Attachment 9-AVN-Review Site casp master.pdf

PDF 36 KB Posted

Attached to
Solicitation - Bombardier Challenger 601 & 604 Strip & Paint - AMENDMENT 0003
Solicitation number
6973GH-18-R-00032
Issued by

About this file

Attachment 9-AVN-Review Site casp master (pdf)

View the file

Other files

File Type Posted
CDRL P001 Program Management Plan.pdf PDF
Questions and Answers 6973GH-18-R-00032-0002.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
6973GH-18-R-00032.pdf PDF
Questions and Answers 6973GH-18-R-00032-0003.pdf PDF
6973GH-18-R-00032-0002.pdf PDF
SOW-Bombardier 600 Series Painting Rev 3.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
6973GH-18-R-00032-0003.pdf PDF
Appendix A - CL-601 Paint Scheme, Rev C.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
SOW-Bombardier 600 Series Painting Rev 2.pdf PDF
Attachment 9-AVN-Review Site casp master.pdf PDF
6973GH-18-R-00032-0002.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
6973GH-18-R-00032.pdf PDF
Questions and Answers 6973GH-18-R-00032-0002.pdf PDF
Appendix A - CL-601 Paint Scheme, Rev C.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Attachment 9-AVN-Review Site casp master.pdf PDF
Appendix A - CL-601 Paint Scheme.pdf PDF
EO 16-02-08-RVSM Critical Area Demarcation CL-604.pdf PDF
6973GH-18-R-00032.pdf PDF
CDRL A001 Paint Scheme Specification Submission.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
SOW-Bombardier 600 Series Painting.pdf PDF
Attachment 8-FAR-145 Audit cklst-of Site review by AVN.pdf PDF
6973GH-18-R-00032-0001.pdf PDF
EO 16-09-11 RVSM CL-601-d.pdf PDF
Appendix B - Paint Drawing Challenger604.pdf PDF
EO 16-09-11 RVSM CL-601-d.pdf PDF
CDRL A001 Paint Scheme Specification Submission.pdf PDF
SOW-Bombardier 600 Series Painting.pdf PDF
6973GH-18-R-00032.pdf PDF
CDRL P001 Program Management Plan.pdf PDF
Appendix A - CL-601 Paint Scheme.pdf PDF
EO 16-02-08-RVSM Critical Area Demarcation CL-604.pdf PDF
SOW-PR Pkg copy 9-11-2017.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVN-324 Computer Generated Form (8/99) Page 1 of 2 G:\SSTANLEY\18-00008 Paint Challenger\22 - SIR Amendments\Attachment 9-AVN-Review Site casp master.doc

CONTINUING ANALYSIS AND SURVEILLANCE PROGRAM

CONTRACT/VENDOR CHECKLIST

02/27/2018 11:45 AM

GENERAL INFORMATION

1. CONTRACT OR PURCHASE ORDER

NUMBER:

8. MANAGER:

2. DATE: INSPECTED 9. CHIEF INSPECTOR:

3. CONTRACTOR / VENDORS NAME 10. E-MAIL

4. ADDRESS:

11. INSPECTORS PHONE

NO OR POC.:

5. WEB PAGE 12. AUDITOR:

6. FAX NO.: 13. SIGNATURE: AND

7. CERTIFICATE NUMBER: DATE

AUDIT PROCEDURES

PERFORMING MAINTENANCE FOR A FAR 135 AIR OPERATOR,

FAR 145.2

NA YES NO REMARKS

1. Does thc contractor performing maintenance or services for Flight Inspection Maintenance Division (FIMD) have an organization adequate to perform the work?

Ref GMM III

2. Are personnel performing RII trained and authorized? GMM, III.

3. If performing maintenance for AVN, are contractors following procedures in AVN’s manuals?

4. Does the contractor participate in an anti drug and alcohol program? Not required for Foreign Repair Station.,GMM/ III

5. Are contract personnel authorized to sign a maintenance release? GMM, III

FAR 145 CERTIFICATED REPAIR STATION NA YES NO REMARKS

1. Review the repair station certificate and operation specifications. Does the repair stations have the rating to perform work for AVN?

2. List the service being performed by the contractor/vendor i.e., overhaul landing gear, repairing instruments, etc.

3. Is the person directly in charge of maintenance appropriately Certificated?

4. Obtain a list of supervisory and inspection personnel

5. Are there suitable shop storage facilities for storing parts, spare parts and raw materials?

6. Are only acceptable parts and supplies used and also stored and protected?

GMM III

7. Does the hangar or shop area have adequate ventilation, lighting and temperature control ?

8. Are incoming inspections being performed on items repaired or overhauled for

AVN? GMM III

9. Are preliminary inspections performed on items repaired or overhauled for AVN?

10. Are precision measurement and test equipment used for returning an item to service being calibrated to a standard? GMM/

11. Does the contractor (repair station) participate in an approved drug and alcohol

AVN-324 Computer Generated Form (8/99) Page 2 of 2 G:\SSTANLEY\18-00008 Paint Challenger\22 - SIR Amendments\Attachment 9-AVN-Review Site casp master.doc program? GMM III

WORK ORDERS

Review the repair stations maintenance work order for the following information: REF GMM CHP/ III

NA YES NO REMARKS

1. A complete description of the work performed

2. For major repairs & alterations, reference to the approved data used to accomplish the work.

3. A completed FAA Form 337 (major alterations) and or a work order for major repairs. FAR 43, appendix. B

4. A completed teardown report for repairs and overhaul

5. A completed maintenance release.

6. A list of parts replaced.

If any discrepancies are noted, complete a written memorandum identifying the problem area. Forward a copy to the contractor or vendor and AVN-320.

CONTRACT/VENDOR CHECKLIST
GENERAL INFORMATION
AUDIT PROCEDURES
REMARKS
WORK ORDERS
FAR 145 CERTIFICATED REPAIR STATION
REMARKS
NO
YES
NA

File details come from the government source that posted it.