| EDE Questions and Answers | ||||||
| # | Page # | Section | Figure/Table | Comment | Question | Government Response |
| 1 | 107 | L.3 | N/A | Non-Technical | Please confirm that Government provided forms that are already numbered (Sections K, I, etc.) are not subject to the requirement that “the proposed pages must be numbered sequentially” listed on page 107 in L.4. | The proposal must follow the Volume and Sections provided under L.3.C. Offerors do not need to remove the page numbers on solicitation pages, but are required to add page numbers reflecting the proposal sequence. |
| 2 | 107 | L.4 | N/A | Non-Technical | Please confirm that headers and footers are not subject to the 12 point, Times New Roman font restriction. | All Font size must be 12, in Times New Roman font, with top and bottom margins equal to 1.0 inch, and left and right margins equal to 1.0 inch. |
| 3 | 110 | L.6 | N/A | Non-Technical | Page 110 states that Volume II must be limited to 40 pages and then states items not included in this limit, among them “sample reports” and “prime contractor submittal letter and subcontract commitment letters.” There is no reference to either of these items in the instructions for Volume II. Please clarify the following: |
a. Are these items required in Volume II?
b. Is there a specific desired format/instructions for submittal?
| c. In what section of Volume II should these items be included? | These are not required but Offerors may include it in their proposal as needed in the desired section. | ||||||
| 4 | 109 | L.5.4 | N/A | Non-Technical | We would like to request that required items under Volume I, Section 4 – namely, the “Dun and Bradstreet Comprehensive Insight Report; Proof of Any existing Line(s) of Credit by a U.S. Banking Institution; and Certified Financial Statements for the last thee (3) completed company fiscal years” be exempt from the “sequential numbering” requirement in L.4. These items are prepared by outside entities and have their own numbering. | No exception to the numbering requirement. Offerors do not need to remove the documents' page numbers, but are required to add page numbers reflecting the proposal sequence. | |
| 5 | 2 | J-13 | Non-Technical | The note calls for the AT controllers in boards E-A and E-B to provide the same functionality as the AT controller in boards UI-A and UI-B. Question; is the functionality listed in the specifications? Please provide the required functionality. | AT controller must have the same functionality as an automatic transfer switch. See refer to specification 262301 for additional information; requirement updated under J-13. | ||
| 6 | J.14, J.15 | Technical | Are the pages following the drawing located at the end of "EDE SIR Attachment J.14 Sample CPDS (starting on pg. 26)" and "EDE SIR Attachment J.15 Sample CPDS (starting on pg. 37)" drawing packets gear and wiring information for EPMS system? | The pages in question contain the list of EPMS monitored points as specified by the FAA. Gear and wiring information for the EPMS is shown in Attachment J-14 pages 9 through 10 and Attachment J-15 pages 9 through 12. | |||
| 7 | J.13, J.14, J.15 | Technical | Some panelboard schedules indicate I-Line Panelboards (SqD) in the notes. Please confirm the notes are incorrect. | Confirmed incorrect | |||
| 8 | 805 | J.14 | Technical | For EPLA-6/EPLB1-7 panelboards shown on E805 that call for dual breakers with shunt trip and kirk keys, is this designation to be designed to comply with UL 67 (wall mount panelboards)? | Yes | ||
| 9 | 801 | J.14 | Technical | CPL Boards typ of 9, same question above on design | Yes | ||
| 10 | 802 | J.14 | Technical | EPL-CAB typ of 6, CPL-CAB typ of 4; same question above on design | Yes | ||
| 11 | 801 | J.14 | UDPLA | Technical | See below | ||
| 12 | 801 | J.14 | CPL 1-9 | Technical | What is the relationship of the picture above to the CPLs panels below. This is common for numerous panels in the TYPE I design. Type II Note 26 calls out key transfer blocks. Does it hold true for Type I? | The picture above represent a key transfer block. The locks on the transfer blocks with desinations matching the locks on the CPL panels must have interchangeable keys. | |
| 13 | 802 | J.14 | Technical | Confirm NDPH-CAB, T-NDPH-CAB, are installing contractor provided and NOT part of the FRP | Confirmed not part of the FRP (RFP) | ||
| 14 | 804 | J.14 | Technical | Confirm NDPA, and the remaining distribution material are installing contractor provided and NOT part of the FRP as indicated on the drawings. | Confirmed not part of the FRP (RFP) | ||
| 15 | 801 | J.15 | Technical | Confirm ATS-FP-CB-A, B with Firepump controller are NOT included in RFP | Enclosed circuit breakers ATS-FP-CB-A,B are included in the RFP. The Firepump controller is not. | ||
| 16 | Traco E800 | J.15 | Note 28 | Technical | Is "automatic switch" considered a molded case switch, if not please define. | "automatic switch" is considered a molded case switch | |
| 17 | ATCT E800 | J.15 | Note 14 | Technical | CPL-CAB panelboards call out Note 14, automatic switch, same question above. | "automatic switch" is considered a molded case switch | |
| 18 | 1 | J.16 | EPMS System | Technical | Document requires vendor to integrate all other supplied equipment into their EPMS system. Will the FAA supply the communication protocol for the FGE equipment, outside of this contract, to allow detailed pricing? | (GFE) vendors may change within the duration of the EDE contract; however currently all GFE monitored by EPMS (ATS, EG, UPS, STS, etc.) uses the Modbus communication protocol. | |
| 19 | J.12 | CLIN 2 | Non-Technical | Please confirm the use of Attachment J-12, tabs for J-13 ACEPS, J-14 CPDS and J-15 CPDS. The contractor is requested to quote the 3 samples projects. The BOM for each project can be listed as complete assembled Panel board or Switchboard. ACEPS Example; E-A, E-B, LBPP will all be lot priced as and assembly (structures, breakers and accessories). | Confirmed the vendor may submit a total price, but must be able to tie each piece of equipment back to the B.2 exhibit. | ||
| 20 | Exhibit B.2 | Exhibit #34 | Non-Technical | References CLIN 0002A through 0002H, please clarify the use of CLIN 0002 | Error. See corrected Section B Amendment. | ||
| 21 | Exhibit B.2 | Exhibit #555, 777 | Technical | What Dual circuit breakers accessories are required? What frame size of breaker | Frame size is 150A-250A. Accessories are kirk key interlocks and aux contacts for each of the (2) breakers. | ||
| 22 | Exhibit B.2 | Exhibit #559, 781 | Technical | What Frame breaker will the motor operator need to work with? | Breaker frame sizes 1000A through 2000A | ||
| 23 | Exhibit B.2 | Exhibit #s 560, 649, 782 | Technical | What ampacity for the disconnect switch is desired? | Disconnect switch ampacity range is 60A through 1200A | ||
| 24 | Exhibit B.2 | Exhibit #'s 2-25 | Technical | Are the Service entrance switches stand alone? Or is cross bus required for additional sections? | Service entrance switches referenced are stand alone. | ||
| 25 | Exhibit B.2 | Exhibit #'s 248, 364 | Technical | How many poles spaces should each panel type be equipped for | 3 poles | ||
| 26 | Exhibit B.2 | Exhibit #'s 801 | Non-Technical | What is the CLIN referenced in the description? | Error See Section B Amendment | ||
| 27 | Exhibit B.2 | Exhibit #'s 808 | Non-Technical | What is CLIN reference in the description? | Error See Section B Amendment | ||
| 28 | Exhibit B.2 | Exhibit #'s 808 | Technical | Please proved the specification for battery monitoring. | Our control battery is only monitored by a Bender relay at the DC distribution panel board. We monitor for under voltage and ground fault. | ||
| 29 | 5 | J-4 | 1.2.1 | Technical | States that EPMS must be a monitoring system only and not control equipment. EPCS systems are to incorporate EPMS plus control functionality. How is this requirement to be squared with para 2.8 stating that the PMCS is a PLC based control system distinct from the EPMS and the two systems are not installed in the same facility? Is the EDE SIR Attachment J.13 Sample AECEPS Phase II Drawing package indicating the controls that are to be integrated into theEPCS? If so, how is the PCMS differentiated from the EPCS? | The EPMS is a monitoring only system. The EPCS is a control system that may include monitoring functionality. Distinct and separate EMS (monitoring only) and EPCS (control and monitoring) systems are not typically installed in the same facility. Attachment J.13 shows the PCMS EDE control subsystem (PCMS). See subsequent comment for further background on PCMS. | |
| 30 | 5 | J-4 | 1.2.2 | Technical | Does the software platform capable of both monitoring and control have to be the same software program or can multiple programs be utilized? I.E. on for monitoring and one for SCADA control? | Multiple software platforms may be used, provided that they are accessible from a single user interface. | |
| 31 | 5 | J-4 | 1.2.3 | Technical | Is the FAA expecting access to the original software code and/or software code documentation for monitoring or control software? Please clarify. | FAA is expecting access to scripting, configuration, ladder logic, etc. and related documentation required to build and/or reconfigure each EPMS/EPCS project. | |
| 32 | 6 | J-4 | 1.5.b | Technical | Does the FAA require mimic bus on the front of equipment showing EPMS hardware and wiring? | The mimic bus should show the location of CTs, voltage sensing, and meter displays. | |
| 33 | 7 | J-4 | 1.7 | Non-Technical | Is a copy of Section C detailing training requirements available? | See Section C.12 training requirements are equal to internal vendor requirements. | |
| 34 | 7 | J-4 | 1.8.1 | Non-Technical | Will the FAA provide the final A&E design drawing in .dwg format so that EPMS can be incorporated into the drawings? | No. Often .dwg files are not available until late in a project. The block level diagram in the A&E design does not have sufficient space for the required detail on the EPMS drawings. | |
| 35 | 7 | J-4 | 1.8.1.3 | Non-Technical | Who is responsible for generating the points list? | FAA or A&E will specify which points are to be monitored. Vendor must incorporate points into detailed list as described in 1.8.1.3 Points List and Alarming. | |
| 36 | 12 | J-4 | 2.3.3 | Technical | Does the EPMS software have to be a SCADA based HMI system? Can the EPMS be a monitoring only software offer? | Yes. EPMS software must be a SCADA based HMI system. No, the system has to be capable of EPMS and EPCS. | |
| 37 | Multiple | J-4 | Multiple | Non-Technical | Please provide guidance and clarify as to which section most defines the scope and responsibility objectives, 2.2.4, 2.3.9, or 3.1 | 2.3.9 and 3.1 define requirements and responsibilities for integrating EPMS/EPCS devices into switchboards, panelboards, etc. 2.2.4 describes requirements for custom enclosures if needed for specific projects. | |
| 38 | 15 | J-4 | 2.5.5 | Do all network switches have to support the 1000 BaseT communication speed indicated? | No | ||
| 39 | 15 | J-4 | 2.6 | Technical | Which para is operational, para 2.6 or 2.2.4? What determines when it is required for EPMS hardware to be in a separate enclosure? Is the intent of para 2.6 for the SCADA supplier to free issue hardware components such as ethernet switches, SER's, meters, VDT's, mini UPS, and PLC's to switchgear and switchboard OEMs for factory mounting and wiring by 3rd party OEM suppliers? | Both paragraphs are operational. 2.2.4 describes requirements for custom enclosures if needed for specific projects. 2.6 describes EPMS/EPCS component integration requirements and exceptions. Means and methods are left to vendor. | |
| 40 | 15 | J-4 | 2.6.2 | Technical | Are the EPMS/EPCS servers separate machines from the PCMS servers? | Yes | |
| 41 | 21 | J-4 | 2.7.4 | Technical | Does this paragraph or the EPMS detail drawings for Type 1 and Type 2 installations determine the scope of hardware to be monitored? What determines whether a particular device is a "monitoring device"? | Paragraph 2.7.4 describes scope for the contract. EPMS detail drawings for Type 1 and Type 2 provide examples of typical projects for pricing purposes. | |
| 42 | 23 | J-4 | 2.7.6.3.4 | Technical | Are all loads simple radial fed so that animated bus via logical combinations of metered buses can be safely used to indicate the true state of bus energization? Is scripting in para 2.7.6.3.5 acceptable for determining a bus as live/dead. | Loads are not all simple radial fed. Power system configurations include main-tie-main, A/B paths, dual fed equipment, and/or potential backfeeding. Scripting in para 2.7.6.3.5 is acceptable for determining bus state. | |
| 43 | 36 | J-4 | 2.8 | Technical | How is the EPCS to be a "distinct" PLC based control system per para 2.8 and also a server client system per para 1.1 and 2.3.1? What means will be used to communicate that an EPCS is required? Is General Note 2 on the PCMS Active One Line Dwgs indicating that an EPCS is required for the critical and essential systems? Do the terms PMCS and EPCS refer to the same system? | The EPCS is based on PLCs that communicate with a server/client but can continue all operations independently of the server/client for instance in the event of a server/client failure. A&E design will indicate whether EPCS is required. General Note 2 on Attachment J-13 WG-ACEPSII-ZXX-E-273, 274 refers to the PCMS. PCMS and EPCS do not refer to the same system. PCMS in this SIR refers to the PCMS EDE control subsystem as shown in the red-clouded areas of Attachment J-13. | |
| 44 | 37 | J-4 | 2.8.4 | Technical | Are all breaker control commands manually entered only and is breaker open/close control the only desired functionality of the EPCS? | Breaker commands may be logic based in addition to manually entered. Breaker open/close is largely the only control functionality of EPCS. Additional control functionality may include such equipment as load bank control panels, etc. | |
| 45 | J-13 | General | Non-Technical | Confirm that only red "clouded" equipment is included in RFP | Confirmed | ||
| 46 | 3 | J-13 | Dwg WG-ACEPSII-ZXX-E-241 | Technical | These drawings show a Kohler paralleling gear for generators and a redundant PLC control scheme for emergency power including control of generators and downstream breakers as part of a PMCS system. Is the PMCS to be standalone from EPMS and EPCS? If not, is one vendor to control generators, critical/essential breaker open/close configuration and provide EPMS/EPCS monitoring an control all in one software package? | Background: In attachment J-13 "PCMS" is used to refer to the entire ACEPS control system as provided by multiple vendors to control generators, breakers, UPS, STS, etc. For the purposes of these responses "PCMS" referrers to the EDE control subset of the entire control system. Response: The PCMS is largely standalone but there is some non-control integration for notification (monitoring). One vendor is not responsible to control generators, critical/essential breaker open/close, UPS, STS, etc. but may be responsible for monitoring said equipment. | |
| 47 | E272, E273, E274 | J13 | PCMS Screen | Technical | Please confirm the new Essential System screen must duplicate the functionality of the existing Critical system. If so, will the FAA provide the firmware/software of the existing Critical System? Is the update of the Critical system screen to include the Essential system functionality included in this RFP? | Confirmed. FAA will provide firmware/software of existing Critical System to extent possible as dictated by copyright, etc. Update of the Critical System to include the Essential System functionality is to be included in this RFP. | |
| 48 | E224 | J.13 | DM Panels | Technical | Are the CH and MCC panels Floor mounted switchboards or wall mounted panleboards. Panel schedules could not be located. | CH and MCC are to be floor mounted switchboards. | |
| 49 | 1 | J-16 | Note 28 | Technical | Is the integration of the EDE and other supplied equipment (STS, EG, Load Bank, UPS) to be made with only the EPMS (monitoring only) and no control required? Are these items to be considered part of an EPMCS system also? | No control is required for STS, EG, Load Bank, UPS, etc. The monitoring of these items is to be considered a part of the EPMCS system. | |
| 50 | 2 | J-1 | 1.3 | Technical | Are the generators existing but the paralleling switchboards specified herein new and to be incorporated into a new PCMS system that interfaces with EPMS/EPCS? Are PCMS and EPCS synonymous? Are boards S-A and S-B and all E.O main breakers immediately downstream of S-A and S-B considered part of the Engine Generator System and excluded form this scope per Attachment J-16? | EG and PSG (in this case PSG refers to Paralleling Switchgear shown on the updated Attachment J-13) are not to be incorporated into the PCMS EDE control subsystem (PCMS). EPCS and PCMS are not synonymous. See "PCMS" background on previous response. Red-clouded areas in attachment J-13 are to be included in the scope. Non red-clouded areas are to excluded. | |
| 51 | 5 | J-1 | 2.1.1 | Technical | Are individual generator control and monitoring panels existing? | No | |
| 52 | EDE SIR110 | L6.b, d | Non-Technical | Does the FAA have a standard compliance matrix form (spreadsheet) for the RFP to a common platform for the bidders? | No, the Offeror must use their format. |