Amendment 0001 - MS ERFO NP VICK 2020-1(2).pdf

PDF 12 MB Posted

Attached to
Vicksburg National Military Park
Solicitation number
693C73-25-B-000002
Issued by

About this file

This document is an Amendment to a Solicitation for the Vicksburg National Military Park, Project MS ERFO NPS VICK 2020-1(2), Solicitation Number 693C73-25-B-000002. The project consists of slide repairs on Grant Avenue and Union Avenue, including clearing, grading, gabions, paving, and other miscellaneous work. The total project cost is expected to be between $5,000,000 and $10,000,000. Bid documents will be issued on or around October 23, 2024, with the bid due date and location specified in the SF 1442. The solicitation is being issued by the Department of Transportation Federal Highway Administration. Key requirements include contractor registration in the System for Award Management (SAM) and completion of annual Representations and Certifications. Subcontracting plan requirements apply for other than small businesses. The amendment provides details on visitor entry procedures for the bid opening.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7325B000002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1411/19/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/24/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project MS ERFO NPS VICK 2020-1(2):

The purpose of this Amendment is to:

1) Provide pre-bid meeting minutes, sign-in sheet, and the PowerPoint presentation from the organized site visit held on November 7, 2024, at 9:00 a.m. CST.

2) Provide bridge inspection reports for the Thayer¿s Approach bridges 1 and 2.

3) Provide amended plan sheets D04 and M04.

4) Respond to bidder questions.

5) The bid opening date of November 26, 2024, 2:00 pm EST remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0001

Info Page 1 of 4

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001 Project MS ERFO NPS VICK 2020-1(2)

Grant Avenue and Union Avenue Slide Repairs Vicksburg National Military Park Solicitation: 693C73-25-B-000002

The purpose of this Amendment is to:

1) Provide pre-bid meeting minutes, sign-in sheet, and the PowerPoint presentation from the organized site visit held on November 7, 2024, at 9:00 a.m. CST.

2) Provide bridge inspection reports for the Thayer’s Approach bridges 1 and 2.

3) Provide amended plan sheets D04 and M04.

4) Respond to bidder questions.

5) The bid opening date of November 26, 2024, 2:00 pm EST remains unchanged.

Solicitation Changes

1) Please see attached for the pre-bid meeting government power point presentation and the pre-bid meeting minutes.

2) Please see attached bridge inspection reports for the Thayer’s Approach bridges 1 (Str.

5600-004P) and 2 (Str.5600-005P).

3) Please see attached amended plan sheets D04 and M04 showing elevation at the site 5 staging area.

4) Responses to bidder questions:

a. Question: Will the FHWA's current bridge load analysis be made available for the bridges in the Park that the Contractor’s equipment will need to cross to access the sites? The Park already has a substantially reduced load limit for their roads that is borderline impractical for some of the equipment/materials that need to access the sites. If the bridges are the main limiting factor, it would be ideal to know what the government's engineers feel they are capable of handling.

Response: The government neglected to add the inspection reports for the 2 bridges (Thayer’s Bridge 1 and Thayer’s Bridge 2) that the Contractor will need to cross to access sites 7-9, and they are added under this Amendment. The Contractor needs to analyze these 2 bridges if they plan to exceed the maximum loads listed in the inspection reports. The Contractor is not allowed to haul materials on any other roads within the park due to existing bridge restrictions (see Special

Info Page 2 of 4

Construction Requirements (SCRs)- J-pages of the solicitation, Page J-3, first paragraph of Subsection 104.05).

b. Question: Line Item A0290 has the stabilized wire face at 350 square feet. Initially this seems small, but it is a little unclear on the exact extents of the wire face. Is the intent for the wire face to be placed along the red line in the picture below?

Response: No, the welded wire face facing is only used on the full depth patch (see supplemental description of the pay item). The full depth patch work is shown in the plans, see sheet B03 and the top of sheet D03.

c. Question: Sheet D04 shows the staging pad and indicates the area will need a large amount of material placed. The sheet however doesn't show the vertical profile of the alignment on the sheet.

could a profile be provided to illustrate the existing, proposed pad, and finished elevations for the area?

Response: Please see revised plan sheets D04 and M04 included as part of this Amendment that show the elevations at the site 5 staging area.

d. Question: Sheet T11-T21 shows the cross sections for the access road at site 5. Sheet B02 shows the typical cross section. In both those sections, there doesn't appear to be a call for the path to be excavated and benched, even though the existing surface has areas with a steep cross slope.

Should the contractor plan to bench the existing surface of the access road path? If so, does the schedule of quantities need to be updated to reflect the volumes?

Response: Benching may be needed per field conditions, and there is a benching detail included in the plans. The government does not pay for both roadway excavation and embankment and pays only for the larger of these two items. In Schedule A (Option 1), the embankment construction pay item includes an extra 10% quantity for all possible overruns.

e. Question: Please provide pre-bid power point.

Response: The power point is being provided under this Amendment.

f. Question: Please clarify protections required for monuments and roadways not in scope.

Response: The Contractor is required to protect the public property in accordance with Subsection

107.02 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) provided as part of the solicitation.

g. Question: Please clarify permits required from Contractor.

Response: The Contractor is not required to obtain permits unless hauling permits are required by the county. Contractor is required to provide Storm Water Pollution Protection Plan (SWPPP) per Section 157 of the SCRs (see page J-12 of the J-pages of the solicitation).

h. Question: Please clarify delegated design required from the Contractor.

Response: See FP-14 (provided as part of the solicitation) Subsection 104.03 that specifies what needs to be included in the specifications and drawings. The Contractor is required to design Mechanically Compacted Aggregate Columns (Rammed Aggregate Piers) per Subsection 302.03A of the SCRs (see page J-17 of the J-pages of the solicitation).

Info Page 3 of 4

i. Question: When can we expect to see the Amendment containing the power point and sign in sheet from the pre-bid meeting? Additionally, we request the CAD files be released for bidding purposes.

Response: The power point, the sign-in sheet of the field review participants, and the questions and answers discussed in the field are included as part of this Amendment. The CAD files cannot be uploaded to SAM.gov but will be provided to the contract awardee upon request prior to the preconstruction meeting with the Construction Operations Engineer. Please note that the CAD files were developed with Open Roads Designer and will not be converted to AutoCAD or to any other format by the government.

k. Question: Is there a Roadway excavation item for Schedule A? Because there is a roadway excavation item per Summaries & Schedule sheet C03, but it’s not called out anywhere in bid schedule or tabulation of quantities.

Response: EFLHD does not usually pay for both roadway excavation and embankment construction, and usually pays for the larger of the two by quantity. As you can see on C03, roadway excavation quantity is less than the embankment construction, so the roadway excavation quantity is included for information only and a pay item for roadway excavation is not included in the column heading.

l. Question: Can we use roadway excavated material for Embankment construction?

Response: Yes, roadway excavation material can be reused for embankment construction provided it meets Subsection 704.01 material requirements (see Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP-14) included as part of solicitation documents). The site location has predominantly Yazoo clay and loess soils. The contractor can utilize the excavated material only if the material is tested and meets the FP-14 requirements but should anticipate that clean fill will need to be imported to the project.

m: Question: Subsection 302.03C(e)(3) states that we can only construct the stone column by utilizing rammed aggregate piers. We request if the use of Casagrande stone column equipment such as what is seen below could be utilized to produce a continuous stone column with quality control methods.

Response: No. The contract documents require rammed aggregate piers using displacement installation method.

n: Question: Specifications state the following:

“302.03C Mechanically Compacted Aggregate Columns Installation.

(e) Column Systems.

(3) Densify each lift using a mandrel/tamper. The mandrel/tamper foot is required to adequately increase the lateral earth pressure in the matrix soil during installation.

Compaction equipment that induces horizontal vibratory energy (such as Vibroflot equipment) is not permitted.

Can you please clarify if any vibratory compaction installation methods are permitted for aggregate pier installation?

Response: No. The contract documents require rammed aggregate piers using displacement installation method.

Info Page 4 of 4

Project: MS ERFO NPS VICK 2020-1(2) Grant Avenue and Union Avenue Slide Repairs Organized Site Visit (Pre-bid Meeting) Minutes

November 7, 2024, 9:00 a.m. CST

The pre-bid meeting for the project was conducted virtually and on site on November 7, 2024, starting at 9:00 am CST and ending at approximately 9:57 am CST. The government shared a power point presentation that discussed high level information on the project. For the full information, see project documents.

The pre-bid meeting was followed by an accompanied field review. On-site meeting participant sign-in sheet is attached.

Virtual meeting participants were as follows:

Government:

• Yanina Kirtley, Design Project Manager, (FHWA-EFLHD)

• Alazar Feleke, Highway Design Manager (FHWA-EFLHD)

• Iqbal Imam, Lead Highway Designer (FHWA-EFLHD)

• Trenton Craig, Environmental Specialist (FHWA-EFLHD)

Contractor Personnel:

• David Bucci, Central Southern Construction

• Bill Barron, Central Southern Construction

• Andrew Polizzi, Meridiam Partners, Denver, CO

• Kyle Apshago, Eclipse Construction, LLC.

Questions and responses for all on site questions:

1. Question: Where are the load rates applied?

Response: On all Park roads. The Contractor is allowed to enter and exit the sites from Howe Lane only, except for salvaging material from Grant Avenue Access Road. See Subsection 104.05 of the Special Contract Requirements (SCRs), J-pages of the solicitation (page J-3).

2. Question: Will the existing plan set erosion control be usable, or will the contractor be required to provide additional submitted amendments?

Response: The proposed plan is to be used. The Contractor is allowed to revise and submit the plan for approval if they feel it’s needed.

3. Question: What is expected of the haul road upon completion of construction?

Response: The area should be restored to original conditions. There are quantities for topsoil and turf establishment for this road.

4. Question: The survey was done 2019-2020, are the conditions now close to what was then? Will this affect the quantities in the contract?

Response: The site assessments were done in 2020, but the ground survey was completed in 2021.

We are expecting minor changes, we are allowed a buffer to compensate for any deviations.

5. Question: Will a job trailer (for field office pay item) be available to be placed on site?

Response: No, a commercial space will need to be obtained by the Contractor in Vicksburg or Clinton, MS.

6. Question: Will sheet piling be allowed to be used to construct the haul road?

Response: Yes, the haul road is to be constructed by the Contractor means and methods, and per Subsection 203.03 of the SCRs (page J-13 of the J pages), the embankment material and the surfacing stone from the haul road will be salvaged.

7. Question: Will the Monuments on site #5 approved staging area be removed by the Park before construction?

Response: Potentially, the Park will evaluate whether they can be moved/relocated.

8. Question: If pavement is damaged by trucks who is responsible for fixing the pavement?

Response: Contractor is Responsible.

9. Question: Can the Contractor burn in the park?

Response: No Burning is allowed in the park. See Subsection 203.03(b) of the SCRs (page J-13 of the J-pages).

10. Question: Can off road trucks be used?

Response: Yes, they must meet weight restrictions stated in the contract (See Subsection 104.05 of the SCRs (page J-3 of the J-pages).

MS ERFO NPS VICK 2020-1(2)

Pre-Bid Meeting

DATE: 11/7/2024

TIME: STARTING 9:00 AM CST

LOCATION: 2414 GROVE STREET, V ICKSBURG, MS

Site Location

MS ERFO NPS VICK 2020-1(2) –

Warren County, MS

Temporary Traffic Control

Both Sites are already closed to traffic

Hauling/Salvage Route- do not access through other park roads

Background

Damage occurs in 1/2020 and earlier due to heavy storms

DDIRs written by EFL 3/2020; EFL design team scoped the sites 6/2022

Scheduled for FY 2025 Delivery

Site 5 - Route 17 Grant Avenue Slide

• Latitude: 32.377133

• Longitude: -90.833177

Repair slide using RSS wall w/gabion basket facing, drilled shafts, riprap basin at the bottom riprap basin at the bottom

Site 5- Route 17 Grant Avenue Slide – Typical Section

Site 5- Route 17 Grant Avenue Slide – Construction Plan

Site 5- Route 17 Grant Avenue Slide - Profile

Site 5- Route 17 Grant Avenue Slide – Construction Access

Site 5- Route 17 Grant Avenue Slide – Deep Pavement Patch

Sites 7, 8, 9- Route 20 Union Avenue Slides

Sites 7, 8, 9 -Route 20 Union Avenue Slides - Map

Sites 7, 8, 9 -Route 20 Union Avenue Slides - Typical

Sites 7, 8, 9 -Route 20 Union Avenue Slides – Site 7 Plan

Sites 7, 8, 9 -Route 20 Union Avenue Slides – Plan

Sites 7, 8, 9 -Route 20 Union Avenue Slides – Sites 8 and 9 Plan

Sites 7, 8, 9 -Route 20 Union Avenue Slides – Sites 7, 8 and 9 Typicals

Work requirements – J pages

Section 104. Contractor vehicle access to work sites will only be permitted from Howe Lane, except for salvaging materials (See Subsection 202.03).

When hauling on National Park Service (NPS) roads, do not exceed the load restrictions shown in Table 104-1. Do not exceed the Inventory Rating loads specified in the bridge inspection reports for NPS owned bridges. If the Inventory Rating loads are planned to be exceeded, submit a non-destructive field load test proposal for review and approval.

Work requirements – J pages (cont’d)

Subsection 108.01

(a) No work will be permitted on National legal holidays.

(b) No work will be permitted on the weekends. A weekend is defined as beginning at 7:00 p.m. Friday and ending at 6:30 a.m. on Monday.

(c) No work will be permitted from 5:00 p.m. to 6:30 a.m., Monday through Friday.

(d) Concurrent work on sites 5, 7, 8 and 9 is permitted.

(e) No tree removal sized 3-inches Diameter at Breast Height (DBH) and larger will be permitted without the wildlife biologist’s clearance within 24-hours of felling.

See Section 623. Time of year tree cutting restrictions may be added if new species of concern are identified at the time of construction.

Subsection 108.03 (c). Stop work and inform the CO and VICK law enforcement (phone: 601-405-3362, email: Rachel_Davidson@nps.gov) upon an incidental discovery of a potentially hazardous incendiary device/unexploded ordnance. The Vicksburg UXO Plan is provided as part of the Government Furnished Information

(GFI).

Subsection 157.04. This project is covered under a Nation-wide “non-notify” National Pollutant Discharge Elimination System (NPDES) permit. Prepare a SWPPP in accordance with the EPA and Mississippi Department of Environmental Quality (MDEQ) guidelines which can be found at https://www.mdeq.ms.gov/wp-content/uploads/2013/04/Small_cnstr_prmt.pdf.

Subsection 201.03. Contact the CO at least 14 days in advance of any clearing and grubbing operations.

Survey and flag trees planned for removal. Flag trees that are 3-inch diameter at breast height (DBH) or larger. Notify and obtain approval from the CO and the wildlife biologist prior to cutting trees. See Section 623.

Subsection 203.03. Salvage the borrow material and the surfacing aggregate used for Site 5 Construction Access Road and Construction Staging Pad and deliver it to NPS storage yard close to the Restoration yard for Cemetery Road. Access the Restoration yard from Howe Lane followed by Sherman Avenue heading north then US Business Route 61 (N. Washington St.) south followed by Given Hill Road headed south.

Subsection 261.04. Provide a professional engineer, on-site supervisor, and installation personnel with experience installing and testing reinforced soil slopes walls. Submit the following for approval at least 30 days before starting work:

(a) Names of personnel.

(b) A résumé for each individual describing their experience on at least five reinforced soil slopes walls of similar complexity over the past 5 years. Include project names, locations, and contact information for project owners.

Subsection 302.03A. Mechanically Compacted Aggregate Columns (Impact (Displacement) Rammed Aggregate Piers). Submit:

(a) Documentation of rammed piers & Load Transfer Platform (LTP) successful installation on 5 projects.

(b) Resume of person in charge of the rammed piers installation experience of 3 years.

Person needs to be able to install & verify (testing) the piers.

(c) Submit drawings for the piers.

(d) Describe equipment, installation techniques & construction procedures.

(e) Soil and gradation of the aggregate.

(f) Design computations.

(g) Proposed verification program – quality control procedures & means/ methods for testing the installation.

Subsection 565.03. Qualifications. At least 30 days before starting drilled shaft work, submit the following for approval:

(a) On-site supervisor;

(a) Drill operator. A résumé for each drill operator describing at least 2 years of experience in the construction of drilled shafts;

(c) Professional engineer or geologist. – 5 yrs of experience in the design and constr. of drilled shafts & logging shaft excavation;

(d) Geotechnical engineer or geologist.- to maintain the boring log.

Subsection 623.02. Wildlife Biologist. Contract the services of a qualified wildlife biologist with expertise in monitoring construction activities for evidence of bats in trees. Include at a minimum the contact information, educational background, relevant certifications, and past experience. The biologist will need to have taken a course in bat auditory surveys.

Submit preliminary bat protection plan, include tree clearance form, monitor all tree felling activities.

Ensure the wildlife biologist visually inspects the flagged trees for the presence of bats within 24 hours of tree cutting work on the site.

Provide a final report at the end of tree felling activities.

Section 625. Turf establishment. Fertilizer is required. Specific seed mixture is provided. Use straw or wood cellulose fiber mulch. Apply ammonium nitrate after growth has begun in areas designated by the CO. Apply pesticide at the first sign of armyworm infestation.

Section 637. — Facilities and Services. Locate the Government field office within 50 miles of the project site. Include furnishings, lighting, sample storage area, copy machine, printer, fax machine, 2 HD computer monitors, keyboard, mouse, telephone, high speed internet, wireless air card. Clean weekly.

Work requirements – Permits – Permit Tracking Form

Questions?

Email all questions to eflhd.contracts@dot.gov mailto:eflhd.contracts@dot.gov

BRIDGE INSPECTION REPORT

THAYER'S APPROACH BRIDGE #1

UNION AVENUE OVER STREAM

VICKSBURG NATIONAL MILITARY PARK

LOOKING EAST

STRUCTURE NO. 5600-004P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/12/2024

NORTH (UPSTREAM) SIDE

Report prepared by:

Federal Highway Administration FLH Office of Bridges and Structures Bridge Inspection Program 22001 Loudoun County Parkway, Building E2, Suite 200 Ashburn, VA 20147 https://bridge.flhd.fhwa.dot.gov

STRUCTURE LOAD RATING STRUCTURE NO. 5600-004P

THAYER'S APPROACH BRIDGE #1 INSPECTION DATE: 03/12/2024

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 8 7 15 14

HS 21 19 36 33

TYPE 3 14 13 25 23

TYPE 3S2 21 19 36 33

TYPE 3-3 23 21 40 36

DESIGN LOADING: 0 - UNKNOWN

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 03/14/2019

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION. STRUCTURE WAS LOAD-TESTED 12/98 WITH TYPE 3 TRUCK WEIGHING 33 TONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5600-004P

THAYER'S APPROACH BRIDGE #1 INSPECTION DATE: 03/12/2024

STRUCTURE IDENTIFICATION

(201) PARK: VICKSBURG NATIONAL MILITARY PARK

(202) STRUCTURE NAME:..............THAYER'S APPROACH BRIDGE #1

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5600-004 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................VNM PARK

(211) PROJECT NO(S):

(212) DRAWING NUMBERS:...........NONE

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:............................................ 284 - MISSISSIPPI

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

28149 WARREN

00000

1 6 1 00500 0

STREAM

UNION AVENUE

5600004P0000000

1.3 MILES BEFORE VICKSBURG

NATIONAL CEMETERY ON ONE-WAY

PARK LOOP ROAD.

99.99 FT ( 99.99 M)

6.40 (KM PT: 1.95 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 11 - ARCH - DECK (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............40 FT ( 12.2 M)

(49) STRUCTURE LENGTH:........... 40.0 FT ( 12.2 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... A) TYPE WEARING SURFACE:.. N - NA

(216B) ABUTMENT #2 FDN:........... 0 - UNKNOWN B) TYPE MEMBRANE:................. N - NA

(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. N - NA

(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... N - NOT APPLICABLE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. K - CLOSED

(66) INVENTORY RATING:..............21 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 19.1

LOADS

(64) OPERATING RATING:..............36 TONS ( 32.7 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/12/2024 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

Inspector: Joshua Voight Structure Number: 5600004P0000000

Inspection Date: 03/12/2024 Facility Carried: UNION AVENUE

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description SOUTH (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE, LOOKING WEST; NOTE VEGETATION GROWTH ALONG NORTH

CURBLINE

PHOTO 6

Description GENERAL TOPSIDE, LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 7

Description TYPICAL TRANSVERSE AND LONGITUDINAL CRACKING IN WEARING SURFACE; CENTER

OF SPAN SHOWN

PHOTO 8

Description SPALLING AND CRACKING OF SOUTHWEST PILASTER

Bridge Inspection Report

Pictures

PHOTO 9

Description PARTIALLY OBSTRUCTED DRAIN INLET AT NORTH SHOULDER OF WEST APPROACH

PHOTO 10

Description GENERAL UNDERSIDE, LOOKING EAST; NOTE LONGITUDINAL CRACKING WITH LEAKAGE

Bridge Inspection Report

Pictures

PHOTO 11

Description LONGITUDINAL CRACK IN UNDERSIDE OF ARCH; FULL LENGTH ALONG NORTH SIDE

PHOTO 12

Description GRID PATTERN CRACKING AT WEST END OF ARCH NEAR CENTER POINT

Bridge Inspection Report

Pictures

PHOTO 13

Description HORIZONTAL CRACKING WITH EFFLORESCENCE AND ALGAL GROWTH ALONG NORTH

FACE AT EAST END

PHOTO 14

Description SPALLING AN DELAMINATION ALONG NORTH FACE NEAR WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 15

Description WEST ABUTMENT; NOTE EFFLORESCENCE AT NORTH END

PHOTO 16

Description EAST ABUTMENT; NOTE HORIZONTAL CRACKING WITH EFFLORESCENCE

Bridge Inspection Report

Pictures

PHOTO 17

Description EFFLORESCENCE AT SOUTH END OF EAST ABUTMENT; NOTE HONEYCOMBING OF BASE

COURSE

PHOTO 18

Description EROSION UP TO 1'H ALONG EAST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 19

Description SETTLEMENT OF GROUTED RIPRAP AT EAST, UPSTREAM BANK

PHOTO 20

Description CRACKING OF GROUTED RIPRAP DOWNSTREAM OF STRUCTURE NEAR EAST BANK

Bridge Inspection Report

Pictures

PHOTO 21

Description BEAVER DAM 30' UPSTREAM FROM STRUCTURE

PHOTO 22

Description UNDERMINING OF GROUTED RIPRAP CHANNEL DOWNSTREAM OF STRUCTURE BEYOND

BEND

Bridge Inspection Report

Pictures

PHOTO 23

Description LOOKING UPSTREAM; NOTE BEAVER DAM

PHOTO 24

Description LOOKING DOWNSTREAM; NOTE GROUTED RIPRAP BANK AND PAVED SPILLWAY

BRIDGE INSPECTION REPORT

THAYER'S APPROACH BRIDGE #2

UNION AVENUE OVER STREAM

VICKSBURG NATIONAL MILITARY PARK

LOOKING EAST

STRUCTURE NO. 5600-005P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/12/2024

NORTH (UPSTREAM) SIDE

Report prepared by:

Federal Highway Administration FLH Office of Bridges and Structures Bridge Inspection Program 22001 Loudoun County Parkway, Building E2, Suite 200 Ashburn, VA 20147 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 5600-005P

THAYER'S APPROACH BRIDGE #2 INSPECTION DATE: 03/12/2024

costly problems in the future.

It should be noted that this road is currently closed to the public due to severe damage to the road as consequence of a heavy rain event that occurred early last year. Roadway damage was part of the ERFO assessment completed in February 2020.

NOTE: Bridge was closed at time of inspection due to severe flood damage to the roadway.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5600-005P

THAYER'S APPROACH BRIDGE #2 INSPECTION DATE : 03/12/2024

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.3,222.

CLEAN AND SEAL CRACKING OF PAVEMENT OVER

STRUCTURE AND OVER APPROACHES. 1 LS

61.3

INJECT GROUT IN VOID AT NORTHEAST WINGWALL AND

INTO VOIDS IN UPSTREAM GROUTED RIPRAP CHANNEL

PROTECTION. SEAL CRACK IN PAVED WATERWAY AT

SOUTHWEST WINGWALL.

3 LS

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

58.6 REPLACE BRIDGE RAILING WITH SYSTEM

MEETING CURRENT SAFETY STANDARDS. 1 LS

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES. 1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5600-005P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 27 24 45 41

TYPE 3 21 19 35 32

TYPE 3S2 33 30 55 50

TYPE 3-3 41 37 68 62

DESIGN LOADING: 0 - UNKNOWN

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 03/14/2019

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE EVALUATION (MBE). SEE

BRIDGE FILE FOR MORE INFORMATION.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5600-005P

STRUCTURE IDENTIFICATION

(201) PARK: VICKSBURG NATIONAL MILITARY PARK

(202) STRUCTURE NAME:..............THAYER'S APPROACH BRIDGE #2

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5600-005 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................VNM PARK

(211) PROJECT NO(S):

(212) DRAWING NUMBERS:...........NONE

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:............................................ 284 - MISSISSIPPI

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

28149 WARREN

00000

1 6 1 00500 0

STREAM

UNION AVENUE

5600005P0000000

1.1 MILES BEFORE VICKSBURG

NATIONAL CEMETERY ON ONE-WAY

PARK LOOP ROAD.

99.99 FT ( 99.99 M)

6.70 (KM PT: 2.04 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 11 - ARCH - DECK (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............23 FT ( 7 M)

(49) STRUCTURE LENGTH:........... 23.0 FT ( 7 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... A) TYPE WEARING SURFACE:.. N - NA

(216B) ABUTMENT #2 FDN:........... 0 - UNKNOWN B) TYPE MEMBRANE:................. N - NA

(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. N - NA

(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... N - NOT APPLICABLE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. K - CLOSED

(66) INVENTORY RATING:..............27 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 24.5

LOADS

(64) OPERATING RATING:..............36 TONS ( 32.7 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/12/2024 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

Inspector: Joshua Voight Structure Number: 5600005P0000000

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description SOUTH (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE, LOOKING WEST; NOTE VEGETATION GROWTH IN CURBLINES AND

CRACKING THROUGHOUT

PHOTO 6

Description GENERAL TOPSIDE, LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 7

Description CRACKING WITH VEGETATION GROWTH AND DEBRIS IMPACTION INSIDE CRACKS

TOWARD EAST SIDE

PHOTO 8

Description TYPICAL EFFLORESCENCE AND STAINING ON PILASTERS

Bridge Inspection Report

Pictures

PHOTO 9

Description VEGETATION ACCUMULATION ALONG NORTH SHOULDER NEAR WEST END

PHOTO 10

Description PARTIALLY OBSTRUCTED DRAIN INLET AT SOUTH SHOULDER OF WEST APPROACH

Bridge Inspection Report

Pictures

PHOTO 11

Description COLLAPSED PAVEMENT WEST OF STRUCTURE

PHOTO 12

Description GENERAL UNDERSIDE, LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 13

Description 18"L X 3"W AREA OF DELAMINATION WITH SPALL IN UNDERSIDE OF ARCH NEAR WEST

END

PHOTO 14

Description TYPICAL SPALLING WITH EXPOSED PLATE REINFORCING IN UNDERSIDE OF SLAB AT

WEST END OF ARCH

Bridge Inspection Report

Pictures

PHOTO 15

Description 6"W X 8"L SPALL WITH EXPOSED PLATE REINFORCING IN UNDERSIDE OF ARCH AT EAST

END

PHOTO 16

Description DELAMINATION ALONG SOUTH FACE OF ARHCH; FULL LENGTH

Bridge Inspection Report

Pictures

PHOTO 17

Description UNDERMINING OF GROUTED RIPRAP AT NORTH END OF EAST ABUTMENT

PHOTO 18

Description SETTLEMENT OF GROUTED EROSION PROTECTION ALONG SOUTHWEST WINGWALL

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL VIEW OF WEST ABUTMENT

PHOTO 20

Description EAST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 21

Description DAMAGED DRAINAGE PIPE AT SOUTH SIDE OF EAST BANK

PHOTO 22

Description LOOKING UPSTREAM

Bridge Inspection Report

Pictures

PHOTO 23

Description LOOKING DOWNSTREAM

T B

A R

CPP;15IN

U P

D

T B

A R

E 2142371.2319

N 1046801.9138

E 2142375.7711

N 1046872.7894

E 2142475.4669

N 1046866.4105

E 2142470.9290

N 1046795.5375

6-inch depth = 150 cuyd

Roadway aggregate, method 1, Embankment Construction = 6500 cuyd

Excavation = 650 cuyd

70' x 100' proposed staging pad

SCALE IN FEET

10 200

N

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 340.55'

Final Elev. 340.55'

Final Elev. 340.55'

1AMENDMENT NO. 1

1 11/13/24 I.I Added final elevation

NO. DATE BY REVISIONS

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION

SITE #5

GRANT AVENUE

VICKSBURG NATIONAL MILITARY PARK

N '5

E 0

N85°48'37"W

.0

P

O B

.0

P

E

:1

P

M

N o v e m b e r

D e s ig n I n tl

F t

C

M S

E R

F O

N P

S V

IC

K

-1 (2

H

W Y

D

E S

\C A

D D

\D

S it e

-P la n

C o n s .E x it

P a d

A m e n d .d g n

.b a k

CONSTRUCTION STAGING PAD

PROJECT

NUMBER

SHEET

D04

NPS Drwg No. 306/188360 NPS PMIS No. 309586 & 233822

T B

A R

CPP;15IN

U P

D

T B

A R

E 2142371.2319

N 1046801.9138

E 2142375.7711

N 1046872.7894

E 2142475.4669

N 1046866.4105

E 2142470.9290

N 1046795.5375

6-inch depth = 150 cuyd

Roadway aggregate, method1, Embankment Construction = 6500 cuyd

Excavation = 650 cuyd

70' x 100' proposed staging pad

SCALE IN FEET

10 200

N

Final Elev. 339.85'

Final Elev. 339.85' Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 339.85'

Final Elev. 340.55'

Final Elev. 340.55'

Final Elev. 340.55'

1AMENDMENT NO. 1

1 11/13/24 I.I Added final elevation

NO. DATE BY REVISIONS

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION

SITE #5, CONSTRUCTION STAGING PAD

VICKSBURG NATIONAL MILITARY PARK

N '5

E 0

N85°48'37"W

.0

P

B

.0

P

E

:1

P

M

N o v e m b e r

D e s ig n I n tl

F t

C

M S

E R

F O

N P

S V

IC

K

-1 (2

H

W Y

D

E S

\C A

D D

\M

S it e

-P la n

C o n s .E x it

P a d

A m e n d .d g n

.b a k

PLAN

EROSION & SEDIMENT CONTROL

PROJECT

NUMBER

SHEET

M04

NPS Drwg No. 306/188360 NPS PMIS No. 309586 & 233822

MS ERFO NPS VICK 2020-1(2) prebid pp.pdf
MS ERFO NPS VICK 2020-1(2) Pre-Bid Meeting
Site Location
Temporary Traffic Control
Hauling/Salvage Route- do not access through other park roads
Background
Site 5 - Route 17 Grant Avenue Slide
�
�
�
�
�
Slide Number 12
�
�
�
�
�
�
�Work requirements – J pages
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – J pages (cont’d)
�Work requirements – Permits – Permit Tracking Form
Questions?��Email all questions to eflhd.contracts@dot.gov
Amendment 1 info - Revised.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project MS ERFO NPS VICK 2020-1(2)
Grant Avenue and Union Avenue Slide Repairs
Vicksburg National Military Park
Solicitation: 693C73-25-B-000002
Amendment 1 info - Revised.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project MS ERFO NPS VICK 2020-1(2)
Grant Avenue and Union Avenue Slide Repairs
Vicksburg National Military Park
Solicitation: 693C73-25-B-000002
Amendment 1 info - Revised.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project MS ERFO NPS VICK 2020-1(2)
Grant Avenue and Union Avenue Slide Repairs
Vicksburg National Military Park
Solicitation: 693C73-25-B-000002

File details come from the government source that posted it. Updated .