EO 16-02-08-RVSM Critical Area Demarcation CL-604.pdf

PDF 176 KB Posted

Attached to
Solicitation - Bombardier Challenger 601 & 604 Strip & Paint - AMENDMENT 0003
Solicitation number
6973GH-18-R-00032
Issued by

About this file

EO 16-02-08-RVSM Critical Area Demarcation CL-604 (pdf)

View the file

Other files

File Type Posted
CDRL P001 Program Management Plan.pdf PDF
Attachment 9-AVN-Review Site casp master.pdf PDF
Questions and Answers 6973GH-18-R-00032-0002.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
6973GH-18-R-00032.pdf PDF
Questions and Answers 6973GH-18-R-00032-0003.pdf PDF
6973GH-18-R-00032-0002.pdf PDF
SOW-Bombardier 600 Series Painting Rev 3.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
6973GH-18-R-00032-0003.pdf PDF
Appendix A - CL-601 Paint Scheme, Rev C.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
SOW-Bombardier 600 Series Painting Rev 2.pdf PDF
Attachment 9-AVN-Review Site casp master.pdf PDF
6973GH-18-R-00032-0002.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
6973GH-18-R-00032.pdf PDF
Questions and Answers 6973GH-18-R-00032-0002.pdf PDF
Appendix A - CL-601 Paint Scheme, Rev C.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Attachment 9-AVN-Review Site casp master.pdf PDF
Appendix A - CL-601 Paint Scheme.pdf PDF
6973GH-18-R-00032.pdf PDF
CDRL A001 Paint Scheme Specification Submission.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
SOW-Bombardier 600 Series Painting.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
EO 16-09-11 RVSM CL-601-d.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
EO 16-09-11 RVSM CL-601-d.pdf PDF
CDRL A001 Paint Scheme Specification Submission.pdf PDF
SOW-Bombardier 600 Series Painting.pdf PDF
6973GH-18-R-00032.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Appendix A - CL-601 Paint Scheme.pdf PDF
EO 16-02-08-RVSM Critical Area Demarcation CL-604.pdf PDF
SOW-PR Pkg copy 9-11-2017.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VN Form 4100-5-2 (12/15) 160208B100.docx

EO No. 16-02-08

REV. -

DATE 10/3/16

APPROVAL

MANAGER, FIS/AME

DATE 10/3/16

ALTERATION PAGE 1 of 4

AIRCRAFT MAINTENANCE AND ENGINEERING

OFFICE OF FLIGHT INSPECTION SERVICES, FAA/DOT

OKLAHOMA CITY, OK

ATA 5300

TITLE RVSM Critical Area Demarcation

EFFECTIVITY CL-604: S/N 5588 (N88)

REFERENCES

ODA PROJECT Nos.

PROJECT ENGR Michael Bumbaugh EO JOB No.

DESIGN ENGR TI MANUAL

PROJECT REQUIREMENTS

Required Data Restoration Instructions

Materials Required Revision Upgrade Instructions

Special Tools Required Identification of Modified Units

X Source of Material Disposition of Surplus Materials

Interchangeability of Modified Units Special Instructions

Fabrication Instructions – Structures Instructions for Continued Airworthiness

Fabrication Instructions – Avionics Substantiation Data

X Accomplishment Instructions – Structures Compatibility with Other Alterations

Accomplishment Instructions – Avionics

ASSOCIATED REQUIREMENTS

Flight Manual Rev. Flight Test Operator Training Inspection System

Company Flt. Man. Rev. Electrical Load Rev. Capital Value Change Spares Affected

F.I. Manual Rev. Maint. Manual Rev. MRL Weight & Balance

Min. Equip. List Rev. Maintenance Plan Project Test Equip. Interdependent EO

Cockpit Checklist Maintenance Training Aircraft Equip. List Compliance Reporting

REVISION LOG

Rev. Date Init. Description List of Affected Sections

- 10/3/16 Original. N/A

PAGE 2 PART B-I EO 16-02-08

10/03/16

1. Purpose and Description

This EO highlights the RVSM critical areas on the Challenger CL-604 aircraft with four corners painted on the area around the Pitot-static tubes. This will help flight and maintenance crews visually reference the critical area.

2. Compliance Date and Action Activity

Refer to Production Control schedule.

3. Estimated Time Required

Sheetmetal: 4 employee-hours

4. Project Requirements

Source of Material a.

All parts shall be obtained from AVN stock.

Accomplishment Instructions – Structures b.

(1) Paint four corners of a boundary box to mark the RVSM critical zone on the aircraft. Use

Aristo Blue i6032 paint to match the existing color scheme of the aircraft. Figure 4-1 shows the dimensions of the corners to be painted, and Figure 4-2 shows the location of the RVSM critical area with the orientation of the corners of the boundary box.

Tech:______ Insp: ______

EO 16-02-08 PART B-I PAGE 3

Figure 4-1: Corner Dimensions

PAGE 4 PART B-I EO 16-02-08

Figure 4-2: Location of RVSM Critical Area, with Painted Boundary Corners

5. Associated Requirements

Weight and Balance Change a.

There is no appreciable change to aircraft weight and balance.

File details come from the government source that posted it.