1. Section B - Supplies or Services-Prices.xlsx-Corrected.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 6973GH-23-R-00185
About this file
This document contains a scope of work for a federal contract solicitation to renovate the second floor of Air Navigation Facility No. 2. The solicitation will provide for the complete demolition and renovation of the existing second floor construction including finishes, HVAC, plumbing, electrical, and ceilings. Specific work includes reconfiguring walls and doors, installing interior signage and window treatments, replacing VAV systems and controls, expanding restrooms and replacing plumbing fixtures, installing new drinking fountains, and modifying the fire suppression system. Bidders should provide a lump sum price for all work required in the scope. The solicitation is identified as number 6973GH-23-R-00185 and is being issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for the Air Navigation Facility No. 2 second floor renovation project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Complete demolition of all existing construction, finishes, HVAC, plumbing, and electrical as indicated in the contract drawings. A small section of existing raised access floor is to be removed to allow for the restroom expansion. All other raised access floor is to remain and be protected during construction. Complete renovation of the AN2 2nd floor as indicated in the contract drawings. This work shall include, but not limited to:
a. Reconfiguration of the 2nd floor walls, doors, and associated door hardware.
b. Replace all existing 2nd floor ceilings and interior finishes.
c. Install interior window treatments.
d. Install FAA, IBC 2015, and ANSI A117.1 compliant signage.
e. Install a new duct system layout to work with the reconfigured 2nd floor.
f. Replace all existing 2nd floor VAVs and controls.
g. Expand the existing restrooms and replace all existing restroom plumbing fixtures and finishes as indicated in the contract drawings. Overbuilt floor shall be installed at the restroom expansion.
h. Drinking fountains shall be replaced with new combo drinking/bottle filler fountains.
i. Modification of the fire suppression system shall be as required to coordinate with 2nd floor reconfiguration.
| CLIN | Description | Estimated Quantity | Unit of Issue | Unit Price | Total Item Amount |
| 00001 | 21-037194; Air Navigation Facility No. 2 (AN2) 2nd Floor Academy Buildout | 1 | EA | $ | $ |
| TOTAL ESTIMATED POTENTIAL VALUE | $ |
File details come from the government source that posted it. Updated .