Attachment J.4 Past Performance Questionnaire.doc
DOC document 53 KB Posted
- Attached to
- Engineering Assessment of Current and Future Vehicle Technologies Federal contract opportunity
- Solicitation number
- 693JJ925R000019
About this file
This is a Past Performance Questionnaire (PPQ) template attached as J.4 to NHTSA solicitation 693JJ925R000019 for Engineering Assessment of Current and Future Vehicle Technologies. The questionnaire is designed to be completed by government representatives evaluating a contractor's previous performance across nine core performance elements: quality of technical approach, effective use of resources, management of subcontractors, customer satisfaction, business behavior, communication, cost control, timeliness, and understanding of requirements.
The evaluation uses a three-tier rating system of Outstanding, Satisfactory, and Unsatisfactory, with specific rating descriptions provided. The form includes spaces for evaluator information, contractor details, and supplemental comments. The questionnaire is to be submitted to Contract Specialist Christopher Clarke via email at c.clarke.ctr@dot.gov or NHTSAOAM@dot.gov. As a template document, it does not contain any completed evaluations or specific performance information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J.1 Cost Proposal Template.xlsx | XLSX spreadsheet | |
| Question and Answer Response.pdf | ||
| SFLLL_2_0-V2.0.pdf | ||
| GG_LobbyingForm-V1.1.pdf | ||
| Attachment J.1 Cost Proposal Template.xlsx | XLSX spreadsheet | |
| RFP 693JJ925R000019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NHTSA RFP 693JJ925R000019
Title: Engineering Assessment of Current and Future Vehicle Technologies
Attachment J.b Attention of Contract Specialist Name: Christopher Clarke Attn: c.clarke.ctr@dot.gov or NHTSAOAM@dot.gov
PAST PERFORMANCE QUESTIONNAIRE
CERTIFICATION
The government representative will inform the party (evaluator) providing the information that “By law, the Government will not disclose the names of individuals providing reference information during discussions with the Contractor identified below:
| NAME OF CONTRACTOR |
| ADDRESS OF CONTRACTOR |
Evaluator’s Printed Name
Title/Role (e.g., Program Manager, Contracting Officer)
Evaluator’s Mailing Address (Agency, Bldg./Rm., Street or P.O. Box, City, State, Zip)
INSTRUCTIONS
Please provide the requested information on the firm listed above. Two forms are provided below to document the government’s conversation with and/or comments made by the individual providing a reference on the identified contractor: 1) Performance Rating Form; and 2) Supplemental Comment Form. Each evaluator is requested to use the following standards in arriving at their rating.
Adjectival Rating Descriptions
· Outstanding: Exceeds specific performance or capability in a beneficial way; has a high probability of satisfying the requirement; and has no significant weakness.
· Satisfactory: Meets evaluation standards; has good probability of satisfying the requirement; and any weakness can be readily corrected.
· Unsatisfactory: Fails to meet a minimum requirement; and deficiency requires a major revision to make it correct.
· Other: If the element is not applicable, indicate with “N/A.” If no data has been obtained or additional comments are provided, please note in this column.
Performance Rating Form
NAME OF COMPANY EVALUATED:
ADDRESS OF COMPANY EVALUATED:
TYPE OF SERVICES PERFORMED:
| NAME OF EVALUATOR |
| EVALUATOR’S COMPANY/AGENCY |
| DATE EVALUATION PROVIDED |
| TIME EVALUATION PROVIDED |
NAME OF GOVERNMENT REPRESENTATIVE DOCUMENTING EVALUATION
OFFICE AND TELEPHONE NUMBER OF GOVERNMENT REPRESENTATIVE
| Performance Element |
| Outstanding |
| Satisfactory |
| Unsatisfactory |
| Other |
1. QUALITY OF TECHNICAL APPROACH
(For example: Were the services comprehensive, complete, and feasible? (Met the needs, performed successfully, and accommodated changing requirements.)
2. EFFECTIVE AND EFFICIENT USE OF RESOURCES
(For example: Was the contractor able to obtain in a timely manner the amount and type of personnel resources required to support the project, effectively train personnel to perform the work required for the project, and maintain the required workforce throughout the term of the contract?)
3. EFFECTIVE AND EFFICIENT USE OF SUBCONTRACTORS
(For example: Was the experience of the subcontractors directly applicable to the project, did the contractor successfully met subcontracting goals and objectives as related to small, woman-owned and small disadvantaged businesses, and did the contractor successfully utilize and manage all subcontractor resources?)
4. QUALITY OF PERFORMANCE/CUSTOMER SATISFACTION
(For example: Was the contractor committed to customer satisfaction?)
5. BUSINESS BEHAVIOR
(For example: Was the contractor reasonable and cooperative at the corporate and program levels in response to changes in technical direction, correcting errors, poor performance, criticism/rejection of contract deliverables and other quality issues?)
6. COMMUNICATION
(For example: Did the contractor work and communicate well with contracting officers, contracting officer’s technical representatives, end users, other contractors, subcontractors, and in-house staff?)
7. COST CONTROL
(For example: Was the contractor successful in planning and proposing realistic costs, monitoring performance, operating at or below budget, and implementing corrections/changes in a cost effective manner?)
Performance Rating Form (Continued)
| Performance Element |
| Outstanding |
| Satisfactory |
| Unsatisfactory |
| Other |
8. TIMELINESS OF PERFORMANCE
(For example: Was the contractor successful in planning and proposing realistic schedules, monitoring performance, completing work on time, and implementing corrections/changes in a timely manner?)
9. UNDERSTANDING OF REQUIREMENTS
(For example: Did the contractor show an understanding of the scope of the requirements and an appreciation of the complexity of the requirements? And did the contractor effectively identify flaws, inconsistencies and other inaccuracies in your technical direction?)
| FOR #10 Thru #15, PLEASE ANSWER “Yes” or “No”, as appropriate. |
| YES |
| NO |
10.
11.
12.
13.
14.
15.
Additional Comment Form
Document any additional comments by the evaluator regarding the performance element ratings in the appropriate spaces below. Please add additional pages as necessary.
Page 1 of 1 Page
File details come from the government source that posted it. Updated .