Attachment 3- Past Performance Eval Form.doc
DOC document 39 KB Posted
- Attached to
- Midshipmen Activity Center A/E Design Services Federal contract opportunity
- Solicitation number
- 693JF720R000017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Follow Up Responses to Qs due by 7.30.2020-Post.pdf | ||
| Amendment 0005- 693JF720R000017.pdf | ||
| SHPO Initial Reponse MAC.pdf | ||
| Follow Up Q and A Form.docx | DOCX document | |
| Amended RFQ 693JF720R000017.pdf | ||
| Area Survey.pdf | ||
| Amendment 4 SF30 693JF720R000017.pdf | ||
| GeoTech.pdf | ||
| Master Plan Map.pdf | ||
| Space Utilization Study Final.pdf | ||
| QA Government Responses-Initial.pdf | ||
| Site Plan.pdf | ||
| Aerial survey.pdf | ||
| Amendment 3- 693JF720R000017.pdf | ||
| Amendment 2- 693JF720R000017.pdf | ||
| Amendment 1- 693JF720R000017.pdf | ||
| RFQ 693JF720R000017.pdf | ||
| Attachment 2 - SF330-16f.pdf | ||
| Attachment 1- SOW.pdf | ||
| Attachment 5- QA Response Form.docx | DOCX document | |
| Attachment 4- Evaluation Methodology Final.pdf | ||
| MAC Design SOW-Final Draft.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Midshipmen Activity Center Architecture and Engineering Design
RFQ #: 693JF720R000017
Attachment 3 – Past Performance Evaluation Form
Name of Evaluator:
Organization:
Official Position:
Phone/Email:
Name of Company Evaluated:
Company Address:
Contract No. (Indicate if prime/subcontractor):
Contract Period of Performance:
_____/_____/______ to ____/____/_____
Contract Type:
Contract Value:
PLEASE RETURN THIS SURVEY VIA E-MAIL TO: LaChelle.Johnson@dot.gov by July 28, 2020 at
10 AM Eastern Time (ET) with the subject line: “Past Performance Evaluation for (insert Vendor)- 693JF720R000017.
Please provide a thorough and complete description of the most recent services you have contracted for from the vendor.
INSTRUCTIONS – For each item, circle the rating that best describes the contractor’s work on this project and provide any additional comments. For items not applicable to your project, please indicate N/A.
5= Exceptional
No problems, issues, or delays in achieving contract requirements
4= Good
Does not impact achievement of contract requirements
3=Acceptable
Requires minor agency resources to ensure achievement of contract requirements
2=Marginal
Requires major agency resources to ensure achievement of contract requirements
1= Unacceptable
Achievement of contract requirement is compromised
N/A= Not applicable Does not apply
(1) Overall Quality of Contract Performance
N/A Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________
(2) Contractor’s ability to meet deadlines, be responsive to
N/A
Inquiries, and provide deliverables as scheduled Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________
(3) Contractor’s ability to effectively forecast, manage
N/A and control costs (Not applicable for Fixed-Price contracts/orders) Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________
(4) Timeliness, completeness and quality of problem identification, N/A corrective action plans, reasonable and cooperative behavior, customer satisfaction, and management of sub contract personnel Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________
Based on this contractor’s overall performance, would you award this contractor a similar contract?
Yes [ ] No [ ] If “no’, please explain:
Has this contract been partially or completely terminated?
Yes [ ] No [ ] If “yes’, please explain:
Were there any changes in contract dollar value throughout the life of the contract?
Yes [ ] No [ ] If “yes”, please explain:
In summary, please give your overall assessment of this contractor and the actual results achieved as a result of this contractor’s performance.
PAGE
File details come from the government source that posted it. Updated .