORDER NO. 6973gh−22−f−01570
FEDERAL AVIATION ADMINISTRATION (FAA)
MIKE MONRONEY AERONAUTICAL CENTER − OKLAHOMA CITY, OKLAHOMA
drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
FINAL SUBMITTAL - NOT FOR CONSTRUCTION
Air Navigation Facility #2 (AN2), Building #12
AN2 2nd Floor Academy Buildout
KEYPLAN
1 2
SEAL:
/3
/2 :4
:3
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r
B u il d o u t R /1 F
IR
E .r v t
/3
/2 :4
:3
P
M B
IM
/1 F
A A M
M A C A
N n d F l o o r B u il d o u t R /1 F
IR
E .r v t
KDC
CME
FIRE SUPPRESSION PLAN 2ND FLOOR - COMPOSITE
KDCTCV
4/20/2023
FX110
3/32" = 1'-0"
FIRE SUPPRESSION PLAN 2ND FLOOR - COMPOSITE
KEYED NOTES :
1. CLEARANCE BETWEEN SPRINKLER DEFLECTOR AND TOP OF STORAGE OR ROOM CONTENTS SHALL BE 18 INCHES OR GREATER IAW
NFPA 13 §8.5.6.1.
2. CONTROL VALVE ASSEMBLY TO INCLUDE BUTTERFLY CONTROL VALVE, MAIN DRAIN GLOBE VALVE, AND FLOW SWITCH FOR ISOLATION, CONTROL AND ANNUNCIATION OF WATER FLOW FOR SECOND FLOOR LEVEL.
3. MAIN DRAIN TO BE ROUTED DOWN AND CHASE AND TIED INTO FIRST FLOOR RISER MAIN DRAIN.
4. FEED MAIN SIZE AND LOCATION TO BE DETERMINED BY LICENSED SPRINKLER CONTRACTOR
5. CONTROL VALVE ASSEMBLY TO CONTROL SPRINKLER SYSTEM IN ELEVATOR. CONTROL VALVE ASSEMBLY DRAIN TO BE ROUTED TO
BUILDING EXTERIOR.
6. FEED LINE TO BE CONNECTED TO SPRINKLER MAIN. DRAIN LINE ROUTING TO BE DETERMINED BY LICENSED SPRINKLER CONTRACTOR.
7. PROVIDE ACCESS PANEL AND SIGNAGE INDICATING CONTROL VALVE ASSEMBLY LOCATION.
8. PROVIDE SIGNAGE INDICATING CONTROL VALVE ASSEMBLY LOCATION ABOVE GRIDDED CEILING.
9. EQUIVALENT LENGTH FROM THE CONNECTION TO CITY MAIN TO BOTTOM OF RISER ASSEMBLY IS 171 FT.
10. EQUIVALENT LENGTH OF RUN FROM TOP OF RISER ASSEMBLY TO SECOND FLOOR VALVE IS 91 FT.
11. LENGTH OF PIPE FROM BOTTOM OF BACKFLOW PREVENTER TO EXISTING BUTTERFLY VALVE IS 6 FT.
SCALE IN FEET - 3/32" = 1'-0"
8' 4' 0' 8' 24'16'
No. Date Description Issued by
Issued to
0 04/20/23 FINAL SUBMITTAL TV MT
1 08/03/23 AMENDMENT 001 TV MT
EXISTING 6"
LEAD-IN
EXISTING 4"
BACKFLOW
PREVENTER
(2 CHECK
AND GATE
VALVES)
EXISTING 4"
FEED TO
2ND FLOOR
EXISTING 4"
TEE
EXISTING 4"
BUTTERFLY
VALVE
| Sheets |
| FA001 - FIRE ALARM GENERAL NOTES AND LEGEND |
| FX001 - FIRE SUPPRESSION GENERAL NOTES AND LEGEND |
| FX110 - FIRE SUPPRESSION PLAN 2ND FLOOR - COMPOSITE |
File details come from the government source that posted it. Updated .