5. 21-037194-EOSH Attachment F-4.pdf

PDF 174 KB Posted

Attached to
6973GH-23-R-00185; Air Navigation Facility No. 2 (AN2) 2nd Floor Academy Buildout
Solicitation number
6973GH-23-R-00185
Issued by

About this file

This document is a notification from an organization's environmental, occupational safety and health (EOSH) representative to a contracting officer's representative regarding applicable operational controls for contractor activities. The EOSH representative lists 14 applicable operational controls related to storm and surface water discharges, solid waste generation, electrical safety, fall protection, physical hazards, and other EOSH areas. The representative notes the operational controls must be implemented into the activities identified in the contractor's notification of activities and communicated to personnel performing the work. The representative provides their name, phone number, and date and requests the COR review and contact them if any questions arise.

The related federal contract opportunity is a solicitation from the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for work on Air Navigation Facility No. 2's second floor buildout.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CCDEDCF GHIJKI KLMNLO

Appendix F

F-11

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use.

Attachment F-4. Notification of Environmental, Occupational Safety and Health Management System (EOSHMS) Operational Control Applicability.

To (COR): __________________________________________________

From (Organization EOSH Representative):__________________

The attached operational controls have been identified as applying to the activities identified in the “Notification of Contractor Activities” (or an equivalent document such as a statement of work that identified work activities) that you recently submitted. Implementing the operational controls into those activities is required for conformance with the MMAC EOSHMS. The contract company is required to communicate these operational controls to personnel who perform the work activities associated with the operational controls. Competency requirements are contained within the operational control documents. A copy of each operational control is attached.

Please review and contact me if there are any questions.

Applicable Operational Controls (list below):

Signature: _______________________________________________________ Phone Number: ___________________________________________________ Routing Symbol: __________________________________________________ Date: ___________________________________________________________

AMP400-ENV-OC-2.4.3-CC Storm & Surface Water Discharges AMP400-ENV-OC-2.5-CC Solid Waste Generation AMP400-OSH-OC-3.1-CC Electrical AMP400-OSH-OC-5.1-CC Falls AMP44-OSH-OC-8.1-CC Physical

AMP-400

2023-06-12T10:26:42-0500
KOU CHANG
I am the author of this document
EOSH Rep Name: Kou Chang
Project COR Name: Mary Tsien
EOSH Rep Phone Number: 405-954-8719
Date_af_date: 06/12/2023

File details come from the government source that posted it. Updated .