EDE SIR Attachment J.4 EPMS Specification.pdf

PDF 302 KB Posted

Attached to
Procurement of Electrical Distribution Equipment and Life Cycle Support
Solicitation number
693KA8-18-R-00005
Issued by

About this file

EDE SIR Attachment J.4 EPMS Specification (pdf)

View the file

Other files

File Type Posted
EDE Amend 002 SF30.pdf PDF
EDE SIR Sec A to M Sol_693KA8-18-R-00005.pdf PDF
EDE SIR Attachment J.11 FAA Asset Identification Process and Procedure Guide.pdf PDF
EDE AMEND 002 Attachment J.13 Sample ACEPS Phase II Drawing - MJI.pdf PDF
EDE SIR Attachment J.13 Sample ACEPS Phase II Drawing.pdf PDF
EDE SIR Attachment J.2 Switchboard Specification.pdf PDF
EDE SIR Attachment J.5 DID and CDRL Index.pdf PDF
EDE AMEND 002 SECTION B.xlsx XLSX spreadsheet
EDE SIR Attachment J.9 FAA-STD-028C Contract Training Programs.pdf PDF
Amendment 0001 693KA8-18-R-00005.pdf PDF
EDE SIR Attachment J.12 Cost Build-Up.xlsx XLSX spreadsheet
EDE SIR Attachment J.4 EPMS Specification.pdf PDF
EDE SIR Attachment J-17 Past Performance Questionnaire.doc DOC document
EDE SIR Attachment J.8 FAA-STD-021A Configuration Management.pdf PDF
EDE AMEND 002 QA.xls XLS spreadsheet
EDE SIR Attachment J.15 Sample CPDS Type 2 Drawing.pdf PDF
EDE SIR Attachment J.10 FAA-C-1217G Electrical Work, Interior.pdf PDF
EDE SIR Attachment J.1 Paralleling Switchboard Specification.pdf PDF
EDE SIR Attachment J.3 Interior Distribution System Specification.pdf PDF
EDE SIR Attachment J-18 End-Of-Course Evaluations.pdf PDF
EDE SIR Attachment J.7 FAA-STD-019e Lightning and Surge Protection.pdf PDF
EDE SIR Attachment J-16 Bid Drawing Instructions.pdf PDF
EDE SIR Attachment J.6 DID and CDRL's.pdf PDF
EDE SIR SECTION B.xlsx XLSX spreadsheet
EDE SIR Attachment J.14 Sample CPDS Type 1 Drawing.pdf PDF
EDE SIR Attachment J.9 FAA-STD-028C Contract Training Programs.pdf PDF
EDE SIR Attachment J.5 DID and CDRL Index.pdf PDF
Amendment 0001 693KA8-18-R-00005.pdf PDF
EDE SIR Attachment J-17 Past Performance Questionnaire.doc DOC document
EDE SIR Attachment J.13 Sample ACEPS Phase II Drawing.pdf PDF
EDE SIR Attachment J.2 Switchboard Specification.pdf PDF
EDE SIR Attachment J.1 Paralleling Switchboard Specification.pdf PDF
EDE SIR SECTION B.xlsx XLSX spreadsheet
EDE SIR Attachment J.14 Sample CPDS Type 1 Drawing.pdf PDF
EDE SIR Attachment J.11 FAA Asset Identification Process and Procedure Guide.pdf PDF
EDE SIR Attachment J.8 FAA-STD-021A Configuration Management.pdf PDF
EDE SIR Attachment J.3 Interior Distribution System Specification.pdf PDF
EDE SIR Attachment J-18 End-Of-Course Evaluations.pdf PDF
EDE SIR Attachment J.15 Sample CPDS Type 2 Drawing.pdf PDF
EDE SIR Attachment J.12 Cost Build-Up.xlsx XLSX spreadsheet
EDE SIR Attachment J.10 FAA-C-1217G Electrical Work, Interior.pdf PDF
EDE SIR Attachment J.7 FAA-STD-019e Lightning and Surge Protection.pdf PDF
EDE SIR Attachment J.6 DID and CDRL's.pdf PDF
EDE SIR Attachment J-16 Bid Drawing Instructions.pdf PDF
EDE SIR Sec A to M Sol_693KA8-18-R-00005.pdf PDF
EDE SIR Attachment J.10 FAA-C-1217G Electrical Work, Interior.pdf PDF
EDE SIR Attachment J.2 Switchboard Specification.pdf PDF
EDE SIR Attachment J.3 Interior Distribution System Specification.pdf PDF
EDE SIR Attachment J.9 FAA-STD-028C Contract Training Programs.pdf PDF
EDE SIR Attachment J.8 FAA-STD-021A Configuration Management.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

693KA8-18-R-00005

PART III - SECTION J

ATTACHMENT J.4 - ELECTRICAL POWER MONITORING (EPMS) SPECIFICATION

ELECTRICAL POWER MONITORING AND CONTROL Page 1 of 39

TABLE OF CONTENTS

1.0 GENERAL……………………………………………………………………………..page 5

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 STANDARDS

1.4 QUALITY ASSURANCE……………………………………………………………..page 6

1.5 IDENTIFICATION

1.5.1 Nameplates

1.6 PROJECT MANAGEMENT

1.7 TRAINING

1.8 DRAWING AND DOCUMENTATION SUBMITTALS……………………………..page 7

1.8.1 Network Drawings

1.8.1.1 Wiring Details

1.8.1.2 Communications

1.8.1.3 Points List and Alarming

1.8.1.4 Drawing Categories

1.8.1.5 Submittals

1.8.2 Rack and Enclosure Drawings

1.8.3 PLC Wiring Diagram

1.8.4 COTS Documentation………………………………………………………………page 8

1.8.5 Operations and Maintenance Manual – User Level

1.8.5.1 Descriptions of Operation and Maintenance

1.8.5.2 User Level Software Operation………………………………………………….page 9

1.8.5.3 Site Specific Content

1.8.5.4 Maintenance

1.8.6 Operations and Maintenance Instructions – Administrative Level

1.8.7 Data Backup Plan/Instruction

1.8.8 Server, Workstation, VDT, and GUI Project Configuration Document……….page 10

1.8.9 Software List

1.8.10 EPMS/EPCS Hardware List

1.8.11 Ethernet IP Address List

1.8.12 Computer Name, Username, and Password List

2.0 PRODUCTS

2.1 MANUFACTURERS

2.2 EQUIPMENT OVERVIEW…………………………………………………………….page 11

2.2.1 Work Station

2.2.2 Server Rack

2.2.3 Tower Switch Enclosure

2.2.4 Custom Enclosure

2.3 EPMS/EPCS SYSTEM OVERVIEW

2.3.1 Summary

2.3.2 Turnkey Solution

2.3.3 EPMS/EPCS Software

2.3.4 Metering……………………………………………………………………………….page 12

2.3.5 Communication Network Architecture

2.3.6 GPS Timing System

2.3.7 Battery Backup Power

ELECTRICAL POWER MONITORING AND CONTROL Page 2 of 39

2.3.8 Client Computers

2.3.9 Integrated EPMS Devices

2.3.10 Open Protocol……………………………………………………………………..page 13

2.4 TIMING REQUIREMENTS

2.4.1 Time Sync

2.4.1.1 Standard

2.4.1.2 Requirements

2.4.2 Time Stamping

2.4.2.1 High-Speed Stamping

2.4.2.2 PC-Based Timing System

2.5 COMMUNICATION REQUIREMENTS……………………………………………..page 14

2.6 EPMS/EPCS HARDWARE REQUIREMENTS

2.6.1 System Server

2.6.2 EPMS/EPCS Workstation………………………………………………………….page 15

2.6.3 Server Rack

2.6.4 Tower Switch Enclosure

2.6.5 Printers………………………………………………………….............................page 16

2.6.6 Touch-Screen Monitors, VDTs

2.6.7 Wireless Mobile Tablet

2.6.8 Distributed Processing Modbus Masters and Protocol Converters

2.6.9 Power Quality Meter

2.6.9.1 Basic Measurements

2.6.9.2 Basic Inputs

2.6.9.3 Basic Compliance Monitoring

2.6.9.4 Basic Event Recording…………………………………………………………..page 17

2.6.9.5 Basic Communication Features

2.6.9.6 IEEE 1159 Power Quality Monitoring Needs

2.6.9.7 Advanced Features…………………………………………………..................page 18

2.6.10 Sequence of Events Recorder

2.6.11 Ethernet Gateway

2.6.12 GPS Time Sync System

2.6.13 Mini UPS

2.6.14 Programmable Logic Controls (PLCs)

2.6.14.1 Power Supply Module

2.6.14.2 Input modules…………………………………………………………………….page 19

2.6.14.3 Output modules

2.6.15 Warranty

2.7 EPMS/EPCS SOFTWARE REQUIREMENTS

2.7.1 Overview

2.7.2 Configuration

2.7.3 Server and Clients………………………………………………………………….page 20

2.7.3.1 Configuration

2.7.3.2 Distributed Processing and Redundancy

2.7.3.3 Clients

2.7.4 Monitored Data

2.7.5 Graphics and Display………………………………………………………………page 21

2.7.5.1 Screens

2.7.5.2 Template

2.7.5.3 Navigation

ELECTRICAL POWER MONITORING AND CONTROL Page 3 of 39

2.7.6 Active One-line………………………………………………………………………page 22

2.7.6.1 Overview

2.7.6.2 Components

2.7.6.3 Animation

2.7.6.4 One-line Screens………………………………………………………………….page 23

2.7.6.5 Floor Plans………………………………………………………………………..page 24

2.7.6.6 Third Party Devices

2.7.6.7 Legend…………………………………………………………………………….page 25

2.7.6.8 Network Drawings

2.7.6.9 Readings / Metered Values

2.7.6.10 Refresh Rate

2.7.6.11 Integrated Waveform Display

2.7.6.12 Graphic Quality

2.7.6.13 Resolution

2.7.6.14 Wireless Mobile Tablet…………………………………………………………page 26

2.7.6.15 Animated Charts and Graphs

2.7.6.16 Graphics Development Software Included

2.7.7 Alarming

2.7.7.1 Overview

2.7.7.2 Alarm States

2.7.7.3 Alarm Priorities

2.7.7.4 Annunciation

2.7.7.5 Response Time…………………………………………………………………..page 27

2.7.7.6 Digital Alarms

2.7.7.7 Analog Alarms

2.7.7.8 Onboard

2.7.7.9 Third Party Alarms

2.7.7.10 Alarm Delays

2.7.7.11 Time Stamp Accuracy

2.7.7.12 Alarm Conditions

2.7.8 Logging………………………………………………………………………….......page 28

2.7.8.1 Overview

2.7.8.2 Log Modes / Screens

2.7.8.3 Searching / Filtering / Sorting

2.7.8.4 Log Formatting

2.7.8.5 Alarm Log

2.7.8.6 Event Log………………………………………………………………………….page 29

2.7.8.7 Diagnostic Log……………………………………………………………………page 30

2.7.8.8 Time Stamp Resolution

2.7.8.9 Acknowledging Alarms

2.7.8.10 Disabling Events and Alarms

2.7.8.11 Commenting on Log Entries…………………………………………………….page 31

2.7.8.12 Log Exporting

2.7.8.13 Archiving

2.7.9 Data Trending

2.7.9.1 Overview

2.7.9.2 User Initiated Trending

2.7.9.3 Constant Trending

2.7.9.4 Trend Display

ELECTRICAL POWER MONITORING AND CONTROL Page 4 of 39

2.7.9.5 Real-Time Mode

2.7.10 Reporting

2.7.11 Meter Configuration……………………………………………………………….page 32

2.7.12 Paging

2.7.13 Maintenance mode………………………………………………………………..page 33

2.7.14 User Security

2.7.14.1 SCADA Application Security

2.7.14.2 Server and Client Security……………………………………………………..page 34

2.7.15 Diagnostics

2.7.16 On-Line Help……………………………………………………………………….page 35

2.7.17 Modifications / Upgrades

2.8 EPCS System Overview

2.8.1 System Integration

2.8.2 Main CPU PLC Cabinet

2.8.3 PLC Programming Software………………………………………………………..page 36

2.8.4 Breaker Control

2.8.5 Sequence of Operations

2.9 LICENSING AND SERVICE AGREEMENT

3.0 INSTALLATION AND CHECKOUT………………………………………………...page 37

3.1 GENERAL

3.2 FACTORY TESTING

3.3 FIELD, STARTUP AND COMMISSIONING SERVICE

3.3.1 Hardware Checkouts

3.3.2 Software Checkouts

4.0 FINAL DELIVERABLES……………………………………………………………..page 38

ELECTRICAL POWER MONITORING AND CONTROL Page 5 of 39

1.0 GENERAL

1.1 RELATED DOCUMENTS

Drawings and general provisions of the Contract apply to this specification

1.2 SUMMARY

1. This specification defines the requirements for both an Electrical Power Monitoring System (EPMS) and an Electrical Power Control System (EPCS). The EPMS system must be a monitoring system only and must not control any equipment. The EPCS system must meet all of the requirements of the EPMS software with the addition of being able to control breakers and equipment. If required, the system shall be both a monitoring and control system and be referred to as Electrical Power Monitoring and Control System (EPMCS).

2. The software platform must be a Supervisory Control and Data Acquisition (SCADA) system capable of both monitoring and control.

3. All written material furnished by the Contractor under this Contract, including electronic documents, must not be copyrighted or require the FAA to obtain special permission for reproduction for any purpose. This must include, but not be limited to, Operations and Maintenance Manuals, Training Material, Shop Drawings, As-builts, Software Code, Software Code Documentation, and Hardware/Software Configuration Documentation. The FAA must have the right to reproduce this information, as well as incorporate it into their internal training programs and documents.

4. Refer to the following related sections or manufacturer’s cut-sheets as well as the drawings for details on quantities of monitoring points and work to be performed.

Automatic Transfer Switches – Attachment J.1 – Paralleling Switchboard Specification Engine Generators – Attachment J.1 – Paralleling Switchboard Specification Paralleling Switchboards – Attachment J.1 – Paralleling Switchboard Specification Switchgear and Switchboards – Attachment J.2 – Switchboard Specification Distribution Equipment – Attachment J.3 – Interior Distribution System Specification Uninterruptible Power Supply (UPS) – Government-Furnished Equipment (“GFE”) cut sheets supplied upon submission of task or delivery order Mini UPS (MUPS) - GFE cut sheets supplied upon submission of task or delivery order Static Transfer Switch (STS) – GFE cut sheets supplied upon submission of task or delivery order EPMS/EPCS – paragraph 2.3.3 below

ELECTRICAL POWER MONITORING AND CONTROL Page 6 of 39

1.3 STANDARDS

As applicable to specific equipment, material, work and testing supplied must be in accordance with the latest edition and amendments of all applicable standards, codes, laws and regulations listed below:

American National Standards Institute (ANSI) National Electrical Code (NEC) Underwriters' Laboratories, Inc. (UL) Institute of Electrical and Electronics Engineers (IEEE) National Electrical Manufacturers' Association (NEMA) Federal, State and local codes and laws.

Seismic Requirements - All equipment furnished must be in accordance with UBC, Zone 4.

1.4 QUALITY ASSURANCE

The manufacturer of the equipment must have been regularly engaged in the manufacture of the specified remote devices for a period of at least ten (10) years and demonstrate that these products have been utilized in satisfactory use in functioning systems for similar applications. The manufacturer must have at least ten (10) years demonstrated capability in EPMS/EPCS design, installation, and start-up.

1.5 IDENTIFICATION

Electrical identification devices placed on equipment must match electrical distribution switch-boards and as specified below:

a. Identify units, devices, controls, and wiring.

b. Mimic Bus: Continuous mimic bus, applied to front of switchboard, arranged in one-line dia-gram format, using symbols and lettered designations consistent with approved mimic-bus diagram.

1. Mimic-bus segments coordinated with devices in switchboard sections to which applied, to produce a concise visual presentation of principal switchboard components and connec-tions.

2. Medium: Painted graphics.

3. Color: Contrasting with factory-finish background.

1.5.1 Nameplates:

Equipment must be labeled in accordance with the instructions in Section C – the Statement of Work, Section C.6.3 – Equipment Identification and Marking. Provide samples for review.

ELECTRICAL POWER MONITORING AND CONTROL Page 7 of 39

1.6 PROJECT MANAGEMENT

The contractor must provide the services of a full-time Project Manager to oversee all EPMS/EPCS related activities, functions, meetings, and deliverables for this Contract. This person shall be the main point of contact for EPMS/EPCS related issues between the contractor and the FAA.

The Contractor must design, develop, and deliver a consistent EPMS/EPCS hardware and software product across all FAA projects, per the FAA’s guidance.

1.7 TRAINING

The Contractor must provide EPMS system training in accordance with the requirements in Section C – the Statement of Work, section C.11 – Training.

1.8 DRAWING AND DOCUMENTATION SUBMITTALS

The following must be submitted in accordance with general provisions of the contract.

1.8.1 Network Drawings

Detailed EPMS/EPCS network drawings showing all point-to-point connection information must be provided to the Government at the time of or prior to gear approval drawings submittals.

These drawings must be based on the provided, FAA-approved A&E final design drawings and show all connections within the EPMS network.

1.8.1.1 Wiring Details

The network drawings must show both field and factory installed EPMS/EPCS wiring and must clearly identify any field-installed variances from the factory standards. All field wiring must clearly identify all wire types, length constraints, and routing considerations. All field wiring terminations must have detailed connection information including pin information, wire color, shield termination, gear or device terminal block designations, terminating resistors, and special instructions as installed. Proper shielding techniques and methods must be used on all cabling to provide reliable signals and minimal data transmission errors and delays. Cable routing recommendations must be provided as necessary.

1.8.1.2 Communications

Device communication type information such as IP addresses, MODBUS addresses, and any additional setup information must be clearly listed.

1.8.1.3 Points List and Alarming

A detailed list of all monitored points must be defined in the drawing set. All digital points must have “Alarm On” point high or low detail listed. FAA defined alarm naming must be shown on the points list.

1.8.1.4 Drawing Categories

Drawings must be split up by signal types (communications, timing, sequence of events, points list, etc.).

ELECTRICAL POWER MONITORING AND CONTROL Page 8 of 39

1.8.1.5 Submittals

There will be three main drawing submittals: Approval, Issued for Construction, and As Built.

During onsite validation and testing, drawings must be redlined as necessary. All contractor and FAA redlines must be incorporated into the As Built drawing submittal.

1.8.2 Rack and Enclosure Drawings

Detailed drawings must be included for each custom device enclosure, tower switch enclosure, and server rack. These drawings must include detailed parts lists, elevation drawings with dimensions, interior device mounting details, detailed point-to-point wiring detail, and device designations.

1.8.3 PLC Wiring Diagram

The PLC wiring diagram must breakdown the relationship between hardware and software for all the PLC drops. The breakdown must indicate what is physically connected to each terminal of the PLC then associate that connection to a software address and/or variable name.

1.8.4 COTS Documentation

The contractor must supply all available documentation for each piece of equipment in the EPMS/EPCS system. Documentation must include but not be limited to (if available):

User’s Guides Installation Guides Operation and Manuals Device Wiring Diagrams and Schematics Electrical Characteristics Descriptive Literature Datasheets Replacement Guides Troubleshooting Guides Quick References Handbooks Programmers Manuals Administrative Manual

Documentation must be submitted in electronic format upon acceptance of the system.

1.8.5 Operations and Maintenance Manual – User Level

The contractor must furnish operating and maintenance (O&M) instructions for the complete arrangement of equipment and devices supplied in the system and for the EPMS/EPCS software application. This manual must document the FAA specific system architecture and software application. This manual must provide user level instruction. No administrative content shall be included in the document.

1.8.5.1 Descriptions of Operation and Maintenance

The operation and maintenance manual must describe in detail the following:

The hardware components and their function in the system.

ELECTRICAL POWER MONITORING AND CONTROL Page 9 of 39

The network architecture Types of communications Monitored data User level operation of all included software Connecting with full or web client Alarm list and description Control scheme (EPCS only) Recommended maintenance and schedules Troubleshooting Lowest Replaceable Unit (LRU) List

1.8.5.2 User Level Software Operation

The manual must provide thorough instructions on how to navigate through the SCADA application. It must describe how to locate and operate all included user level features. User level operations are defined as all non-administrative operations of the software as defined by the FAA. At a minimum, the following software features must be covered in detail:

Active One-lines Floorplans Alarm and Event Log Third Party Device Screens Metering Legend Trending Reporting Meter Configuration Maintenance Mode Paging

1.8.5.3 Site Specific Content

The manual must cover all operation of the project/site specific system and software. A generic manual may be developed for all projects/sites if site specific content and operation can be conveyed by describing components, navigation, and theory of operation used to create the custom content in a generic fashion.

1.8.5.4 Maintenance

Maintenance of the EPMS/EPCS shall be limited to the replacement of the major components as LRU items. Self-diagnostics and troubleshooting algorithms must be incorporated to minimize the technicians’ time to troubleshoot the system. The O&M manual must include detailed maintenance descriptions and a list of LRU items. See the training requirements in Section C, the Statement of Work.

1.8.6 Operations and Maintenance Instructions – Administrative Level The contractor must provide an operation and maintenance manual that covers all administrative functions of the hardware and software in the EPMS/EPCS system not covered in the user level O&M manual. This manual must contain the following at a minimum:

Network drawing file location and update instructions Device replacement and configuration instructions User security administration instructions (add/remove/edit users and access level) Administrative screens and functions

ELECTRICAL POWER MONITORING AND CONTROL Page 10 of 39

Debugging tools Configuration tools (paging, maintenance mode, meter configuration, etc.)

Required Windows services list Troubleshooting guide Software application startup/shutdown procedures Communication ports in use LRU configuration Firmware upgrade procedures (reference COTS documents if necessary)

1.8.7 Data Backup Plan/Instruction

The contractor must provide a document defining their recommendation of data backup methodology in detail. It must include but not be limited to:

Filenames and locations of files that contain historical data and are updated on a regular basis (ex: Alarm log files, waveform captures, data log files, database files, diagnostic logs, etc.).

Recommended backup frequency Recommendations for external backup

1.8.8 Server, Workstation, VDT, and GUI Project Configuration Document The contractor must provide a document defining all that is required for a new server, workstation, and VDT to be configured for purposes of consistency in new installation by the contractor or replacement/modification by the FAA. It must include but not limited to:

Separate sections for server configuration, workstation configuration, and Video Display

Terminal (VDT) configuration Loading the operating system and any other required applications Computer names (per FAA defined template) Site specific user account and password setup (per FAA defined template) Folder/file structure configuration Required drive partitioning Site specific passwords Communication configuration Time sync configuration Project/file naming IP address schemes (FAA Defined) Alarm naming (FAA Defined) Point/breaker change of state consistency (aux, trip, etc.)

Any SCADA FAA project specific parameters or configurations Database configuration Required software and drivers Network drawing file location and update instructions

1.8.9 Software List

This document must list all software used throughout the EPMS/EPCS system including versions.

1.8.10 EPMS/EPCS Hardware List

This document must list all hardware used throughout the EPMS/EPCS system including firmware versions and device model numbers.

ELECTRICAL POWER MONITORING AND CONTROL Page 11 of 39

1.8.11 Ethernet IP Address List

This document must list all EPMS/EPCS device IP addresses by device name.

1.8.12 Computer Name, Username, and Password List

This document must list all computer names, usernames, and passwords for all server, workstation, and VDT computers.

2.0 PRODUCTS

2.1 MANUFACTURERS

Individual components can be from different sources, integrated package and support for the EPMS must be from the single contractor supplying the switchboard.

2.2 EQUIPMENT OVERVIEW

The following equipment must be included and integrated into a complete electrical power monitoring system (EPMS).

2.2.1 Work Station

Two 20-inch (minimum) monitors One computer One printer Desk with chair

2.2.2 Server Rack

Cabinet.

LAN Switch, 24 or 48 port with redundant power supply (depending on the number of devices in the system).

Server.

Monitor.

GPS with antenna, receiver, and accessories.

Uninterruptable Power Supply (UPS).

Dual input circuit breakers.

Dual power distribution strips.

Pullout keyboard and mouse.

2.2.3 Tower Switch Enclosure (If required)

Wall-mount vented enclosure.

DIN-mount Ethernet LAN Switch.

DIN mount mini UPS Input Circuit Breaker Termination boards.

2.2.4 Custom Enclosures

As required, provide stand-alone enclosure(s) to house EPMS devices such as power quality meters, sequence of events recorders, Ethernet gateways, etc. Enclosures must be wall mountable and include input circuit breaker, terminal blocks, and required power supplies. A mini UPS shall be optional.

2.3 EPMS/EPCS SYSTEM OVERVIEW

ELECTRICAL POWER MONITORING AND CONTROL Page 12 of 39

2.3.1 Summary

The Electrical Power Monitoring System (EPMS) must gather, display, and alarm on data from various defined remote devices throughout the power system as defined by the FAA. It must be a server/client monitoring system. The EPMS is defined to include, but not to be limited to, remote devices for monitoring, protection, device communication interface hardware, intercommunication wiring, monitoring stations, software, software configuration, ancillary equipment, startup, and training services.

2.3.2 Turnkey Solution

Once provided with an FAA defined EPMS/EPCS network design the contractor must provide a complete, ready-to-use system that requires no further configuration or setup once commissioned. The contractor must be responsible for the complete process from design to installation and testing.

2.3.3 EPMS/EPCS Software

The EPMS software must be a SCADA based Human-Machine Interface (HMI) system. The EPMS software must not be perform any control functions on equipment unless required by FAA system design. The control system would fall under the EPCS category and all requirements listed in this document would apply with the addition of Section 2.3, EPCS System Overview. All requirements of the control and monitoring system will be defined by the FAA.

The software must have FAA defined GUI screens showing animated power flow one-lines and device diagrams. It must be capable of capturing, logging, and annunciating on system events and device changes of state.

2.3.4 Metering

Strategically placed power quality meters must be utilized throughout the system to capture anomalies. These meters must be capable of real-time power monitoring and waveform capture on sag, swell, transient events, etc. Sequence of events recorders must be utilized to capture high speed changes of state of defined devices with a high degree of accuracy. Circuit breaker trip units with metering and communications capabilities must be utilized for branch circuit monitoring. Communication to other devices must be utilized to bring data in to the software.

2.3.5 Communication Network Architecture

The EPMS must be a stand-alone communications network and GPS timing system. It must not be connected to any other system (unless determined by the FAA to accommodate paging/emailing capability) and must be fully capable of operating independent of any other network.

2.3.6 GPS Timing System

The EPMS must use a GPS timing system to distribute synchronized time to all required monitoring/control devices and computers. This is to ensure accurate time synchronization throughout the monitoring/control system. It must consist of a GPS antenna and receiver for timing distribution.

2.3.7 Battery Backup Power

All necessary and specified EPMS hardware (including but not limited to power meters, computers, tower Ethernet switch, and server rack components) must have UPS or battery

ELECTRICAL POWER MONITORING AND CONTROL Page 13 of 39 backed power. This must be in the form of integrated mini UPS devices and/or facility critical power circuits as defined by FAA design drawings.

2.3.8 Client Computers

Client computers must be used throughout the system to provide access to the user interface.

The system must include one operator workstation desktop computer with printer. In addition, the system must utilize a touch-screen interface with screens as required by the design drawings. These are referred to as Video Display Terminals (VDT). If required, a wireless tablet solution must be provided.

2.3.9 Integrated EPMS Devices

EPMS devices must be integrated as much as possible into the switchgear and panelboards as required by the FAA design. These devices must come fully wired and installed into the gear.

They must be located in compartments such that they are isolated from any exposed bussing.

External power circuits shall be provided by the FAA for control power. Gear must have factory wired terminal blocks for easy field connection of control power circuits. If more than one Ethernet based device exists, they must be wired to a consolidating switch within each piece of gear such that the installation technician need only provide one connection for communication to the network. If external wiring is needed due to but not limited to PLC I/O, SER inputs, or time sync wiring all wiring must be terminated to terminal strips that are easily accessible for field wiring. Testing must be accomplished by the contractor in the factory to ensure all wiring is installed properly.

2.3.10 Open Protocol

The EPMS will utilize open protocol standards such as Ethernet TCP/IP; Modbus over Ethernet TCP/IP; and Serial Modbus Remote Terminal Unit (RTU).

2.4 TIMING REQUIREMENTS

2.4.1 Time Sync

2.4.1.1 Standard

Global Positioning Satellite (GPS) time standard must be implemented as part of the EPMS for proper sequence of operations and events. GPS timing must be used for maintaining a 1-millisecond resolution throughout the monitoring system.

2.4.1.2 Requirements

GPS timing signal must be transmitted in the form of both IRIG-B and NTP. All devices capable of receiving/synching to NTP must be wired and configured for NTP, including but not limited to the server, workstation, VDT's, meters and third party equipment. All devices capable of receiving/synching to IRIG-B must be wired and configured for IRIG-B, including but not limited to sequence of events recorders, meters, and third party equipment. If a device is capable of synching to both, NTP must be used. The server, workstation, and VDT’s must all sync to the NTP source.

2.4.2 Time Stamping

All logged and displayed data on any computer in the system must show time stamps that are synched to the GPS source and are formatted the same throughout. Time stamping must occur at the device where the event occurred.

ELECTRICAL POWER MONITORING AND CONTROL Page 14 of 39

2.4.2.1 High-Speed Stamping

All points indicated on the FAA defined points list associated with the below listed equipment must be time and date stamped to 1-millisecond through the use of GPS timing. Necessary EPMS hardware and associated equipment alarm/status contacts must be provided in order to meet the 1-millisecond requirement as defined by the FAA design drawings. The software will show and log event and alarm times out to 1-millisecond in the sequence in which they occurred.

Switchboards/Panelboards - Sequence of event recorders and power quality meter.

Any other specified point wired to either a sequence of event recorder or power quality meter digital input.

2.4.2.2 PC-Based Timing System

The hardware listed below must have a PC-based timing system for maintaining a 1-second resolution throughout the monitoring system. The software will show and log event and alarm times out to 1-second in the sequence in which they occurred. Where possible time stamping must occur at the device where the event occurred. All points indicated on the points list associated with the below listed equipment must be time and date stamped to 1-second through the use of PC-based timing. Necessary EPMS hardware and associated equipment status/alarm contacts must be provided in order to meet the 1-second requirement.

Switchboards/Panelboards – Circuit breaker trip units and meters without millisecond time sync capability Generators – Modbus RTU or TCP/IP.

UPS Systems - Modbus RTU or TCP/IP.

Static Transfer Switches (STS) - Modbus RTU or TCP/IP.

Automatic Transfer Switches (ATS) – Modbus RTU or TCP/IP

2.5 COMMUNICATION REQUIREMENTS

The EPMS must be able to utilize the following standard communications configurations, as a minimum, at the same time:

1. Modbus TCP/IP communications for meters, trip units, Ethernet gateways, third party devices and equipment, sequence of events recorders, etc. must be utilized if available. CAT-6 Ethernet cable must be used for cable runs of less than 325 feet.

2. All EPMS Modbus TCP/IP device IPs must be static and adhere to FAA defined IP address scheme.

3. If Modbus TCP/IP is not available for a particular device, Modbus RTU communications must be used. Direct RS485 communications must be used for cable runs of less than 3000 feet .

Longer RS485 runs can be achieved with the use of a RS485 repeater. RS485 supports communication with up to 32 devices per communication string. Each string must consist of an approved 22 AWG (or greater) twisted pair shielded cable for RS485 communications.

4. GPS time sync signal distribution must be in the form of modulated and unmodulated IRIG- B and Network Time (NTP). IRIG-B distribution wiring must be either shielded coax or twisted pair shielded cable. NTP communicates over standard Ethernet. The GPS receiver shall be the NTP server. If this feature is not a capability of the receiver, the EPMS server must be configured as the NTP server and must sync its time to the receiver. All Computers and third

ELECTRICAL POWER MONITORING AND CONTROL Page 15 of 39 party devices capable of NTP syncing must be configured to sync to the NTP server. If a device requires an additional Ethernet connection for NTP time synching, a second cable must be run.

Time sync signal must be sensed by all devices connected to the time sync base unit reliably.

5. Ethernet communications of either CAT-6 or fiber optic must be supported at a 10 BaseT, 100 BaseT, 1000 BaseT, and 1000 Base SX communications speed and must conform to the

802.3 Ethernet communications standards.

2.6 EPMS/EPCS HARDWARE REQUIREMENTS

All EPMS/EPCS hardware components (with exception to the server rack components, workstation components, tower switch enclosure components, and optional custom enclosure components) must be integrated into the switchgear, switchboards, and panelboards per the FAA design.

2.6.1 System Server

System server must ensure a maximum 1-second refresh rate at workstations and video display terminals (VDT) equipped with industrial PCs. The EPMS/EPCS server must include 1 to 2 factory supplied server computers with at least the following features:

Rack mount server or approved equivalent Server class processor, minimum 8 cores 2.8 Ghz, or approved equivalent Minimum 16GB RAM with additional RAM as required to support all applications required by EPMS/EPCS software suite.

Three 1 TB, 6Gbps (minimum) hot swappable hard disk drives or approved equivalent configured for on board RAID 5.

DVD read/write drive, 17-inch rack mountable flat-panel monitor, video card, (2) onboard

Gigabit Ethernet ports, remote 101-key enhanced keyboard, mouse, and dual AC power supplies.

The operating system must be Windows Server with a minimum of 10 user license CALs.

A minimum of 4 USB ports.

Server must come equipped with Adobe Reader and Microsoft Office or approved equivalent.

Server must meet software Contractor’s recommended requirements for all applications required by EPMS/EPCS software suite.

2.6.2 EPMS/EPCS Workstation

The EPMS project must include 1 workstation with the following features:

Business class workstation or approved equivalent.

Minimum quad core 3.0 Ghz, 8 MB Cache CPU computer with 4 GB RAM, two 250 GB hard drives, DVD read/write drive, two 20-inch flat-panel monitors, dual video card, full-size 101-key enhanced keyboard, optical mouse, and external speakers.

A minimum of 4 USB ports.

Microsoft Windows operating system Workstation must come equipped with Microsoft Office Professional, and Adobe Reader and Internet Explorer, latest editions or approved equivalents.

2.6.3 Server Rack

The EPMS/EPCS server rack must house the following equipment:

Cabinet with front and rear access.

ELECTRICAL POWER MONITORING AND CONTROL Page 16 of 39

LAN Switch, 24 or 48 port with redundant power supply and patch panel (depending on the number of devices in the system).

Server on pullout slides.

Monitor.

GPS with antenna, receiver, and accessories.

Uninterruptable Power Supply with aux contacts wired to a nearby I/O device for monitoring

UPS and battery status.

Dual input circuit breakers clearly labeled with voltage level.

Dual power distribution strips.

Pullout keyboard and mouse.

Fans Grounding strips Receptacles (where required)

2.6.4 Tower Switch Enclosure (if required)

The EPMS/EPCS tower switch enclosure must be used when Ethernet runs going up the Air Traffic Control Tower exceed the Ethernet cable maximum distance. The tower Ethernet switch must house the following equipment:

Wall-mount vented enclosure DIN-mount Ethernet LAN Switch DIN mount mini UPS with aux contacts wired a nearby I/O device for UPS and battery monitoring.

Input circuit breaker for incoming power feed Termination boards

Fast Ethernet Switches: The EPMS/EPCS project must include Fast Ethernet Switches with the following features:

Rack mount switch or approved equivalent with 48/24 network ports for 10, 100, 1000

Base-T, 2 SFP transceiver slots, and 1 management port.

Full duplex, auto sensing, flow control, layer 2 switching.

Status indicators with link activity, speed, collision status, duplex mode, power, redundant power.

Redundant power supply.

2.6.5 Printers

Provide 1 color inkjet or color laser network printer.

2.6.6 Touch-Screen Monitors, VDTs

The EPMS/EPCS project must include touch-screen monitors with industrial PCs meeting the minimum requirements (quantities determined for each project):

20-inch analog resistive or capacitive touch-screen.

1280 by 1024 resolution 256 colors (minimum). Resolution must support the software requirements.

Dual core, 2.0 GHz CPU (minimum) 4 GB RAM (minimum) Windows operating system.

120GB hard drive.

10/100 Mbit/s Ethernet connection (minimum).

24, 48 or 125 VDC, 120 VAC.

ELECTRICAL POWER MONITORING AND CONTROL Page 17 of 39

2.6.7 Wireless Mobile Tablet

The EPMS graphics screens must be capable of being viewed on a wireless mobile tablet. The tablet must have a touch interface for navigating screens and a battery life with a minimum of 2 hours. Additional tablet specifications shall be determined by the contractor. If custom screens are required for proper viewing on the tablet, these must be developed and tested as well. The necessary wireless network will be provided by the FAA.

2.6.8 Distributed Processing Modbus Masters and Protocol Converters The EPMS/EPCS project must include the required Distributed Processing Modbus Masters and Proprietary Protocol Converters as indicated on the drawings.

2.6.9 Power Quality Meter

2.6.9.1 Basic Measurements

Revenue Grade metering that meets or exceeds ANSI C12.20 Class 0.2 and IEC687

(Accuracy) Instantaneous 3-phase voltage, current, frequency, power factor.

Energy: bi-directional, absolute, net, time-of-use, loss compensation.

Energy Demand: rolling block, predicted, and thermal.

Harmonics: individual harmonic distortion up to the 63rd or better.

Transient detection: 17us at 60Hz, and sag/swell recording or better.

2.6.9.2 Basic Inputs

Five voltage inputs capable of measuring three phases, neutral, and ground for 480/277V and 208/120V systems.

Four current inputs capable of measuring three phases, and neutral.

2.6.9.3 Basic Compliance Monitoring

ANSI C37.90.1 (Surge Withstand) ANSI C62.41 (Surge) ANSI/IEEE C37.90.1 – Surge Withstand IEC 1000-4-4 – Fast Transient IEC 1000-4-5 – Surge Immunity IEC 868 – Flicker Meter IEC 61000-4-15 – Flicker Meter

EN 50160 FLICKER AND COMPLIANCE MONITORING

2.6.9.4 Basic Event Recording

Disturbance Waveform Capture Steady State Waveform Capture

2.6.9.5 Basic Communication Features

Modbus TCP/IP Synchronization with other Meters via GPS clock or other of equal resolution.

2.6.9.6 IEEE 1159 Power Quality Monitoring Needs

Impulsive transient detection to 1ms duration High, medium, and low frequency oscillatory transients Instantaneous sags and swells Momentary sags, swells, and interruptions

ELECTRICAL POWER MONITORING AND CONTROL Page 18 of 39

Temporary sags, swells, and interruptions Long duration interruptions, overvoltages, and undervoltages Voltage Imbalance DC Offset Harmonics (to the 100th order) Interharmonics (0-6 kHz) Notching Broad-band noise Voltage fluctuations (flicker) Power frequency variations

2.6.9.7 Advanced Features

Trending and forecasting Memory logging Min/max/average log Alarm/event log Synchronization with other PQMs (GPS clock or cross-triggering) Adaptive waveform capture Disturbance waveform capture Steady-state waveform capture Waveshape alarm Disturbance alarm Digital input/output capability with alarming Setpoint-driven alarms (voltage, real and apparent power, current, power factor) IEC, ANSI accuracy compliance

2.6.10 Sequence of Events Recorder

Sequence of Event Recorders meeting the following requirements (Note any exceptions taken with a detailed description):

I/O: Distributed I/O modules.

Event Time Stamping: Events must be recorded to the 1 millisecond accuracy and must be logged in the sequence in which they occurred.

Logging: Logging must take place onboard. SCADA software application must access the onboard log to retrieve events. Device must retain events onboard when device power is lost.

Communications: Modbus TCP/IP with a 10/100 Base-T Ethernet connection.

Time Sync: The module must be capable of receiving an IRIG-B time code signal or NTP time syncing signal with NTP being the preferred method.

Debounce: The module must contain circuitry or software filter to ensure that “chatter” or

“bounce” encountered during contact change does not initiate erroneous alarms.

Power: 24, 48 or 125 VDC, 120 VAC On-board Event Memory: 5000 events minimum Configuration: Must be configurable via web interface along with a serial connection over

RS-232.

Operating Conditions: Operating Temperature: -20 C to +85 C, Humidity: 0 to 95% non-condensing Standards: Device must meet all international standards for Electromagnetic Emissions

FCC Part 15 Subpart B, Class A Class A Digital Device, Radiated Emissions EN55011 (CISPR 11) Radiated/Conducted Emissions (Group 1, Class A) EN55022 (CISPR 22)

ELECTRICAL POWER MONITORING AND CONTROL Page 19 of 39

Radiated/Conducted Emissions (Class A) EN50081-2 Electromagnetic Compatibility, emissions.

2.6.11 Ethernet Gateway

Communications: Ethernet gateway must provide means to convert a 10/100BaseT

Modbus TCP/IP to a Modbus RTU over RS-485.

Configuration: The gateway must be configurable via web interface along with a serial connection over RS-232.

Power: 24 Vdc or 120 Vac

2.6.12 GPS Time Sync System

GPS system must be comprised of receivers, cables, antennas and associated mounting hardware and must be provided and configured for interfacing to the EPMS hardware.

GPS hardware is to be provided by the EPMS supplier. GPS receiver must be mounted in the server rack. Antenna must be field mounted by installation contractor.

Receiver must provide at a minimum modulated and unmodulated IRIG-B outputs, NTP output, and serial port output options.

Contractor must supply in-line antenna cable surge suppressor. This will be field installed by an installation contractor.

2.6.13 Mini UPS

Battery Backed Power: All necessary and specified EPMS hardware (including but not limited to power meters, computers, tower ethernet switch, and server rack components) must have UPS or battery backed power for a minimum of 15 minutes on total loss of commercial power. Server rack equipment (server, ethernet switch, and GPS receiver) must have UPS or battery backed power for a minimum of 30 minutes on total loss of commercial power. This must be in the form of integrated mini UPS devices and/or facility critical power circuits as defined by FAA design drawings.

Monitoring: UPS must have monitoring capabilities including but not limited to “Load Not Supported by UPS" and "Battery Fault". These should be wired to a terminal block.

Maintenance: All mini UPS’s must have the capability to perform a self-test to verify proper UPS operation.

2.6.14 Programmable Logic Controls (PLCs)

EPCS PLCs must meet the following minimum requirements:

2.6.14.1 Power Supply Module

All PLC drops must be capable of accepting the DC voltages 5V, 24V, 48V, and 125V and AC voltages 24V and 120V as the supply power of the entire drop.

2.6.14.2 Input modules

All PLC drops must be capable of accept the DC voltages 5V, 24V, 48V, and 125V and AC voltages 24V and 120V as Discrete Digital inputs.

The system must contain circuitry to ensure that “chatter” or “bounce” encountered during contact change does not initiate an erroneous signal.

2.6.14.3 Output modules

All output PLCs must activate by either applied voltage or dry-contact closure.

Dry-contact closure must be either solid state (ex. triac) or relay contacts.

ELECTRICAL POWER MONITORING AND CONTROL Page 20 of 39

Relay contact type outputs must be voltage free, isolated from ground, and fully independent from each other, with a minimum contact rating of 2 amps.

Output PLC using applied voltage as its output must have modules capable of producing DC voltages 5V, 24V, 48V, or 125V or AC voltage 24V, 48V, or 125V.

2.6.15 Warranty

Servers, workstations, video display terminals, printers, and switches must be covered by warranties in accordance with the provisions of Section H.

2.7 EPMS/EPCS SOFTWARE REQUIREMENTS

2.7.1 Overview

The EPMS/EPCS SCADA software platform must be commercial off-the-shelf (COTS), requiring no custom code development. The EPMS/EPCS server software must be designed on a Microsoft Windows-based platform and have on-line full-screen editing to facilitate the programming and monitoring of the system. The EPMS/EPCS server, full client, and web-based client locations will allow the monitoring of vital system parameters and provide a scalable system for future expansions without replacement of the EPMS/EPCS hardware or software.

The proposed SCADA software platform must support unlimited web-based clients and unlimited monitoring points for server and clients.

The SCADA software application must communicate with all monitored devices to gather data for purposes of displaying, trending, logging, and alarming data. The application must also be capable of remotely controlling breakers and devices in the system if required by the FAA (see Section 2.3 EPCS/EPMS).

2.7.2 Configuration

The Contractor must maintain a standard configuration across FAA SCADA projects. Software configuration standardization must also be maintained for the following:

Point/breaker change of state consistency (aux, trip, etc.)

Project/file naming Site specific user account, access levels, and password setup (per FAA definition) Database configuration Alarm nomenclature, behavior, and priority (per FAA definition) Project specific parameters

GUI one-line device symbols, colors, fonts, animation, behavior, navigation, third party device screens, etc.

2.7.3 Server and Clients

2.7.3.1 Configuration

Server shall not be used on a frequent basis, only for configuration purposes by an administrator. Servers must be configured so that it only can be accessed by an admin. Users can only access server through a client from EPMS workstations. Server must have auto-reboot capability enabled so that upon return from a power failure, the server automatically reboots, logs in, and all necessary programs automatically launch without user intervention.

The server must lock itself out immediately.

The Contractor must maintain a standard server, workstation, and VDT configuration across FAA projects. The FAA will provide a template to achieve consistency in the following areas:

ELECTRICAL POWER MONITORING AND CONTROL Page 21 of 39

Computer names (per FAA defined template) Site specific user account, groups, and password setup (per FAA definition) IP address schemes (per FAA definition)

Configuration standardization must also be maintained for the following:

Folder/file structure configuration Required drive partitioning Communication configuration Time sync configuration

2.7.3.2 Distributed Processing and Redundancy

SCADA software processing must be capable of being distributed across multiple processors and/or servers for higher redundancy and performance. Software must be configured to distribute processes across multiple processors as a standard configuration. If required by the FAA design, dual servers with redundant processes on both servers must be utilized. A copy of the software must run on the second server in a hot standby configuration.

2.7.3.3 Clients

The EPMS software must have the main application running on the server machine and be configured for both web-based clients and full clients (if available). At a minimum, dedicated EPMS workstations and VDT’s must be configured as web-based clients, but full clients are preferred if available. If tokens are required, they must be soft key tokens, as opposed to physical tokens. The web-based clients must require no loading of software to view all the EPMS screens, data, meter configuration, and waveforms. Any computer that is connected to the EPMS network and has a properly configured IP address and compatible browser must be able to connect as a web-based client. The web-client at a minimum must be fully compatible with the latest version of Microsoft Internet Explorer.

2.7.4 Monitored Data

The SCADA software must communicate to all monitoring devices in order to gather data for purposes of displaying, trending, logging, and alarming data. These devices include breaker trip units, protective relays, third party equipment, and any digital meters on the electrical distribution system. Additional analog and discrete statuses required to be monitored as required by the FAA system design must be tied back to I/O units and communicated back to the power monitoring software.

The EPMS software must be able to take incoming monitored data and perform mathematical and logical operations for control, viewing, logging or alarming.

2.7.5 Graphics and Display

The EPMS SCADA software must include a graphical package that allows specific configurable custom graphic screens to match customer one-line drawings and floor plans to match facility design drawings as agreed upon by the FAA. They must accurately and clearly depict real-time power flow throughout the monitored portion of the system. FAA will define colors, naming/numbering schemes, and general arrangement of screens. The software must be capable of supporting any number of screens and the FAA must not be limited in the number of

ELECTRICAL POWER MONITORING AND CONTROL Page 22 of 39 screens requested. Screens must have a consistent look and navigational structure. This custom interface will be referred to as the SCADA application.

2.7.5.1 Screens

The EPMS software must provide the following screens as standard in the software.

Active One-lines Alarm Log Event Log Floor Plans Third Party Devices Legend Network Drawings

2.7.5.2 Template

Throughout the user interface the screens must have a consistent template that contains the following information listed below. Exceptions may be made as necessary if approved by the

FAA.

1. Minimum of last three unacknowledged alarms sorted by active then inactive.

2. A compact navigational scheme that is intuitive and user-friendly for both touch screen and mouse interfaces. One or two click access must be provided to the following at a minimum:

One-lines Floorplans Alarm logs User Login Legend Small FAA defined logo Site name Time and date Currently logged in user

2.7.5.3 Navigation

The SCADA application must incorporate an intuitive and user-friendly navigational control scheme that allows the user to navigate between screens. The navigational controls must be designed for use with both pointer (mouse) and touch screen interfaces. They must have a consistent look throughout the application so that the function of each control is clear before it is activated by the user.

2.7.6 Active One-line

2.7.6.1 Overview

The Active One-line must be a representation of the power system’s one-line drawing that is animated and colored based on logical combinations of monitored data throughout the system.

2.7.6.2 Components

ELECTRICAL POWER MONITORING AND CONTROL Page 23 of 39

1. Equipment and Gear – Representation of switchgear, switchboards, panelboards, and third party devices typically containing buses, breakers, meters, and other symbols enclosed in an identifying border and clearly labeled.

2. Symbols – Representation of breakers, switches, fuses, meters, third party equipment, transformers, or other various devices throughout the power system.

3. Power Flow Lines – Representation of power conductor paths between pieces of gear and equipment.

4. Buses – Representation of busing inside of a piece of gear or equipment.

2.7.6.3 Animation

1. Power Flow Lines and Buses Power flow lines and buses must be colored based upon whether or not they are in one of three states: Red for Energized, Green for De-Energized, and Magenta for Unknown.

Any line or bus that is not monitored, cannot be calculated, or cannot be logically determined must be colored black.

Lines crossing between screens must be shown on both screens and animated identically. Navigation must be provided to follow the continuation of the lines between screens. Labels must also be provided stating the destination gear/device at the beginning/ending points of the lines.

Power flow lines and buses are animated based on metered values and/or the logical combination of metered values and breaker states.

2. Symbols If possible symbols must be colored and animated based on the state of the monitored device as defined by the FAA.

Breakers and switches are animated with a standard breaker symbol depicting open/closed/tripped/withdrawn state.

UPS, Static Transfer Switches, Automatic Transfer Switches, and Generators must be colored and animated according to their internal operation as defined by the FAA. Third party device states must be provided in dynamic text form near the respective symbols.

Transformers must be colored to match connected power flow lines.

All other symbols’ animation will be defined by the FAA as required.

Any…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.