This document provides details for a full and open competitive solicitation for the construction of a new Wind and Waves Evacuation and Survival (WiWAVES) Research Facility at the Mike Monroney Aeronautical Center in Oklahoma City, OK. The Federal Aviation Administration requires construction services with an estimated price range of $30-40 million to be awarded as a firm-fixed-price contract. A pre-proposal teleconference will be held on February 3, 2021, and optional site visits are available February 3-5, 2021. Questions regarding the project are due by February 12, 2021, and proposals must be received by 3:00pm CT on that same date. The NAICS code for this opportunity is 236220. The contractor must be registered in SAM.gov by the date established for receipt of offers.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 1
0010 03/05/2021
AAQ-731 FAC. & AVIATION SAFETY ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ0731-AFN
OKLAHOMA CITY OK 73125
AAQ-731 FAC. & AVIATION SAFETY ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ731-AFN
OKLAHOMA CITY OK 73125
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-21-R-00001
1 copies to the issuing office.
01/21/2021
(x)
WO#14-002117
CAMI WiWaves New Facility
The purpose Amendment 0010 is to add a Questions and Answers attachment.
FIRST: Questions and Answers attachment dated March 5, 2021 is hereby incorporated.
Questions 195-198 have been added.
SECOND: The Proposal Due Date remains as Tuesday, March 9, 2021 at 3:00 PM CT.
THIRD: All other terms and conditions remain unchanged and in full force and effect.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Stephanie Riddle
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SIR/RFO 6973GH-21-R-00001 CAMI WiWAVES Facility March 5, 2021
Questions and Answers
1. QUESTION: How is the evidence email to be submitted? Is it as simple as attaching the PDF copy of the emails to the submission email? Are they to be a second attachment or a part of the section 1 submission?
Does this effectively make it so that the only submission documents from GC’s for section 2 is proof of the sent emails as the responses will come directly to you?
ANSWER: The evidence provided can be the email submitted to the reference. It can be a PDF. In accordance with L.3 Instructions for Preparation and Submission of Proposals (f), the evidence should be provided with section 2. Please refer to L.3 Instructions for Preparation and Submission of Proposals for what should be submitted.
2. QUESTION: As a General Contractor, are we required to submit survey’s for Mechanical, Electrical, and
Pool Subcontractors on the projects we plan to submit a survey on?
ANSWER: The intent is for the General Contractor to have the subcontractors they intend to use on this project submit surveys as described in the SIR. Amendment 0001 has revised Section L.3 (f).
3. QUESTION: The sample client authorization letter is referenced as attachment 11 in Section J, however, the sample client authorization letter has attachment 12 listed in the bottom right. Please confirm this is intended to be attachment 11. On the same note, the contractor’s release is listed as attachment 12, however, no attachment number is listed on the document.
ANSWER: The sample client authorization letter has been revised and the updated copy can be found attached to Amendment 0001. The contractor’s release does not need an attachment number listed on the document.
4. QUESTION: Reference attachment 10, page 2, #2. Please confirm verbiage referencing “HQB Building Lobby Remodel” is incorrect. Will this document be corrected and reissued?
ANSWER: Attachment 10, page 2, #2 has been revised and the updated copy can be found attached to Amendment 00001.
5. QUESTION: Refer to Section 001010.1.3.C. The specifications state bids to be held good for 210 calendar days. The solicitation form says 120 calendar days. Please clarify.
ANSWER: 120 calendar days.
6. QUESTION: Are there any federal budget allocation restrictions on how much work can be paid for in a 12 month period on this project? Must the project take 24 months to complete?
ANSWER: No restrictions on how much work can be completed in a 12 month period. It is acceptable to complete the project in less than 24 months.
7. QUESTION: Currently there is only one pay item listed on the Solicitation form. Do you expect more pay items or alternates to be added?
ANSWER: Section B has been revised in Amendment 0006 to add an additional item.
8. QUESTION: Refer 3.4.1-1 of attachment 6973GH-21-R-00001. Bid bond of 20% is requested. Does this request allow for the “or $3 million maximum” option clause per FAR 28.101-2?
ANSWER: The FAA is not governed by the FAR and does not follow the FAR.
9. QUESTION: Attachment 10, Past Performance Survey. The top portion of page 1, whose information goes there?
ANSWER: The top portion of page 1 should be the reference’s information.
10. QUESTION: Can you please confirm the name of the entity to which the proposal bond should be made?
ANSWER: The Bid Identification is for Construction of the Mike Monroney Aeronautical Center CAMI WiWAVES Facility, Oklahoma City, OK.
11. QUESTION: Is it acceptable to provide an attachment if necessary for the response to the PPS question 2?
The amount of space provided is somewhat small.
ANSWER: An attachment page maybe provided for the response to the PPS, page 2, question 2 if necessary.
12. QUESTION: Can you send me a plan holders list for this project?
ANSWER: There is not a plan holders list.
13. QUESTION: Do you have a list of GC’s that you could provide that are interested in the above project?
ANSWER: We do not have a list of interested GC’s.
14. QUESTION: Drawing C-141 notes to Jack and Bore below Christian Avenue for the data and medium voltage. Jack and bore is usually only used for water lines to keep the road from washing out in the event of a line rupture below the street. Would a convential HDD bore for electrical conduit installation be acceptable?
ANSWER: Per direction from the FAA, neither Jack and Bore nor HDD bore will be allowed; conduits will be constructed with open-trenching, and concrete encased. Payment removal will be of full panels/to clean joints.
15. QUESTION: The specifications call for the charging motors to operate on a 24V AC system. This will be the only medium voltage switch on the campus that operates in this manner. Do you want to change the switch operation to maintain consistency within the campus?
ANSWER: Switch specifications will be modified to match other switches on site in Addendum 002 of Amendment 0006 of the SIR.
16. QUESTION: ES101 notes to pull back the existing 15KV cables and feed the new switch. The cables will not be long enough to do this. Two options:
- Splice the cables in the manhold
- Repull the cables to the next termination point to the south of the project
Please advise.
ANSWER: Guernsey drawings show this cable will be adequate as new switch location is closer to MH.
17. QUESTION: If the Mechanical, Electrical and Pool subcontractors PPS is due on bid day how will the General Contractor’s know which of these will be acceptable?
ANSWER: In accordance with Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information, “The Offeror (General Contractor), as well as proposed Mechanical, Electrical, and Pool sub-contractors, are required to provide Past Performance Surveys (PPS), attached to the SIR (Section J, Attachment 10), along with Client Authorization Letters (format at Section J, Attachment 11) to past customers/clients. The Offeror, along with their Mechanical, Electrical, and pool sub-contractors, will send Past Performance Surveys (PPS) to clients who are familiar with the work demonstrated through previous contracts of a similar nature.”
18. QUESTION: Is the 1500kVA pad mount transformer (TX-1) shown on drawings ES-101 and E-601 new or existing?
ANSWER: Specification section has been added to Addendum 002 of Amendment 0006 of the SIR.
19. QUESTION: Are service disconnects required at the pool fans on drawing EP102?
ANSWER: No. The breakers feeding the drives within site of the drives and are specified to be lockable.
Contractor may consider separate disconnecting means in place of lockable breakers.
20. QUESTION: What is the voltage and conductor type for feeder #1 on E-601?
ANSWER: This is 15kV – MV105 cable. Further information has been added to Addendum 002 of
21. QUESTION: Is a City of Oklahoma City electrical permits required?
ANSWER: Yes
22. QUESTION: Is directional boring an acceptable means for crossing under the roadways for communication and electrical conduits?
ANSWER: Per direction from the FAA, neither Jack and Bore nor HDD bore will be allowed; conduits will be constructed with open-trenching, and concrete encased. Pavement removal will be of full panels/to clean joints. Refer to updated Civil drawings in Addendum 002.
23. QUESTION: Is there anyway you could move the bid date 2 weeks?
ANSWER: Per Amendment 0004, the proposal due date has been extended to March 3, 2021, 3:00 pm CT.
24. QUESTION: Are we allowed to submit the NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) for completed projects, instead of the PPS provided in the solicitation?
ANSWER: In accordance with Section L.3 (f), “The Offeror (General Contractor), as well as proposed Mechanical, Electrical, and Pool sub-contractors, are required to provide Past Performance Surveys (PPS), attached to the SIR (Section J, Attachment 10), along with Client Authorization Letters (format at Section J, Attachment 11) to past customers/clients”. Substitutions for the Past Performance Survey are not allowed.
25. QUESTION: Please confirm that small business participation and subcontracting plans are not required to be submitted at bid time.
ANSWER: Please refer to clauses AC4559 Subcontracting Plan (SEP 2007) and 3.6.1-4 Small, Small Disadvantaged, Women-Owned and Service-Disabled Veteran Owned Small Business Subcontracting Plan (JULY 2019) of the SIR for subcontracting plans.
26. QUESTION: Reference pages A224, A225, A226. Notes call for painting to stop at certain levels in the rooms. Please confirm that exposed roof structure in these room does not paint. Also, please confirm whether the mechanical ductwork in those rooms required to be painted. If so, does ductwork paint above the stated levels?
ANSWER: The only room that has a painted structure/ductwork is Equipment Lab 102. All other exposed ceilings and ductwork are not painted.
27. QUESTION: Refer to spec 099113 Exterior Painting and 090690 Color Schedule. No paint products are described in section 09113.3.6, only reference to 090690 Color Schedule which only lists color. Please provide paint system specifications for the exterior applications (doors & frames, bollards, concrete wall panels; CMU, gas & fire suppression pipe.)
ANSWER: This specification is revised in Addendum 002 of Amendment 0006 of the SIR.
28. QUESTION: Refer to spec 051200 thru 055213. These steel specs make reference to 099113 for matching primers with exterior paint systems but there is no information in 099113. Case in point are the rooftop stairs, ladders, rails and screen wall framing structure. Are they all unpainted galvanized or primed ferrous field painted or field paint galvanized. Please provide information and intent.
ANSWER: All exterior exposed steel is galvanized, and field painted.
29. QUESTION: Refer Spec 051200.1.9.A. It has been requested that the structural engineer allow qualified steel fabricators who use 3rd party plant inspections in lieu of AISC Certification be allowed to bid on this project. This exception is routinely given and many past and present projects on the FAA campus have been supplied by these quality fabricators.
ANSWER: Steel fabricator shall be AISC certified per 051200.1.9.A.
30. QUESTION: Refer Page A641 General Room Finish Schedule Note L. Note L states all exterior rails are galvanized or fiberglass and will not be painted. However, Elevations show exterior handrails to be painted. (refer 6/A202). Please verify if any exterior handrails are to be painted.
ANSWER: All exterior exposed steel is galvanized, and field painted. No fiberglass on the exterior.
Interior fiberglass rails, grates, ladders, etc. do NOT get painted.
31. QUESTION: The Subcontractors are to submit PPS’s for the project, are we to include these with our proposal and identify who we intend to utilize?
ANSWER: The intent is for the General Contractor to have the subcontractors they intend to use on this project submit surveys as described in Section L.3 Instructions for Preparation and Submission of Proposals
(f) Past Performance Information in the SIR and Amendment 0001.
32. QUESTION: It appears that the Subcontractor’s PPS’s will be utilized in determining award. Typically we would receive subcontract quotes from multiple subcontractors and the low bid utilized. Since we have no way of knowing how a Subcontractor will fair in your PPS’s review and what value you will assign said Subcontractor that assessment could lower the value of our bid. We suggest that we be allowed to submit the low Subcontractor as our base bid, with alternate subcontractors included as additives that you may select if you deem that sub the best value. Would this be acceptable?
ANSWER: The Government will be selecting an offeror, which provides the best value to the Government. Since this will be a firm fixed price contract, the Government will not be accepting alternates for the subcontracting team.
33. QUESTION: Is it acceptable to provide Value Engineering options in our proposal for your consideration?
ANSWER: No. This is a firm fixed price contract to be based upon the SIR, Drawings, Specifications, and Amendments.
34. QUESTION: Since this is a Best Value award, and your instructions say “Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.”
What may be included in the proposal? Is our past performance review limited to just the PPS’s? Can breakdown of pricing be provided for “Best Value” analysis?
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals for what is to be included in the proposal.
35. QUESTION: Can you elaborate on what you expect to see in the proposal beyond the basic documents provided?
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals of the SIR for what is to be provided.
36. QUESTION: Refer to Plumbing Drawings P-001. There are a few items that did not get scheduled:
- Main thermostatic mixing valve
- Wall hydrants
- Roof hydrants
- Control valves for shower The specs for each of these items only list manufacturer, but no model numbers.
ANSWER: Wall and roof hydrants model to meet specification requirements. Refer to updated schedules on sheet P-001 issued in Addendum 002 of Amendment 0006 of the SIR.
37. QUESTION: As the subcontractors send out past performance surveys, I believe that they are to send them to the owners of the past projects, not the General Contractors. Is this correct?
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals (f) Past Performance Information of the SIR and Amendment 0001.
38. QUESTION: The Bid Bonds needs to be a hardcopy original delivered by 2-19-21, correct? Everything else can be emailed?
ANSWER: In regards to the Proposal Guarantee, please refer to Section L.3 Instructions for Preparation and Submission of Proposals (e) (4) Proposal Guarantee of the SIR.
39. QUESTION: Is the contractors release to be submitted?
ANSWER: No. This is to be submitted after the contract is completed.
40. QUESTION: Do the PPS need to be returned to you by 3-19-21 @ 3 PM or just the receipts that they have been requested?
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information of the SIR and Amendment 0001.
41. QUESTION: Can you verify the list below is exactly what is to be turned in?
- Section 1: Contract Documentation/Price Proposal o Section A – Solicitation, Offer & Award
• 3 pages of job info o Section B – Supplies or Services/Prices
• 1 page/1 line item for pricing o Section C – just acknowledge?
o Section D – just acknowledge?
o Section E – just acknowledge?
o Section F – just acknowledge?
o Section G – just acknowledge?
o Section H – just acknowledge?
o Section I – just acknowledge?
o Section J – just acknowledge?
o Section K – fill in some information and acknowledge o Proposal Guarantee – 20% Bid Bond
- Section 2: Past Performance Information (PPS – Past Performance Survey)
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals of the SIR and Amendment 0001.
42. QUESTION: We are hearing a couple of subcontractors mentioning this is due tomorrow? Is anything due on 2-9-21? Or is it all due 2-19-21?
ANSWER: Please refer to Page 1 Block 13 and Section L.12 Directions for Submitting Proposal(s) of the SIR, and Amendments 0001 and 0002 for when proposals are due.
43. QUESTION: Reference Section 131500 2.3 Pool Filters, “For consideration of an alternate, Contractor must submit request with all detailed design information to Architect at least 15 days prior to bid.” With the duration and time required to submit an alternate, it will not be ready in time for bid to be approved.
Can an alternate manufacture be utilized that meet the design requirements of the specifications? If alternate filters have to be submitted in advance as the specifications indicate, can additional time be allowed or an accelerated process be put in place to review alternates now? Keeping in mind it will take 5 working days to prepare an alternate request once we have confirmation.
ANSWER: According to spec section 001250, Part 1, 1.4, the CO will only consider requests for substitutions within ten (10) days after the award of the contract.
44. QUESTION: Since subs are required to turn in the PPS 10 days before the bid date, will there be a list of accepted subs available to general contractors?
ANSWER: There is not a list of general contractors. Also, please reference Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information of the SIR and Amendment 0001 as to when PPS are to be submitted.
45. QUESTION: It is our understanding that the surveys need to be sent to our current or past clients to grade our performance so that we may be in consideration for this project. However, we are hearing some conflicting information such as we need to list current or previous General Contractors, we have done work for to grade our performance. Can you clarify?
ANSWER: Please refer to Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information of the SIR and Amendment 0001 regarding Past Performance Surveys.
46. QUESTION: Drawing FX101 Fire Suppression General Note 17. (FUTURE PHASE) - PROVIDE
ELECTRIC FIRE PUMP WITH REMOTE START/STOP CAPABILITY.
Drawing FX401 Details 2 & 4 depict (Future Phase) Fire Pump.
No specifications are provided for fire pump apparatus.
Please confirm NO fire pump is to be included with this phase of the project
ANSWER: Confirmed. There is NO fire pump for this project.
47. QUESTION: Drawing FX101 Detail 3 depicts two control valves and a check valve upstream of the backflow preventer.
Please confirm these are NOT necessary with this phase of the project
ANSWER: Confirmed. These are shown as future valves which will be required for the future fire pump.
48. QUESTION: Drawing FX101 Detail 3 depicts a backflow preventer with OS&Y valves.
Specification Section 211313 2.3 CONTROL VALVES A. All valves installed on the aboveground piping of the wet pipe sprinkler system which control the water supply to the sprinkler system shall be of the indicating, butterfly-type, with integral tamper switches.
2.4 BACKFLOW PREVENTION
A. A double check backflow prevention assembly shall be provided.
Please confirm the backflow prevention assembly MAY be installed with butterfly valves.
ANSWER: Confirmed. Butterfly valves are acceptable for the backflow preventer.
49. QUESTION: Drawing FX101 Detail 3 depicts a forward flow test riser cross connected with the fire department connection.
Please confirm these two apparatuses MAY be piped separately.
ANSWER: Confirmed. It is acceptable to separate these. Caution should be taken for limited available space to accommodate the expected size of the future fire pump.
50. QUESTION: On PS1.02, note #19, engineer suggests use of dry-gunite construction for the walls. Past experience suggests from a pool subcontractor that the research tank walls should be fully formed and cast-in place concrete. Please confirm this is acceptable as an alternative means of construction.
ANSWER: Research Tanks walls may be Gunite, shotcrete, or cast-in-place.
51. QUESTION: Can you confirm whether or not there will be power available on site or if we should get you alternate pricing for solar units:
ANSWER: There is a 12.5KV-480/277V pad mounted transformer and one 480V panel that are located between the Flight Sim and the Storage building. The 480V panel feeds the Flight Sim, and also used to feed the GOB building. There should be some capacity after the GOB was demoed. The transformer can be used but OCAT needs to approve. See attached photos.
52. QUESTION: The specifications Section 00411 Pool Subcontractor Prequalification states: “General Contractors may only utilize Pool Contractors approved by formal addendum. Failure to list an approved Pool Contractor will result in disqualification of the entire bid.”
The pool subcontractors are required to submit this 14 days in advance. Addendum 1 requires the Pool Subcontractor to submit a PPQ survey to owners. Will both the survey and the prequalification be required? These two seem to be redundant, and the survey not necessary if the Pool Sub has already been qualified.
ANSWER: List of approved Pool Sub-Contractors
- Capri Pools
- CEM Aquatics
- KC Gunite
- Progressive Commercial Aquatics
- Sunbelt Pools
The Mechanical, Electrical, and Pool subcontractors the General Contractor proposes to use for this project are required to submit past performance surveys and evidence to show that the PPS was provided to the primary reference by no later than 10 days prior to the SIR closing date… that will be used to determine which team will provide the Best Value to the Government for this project. Please also refer to Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information and Amendment 0001 of the SIR.
53. QUESTION: Reference Medium Voltage Transformer Specifications. There are no specification listed for the medium voltage transformer. Please advise.
ANSWER: Spec secion 261219 – Pad Mount Medium Voltage Transformers is added to the project in Addendum of Amendment 0006 of the SIR.
54. QUESTION: Refer to Drawing S171 note and spec 412213.13.2.2.D. The note calls out a “Human-Rated Double Girder Bridge Crane” and the specs say “the crane to be human-rated. Conform to all OSHA and safety requirements”. Several crane suppliers want to know where they can find engineering/safety criteria that will allow them to provide an overhead crane that is safely “human-rated”. Can the architect/engineer provide some guidance as to where to find the standards (fall-protection, redundant power source?) for such a crane?
ANSWER: Recommended references are ASME-B30.23, Personnel Lifting Systems, and CMAA 70, Multiple Girder Cranes, latest editions. Final design and safety criteria shall be left to the expertise of the crane manufacturer and shall meet the stated project requirements.
55. QUESTION: Refer to Spec 01400 Quality Requirements, paragraph 1.6.A and 1.10.C. Paragraph 1.6A says Special Inspections are to be acquired by contractor and included in base bid. Paragraph 1.10.C says owner will engage a testing agency to conduct special test and inspections “as the responsibility of the owner”. Please confirm whether the contractor should have “Special Inspection as required by Oklahoma City” costs in his bid.
ANSWER: The Special Inspections will be acquired by the Contractor and included in the Base Bid.
56. QUESTION: We need additional information on the occupancy info personnel riding on the crane or hoist.
Cranes and hoists are not rated for carrying people and most manufacturers/insurers will decline to cover or offer products. We may be able to add an auxiliary hoist until that is man rated by need additional information.
ANSWER: Final design and safety criteria shall be left to the expertise of the crane manufacturer and shall meet the stated occupancy requirements.
57. QUESTION: Please provide paint systems for 099113 – EXTERIOR PAINTING similar to that shown in 099123 – INTERIOR PAINTING. Various specs from 051200 to 055213 make reference to 099113 for primers compatible with exterior paint systems.
ANSWER: A revised specification section is provided in Addendum 002 of Amendment 0006 of the SIR.
58. QUESTION: Please provide geotechnical report for the project.
ANSWER: Geotech Report is attached to Amendment 0004 along with this set of responses.
59. QUESTION: Reference 312000 1.5C Seismic Survey report from seismic survey agency. Please clarify requirement for seismic survey.
ANSWER: Requirement for seismic survey has been removed from the specifications in Addendum 002 of
60. QUESTION: Reference 131500 – Please provide research tank specification section.
ANSWER: Provided in Addendum #001.
61. QUESTION: Reference Specification 001270 Unit Prices states to provide labor rates for each classification for Straight time, Over time, and Double time. As well as provide a unit price for Drilled Concrete Piers and Shafts per CY of Concrete. Please advise if this information needs to be submitted along with the Bid Proposal for review and Consideration for Project award.
ANSWER: Unit prices for Labor Rates is omitted. Section B has been revised in Amendment 0006 to add an additional line item for Unit Pricing for Drilled Piers.
62. QUESTION: Specification 001010 – Summary 1.5 – Access to Site “Contractor will be allowed to park vehicles within the Contractor Staging area only”. Please advise on location of the Contractor Staging Area”, and are Connexs, Job trailer, permitted in the “Contractor Staging area”?
ANSWER: Contractor Staging Area will be shown on Sheet C-102 in Addendum 002 of Amendment 0006 of the SIR. Connex boxes and job site trailer will be permitted in the staging area.
63. QUESTION: Please confirm if a price should be provided for the future Fire Pump or will this be at a later date? If pricing is needed please provide specifications and details.
ANSWER: No. Pricing is not required for a future Fire Pump.
64. QUESTION: Spec Section 101419 indicates that there is signage with illuminated channel letters however sheet A-721 – SIGNAGE AND SPECIALITIES PLAN, does not indicate such a sign. Are there any illuminated channel letter signs on the project? Also, this specification refers to Floresville Electric Light & Power System New Headquarters rather than CAMI-WiWAVES. Is it possible that we have the wrong sign spec?
ANSWER: Spec section 101419 Dimensional signage will be removed. Please reference Panel signage general signage information and 101416 Plaques for FAA logo information (SN7). This section has been added to Addendum 003 of Amendment 0007 of the SIR.
65. QUESTION: Can you provide the Geo Tech report and boring logs for the project? We do not know how much undercut beneath the building slab will be required or the requirement for pool subgrade modifications.
ANSWER: Refer to Amendment 0004.
66. QUESTION: Refer to Drawing A641 Room Finish Schedule. Epoxy Flooring is shown in Room 101 Lobby/Gathering Area. There is no specifications for Epoxy Flooring. Please provide a specification for Epoxy Flooring.
ANSWER: Specification Section 096723 Resinous Flooring provided in Addendum #001.
67. QUESTION: Work Class of crane is A, B, C, D, E, or F? Class C is the standard.
ANSWER: Assume Class C. Final design shall be left to the expertise of the crane manufacturer to ensure crane meets the project requirements.
68. QUESTION: The specifications say that the environment is corrosive. Is there a group, class & division rating to follow? Looks like there is only water vapors in that area.
ANSWER: Environmental issues typical of an indoor pool shall be taken into account.
69. QUESTION: Are we supplying the runway rail or beams?
ANSWER: Runway rail and beams shall be provided by the crane supplier.
70. QUESTION: Are we providing an installation quote? If so, is the roof going to be off when this bridge crane is being installed?
ANSWER: Refer to Construction Sequence General Notes on sheet G-002 in Addendum 002 of
71. QUESTION: I assume we are providing a load test quote?
ANSWER: Yes, provide a load test quote. The crane will be used to lift equipment carrying humans, as stated. Crane basis of design contact information is provided in specification section 412213 in Addendum 002 of Amendment 0006 of the SIR.
72. QUESTION: On sheet FB2.03 for the CAMI WiWaves Research Facility detail B is cut off at the top.
Can you please send that full detail?
ANSWER: Updated Detail B is provided in Addendum #001.
73. QUESTION: Do you by chance have a detailed breakdown of sizes and quantity for the following:
- Concentric Reducers, Eccentric Reducers, Gate Valves, Butterfly Valves, Actuated Valves, Flap
Valves
ANSWER: No.
74. QUESTION: I am getting turned down on getting hoist & crane quotes for this project. The issues are that in the crane specifications section “1.2-B-7& 8” ASME NOG-1 & NUM-1 specifications are listed which are for Nuclear facilities. It is going to be very hard to find any manufacturer to meet those specifications.
I am also having trouble finding a hoist manufacturer that will quote me hoist rated for human lifting. We can ask to see if at least they can take exceptions to those specifications listed. Let me know how to proceed.
ANSWER: The overhead bridge crane must meet the project requirements to safely lift and move equipment containing humans into and out of the water tank. Final design and safety criteria shall be left to the expertise of the crane manufacturer and shall meet the occupancy requirements.
75. QUESTION: What code is the tank required to be built to? (AWWA, NFPA, etc…). This code will affect manway quantity, hatch sizing, etc… It will also affect the weld process for erection.
ANSWER: Tank will be designed to AWWA D103-09. See Spec section 131500: 2.7 in Addendum 001.
76. QUESTION: What coating system is required? Is high corrosive paint going to be required?
ANSWER: Tank shall be rated for use with chlorinated water. See Spec section 131500: 2.7 for details.
77. QUESTION: Drawings depict a bolted/riveted tank, is this what will be required?
ANSWER: No, the tank is not required to be bolted.
78. QUESTION: We assume based on the drawings this tank will NOT be used for drinking or fire suppression, and WILL be used for the pool portion. Which makes me believe the coating will need to be able to withstand the elevated chlorine levels not normally found in potable and/or fire suppression system tanks. Tnemec should have a coating to meet this need, however IT MAY NOT meet potable water drinking standards and there will be a dramatic different in cost between the two. Please can you confirm if the tank has to be built to potable water standards and provide a coating system?
ANSWER: The holding tank will not be used for drinking water or fire suppression. Tank shall be rated for use with chlorinated water. See Spec section 131500: 2.7 for details in Addendum 001.
79. QUESTION: In reference to the crane subcontract. It looks like there are 3-4 monorails. I need the length of each of these. Also on the bridge crane what is the length of the runway? The span is 121 ft. I am assuming the length is around 140.
ANSWER: This information is provided in Addendum 002 of Amendment 0006 of the SIR.
80. QUESTION: Has there been any discussion about the date possibly moving from Friday 2-19-2021 to a later date if the historic weather we are forecasted to receive actually comes in? Projections on snow totals and it’s direct affect to travel, etc…will make it near impossible to be able to work on the proposal for possibly 1, 2, or even 3 days or longer.
ANSWER: Per Amendment 0004, the proposal due date is extended to March 3, 2021, 3:00 PM CT.
81. QUESTION: What sinks are to be used in the vanities? The plumbing schedule states solid surface refer to archs. They aren’t any help. The section view shows what looks like an integral sink. But the elevations look like drop-in sinks.
ANSWER: Integral sink to be used at all vanities. Size and shape called out in spec section 123661.16.
Notes updated in schedule on sheet A-641. Millwork section noting updated on sheet A-361. This information was provided in Addendum 002 of Amendment 0007 of the SIR.
82. QUESTION: I am contacting to learn more about the GC contacts that are qualified to bid the project, and hoping to receive a List of Bidders and contacts for this project.
ANSWER: There is not a list of qualified GC’s or a List of Bidders. The pre-proposal teleconference and site visit attendees lists have been posted to BetaSAM.
83. QUESTION: Are the VFD’s for (F1 thru F11) provided by the Mechanical Contractor as listed in the “HVAC Power Ventilator – Propeller Fan Schedule” on M-602 or the Electrical Contractor as listed on note #4 of EP102?
ANSWER: The VFD is ordered with the Fans to keep compatibility. General contractor should coordinate this.
84. QUESTION: Feeder #7 on sheet E-601 has (3) sets of 4-500MCM, 3/0-GND in (3) 2” EMT. Is this correct?
ANSWER: This information has been updated in Addendum 002 of Amendment 0006 of the SIR.
85. QUESTION: Feeder #8 on sheet E-601 has (2) sets of 4-350MCM, #1-GND in (3) 3 ½” EMT is this the correct size and quantity of conduits?
ANSWER: This information has been provided in Addendum 002 of Amendment 0006 of the SIR.
86. QUESTION: Both feeder #7 & 8 list to use EMT is this the correct conduit type for the corrosion area that it terminates in?
87. QUESTION: Refer to Drawing P001 Plumbing Fixture Schedule. The Schedule says to “refer to arch” for BOD of the solid surface sinks. The architectural gives no information. The section views show what looks like an integral sink but the elevations are drawn as a drop-in type sink. Please clarify which sinks are integral solid surface and which are drop-in. Give a fixture type if drop-in.
ANSWER: Integral sink to be used at all vanities. Size and shape called out in spec section 123661.16.
information was provided in Addendum 002.
88. QUESTION: Is there a Geotech report to review for this project? Where can we access it?
ANSWER: The Geotech report can be found attached to Amendment 0004.
89. QUESTION: Refer to EL102, Electrical Lighting Plan A. There is a Keyed Note 8 symbol in Gathering Rm. 101E, however there is no Keyed Note 8 description. Please provide Keyed Note 8 description.
90. QUESTION: Refer to E601, Feeder Schedule. Feeders #0 and #1 call for (1) set of conductors and (2) conduits. Is one of these conduits meant to be a spare or should there be (2) sets of conductors?
ANSWER: Conduit is spare for future use.
91. QUESTION: Refer to E601, Feeder Schedule. Feeder #7 calls for (3) sets of 4#500 MCM and 1#3/0 GND in (3) 2” conduits. The conductors size for feeder #7 is too large for the conduit size on feeder #7. What conduit size should be used for feeder #7?
92. QUESTION: Refer to E601, Feeder Schedule. Feeder #8 calls for (2) sets of conductors and (3) conduits.
Is one of the conduits a spare or should there be (3) sets of conductors?
93. QUESTION: Refer to E601, One-Line. What amperage is the new medium voltage distribution cabinet?
What amperage are the breakers of the new medium voltage distribution cabinet?
94. QUESTION: Addendum 3 answered questions in regards to listing out of approved pool and mechanical, electrical subcontractors as basically at your discretion based on the surveys provided, however the specs state that the pool subcontractors approved to bid would be listed out in a forthcoming addendum. Why would this not be the case also for the mechanical and electrical subcontractors if they also first meet approval by the survey reviews?
ANSWER: The approved Pool Subcontractors for this project are listed in Question #121. The Mechanical, Electrical, and Pool subcontractors the General Contractor proposes to use for this project are required to submit past performance surveys and evidence to show that the PPS was provided to the primary reference by no later than 10 days prior to the SIR closing date… that will be used to determine which team will provide the Best Value to the Government for this project. Please also refer to Section L.3 Instructions for Preparation and Submission of Proposals (f) Section II – Past Performance Information and Amendment 0001 of the SIR.
95. QUESTION: On page 21 of specifications volume 1, Allowances, Section 001270 Unit Prices, 2 scheduled units (after hours and weekend work and piers) are shown but yet in a previous Q/A reply it was stated bid form will likely not be updated. Where are we to list out these units?
ANSWER: Unit prices for Labor Rates is omitted. Section B has been revised in Amendment 0006 to add an additional line item for Unit Pricing for Drilled Piers.
96. QUESTION: Many questions state refer to L.3 Instructions for Preparation and Submissions of Proposals, where is this document and related documents located?
ANSWER: All documents can be found at https://beta.sam.gov; Keyword: 6973GH-21-R-00001. All documents are posted in the Attachments/Links section. Section L.3 Instructions for Preparation and Submissions of Proposals can be found in the SIR 6973GH-21-R-00001 and revised in Amendment 0001.
97. QUESTION: Earlier Q/A on one of the addendums said a City of OKC permit was required. Has the permit been applied for, if so, has the review comments been provided yet? Also whom is responsible for the permit fees? If to be included in the bid, please provide what those fees are including the streets/improvements impact fees if applicable.
https://beta.sam.gov/
ANSWER: The A/E is responsible for submitting the plans to the City of OKC for a Building Permit. The Contractor will be responsible for all permit fees when they pick up the Building Permit.
98. QUESTION: Is the project subject to sales tax or is the project exempt from sales taxation?
ANSWER: This project is subject to sales tax.
99. QUESTION: Spec section 01400 Quality Requirements has contradicting statements. Section 1.6 Special Inspections item A states the Contractor is to employ an independent testing agency. Under 1.10 Item C Special Tests and Inspections (those required in addition/beyond City of OKC inspections), it states “owner will engage a testing agency to conduct special tests and inspections”. Please clarify so bid can either reflect the expenses of a contractor provided testing agency or not.
ANSWER: The Special Inspections will be acquired by the Contractor and included in the Base Bid.
100. QUESTION: Refer to section 051200 Structural Steel Framing, confirming 1.9 Quality Assurance that the fabricator must be AISC Quality Certification Program designated, this usually is waived on steel jobs of this size, either waived completely or allowance of inspection at the fabrication site in lieu of.
ANSWER: Steel fabricator shall be AISC certified per 051200.1.9.A.
101. QUESTION: Where can the geotechnical report be found?
ANSWER: The geotechnical report can be found in Amendment 0004.
102. QUESTION: The table of contents volume 1, Division 13 Special Construction lists section 131500 as Research Tank and 131520 as Testing/Training Pool however the actual specification for 131500 is Testing/Training Pool. Is there a Research Tank spec? Also is there a holding tank specification? The SP sheet that has the most details regarding the holding tank is mainly on the foundation aspects of the tank, I can find no spec that refers to approved manufacturers/suppliers of the actual holding tank and it’s components.
ANSWER: Spec section 131500 has been updated and has the holding tank spec. There was not intent for a Spec Section 131520 in Addendum 001.
103. QUESTION: Will we be able to utilize the entire area of the empty lot for our laydown area? Can you put out a drawing that defines the laydown area and where we can stage?
ANSWER: Contractor staging area is shown on sheet C-102 in Addendum 002 of Amendment 0006 of the SIR.
104. QUESTION: With the depth of the excavation for the Research Tank (24’ +) it is likely that we will be below the water table. Would the Contractor be able to discharge the water from the dewatering well or well point system?
ANSWER: Discharge of recovered waters must meet municipal and state regulatory requirements and must be discussed in the contractor’s SWPPP. Also, groundwater encountered during excavation activities must be periodically sampled for volatile organic compounds (VOCs). If VOCs are encountered during construction activities, the contractor shall contact the Contracting Officer Representative (COR) and the Office of Environmental and Occupational Health and Safety (EOSH) to determine if mitigation is required.
105. QUESTION: We request the Geotech Report. We are assuming it will show us how we treat the sub slab underneath the Research Tank. It appears on the drawings that there is a 2’2” mud slab under the Tank with an aggregate base between the mud slab and Tank slab. Can you provide the Geotech Report and provide guidance on how we treat the subgrade underneath of each and every tank?
ANSWER: The Geotech Report has been provided with Amendment 0004. Per note 8 on PS1.02, the research tank pool slab shall be constructed on a minimum 12” thick zone of clean granular drainage fill material above the underlying soils. The granular drainage fill material shall be placed over reconditioned and approved native soils or additional controlled engineered fill material. The Geotechnical Engineer shall determine if the exposed subgrade soils are acceptable to support the research tank below pool slab fill material, or if unstable or unsuitable soils exist which require removal and replacement with controlled engineered fill material. See Detail B-PS1.02 for additional information. A mud slab is not indicated or required.
106. QUESTION: We also believe the Geotech will indicate the building itself is undercut 3’ and brought back to grade with some kind of select. Can you provide guidance on this?
ANSWER: Refer to FOUNDATION NOTES on sheet S-001 and referenced Geotechnical Report for known subgrade requirements.
107. QUESTION: Please confirm, this project is not tax exempt, correct?
108. QUESTION: Reference PS 1.02 Note 6 which mentions a minimum of 24” of drainage fill behind the walls. Then it goes on to say in 22 that the fill material will be either a crushed rock. Is it the intent that the entire excavated area outside the walls will be backfilled with the Aggregate material as described, and that no select fill will be allowed?
ANSWER: The FAA believes this is referencing note 9 and NOT note 6 for this question. The minimum 24”of granular drainage fill material is at the base of the wall and is intended to extend up at an angle away from the wall as defined in the Geotechnical Report. The entire area as defined in the Geotechnical Report shall be backfilled with the granular drainage material as indicated in note 9 on PS1.02 and defined in note 22 on PS1.02.
109. QUESTION: In the past some projects at Mike Monroney have been tax exempt and some have not depending on buildings being owned by FAA or by the City of Oklahoma. I have been unable to find tax requirements in Solicitation documents to whether this project is tax exempt or not.
110. QUESTION: Sheet M-701 (2) shows (To Filters REF SP2.03) referring to Tank Heating Water Piping.
Sheet SP2.03 does not exist. Are FB1.01 (A) and FB2.02 (A) the correct references for this piping system?
ANSWER: Yes, FB1.01 & FB2.02 are the correct sheets for connections of heater piping to filtration system.
111. QUESTION: The fixture schedule on sheet P-001 states that sink P-4 is a “solid surface lavatory” and to reference the architectural drawings. Detail 4/5 on sheet A-221 illustrates a “drop-in” sink contrary to the integral sink stated in the plumbing drawings. The cost difference between an integral sink and a drop-in sink is between $50 and $200/sink. Please advise whether sink P-4 shall be an integral sink or a drop-in sink. In either cases, we will need a specification issued.
ANSWER: Integral sink to be used at all vanities. Size and shape called out in spec section 123661.16.
information was provided in Addendum 002.
112. QUESTION: Please provide an allowance amount for the research tank if a specification is not issued.
ANSWER: Refer to updated specification section 131500 provided in Addendum 001 of Amendment 0005 of the SIR.
113. QUESTION: Sheet A-461 finishes schedule shows TS3 transition strip to be Schluter Dilex-EKE aluminum (this is PVC). Detail #7 shows Schluter Dilex-AHK. Please indicate which one shall be used.
ANSWER: TS3 will be Schluter Dilex-AHK. The schedule has been updated in Addendum 002 of
114. QUESTION: Architectural sheet A-461/Det. 4 shows a 3”x1/2” solid surface threshold. Please indicate the product to be used and the color.
ANSWER: Corian Designer white will be used. The schedule notes have been clarified in Addendum 002 of Amendment 0006 of the SIR.
115. QUESTION: Sheet A-641 detail shows Schluter Kerdi Board in shower. Is Kerdi Board just to be used in the shower only over the PFT1 floor?
ANSWER: The tile backing board is specified in section 092900 Gypsum Board. The Schluter Kerdi waterproof fleece membrane is specified in section 093013 Ceramic Tile. Kerdi Board and waterproofing sheet will be used on shower walls. Kerdi waterproofing sheet and tape will be used below the PFT1 floor.
TS3 Detail will be updated to show information. This has been updated in Addendum 002 of Amendment 0006 of the SIR.
116. QUESTION: What type of wall board in the locker room and rest rooms, where PWT1 is to be installed.
Depending on the type, whether it’s sheetrock or concrete board, will indicate if mastic should be used or thin-set. There is a substantial cost difference between mastic (higher cost) vs thin-set (cheaper cost) which could affect the cost for this scope.
ANSWER: The tile bracing board is specified in section 092900 Gypsum Board. This has been updated in Addendum 002 of Amendment 0006 of the SIR.
117. QUESTION: Will a qualified list of M/E subcontractors be provided via Amendment?
ANSWER: No list will be provided.
118. QUESTION: Will a copy of the construction agreement be provided prior to the submission date? This inquiry is to confirm that the Solicitation, Offer and Award plus the clauses were the only documents that would comprise the agreement (contract).
ANSWER: Any resultant contract will include the Solicitation, Offer, and Award document, Attachment 1 Section B – Supplies or Services-Prices, Attachment 2 WiWaves Specs Volume 1, Attachment 3 WiWaves, Specs Volume 2, Attachment 4 WiWaves Drawings, Attachment 5 Chapter 33, Construction Safety, Attachment 6 Standard Form 25, Performance Bond, Attachment 7 Standard Form 25A Payment Bond, Attachment 8 Operational Control Documents, Attachment 9 Wage Rate Decision, General Decision No, OK 20200049, and Attachment 12 Contractor’s Release, CAMI-WiWAVES Geotechnical Report – Add1- Pier Size 2020-04-28 attachment, CAMI WiWAVES – Geotechnical Report – Rev1 2020-03-18 attachment, Addendum 001 Summary attachment, Addendum 001 Drawings attachment, and Addendum 001 Specs attachment. Attachment 10 Past Performance Survey and Attachment 11 Client Authorization Letter will not be physically included in any resultant contract. These documents have been posted to the BetaSAM website.
119. QUESTION: M-301 Detail 5 shows stacked…