Appendix_O-Planning Board Regulation No13.pdf

PDF 958 KB Posted

Attached to
BRIDGE REPLACEMENTS IN CANOVANAS - PR ER PRMNT RPR(1)
Solicitation number
693C73-24-R-000030
Issued by

About this file

This document is a special flood hazard areas regulation adopted by the Puerto Rico Planning Board. It establishes the requirements and procedures for managing development within special flood hazard areas in Puerto Rico. The regulation covers topics such as the adoption and mapping of special flood hazard areas, classification of flood zones, requirements for development in different flood zones, permitting and review processes, exceptions and variances, and enforcement. Key details include:

  • The Planning Board is designated as the state coordinating agency for the National Flood Insurance Program and has the authority to adopt regulations and maps for flood hazard areas.
  • The regulation classifies special flood hazard areas into zones such as floodway, coastal high hazard zone, and other flood zones based on FEMA's designations. It provides specific requirements for development in each zone.
  • The regulation establishes permitting, review, exception, and variance procedures that developers must follow for construction, substantial improvements, and other development activities in the flood hazard areas.
  • The regulation aims to minimize flood risks, reduce public expenditures, and ensure compliance with NFIP requirements in order for Puerto Rico to maintain eligibility for flood insurance and disaster assistance.

View the file

Other files

File Type Posted
Shortlist - PR ST ER PRMNT RPR(1).pdf PDF
Amendment 0001 - PR ER PRMNT RPR(1).pdf PDF
Appendix_B-PR ST ER PRMNT RPR(1)_Final DSR_Redacted.pdf PDF
Appendix_V-PRHTAs Special Provisions.pdf PDF
Appendix_W-PRHTAs Standard Drawings.pdf PDF
Appendix_P-PRHTAs Design Directive_107.pdf PDF
Appendix_AC-109.02 Request for Progress Payment Forms_RPR(1).xlsx XLSX spreadsheet
DRAFT RFP 693C73-24-R-000030.pdf PDF
Appendix_F-Bridge 653_Modular Bridge Shop Drawings.pdf PDF
Appendix_AA-Work Zone and Mobility Policy.pdf PDF
Appendix_A-PR-ST-ER-PRMNT-RPR(1)_Plans-30.pdf PDF
Appendix_Z-Puerto Rico Governor Executive Order_OE-2023-024.pdf PDF
Appendix_C-Bridge 606 Bridge Inspection Reports 02-01-2023.pdf PDF
Appendix_J-Bridge 653 Preliminary Bridge Hydraulics Memo.pdf PDF
Appendix_M-Utility Agreement PRHTA and PREPA.pdf PDF
Appendix_U-PRHTAs Material Testing Schedule.PDF PDF
Appendix_X-PRHTAs Standard Specifications.pdf PDF
Appendix_R-PRHTAs Design Directive_111.pdf PDF
Appendix_G-FHWA NEPA FONSI.pdf PDF
Appendix_AB-109.06 Price Proposal Forms_RPR(1).xlsx XLSX spreadsheet
Appendix_E-Bridge 606_Modular Bridge Shop Drawings.pdf PDF
Appendix_Q-DTOPs Manual de Senales de Transito (MST).pdf PDF
Appendix_H-Geotechnical Report.pdf PDF
Appendix_D-Bridge 653 Bridge Inspection Reports 08-05-2022.pdf PDF
Appendix_Y-PRHTAs Supplemental Specifications.pdf PDF
Appendix_I-Bridge 606 Preliminary Bridge Hydraulic Memo.pdf PDF
Appendix_S-PRHTAs Design Directive_114.pdf PDF
Appendix_L-Utility Agreement PRHTA and PRASA.pdf PDF
Appendix_N-Manual de Rotulacion para las Vias Publicas de Puerto Rico.pdf PDF
Appendix_T-PRHTAs Design Directive_410.pdf PDF
Appendix_K-USFWS Conservation Measures.pdf PDF
RFQ - PR ER PRMNT RPR(1).docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[CERTIFIED TRANSLATION]

COMMONWEALTHOFPUERTORICO
PLANNINGBOARD

SAN JUAN, PUERTO RICO

SPECIALFLOODHAZARDAREASREGULATION
(PlanningRegulationNo.13)

EIGHTH REVISION

EFFECTIVE DATE: JANUARY 9, 2021

GOBIERNO DE PUERTO RICO

JUNTA DE PLANIFICACION

SAN JUAN, PUERTO RICO

Guia Operacional para las Determinaciones de Danos y Mejoras Sustanciales

;·-"i , ADOPTADO

17 DE DICIEMBRE DE 2020

GOVERNMENT OF PUERTO RICO

OFFICE OF THE GOVERNOR

SAN JUAN, PUERTO RICO

Administrative Bulletin Number: OE-2020-089

EXECUTIVE ORDER OF THE GOVERNOR OF PUERTO RICO, HONORABLE

WANDA VÁZQUEZ GARCED, TO APPROVE THE EIGHT REVISION OF THE

SPECIAL FLOOD HAZARD AREAS REGULATION, ALSO KNOWN AS

PLANNING REGULATION NUMBER 13, AND REPEAL THE SEVENTH

REVISION OF THE SPECIAL FLOOD HAZARD AREAS REGULATION

WHEREAS: According to Public Law No. 75 of June 24, 1975, as amended, the

Planning Board has the power, among other things, to adopt territorial ordinance plans and planning regulations in Puerto Rico.

Furthermore, as provided in Public Law Number 3 of September 27, 1961, as amended, also known as the Building Control in Flood-Prone Zones Act, the Planning Board is the agency authorized to adopt the regulation and maps for the control of buildings in flood-prone zones on our island.

WHEREAS: Since 1978, Puerto Rico has participated in the National Flood

Insurance Program (NFIP), created by the United States Congress through the Flood Insurance Act of August 1, 1968. The NFIP is administered by the Federal Emergency Management Agency

(FEMA).

WHEREAS: Pursuant to the provisions of our Building Control in Flood-Prone

Zones Act and the federal Flood Insurance Act, the Planning Board was designated as the state coordinating agency of said program.

The Planning Board is acknowledged and reiterated as the government agency designated with the power to adopt regulations and maps in accordance with the minimum federal requirements for the NFIP regulation.

WHEREAS: As part of the minimum compliance requirements with the NFIP regulation, the Planning Board recommended and implemented an administrative procedure conducive to amending the Seventh Revision of the Special Flood Hazard Areas Regulation (Planning Regulation No. 13), in order to clarify and amplify the regulatory provisions and eliminate others.

[illegible initials]

WHEREAS: The Eight Revision of the Special Flood Hazard Areas Regulation (Planning Regulation No. 13) has been developed in accordance to the powers granted to the Puerto Rico Planning Board by its Organic Law, the Building Control in Flood-Prone Zones Act, pursuant and in accordance with the requirements of Public Law 38-2017, as amended, also known as the Puerto Rico Uniform Administrative Procedure Act, and Public Law 107-2020, also known as Puerto Rico Municipal Code; and in accordance with NFIP rules.

WHEREAS: The Eight Revision proposed by the Special Flood Hazard Areas

Regulation (Planning Regulation No. 13) was presented in public hearings on January 27, 29 and 31, 2020 in San Juan, Aguadilla and Ponce, respectively, offering ample opportunity for the public to expose their comments and feedback. After taking into consideration the statements collected from the public hearings as well as the comments received in this regard, the Planning Board incorporated those it deemed relevant into the Regulation.

WHEREAS: The Eight Revision of the Special Flood Hazard Areas

Regulation (Planning Regulation No. 13) was presented before the Office of Permit Management of the Department of Economic and Commercial Development and was certified as a “categorical exclusion” on August 25, 2020, in accordance with the provisions of Public Law 416-2004, as amended, also known as Environmental Public Policy Act.

WHEREAS: The Planning Board, in accordance with the provisions of the laws mentioned before and in accordance with their requirements, adopted the Eighth Revision of the Special Flood Hazard Areas Regulation (Planning Regulation No. 13), by Resolution No. JP-RP- 13-8-2020 in a meeting held on August 28, 2020.

WHEREAS: I, WANDA VÁZQUEZ GARCED, in virtue of the powers vested in me by the Constitution and laws of the Government of Puerto Rico, hereby enact and order the following:

Section 1: The amendments to Planning Regulation No. 13 are hereby approved, including its Eighth Revision, as adopted by the Board on August 28, 2020 by Resolution JP-RP-13-8-2020.

Section 2: The Special Flood Hazard Areas Regulation, Seventh Revision, is repealed and submitted before the Department of State with number 7797.

Section 3: The Board will enforce the provisions of Article 28 of Public Law

No. 75-1975 and Public Law 38-2017, pursuant to the publication of the amendments to Planning Regulation No. 13.

Section 4: NO CREATION OF ENFORCEABLE RIGHTS. This Executive

Order is not intended to create substantive or procedural rights in favor of third parties, enforceable before judicial, administrative forums, or of any other kind, against the Government of Puerto Rico, or its agencies, officials, employees or any other person.

Section 5: EFFECTIVE TERMS: This Executive Order is effective immediately.

Section 6: PUBLICATION: This Executive Order shall be presented immediately before the Secretary of State and its wide publication is ordered.

IN WITNESS WHEREOF, I issue this Executive Order and hereunto set my signature and great seal of the Commonwealth of Puerto Rico, in San Juan, Puerto Rico, today, December 4, 2020.

[illegible signature]

WANDA VÁZQUEZ GARCED

GOVERNOR

Enacted in accordance with the law, today, December 4, 2020.

[illegible signature]

RAÚL MÁRQUEZ HERNÁNDEZ

SECRETARY OF STATE

[raised gold seal:

Great Seal of the Commonwealth of Puerto Rico]

GOVERNMENTOFPUERTORICO
PLANNINGBOARD

San Juan, Puerto Rico

August 28, 2020

Resolution No. JP-RP-13-8-2020

TOADOPTTHEEIGHTHREVISIONOFTHESPECIALFLOODHAZARDAREASREGULATION(PLANNING
REGULATIONNUMBER13)ANDREPEALTHESEVENTHREVISIONOFTHESPECIALFLOODHAZARDAREAS

REGULATION

WHEREAS: The Puerto Rico Planning Board is the state agency authorized by Public Law No. 3 of

September27,1961,asamended,alsoknownastheBuildingControlinFlood-Prone
ZonesActtopreparetheregulationandmapsforthecontrolofbuildingsinflood-prone

zones.

WHEREAS: In August 1978, Puerto Rico became a participating community of the National Flood

InsuranceProgram(NFIP),createdbytheUnitedStatesCongress,throughtheFlood
InsuranceActofAugust1,1968,andadministeredbytheFederalEmergency
ManagementAgency(FEMA).

WHEREAS: The Board was named by the Governor of Puerto Rico as the state coordinating agency

ofsaidprogram,tothatend,itisresponsibleforadoptingregulationsandmapsin
accordancewiththeminimumfederalrequirementsoftheNFIPregulation.

WHEREAS: As part of the minimum compliance requirements of the NFIP regulation, the

amendmentoftheSeventhRevisionoftheSpecialFloodHazardAreasRegulationis
recommended(PlanningRegulationNo.13)inordertoclarifyandexpandtheregulation
provisionswhileeliminatingothers.

WHEREAS: The Eighth Revision of the Special Flood Hazard Areas Regulation (Planning Regulation

No.13)hasbeendevelopedinaccordancewiththepowersgrantedtothePuertoRico
PlanningBoardbyPublicLawNo.3of1961,BuildingControlinFlood-ProneZonesAct;
PublicLawNo.75ofJune24,1975,OrganicLawofthePuertoRicoPlanningBoard;
PublicLaw38-2017,PuertoRicoUniformAdministrativeProcedureActandPublicLaw
107-2020,PuertoRicoMunicipalCode;andinaccordancewiththerulesofFEMA’s
NationalFloodInsuranceProgram.

WHEREAS: The amendments proposed by FEMA and the Board were incorporated to the draft of

theEighthRevisionofPlanningRegulationNo.13,inordertoupdateitaccordingtothe
newtendenciesregardingfloodplainadministration.Theamendmentsrecommended
arethefollowing:

1. A section about Inspections is included, referencing Section 1612.4 of the Puerto

Rico Building Code.

2. “Regulation and Permits Administrator” was replaced by “Floodplain Administrator.”

3. The use of the designated form was eliminated in the exceptions and variances.

4. Thetitleof“FloodElevationRegistry”wasmodifiedtoread“RegulatoryFloodZone
CertificationandDataRegistry.”

5. Additional definitions were included, such as “Street Vendor,” among others.

6. Section 8.04 was eliminated.

7. Parameters for pools in Zones VE were included.

8. A reference was included to ASCE standard 24 and the new building codes adopted by Puerto Rico, which include National Flood Insurance Rate Program regulations.

[ink stamp: JP

GOVERNMENT OF PUERTO RICO

PLANNING BOARD]

ResolutionJP-RP-13-8-2020
Page2

WHEREAS: The Eighth Revision of the Special Flood Hazard Areas Regulation (Planning Regulation

No.13)proposeddraftwaspresentedinpublichearingsonJanuary27,29,and31,2020
inSanJuan,Aguadilla,andPonce,respectively,offeringampleopportunityforthe
generalpublictosubmitcomments.Aftertakingintoconsiderationallthefeedbackand
commentsreceivedinthepublichearings,theBoardincorporatedthoseitdeemed
relevantintotheRegulation.

WHEREAS: The Eighth Revision of the Special Flood Hazard Areas Regulation (Planning Regulation

No.13)wassubmittedbeforethePermitManagementOffice,casenumber2020-
323186DEC-086936.ItwascertifiedasCategoricalExclusiononAugust25,2020,in
accordancewiththeprovisionsofPublicLaw416-2004,asamended,alsoknownas
EnvironmentalPublicPolicyAct.

WHEREAS: The Puerto Rico Planning Board, in its role as the NFIP State Coordinating Agency, and in

accordancewithPublicLawNo.3ofSeptember27,1961,asamended,alsoknownas
theBuildingControlinFlood-ProneZonesAct;PublicLawNo.75ofJune24,1975,as
amended,alsoknownastheOrganicLawofthePuertoRicoPlanningBoard;PublicLaw
161-2009,alsoknownasthePuertoRicoPermitProcessReformAct;PublicLaw107-
2020,alsoknownasthePuertoRicoMunicipalLaw;PublicLaw38-2017,alsoknownas
theUniformAdministrativeProcedureoftheGovernmentofPuertoRico;andin
accordancewiththerulesofFEMA’sNationalFloodInsuranceProgram,assetforthin
Title44oftheCodeFederalofRegulationspart60.3subparagraph(d),(c)andSubpartB
anditssectionsregardingsaidprogram,ADOPTStheEighthRevisionoftheSpecial
FloodHazardAreasRegulation(PlanningRegulationNumber13)thusbecomingan
integralpartofthisResolution.

FIRST: The Seventh Revision of the Special Flood Hazard Areas Regulation, registered with the

Department of State with number 7797 is repealed.

SECOND: It is hereby resolved that the Eighth Revision of the Special Flood Hazard Areas

Regulation(PlanningRegulationNo.13)willcomeintoeffectthirty(30)daysafterithas
beenfiledwiththeDepartmentofState,asprovidedinArticle2.8ofPublicLaw38-

2017.

ADOPTED in San Juan, Puerto Rico, today, August 28, 2020.

[signed:illegible]
MARÍADELC.GORDILLOPÉREZ

President [signed: illegible] [signed: illegible]

SUHEIDYBARRETOSOTOREBECCARIVERATORRES
AssociateMemberAssociateMember

[signed: illegible]

PABLOCOLLAZOCORTÉS
AssociateMember

I HEREBY CERTIFY the above is a true and exact copy of the resolution adopted by the Planning Board, today, August 28, 2020.

[signed: illegible]

LOIDA SOTO NOGUERAS

Secretary

[ink stamp: JP

GOVERNMENTOFPUERTORICO
PLANNINGBOARD]
SPECIALFLOODHAZARDAREASREGULATION
(PlanningRegulationNo.13)

EIGHTH REVISION

TABLE OF CONTENTS

ACRONYMS

TOPIC 1 – APPLICATION AND INTERPRETATION

SECTION 1.00 General Provisions

1.01 Title

1.02 Legal Base

1.03 Purpose

1.04 Application

1.05 Terms Employed

1.06 Provisions of Other Regulations

1.07 Conflicting or Contradictory Provisions

1.08 Sanctions

1.09 Public Safety

1.10 Release of Liability

1.11 Derogation Clause

1.12 Severability Clause

SECTION 2.00 Definitions

2.01 General Provision

TOPIC 2 - SPECIAL FLOOD HAZARD AREAS

SECTION 3.00 ADOPTION OF SPECIAL FLOOD HAZARD AREAS

3.01 General Provision

3.02 Adoption Purposes

3.03 Notification and Publication of the Adoption

3.04 Review Procedure for the Adoption

SECTION 4.00 FLOOD INSURANCE RATE MAPS

4.01 General Provision

4.02 Map Content

4.03 Prerogatives

4.04 Map Amendments

4.05 Zone Limits

SECTION 5.00 SPECIAL FLOOD HAZARD AREAS CLASSIFICATION

5.01 Classification by Zones

5.02 Zone Types

SECTION 6.00 FLOODWAY

6.01 Developments in the Floodway

6.02 Manufactured Homes and Recreational Vehicles in the Floodway

6.03 Land Subdivision in the Floodway

6.04 Floor Elevation

SECTION 7.00 ZONE AE, LANDS BETWEEN THE LIMIT OF THE FLOODWAY AND THE

FLOODPLAIN, LANDS IN THE FLOODPLAIN, ZONE A AND ZONE AO/AH

7.01 General Provisions

7.02 Hydrologic – Hydraulic Studies (Zone A, without detailed study)

7.03 Developments in Zone AE Lands (where the base flood elevation is known and the floodway has been defined)

7.04 Developments in Zone AE Lands (where the base flood elevation is known and the floodway has not been defined)

7.05 Developments in Zone AO and AH Lands (where the base flood depth is between 0.30 meters (1 foot) and 0.91 meters (3 feet)

7.06 Manufactured Homes, Recreational Vehicles and Manufactured Structures in Zones AE and A

7.07 Fill in Zone A

SECTION 8.00 COASTAL AREAS

8.01 Zone VE and Coastal Zones

8.02 Fill in Zone VE

8.03 Land Subdivisions in Zone VE

TOPIC 3 – MANAGING THE REGULATION

SECTION 9.00 PERMITS

9.01 General Provision

9.02 Permit Requirement

9.03 Issuing Permits

9.04 Effective Terms for Permit Decisions

9.05 Submitting Permit Requests

9.06 Permit Request Review

9.07 Map Review Compliance – General Provisions

9.08 Design and Base Flood Elevation

SECTION 10.0 REGULATORY FLOOD ZONE CERTIFICATION AND DATA REGISTRY

10.01 General Provision

SECTION 11.00 EXCEPTIONS

11.01 General Provision

11.02 Developments Considered Exceptions

11.03 Conditions when Making Exceptions

11.04 Effective Term for Exception Decisions

11.05 Initiative

SECTION 12.00 VARIANCES

12.01 General Provision

12.02 Initiative

12.03 Public Hearings

12.04 Conditions to Issue Variances

12.05 Effective Term for Decisions on Variances

12.06 Registry of Variances

12.07 Notice

12.08 Considerations for Variance Evaluation

SECTION 13.00 SURVEILLANCE AND INSPECTION IN FLOOD HAZARD ZONES

13.01 General Provision

13.02 Inspections

TOPIC 4 – OVERSIGHT PROCEDINGS

SECTION 14.00 VERIFICATION OF DATA, WORKS AND PENALTIES

14.01 Administrative or Judicial Actions

14.02 Penalty

TOPIC 5 – ADOPTION AND EFFECTIVE DATES

SECTION 15.00 Adoption

15.01 Effective Dates

Acronyms

ASCEAmericanSocietyofCivilEngineers
ASTMAmericanSocietyforTestingandMaterials
BFEBaseFloodElevation
BMBenchMark
CFRCodeofFederalRegulations
CWACleanWaterAct
DRNADepartamentodeRecursosNaturalesandAmbientales(Departmentof
NaturalandEnvironmentalResources)
FEMAFederalEmergencyManagementAgency
FIRMFloodInsuranceRateMap
FISFloodInsuranceStudy
H-HHydrologic-HydraulicStudy
ICCIncreasedCostofCompliance
JPPlanningBoard
LOMRLetterofMapRevision
MSLMeanSeaLevel
MOWAModerateWaveActionArea
NAD83NorthAmericanDatumof1983
NFIPNationalFloodInsuranceProgram
NGSNationalGeodeticSurvey
OGPeOficinadeGerenciadePermisos(OfficeofPermitManagement)
PRVD-02PuertoRicoVerticalDatumof2002
SFIPStandardFloodInsurancePolicy
ZMTZonaMarítimoTerrestre(Maritime-TerrestrialZone)

TOPIC 1 – APPLICATION AND INTERPRETATION

SECTION 1.00 General Provisions

1.01 Title

ThisPlanningRegulationNo.13willbeknownandquotedasthe“Special
FloodHazardAreasRegulation.”

1.01 Legal Base

ThisRegulationisadoptedinaccordancetotheprovisionsofPublicLaws
No.3ofSeptember27,1961,“BuildingControlinFlood-ProneZonesAct”
andNo.75,“OrganicLawofthePuertoRicoPlanningBoard”;PublicLaw
No.161ofDecember1,2009,asamended,“PuertoRicoPermitProcess
ReformAct”and“PuertoRicoUniformAdministrativeProcedureAct”,
PublicLawNo.38ofJune30,2017,asamendedandinaccordancewith
theregulationsoftheFederalEmergencyManagementAgency(FEMA)
NationalFloodInsuranceProgram,Part44CFR,Section60.3(d&e)and
applicablesectionsofSubchapterBregardingtheProgram.

1.03 Purpose

TheprovisionsofthisRegulationestablishthesafetymeasuresto
regulatetheconstructionanddevelopmentofthelandsintheareas
declaredtobesusceptibletofloodingandhavethefollowingpurposes:
a. Restrictorprohibitdevelopmentsthatarehazardoustopublichealth,
safetyandpropertywhenthesepromoteanincreaseofflood
elevationsorwatervelocities,whichinturnincreaseerosion.
b. Requirethatflood-pronedevelopments,includingtheirservice
facilities,beprotectedagainstfloodingatthetimeoftheiroriginal

construction.

c. Preventorregulatethemodificationofnaturalfloodplains,
watercourses,naturalprotectivebarriersthataccommodateor
channelfloodwatersorstormsurges.
d. Controlthefilling,grading,dredging,encroachingandanyothertype
ofdevelopmentthatmayincreasedamagefromfloodingorstorm

surges.

e. Preventorcontroltheconstructionofbarriersthatalterthewater
floworthatmayincreasethefloodriskinotherareas.
f. Notpromotingthelocationofnewdevelopments,encroachmentsor
substantialimprovementsunlessthereisproofthatotherlocation
alternativeshavebeenevaluatedandtheyareprovennottobe

feasible.

g. ToparticipateintheNationalFloodInsuranceProgramandmaintain
theeligibilityforfloodinsuranceanddisasterassistance.

1.04 Application

ThedispositionscontainedinthisRegulationwillapplyandcover:
a. TheSpecialFloodHazardAreasadoptedbythePlanningBoard,and
thepropertiesinsaidareas.
b. Anyperson,naturalorlegal,publicorprivate,andanygrouping

thereof.

c. The lands, which, because of their topographic nature, or location

withrelationtoabodyofwater,haveahistoryoffloodingorareat
riskofflooding.

1.05 Terms Employed

WhenitsuseisjustifiedinthisRegulation,anywordusedinsingularshall
alsoincludethepluralandviceversa;andthemasculineshallincludethe
feminineandviceversa.

1.06 Provisions of Other Regulations

TheprovisionssetforthinthisRegulationwillbesupplementedbythe
provisionsofanyotherregulationineffectapprovedbythePlanning
Board,orbytheParticipatingCommunity,whichmaybeapplicableto
thespecificzonewherethepropertyislocated,aswellasanyother
applicablefederalregulation.

1.07 Conflicting or Contradictory Provisions

IfarequirementestablishedbyanyprovisionofthisRegulationismore
orlessrestrictivethanarequirementestablishedbyanyofitsother
provisions,orbyanyotherlaw,regulationorruleestablishedbyanyduly
constitutedgovernmentauthoritywithjurisdiction,thestricter
requirementshallprevail.

1.08 Sanctions

AnyviolationtotheprovisionsincludedinthisRegulation,willbe
penalized,inaccordancewithPublicLawNo.3de1961,PublicLawNo.
75of1975andPublicLaw161-2009,asamended,andanyother
applicablepenaltyestablishedbyFEMAfortheParticipatingCommunity.

1.09 Public Safety

TherulesestablishedinthisRegulationconstituteminimalrequirements.
ThePlanningBoardorParticipatingCommunitywillbeabletorequire
andprovideforthecomplianceofthemajorrequirementsincasethere
isanexistingconditionoranunforeseenconditionisanticipatedinthis
Regulation,whichpresentsathreattopubliclifeorpropertyoraserious
dangertopublichealthandsafety.

1.10 Release of Liability

ThedegreeoffloodprotectionrequiredbythisRegulationisconsidered
reasonableforregulatorypurposesandisbasedonscientificand
engineeringconsiderations.Severefloodingmayandwilloccuronrare
occasions.Thefloodelevationcanincreasebecauseofnaturalorman-
madecauses.ThisRegulationdoesnotimplythelandsoutsideofthe
SpecialFloodHazardAreasortheusesallowedwithinthoseareasare
safefromflooding.ThisRegulationdoesnotcreateliabilityonthepartof
FEMA,thePlanningBoard,theOGPeortheParticipatingCommunity
resultingfromrelianceonthisRegulationoranyadministrativedecision
lawfullymadehereunder.

1.11 Derogation Clause

Planning Regulation No. 13 effective January 7, 2010 is hereby repealed.

1.12 Severability Clause

Ifanyword,sentence,subparagraph,subsection,section,topicorpartof
thisRegulationwerechallengedforanyreasonbeforeaCourtand
declaredunconstitutionalorvoid,suchjudgmentshallnotaffect,
undermineorinvalidatetheremainingprovisionsandpartsofthis
Regulation,insteaditseffectshallbelimitedtotheword,sentence,
subparagraph,subsection,section,topicorpartsodeclared
unconstitutionalorvoidandthenullityorinvalidityofanyword,
sentence,subparagraph,subsection,section,topicorpartofanyspecific
caseshallinnowayaffectorprejudiceitsapplicationorvalidityinany
othercase,exceptwhenitisspecificallyandexpresslyinvalidatedforall

cases.

SECTION 2.00 Definitions

2.01 General Provision

Thetermsorphrasesdefinedbelowwillhavethemeaningsetforthfor
eachonewithinthecontextestablishedherein.

1. Acre – land measure equivalent to 1.0296 cuerdas and to 4,046.87 square meters.

2. Addition:Anextension,enlargementorincreaseofthegrossfloor
areaorheightofastructure.Alladditionswillbetreatedasnew

construction.

3. Floodplain Administrator: the president of the Puerto Rico Planning

Boardortheperson,entityoragencydesignatedbyhim/herorthe
AutonomousMunicipalityortheParticipatingCommunityauthorized
toadministerandimplementthisguidebygrantingordenying
developmentpermitsinaccordancewiththeprovisionsestablished
thereof;accordingtotheprovisionsofPublicLawNo.3of1961,
PublicLawNo.75of1975,PublicLawNo.107-2020ofthePuerto
RicoMunicipalCodeorPublicNo.161-2009,alsoknownasthe
PuertoRicoPermitProcessReformAct.TheAdministratorwillbeable
todesignateandgrantfunctionsortaskstooneormoreFloodplain

Co-administrators.

4. Federal Emergency Management Agency (FEMA): Department of

HomelandSecurityfederalagency,whichalsomanagestheNational
FloodInsuranceProgram.
5. StructuralModification:Anychangetothestructuralelementsofa
buildingorexistingstructure,suchas:load-bearingwalls,columns,
beams,androofs;oranyaddition,extension,enlargementor
variationinsizeoftheexistingstructuralelementsortheconstruction
inthebuildingofnewadditionalstructuralelements,suchas:roofs,
beams,columnsorload-bearingwalls.

6. Coastal High Hazard Areas: Areas along the coast subject to the base

floodandhighwatervelocity,includingstormsurge.Theseareasare
designatedasZoneVEontheFloodInsuranceRateMaps(FIRM).

7. Shallow Flooding Area – An area designated AO or AH in the Flood

InsuranceRateMap(FIRM)withaonepercent(1%)annualchanceof
floodingormore,withameanannualdepthofonetothree(1’-3’)
feetwherethefloodwayisnotclearlydefined,thefloodrouteis
unpredictableandthevelocityflowcanbeevident.Saidfloodingis
characterizedbypondingorsheetflow.
8. SpecialFloodHazardArea–Ahighhazardareadefinedasanyland
subjecttoaonepercent(1%)annualchanceofbeingflooded(also
calledbaseflood).Thisareamaybedesignatedas:ZoneA,AE,AH,
AO,A1-A30,A99,V,VO,VEorV1-V30.TheFloodHazardArea
standardincludesareasonablecompromisebetweentheneedfor
buildingrestrictionstominimizethepossiblelossoflifeandproperty
andthefinancialbenefitsthatmayresultfromdevelopingthe
floodplains.ThedevelopmentcouldbebuiltintheseSpecialAreasas
longasitcomplieswithstateandmunicipalFloodplainregulations
andordinancesthathavetobeinaccordancewiththeminimum
federalrequirements.

9. ASCE Standard 24 – Flood-resistant design and construction standard developed by the American Society of Civil Engineers (ASCE).

10. IncreasedCostofCompliance(ICC)–Whenastructureiscoveredby
thispolicy,anditsustainsalossbecauseofafloodandhasbeen
declaredsubstantiallyorrepetitively(repetitivelosses)damaged,the
ICChelpscoverthecostsofelevating,flood-proofing,demolishingthe
structure,oranycombinationthereof,ifthestructureiseligibleand
complieswithICCprovisions.Thiscoverageisinadditiontothe
StandardFloodInsurancePolicy(SFIP)coverage,andallthepolicies
issuedorrenewedonorafterJune1997,includeICCcoverage,except
forthepoliciesforstructuresthatfallundertheGroupFlood
InsurancePolicy.
TheStandardFloodInsurancePolicyprovidesforthepaymentofa
claimintendedtohelpcoverthecosttocomplywithstateor
municipalregulationsorordinancesforfloodplainmanagementdue
toafloodingeventwhereabuildingorstructurehasbeendeclaredas
havingsubstantialorrepetitivedamage.Whenaninsuredbuilding
sustainsflooddamageandthestateorparticipatingcommunity
declaresthebuildinghassustainedsubstantialorrepetitivedamage,
theICCcoveragewillhelppaythecostofelevating,floodproofing,
demolishingorrelocatingthebuildinguptothepreviously
establishedmaximumbenefit.Thiscoverageisinadditiontothe
physicaldamagecoverageforbuildings.
11. CoastalBarrier:ConstitutesadeclarationbytheFederalGovernment
ofnon-participationanddiscouragesthedevelopmentinsuchareas.
TheCoastalBarrierCoastalBarrierResourcesAct(CoBRA)of1982
prohibitsprovidingfloodinsuranceinallthebuildingsinthoseareas.
ThepurposeoftheActistominimizethelossoflife,wasteoffederal
fundsanddamagetowildlifeandnaturalresources.
12. Barrio,barriopuebloandsub-barrios(division,towndivisionand
subdivisions)–Themunicipalitiesarelegallydividedinsmaller
geographicalareas.Thebarriosrepresentthemainlegaldivisionof
eachmunicipality.Thebarriopueblotendstobeconsideredthe
urbancenterofthemunicipality.Thesub-barriosarelegaldivisionsof
thebarriopuebloandsomeadjacentbarrios.
13. HydrodynamicLoad–Pressureperunitofweightthatactson
submergedobjectsinaliquidduetoitskineticenergy.The
hydrodynamicloadisproportionaltothesquareoftheliquidvelocity
accordingtotheratioHD=V2/2G,whereV=liquidvelocityandG=
gravityacceleration.

14. Hydrostatic Load – Pressure per unit of weight produced by a liquid

atrestonanypointofcontactwithastructure.Thestaticpressure
increaseswithdepth,affectingstructuralelements,suchasfloors,
walls,foundationpilesandroofs.TheratioisHS=P/Y,whereP=
staticpressureandY=isthespecificweightoftheliquid(usually

water).

15. ManufacturedHome–astructure,transportableinoneormore
sections,builtonapermanentchassisanddesignedtobeusedwith
orwithoutapermanentfoundationwhenconnectedtotherequired
utilities(water,electricity,gas,etc.).

16. Watercourse: A river, stream or creek channel where water usually flows.

17. Floodway:thechannelofariver,streamorotherwatercourseand
theadjacentlandareasthatmustbereservedinordertodischarge
thebasefloodwithoutcumulativelyincreasingthewatersurface
elevationofthefloodplainmorethan0.30meters(one(1)foot)in
currentdetailedstudiesinaccordancewithsections6.01and7.04.In
thecaseofanewdetailedstudyinZoneA(Section7.02)andthe
evaluationofadepositoffill(Section7.07),themaximumincrease
allowedwouldbe0.15meters(half(1/2)afoot),asdeterminedby
theHydrologic–HydraulicStudy.

18. Certification: Declaration by a licensed architect, engineer or

surveyorthattheplansandotherdocumentssubmittedcomplywith
thespecificationsofthisRegulation,andareinaccordancewiththe
bestpracticesoftheprofession.
19. ElevationCertificate:DocumentorformprovidedbyFEMA(FEMA
Form086-0-33,revised)thatprovidesforfloodinsurancerate
adjustment,butdoesnotexcludethepropertyfromtheSpecialFlood
HazardArea.Itprovidesinformationaboutfloorandlandelevation,
amongothers,inordertocompareitwiththebasefloodelevation
anddetermineifitisnecessarytoadjustthefloodinsurance.The
certificatemustbesignedandcertifiedbyalicensedlandsurveyor,or
professionalauthorizedtoperformlandsurveysinPuertoRico.This
certificateshallberequiredfortheevaluationandapprovalofa
buildingpermit.

20. Flooding Certificate: Declaration by the Planning Board or

ParticipatingCommunity,whichstatesthefloodingcondition
affectingaparticularland,parcel,lot,orareaissuedbytheOfficeof
theSecretaryoftheBoardorbytheofficedesignatedbythe
ParticipatingCommunityattherequestofanyperson,organizationor

group.

21. Start of Construction – the date the building permit was issued,

providedthattheactualandeffectivestartofconstruction,repair,
rebuild,rehabilitation,addition,placementorotherimprovement
tookplacewithin180daysofthepermitissuedate.Permanent
constructiondoesnotincludepreparationoftheland,suchas
clearing,grading,andfilling;theinstallationofstreetsorsidewalks;
theexcavationforbasements,footings,foundationsorpiers;the
erectionoftemporaryforms,ortheinstallationofaccessory
buildings,suchasgaragesorshedsnotoccupiedasdwellingunits,
whicharenotpartofthemainbuilding.
Forasubstantialimprovement,theactualstartofconstructionmeans
thefirstmodificationofanywall,roof,floor,orotherstructural
elementofabuilding,whetherornotthatmodificationaffectsthe
dimensionsofthebuilding.
22. Community–State,municipalgovernmentorpoliticalsubdivision
withtheauthoritytoadoptandenforcetheNationalFloodInsurance
Programregulations.
23. ParticipatingCommunity–Communitywithlocallanduseauthority
thatadoptsandenforcestheprovisionsofthisRegulation.

24. Substantial Damage – Damage of any nature sustained by a structure,

whoserepaircosttoitspre-damageconditionwouldequalorexceed
fiftypercent(50%)ofthemarketvalueofthebuildingbeforethe
damageoccurred.Italsomeansdamagerelatedtofloodingsustained
byastructureduringtwo(2)separatefloodingeventsinaperiodof
ten(10)years,forwhichtherepaircostatthetimeofsaidevents
equalsorexceedstwenty-fivepercent(25%)ofthemarketvalueof
thestructurebeforethedamageofeachoftheeventsoccurred.

25. Datum means the following:

a) Elevation used as a reference (the other points in a map).

b) Horizontal Datum – NAD 83, North American Datum of 1983.

c) Vertical Datum – Level surface to which elevations are referred to

bygovernment-relatedentities,suchastheFederalEmergency
ManagementAgencyandtheNationalGeodeticSurvey(NGS).
TheverticaldatummostusedbyFEMAinPuertoRicoisMSLor
PRVD-02;NGVD29doesnotapplytoPuertoRico.

26. Department of Natural and Environmental Resources: Government

Agency created by Public Law No. 23, June 20 of 1972, as amended.

27. Development–Start,construction,changeoradditionofanyuseor
structure,onlandorwater;theunloading,gradingordivisionofland
intwoormorelotsincluding,butnotlimitedtothefollowing:

a) Construction, rebuilding, modification or addition of a building or structure;

b) Change in the type of use for a building, structure or land;

c) Substantialincreaseintheintensityoflanduse,suchasan
increaseinthenumberofbusinesses,offices,manufacturing
institutionsorhousingunitslocatedinabuildingorstructure;

d) The beginning or expansion of the extraction of resources, mining,

excavation,farming,horticultureorforestactivities,onlandor
water(excepttoobtainsoilsamples);

e) The demolition of a building or structure, the removal of trees or vegetation of a plot of land;

f) Thedeposit,ordisposaloftrash,solidorliquidwasteorfillina
plotofland;
g) Thephysicalorchemicalmodificationoftheshore,bankor
channelofanoceanshore,lake,pond,channelorotherbodyof
water,orthemodificationofanylandsubjecttoflooding.

28. Land Development: Man-made improvements to land, consisting of

themovementofsoiltofillorexcavateandotherurbandevelopment
work,suchasstamping,paving,curbs,sidewalks,including,butnot
limitedto,utilitiesstructuresandfacilities,suchas:waterdistribution
systems,storm,andsanitarydrains,illuminationandpower
distributionandtelephonelines.
29. Levee:Man-madestructureinthefloodplain,usuallyanearthen
berm,designedandbuiltaccordingtothestandardengineering
practicestocontain,controlordivertthewaterflowtoprotect
againsttemporaryflooding.

30. Design – Will be understood as that performed for flood protection

worksnecessaryforaonepercent(1%)annualchanceflooding(also
calledbaseflood).Floodcontrolandflood-proofingworksforthe
purposesofthisRegulationwillbedesignedforthebaseflood

protection.

31. Freeboard – a safety factor consisting of a free vertical distance

abovethebasefloodelevationthatmustobservetheminimum
elevationofflood-controlworksandothers,suchasbridgesand
sewersinordertocompensateforunknownorunforeseenfactors
whencalculatingbasefloodelevations.Thisfreeboardshallbenoless
than0.30meter(1foot)orasdefinedinotherapplicablerulesand
regulations,whicheverisgreater.Whereembankments(levees)are
concerned,freeboardshallbenolessthan0.91meter(3feet).
Incasesofresidentialconstruction,thelowestfloorelevationwill
haveafreeboardofnolessthan0.30metersabovethebaseflood
elevation.Forcommercialusethefloorelevationwillbein
accordancetotheprovisionsestablishedinthezonewhereitis

located.

32. Natural Storm Drainage: A depression in the land where water runoff flows.

33. Sanddunes–naturally-occurringaccumulationsofsandinridgesor
moundsinlandfromtheshore.
34. PrimaryFrontalDune–acontinuousornearlycontinuousmoundof
sandwithrelativelysteepseawardandlandwardslopesimmediately
landwardandadjacenttothebeachandsubjecttoerosionfromhigh
tidesandwavesduringmajorcoastalstorms.Theinlandlimitofthe
primaryfrontalduneoccursatthepointwherethereisadistinct
changefromarelativelysteepslopetoarelativelymildslope.
35. Building–Structureswitharoofandwalls,orpartofit,tobe
occupiedpermanentlyortemporarilybypeople,including:houses,
temples,offices,theaters,warehouses,factories,schools,hospitals,
storesoranyothersimilarstructure.Seealsostructures.

36. Elevated Building – A building with no basement built with its lowest

floorabovethegroundbyusinginitsperimeterfillorsolid
foundationwalls,pilings,columns(postsandpiers)orshearwalls.

37. Erosion Caused by Flooding – Landslide along the shores of a body of

waterasaresultofsoilremovalmechanismscausedbywavesor
watercurrentsexceedingtheiranticipatedcycliceventsorbyan
unusualriseinthewaterlevelorsurgeresultinginflooding.

38. Structures – That which is erected, built, fixed or placed by man on,

aboveorundertheground,including,butnotlimitedto,buildings,
towers,chimneys,airtransmissionlines.Forthepurposesof
floodplainmanagement,abuildingwithwallsandaroof,including
gasorliquidstoragetanksmainlyabovegroundaswellas
manufacturedhousing.

39. Historic Structure – A structure listed in the National Registry of

HistoricSitesorintheInventoryofHistoricSitesorPlacesoran
EligiblePropertyinahistoriczone.EligiblePropertyisapropertyof
historicvaluethatmaysatisfytheeligibilitycriteriaasaHistoricSite,
buthasnotbeendesignatedassuchindividually.

40. Hydrologic-Hydraulic Study – Scientific technical study to determine

thedifferentwatervolumesfordifferentfloodingevents,theanalysis
ofthecharacteristicsofthebodiesofwaterandadjacentlandsto
provideestimatesforthefloodelevationfordifferentrecurring
eventswithinahydrographicbasin.

41. Flood Insurance Study (FIS): Official report provided by FEMA

indicatingthefloodprofileaswellasthefloodways,floodinglimits,
andbasefloodelevation.

42. Exception: Authorization to utilize a property for a use admitted and

toleratedbytheregulationinazoneordistrict,aslongasitcomplies
withtherequirementsorconditionsestablishedintheapplicable
regulationauthorizingsaiduse.

43. Flood:

a) Ageneralandtemporaryconditionofpartialorcomplete
overflow/inundationofusuallydrylandareasfrom:
1. theoverflowofinlandortidalwaters;
2. theunusualandrapidaccumulationorrunoffofsurface
watersfromanysource;
3. mudflow;or
b) thecollapseorsubsidenceoflandalongtheshoreofalakeor
otherbodyofwaterasaresultoferosionorunderminingcaused
bywavesorcurrentsofwaterexceedinganticipatedcyclicallevels
resultinginafloodasdefinedin(a)above.
c) Forinsurancepurposes,afloodingeventinvolvestwo(2)ormore
acresofusuallydrylandarea,ortwo(2)ormoreproperties.
44. BaseFlood:Afloodhavingaonepercent(1%)chanceofbeing
equaledorexceededinanygivenyear.Itisknownasafloodwitha
recurringperiodofonehundred(100)years.
45. CriticalFacilities:Allman-madestructuresorimprovements,which
areimportantbecauseoftheirsizeorservicewiththepotentialto
causeordisruptvitalactivitieswithoutbeingdestroyed,damaged,or
iftheirservicesaresuddenlyinterruptedbyanaturalor
anthropogenicphenomenon,suchas:

a) hospitals, nursing homes and housing probably occupied by

peoplewithoutenoughmobilitytopreventtheirdeathorlesions
duringafloodingevent;
b) policestations,firestations,vehicleandequipmentstorage
facilities,andemergencyoperationcentersnecessaryfor
responseactivitiesbefore,duringandafterafloodingevent;

c) public and private utilities facilities vital to maintaining or

restoringregularservicesinfloodedareasbefore,during,and
afterafloodingevent.

46. The Adjudicative Board of OGPe –

a) The Adjudicative Board is an agency attached to the OGPe. It is responsible for evaluating and adjudicating final determinations

regardingdiscretionalcharacterandhavethedutiesand
responsibilitiespursuanttoPublicLaw161-2009,theprovisionsof
thisRegulation,aswellasanyotherapplicableOGPeinternal

regulation.

b) ThefinaldeterminationsoftheAdjudicativeBoardwillbe
consideredfinalOGPedeterminations,whowill:

1) Notify any final determination from the Adjudicative Board to

allthepartsinvolvedwithinaperiodnogreaterthanten(10)
daysfromitsissuedate.
2)ThefinaldeterminationnotificationfromtheAdjudicative
Boardshallincludethefindingsoffactandconclusionsoflaw.

47. Planning Board - government body created by Public Law No. 75 of

June24,1975,asamended,alsoknownastheOrganicLawofthe
PuertoRicoPlanningBoard.ItisalsotheStateCoordinatingAgency
fortheNationalFloodInsuranceProgramandtheFloodplain

Administrator.

48. Land Subdivision - refers to the division of a property into two (2) or

morepartsforitssale,transfer,lease,donation,usufruct,use,
census,trust,divisionofinheritanceorcommunity,oranyother
transaction;aswellasfortheconstructionofone(1)ormore
buildings;constitutingcommunitypropertyaboutalot,plotorparcel
ofland,wherethespecificlotsareassignedtotheco-owners;aswell
asfortheconstructionofone(1)ormorebuildings;andalsoincludes
urbandevelopment,asdefinedintheapplicableregulation;italso
includesamerelandsegregation.

49. Map - Geographic or topographic representation of the flood hazard area.

50. FloodInsuranceRateMap(FIRM)-officialmappreparedand
approvedbyFEMA,adoptedbythePlanningBoard,whichidentifies
theSpecialFloodHazardAreasaccordingtothefollowingzones:

a. Zone A - Special Flood Hazard Area with a recurring period of

onehundred(100)yearsdeterminedbyusingapproximate
methodologieswithnobasefloodelevationorFloodway

determined.

b. Zone AE - Special Flood Hazard Areas with a recurring period

ofonehundred(100)yearsdeterminedbydetailed
methodologieswithbasefloodelevationsindicated.According
tothescopeofthestudy,mayincludetheFloodway

determination.

c. Zone AO/AH – shallow Special Flood Hazard Areas with a

recurringperiodofonehundred(100)yearswithabaseflood
depthfluctuatingbetween0.30meters(one(1)foot)and0.91
meters(three(3)feet).Theaverageflooddepthsareobtained
fromadetailedhydraulicanalysis.

d. Zone A99 – areas prone to flooding from a flooding event with

aonepercent(1%)annualchanceofoccurring.Thesespecial
areasarewithinafloodprotectionorcontrolsystemwhere
enoughprogresshasbeenmadeinitsconstruction,even
thoughithasnotbeencompleted,butthespecificstatutory
progresshasbeenreachedtocompleteit.Thiszonedoesnot
detailbasefloodelevationsorfloodingdepths,soitis
recommendedtouse,ifrequired,thepreviousfloodelevation
forZone99.Mandatoryfloodinsurancepurchase
requirementsapply.

e. Zone D – Flooding area that is not determined but is possible.

f. Zone VE – Coastal high flood hazard area with a recurring

periodofonehundred(100)yearswithvelocityandenergy
(stormsurge)andadeterminedbasefloodelevation.

g. Zone X (shaded) – flooding area with 0.2% chance of occurring

eachyearortheonehundred(100)yearfloodwithawater
depthoflessthan0.3meters,withdrainageareasoflessthan
2.6squarekilometersorareasprotectedbyleveesagainstthe
onehundred(100)yearflood.

h. Zone X (unshaded) - Area determined to be outside the five hundred (500) year storm flood.

51. FloodproofingMeasures–referstotechniquesoracombinationof
measures,that,whenapplied,preventfloodwatersfromenteringthe
structure,thusprotectingitsutilitiesandequipmentorstructural

elements.

52. DryFloodproofing–acombinationofmeasuresthatresultina
structure,includingitsutilitiesandequipment,tobewaterproof,with
allitselementssubstantiallyimpermeabletotheentranceofwater,
withallstructuralelementsbeingabletoresisthydrostaticand
hydrodynamicloadsandtheflotationeffect.

53. Substantial Improvement - any addition, reconstruction,

rehabilitationorotherimprovementtoastructure,wherethetotal
costoftheimprovementoveranycontinuousten-year(10)period
equalsorexceedsfiftypercent(50%)ofthecurrentmarketvalueof
thestructure,orthevalueaccordingtoanappraisalpreparedand
certifiedbyaprofessionalappraiserbeforestartingtheconstruction
oftheimprovements.

However, it does not include:

a) Anyimprovementprojecttostructuresinordertocorrect
violationstostateormunicipalhealth,sanitaryorlife-
protectionsafetycodespecificationsidentifiedbythespecific
agencyconstitutingminimumrequirementstoensuresafe
livingconditions.
b) Anymodificationofahistoricstructureprovidedthatthe
modificationdoesnotprecludethestructurecontinuesbeing
designatedasahistoricstructure.

54. Cumulative Substantial Improvement: Substantial improvement with

arepairorimprovementcostaccumulatedduringaperiodoftimein
awaythatthestructureisrequiredtocomplywiththefloodplain
regulation.Itusuallyalsoreferstocumulativesubstantialdamage.
55. Municipality:Geographicaldemarcationwithallitsbarrios(divisions),
whichhasaspecificnameandisgovernedbyalocalgovernment,
composedofaLegislativeBranchandanExecutiveBranch.

56. Autonomous Municipality: Municipality with an effective Territorial

OrdinancePlanthathashadtheTerritorialOrdinancecompetencies
transferredinaccordancewiththeprovisionsofPublicLaw107-2020
ofthePuertoRicoMunicipalCode.
57. BaseFloodElevation-anticipatedmaximumelevationreachedby
theoverflowingwatersofariver,streamorotherwatercourseduring
abaseflood.Theelevationwithonepercent(1%)chancetobe
equaledorexceededinanygivenyear.
58. MeanSeaLevel(MSL)-forthepurposesofFloodplain
Administration,thePuertoRicoVerticalDatum(PRVD-02)orany
otherdatumusedbytheNationalGeodeticSurvey(NGS)toreference
thebaseelevationintheparticipatingcommunity’sFloodInsurance
RateMap(FIRM).

59. Highest Adjacent Grade - the highest natural elevation of the ground

surfacepriortoconstructionandnexttotheexteriorwallsofthe
proposedstructure.

60. New Construction: structure for which the start of construction

beganonoraftertheeffectivedateoftheprovisionsestablishedin
thisRegulation,includinganysubsequentimprovementstosuch
structure.FortheeffectsofthisRegulation,anyadditionthatincludes
anenlargementofthegrossfloorareawillbeevaluatedasnew

construction.

61. Encroachment (obstruction, invasion or restriction) - Includes any

dam,diversion,development,newconstruction,riprap,
embankment,levee,dike,pile,abutment,projection,excavation,
channelrectification,bridge,conduit,culvert,filloranyother
analogousornaturalstructurealong,across,orprojectedintoany
regulatoryfloodplain,whichmayimpede,delay,oralterthewater
flowpattern,eitherbyitselforbycatchingorcollectingdebriscarried
bywaterorlocatedwherethenaturalflowofwaterwouldcarry
themdownstreamandcausedamageorlossofeitherlifeor

property.

62. Permits Management Office (OGPe, by its Spanish acronym) - the

OGPeiscreatedinaccordancewithPublicLaw161-2009,knownas
thePuertoRicoPermitProcessReformAct.Itisdirectedbyan
AssistantSecretaryortheofficersthatreplacehim/herorwhoever
thepowersandattributionshavebeendelegatedto,asprovidedin
PublicLaw161-2009,asamended.

63. Breakaway Wall - A wall that is not part of the structural support of

thebuildingandisintendedthroughitsdesignandconstructionto
collapseunderspecificlateralloadforces,withoutcausingdamageto
theelevatedportionofthebuildingorsupportingfoundationsystem.

64. Manufactured Home Park or Subdivision – A parcel (or contiguous

parcels)oflanddividedintotwoormoremanufacturedhomelotsfor
rentorsale.
65. RepetitiveLoss-Flood-relateddamagetoastructureintwo(2)
separatefloodingeventsinanyten(10)yearperiodforwhichthe
averagerepaircostatthetimeoftheeventsequalsorexceeds
twenty-fivepercent(25%)ofthemarketvalueofthestructurebefore
thedamageoccurredineachevent.

66. Person: Any natural or legal, public or private person and any group thereof.

67. LowestFloor–thelowestfloorofthelowestenclosedarea(including
thebasement).Anunfinished,floodresistantenclosure,usedsolely
forparkingofvehicles,buildingaccess,orstorageinanareathatis
notthebasement,isnotconsideredthebuilding'slowestfloor,
providedthatsuchenclosureisnotbuiltinviolationofthedesign
elevationrequirementsapplicabletothisRegulation.

68. National Flood Insurance Program (NFIP): Program created by the

UnitedStatesCongressintheyear1968,whichmakesfloodinsurance
availabletotheparticipatingcommunities.

69. Property: Land, building, structure or any combination thereof, including historic sites.

70. Creek:Watercourse,whichispartofthetributarysystemofariveror
dischargesintoalake,lagoon,seaorocean.
71. RealandEffectiveConstruction–Thestartofurbandevelopment
andpermanentconstructionworksofanabovegroundstructurethat
goesbeyondtheexcavationstage,suchas:thecastingofthefloor
slaborfoundation,drivingpiles,theconstructionofcolumnsandany
work,orplacementofamanufacturedhomeonitsfoundations.

72. Reconstruction - The restoration or renewal of any part or parts of a

structure.Whendealingwithpropertieswithhistoricorarchitectonic
value,itreferstothenewconstructionthatcopiesthematerialsand
formofthehistoricstructurethatpredatesitbasedonproven
documentationorsubstantiatedbyscientificevidencethroughthe
studyoftypologies.

73. Repair - The replacement of existing minor work in a structure,

withoutincludingadditionalworkthatconstitutesastructuralor
façademodification,expansioninareaorheight,orchangetothe
meansofegress.
74. River-watercoursethatactsasthemaindrainageofabasinand
dischargesintoanotherriver,lake,lagoon,seaorocean.

75. Flood Insurance - insurance coverage proposed under the National

Flood Insurance Program (NFIP).

76. Basement-anyportionofastructurethathasitsfloorbelowground
levelonallsidesorthatpartofabuildinglocatedbelowtheelevation

This is the start of the file's text. The full file is on GovTribe.