Appendix_A-PR-ST-ER-PRMNT-RPR(1)_Plans-30.pdf
PDF 8 MB Posted
- Solicitation number
- 693C73-24-R-000030
About this file
The provided document is the Appendix A for the PR ST ER PRMNT RPR(l) project, which details the design and permanent repair of storm-damaged bridges on PR-957 and PR-962 roads in the Canovanas municipalities of Puerto Rico. The project has a total length of 0.09 miles and includes the repair of two bridges - Bridge 653 and Bridge 606. The document outlines the project specifications, including design designations, traffic data, and construction standards.
The related federal contract opportunity is a two-phase design-build solicitation (Solicitation Number: 693C73-24-R-000030) for the BRIDGE REPLACEMENTS IN CANOVANAS project, issued by the Department of Transportation Federal Highway Administration. The solicitation is for Phase I, the Request for Qualifications (RFQ), to select qualified contractors for the design-build project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
PR ST ER PRMNT RPR(l) U. S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
KEY MAP OF PUERTO RICO 12 24
SCALE IN MILES
DESCRIPTION OF PROJECT
IMPROVEMENT: Design and permanent repair of storm damaged bridges.
PROJECT LENGTH: 0.09 Miles
LANE MILES: 0.18 Miles
ROAD:
PR-957 AND PR-962
BRIDGE:
WIDTH SURFACE
20' - 34' 2" - 4" ACP
Bridge 653
Bridge 606
Date of Last Inspection: 07/19/2023
Date of Last Inspection: 02/01/2023
DESIGN DESIGNATION:
PR 957-Bridge 653 PR 962-Bridge 606
ADT (YR) 2997 (2016) 4412 (2016)
ADT (YR) 4082 (2038) 6010 (2038)
DHV 240 485
D 50/50 80/20 %Trucks 0% 1%
V (MPH) 30 30
C/A None None e(max) 8% 8%
SPECIFICATIONS:
"Puerto Rico Highway And Transportation Authority Standard Specifications For Road And Bridge Construction 2005"
Project Manager Highway Design Manager Lead Designer
Edna Gomez-Rosario Chris Burnell Michael Toomer
BASE SUBGRADE
4" - 6" N/A
PLANS FOR PROPOSED
PROJECT PR ST ER PRMNT
RPR(l)
REPAIRS ON BRIDGES
606 AND 653
CANOVANAS MUNICIPALITIES,
PUERTO RICO
PROJECT
PR ST ER PRMNT RPR(l)
CARIBBEAN SEA
ATLANTIC OCEAN
0 12
SCALE IN MILES
SHEET
NO
A0l A02-A03 A04-A06 B01-B03 D01-D12 R01-R02
N
STATE PROJECT
SHEET
NUMBER
PR PR ST ER PRMNT RPR(l) AOl
INDEX TO SHEETS
DESCRIPTION
Title Sheet Symbols And Abbreviations Location Map Typical Sections Construction Plans and Profiles Bridge Plans
Know what's below.
Call before you dig.
30 °/o PLANS
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
JULY 2024
sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
V vertical point of intersection vehicles per hour varies design speed
W west mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
BH TP
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
HW
hex.
hdwl.
inv.
ID
jt.
high water hexagon headwall invert inside diameter joint ftg.
flg.
fin.
footing flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
LW
lt. or LT Ls
LPSM
long.
LOD
lat.
lam.
L low water left length of spiral lump sum longitudinal Limits of Disturbance latitude lamination length of curve gnd or grnd galv.
GAB
ga.
HW
hex.
hdwl.
ground galvanized graded aggregate base gage (gauge) high water hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:3
P
M
J a n u a ry
S
H E
E T
C
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\A
-A
E
R -P
R M
N T
-R P
R (1 s y m b o l.
d g n
STATE PROJECT
NUMBER
SHEET
PR PR ST ER PRMNT RPR(1) A02
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
SYMBOLS AND ABBREVIATIONS
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:5
A
J u ly
S
H E
E
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
H
W Y
D
E S
\C A
D D
\A
-A
E
R -P
R M
N T
-R P
R (1 s y m b o l.
d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) A03
E: 844847.9279 N: 848308.3880 Bridge 606 - Canóvanas
E: 844687.0318 N: 839761.3684 Bridge 653 - Canóvanas
LOCATION MAP
NOT TO SCALE
:0 a n u a r y
S h e e t
A
O v e r v ie w L o c a ti o n M a p
P R
O J E
C T
S
S T
A T
E D
O T
\P R
\E R
P R
M N
T R
P R
(1
H W
Y D
E S
\C A
D D
\A -A
E
R -P
R M
N T
-R P
R (1 lo c .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) A04
E: 844847.9279
N: 848308.3880
- CanóvanasBridge 606
TO CAROLINA
5 KM
T O
L O
M A
S
K
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
CANÓVANAS, PR
BRIDGE 606
PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
NOT TO SCALE
:3 a n u a r y
S h e e t
A
B r id g e
P R
O J E
C T
S
S T
A T
E D
O T
\P R
\E R
P R
M N
T R
P R
(1
H W
Y D
E S
\C A
D D
\A -A
E
R -P
R M
N T
-R P
R (1 lo c .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) A05
E: 844687.0318
N: 839761.3684
Bridge 653 - Canóvanas
T O C
A R
O L I
N A
T O
L O
M A
S
K
M
K
M
K
M
T O R
ÍO
G
R A
N D E
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
CANÓVANAS, PR
BRIDGE 653
PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
NOT TO SCALE
:5 a n u a r y
S h e e t
A
B r id g e
P R
O J E
C T
S
S T
A T
E D
O T
\P R
\E R
P R
M N
T R
P R
(1
H W
Y D
E S
\C A
D D
\A -A
E
R -P
R M
N T
-R P
R (1 lo c .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) A06
CL
(BRIDGE 606 REALIGNMENT)
PR-962 PROPOSED APPROACH TYPICAL SECTION
Proposed Pavement (Depth and type TBD)
Aggregate Base (Depth TBD)
18" Depth Non-Mountable PCC Curb
4" Concrete
4" Aggregate Base
Varies1V:3H or flatter
(Depth Varies)
Embankment Construction
1V:3 H o r fl att erVa rie s
4% 2% 2% 4% 1%
8' 11' 11' 2.5' 5'
Curb - 0.5'
Paved Shoulder Travel Lane Travel Lane
Shoulder
Paved
Sidewalk
CL
(BRIDGE 606 REALIGNMENT)
PR-962 PROPOSED RETAINING WALL TYPICAL SECTION
Proposed Pavement (Depth and type TBD)
Aggregate Base (Depth TBD)
18" Depth Non-Mountable PCC Curb
4" Concrete
4" Aggregate Base
4% 2% 2% 4% 1%
8' 11' 11' 2.5' 5'
Curb - 0.5'
Paved Shoulder Travel Lane Travel Lane
Shoulder
Paved
Sidewalk
Embedment Depth Varies (typ.)
Wall Height Varies
Select Granuar Backfill (typ.)
Precast Concrete Panel Facing (typ.)
Concrete Guardwall (typ.)
Embankment Construction (Depth Varies)
Placed Riprap, Method A, Class 4 (typ.)
Guardrail MGS, Type 2, Class A Steel Posts (typ.)
Existing Ground (typ.)
Existing Ground (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
PR-962 (BRIDGE 606)
:2
J a n u a r y
B
B R
T y p ic ls
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\B -B
-E
R -P
R M
N T
-R P
R (1
B
R ty p .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) B01
See Note 1
2% & varies
Existing aggregate base course
Variable Depth
Existing asphalt pavement
Two-way Traffic
18' ±
Method 2
Roadway obliteration, Limit of construction
CL
(BRIDGE 606 REALIGNMENT)
PR-962 PROPOSED APPROACH ROADWAY OBLITERATION TYPICAL SECTION
NOTES:
accordance with Section 625.
Establish turf on all disturbed areas in 2.
and eliminate any low spots.
Grade existing roadway prism to drain 1.
U.S. DEPARTMENT OF TRANSPORTATION
PR-962 (BRIDGE 606)
:5
J a n u a r y
B
B R
T y p ic a ls
S h e e t
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\B
-E
R -P
R M
N T
-R P
R (1
B
R ty p .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) B02
L
(BRIDGE 653)
PR-957 PROPOSED APPROACH TYPICAL SECTION
Proposed Pavement (Depth and type TBD)
Aggregate Base (Depth TBD)
18" Depth Non-Mountable PCC Curb
4" Concrete
4" Aggregate Base
Va rie s
1V:3 H o r fl att er
4%2%2%4%1%
1'11'11'0'-3' Varies5'
Curb - 0.5'
Travel LaneTravel Lane
Shoulder
Paved Sidewalk
Existing Ground (typ.)
Embankment Construction
Shoulder
Paved
Structure transition railing (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
PR-957 (BRIDGE 653)
:4
J a n u a r y
B
B R
T y p ic ls
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
H
W Y
D
E S
\C A
D D
\B
-B
-E R
-P R
M N
T -R
P R
(1 d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) B03
I
V
.8
I N
V
.5
X .6
'R
C P
BERM
BERM
BERM BERM
JH
6060BROKEN
INFO
CURVE WARNING
25MPH
SPEED LIMIT
N
BEGIN PROJECT
Sta. 102+00
N 848341.4139
E 844753.5390
Sta. 102+00
Begin Mill & Overlay
Sta. 106+20
Begin existing Roadway ObliterationPR 962 Proposed Centerline
Proposed Edge of Travelway
Proposed Edge Shoulder
Proposed Concrete Sidewalk, width = 5'
Proposed Cut/Fill Limits
Sta. 102+60 to Sta. 103+00
Type MGS Flared
Proposed Guardrail Terminal Section, Sta. 103+00
Begin Proposed Concrete Sidewalk
Begin Roadway Reconstruction
End Mill & Overlay
Sta. 103+00 to Sta. 109+20
Class A Steel Posts
Proposed Guardrail MGS, Type 2, Existing Edge of Right of Way Limits
Sta. 103+95
Remove and replace culvert
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PLAN
PR-962 (BRIDGE 606)
STA. 103+00 TO STA. 107+50
S T
A
M A
T C
H L I N
E
SCALE IN FEET
0 20 40
S70°44'32"E e = ___
'126.41L =
'63.24T =
'1,600.00R =
(LT)04°31'37"Δ =
101+49.07PI
e = ___ '257.27L = '130.64T = '600.00R =
(LT)24°34'04"Δ =
107+42.13PI
.2
.4
:4
J a n u a ry
S h e e t
D
B
R
P la n
C
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D
-D
-E R
-P R
M N
T -R
P R
(1
B R
-v
P P
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D01
.5
Sta. 103+00
Begin Roadway Reconstruction
Existing Ground
BEGIN PROJECT
Sta. 102+00
Elev. 58.43'
Exist. Inv. 53.1968'
Sta. 103+94.64
(Designed by DB Team)
Existing 30" Culvert to be removed and replaced
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-962 (BRIDGE 606)
STA. 102+00 TO STA. 107+50
101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50
40 40
42 42
44 44
46 46
48 48
50 50
52 52
54 54
56 56
58 58
60 60
62 62
64 64
66 66
68 68
70 70
72 72
74 74
76 76
78 78
80 80
82 82
84 84
+0.008% +0.008%
.4
.4
.6
' VC100
80K =
'INFHLSD =
' VC534
100K =
'440.47HLSD =
:0
J a n u a r y
S h e e t
D
B R
P r o f il e
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D -D
-E
R -P
R M
N T
-R P
R (1
B
R -v
P
P .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D02
BERM
BERM
BERM
GABION WALL
GABION WALL
NAIL
CURVE WARNING
NAIL
NAIL
PK
JH
LANDSCAPING
LANDSCAPING
STOCKPILE
ROCK
STOCKPILE
ROCK
BAM
BO
O
OM
CHEVRON
OM
OM
POST
N
PR 962 Proposed Centerline
Proposed Edge of TravelwayProposed Edge of Shoulder
Existing Bridge 606 to be removed
Existing Roadway to be Obliterated
Proposed Concrete Sidewalk, width = 5'
Proposed Cut/Fill Limits
Sta. 103+00 to Sta. 109+20
Class A Steel Posts
Proposed Guardrail MGS, Type 2, Existing Edge of Right of Way Limits
Sta. 109+20
Begin Proposed Bridge
End Roadway Approach
Sta. 111+72
Begin Roadway Approach
End Proposed Bridge
See R-Sheets for Bridge Plans
Sta. 109+20 to Sta. 111+72
Proposed Bridge 606
C a n o v a n a s R iv e r
C a n o v a n a s R iv e r
C a n o v a n a s R iv e r
Sta. 111+72 to Sta. 114+60
Left Offset - 19'
Right Offset - 19'
Proposed Concrete Guardwall
Proposed Retaining Wall
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PLAN
PR-962 (BRIDGE 606)
STA. 107+50 TO STA. 113+00
S T
A
M A
T C
H L I N
E
S T
A
M A
T C
H L I N
E
SCALE IN FEET
0 20 40
N84°41'24"E e = ___
'257.27L =
'130.64T =
'600.00R =
(LT)24°34'04"Δ =
107+42.13PI
.7
:0 u ly
S h e e t
D
B
R
P la n
M P
R O
J E
C T
S
S T
A T
E D
O T
\P R
\E R
P R
M N
T R
P R
(1
H W
Y D
E S
\C A
D D
\D -D
-E
R -P
R M
N T
-R P
R (1
B
R -v
P
P .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D03
Sta. 109+20
Elev. 77.00'
BEGIN PROPOSED BRIDGE
Sta. 111+72
Elev. 90.49'
END PROPOSED BRIDGE Exist. Elev. 65.39'
Elev. 90.92'
Sta. 111+72
Begin Proposed Retaining Wall
Existing Ground
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-962 (BRIDGE 606)
STA. 107+50 TO STA. 113+00
107+50 108+00 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00
56 56
58 58
60 60
62 62
64 64
66 66
68 68
70 70
72 72
74 74
76 76
78 78
80 80
82 82
84 84
86 86
88 88
90 90
92 92
94 94
96 96
98 98
100 100
+5.
3%
:2
J a n u a r y
S h e e t
D
B R
P r o f il
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D -D
-E
R -P
R M
N T
-R P
R (1
B
R -v
P
P .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D04
X .6
'R
C P
IN
V
.6
WV
PS
I G
AUGE
NAIL
1.8 KM
N
Sta. 116+65
End existing Roadway Obliteration
PR 962 Proposed Centerline
Proposed Edge of Travelway Proposed Edge of Shoulder
Existing Roadway to be Obliterated
Proposed Concrete Sidewalk, width = 5'
Sta. 111+72 to Sta. 114+60
Left Offset - 19'
Right Offset - 19'
Proposed Concrete Guardwall
Proposed Retaining Wall
Proposed Cut/Fill Limits
Sta. 114+60 to Sta. 121+00
Class A Steel Posts
Proposed Guardrail MGS, Type 2, Existing Edge of Right of Way Limits
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PLAN
PR-962 (BRIDGE 606)
STA. 113+00 TO STA. 118+50
S T
A
M A
T C
H L I N
E
S T
A
M A T
C H
L
IN
E
SCALE IN FEET
0 20 40 e = ___
'506.73L =
'269.58T =
'600.00R =
(RT)48°23'21"Δ =
117+93.52PI
.9
3 1
4 1
5 1
:4
J a n u a ry
S h e e t
D
B
R
P la n
C
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D
-D
-E R
-P R
M N
T -R
P R
(1
B R
-v
P P
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D05
Exist. Elev. 97.29'
Elev. 105.91'
Sta. 114+60
End Proposed Retaining Wall
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-962 (BRIDGE 606)
STA. 113+00 TO STA. 118+50
113+00 113+50 114+00 114+50 115+00 115+50 116+00 116+50 117+00
78 78
80 80
82 82
84 84
86 86
88 88
90 90
92 92
94 94
96 96
98 98
100 100
102 102
104 104
106 106
108 108
110 110
112 112
114 114
116 116
118 118
120 120
122 122
+5.
3%
117+50 118+00 118+50
102 102
104 104
106 106
108 108
110 110
112 112
114 114
116 116
118 118
120 120
122 122
124 124
126 126
128 128
130 130
132 132
134 134
136 136
138 138
140 140
142 142
144 144
146 146
+5.
3%
:0 e c e m b e r
S h e e t
D
B R
P r o f il
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D -D
-E
R -P
R M
N T
-R P
R (1
B
R -v
P
P .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D06
X .6
'R
C P
I N
V
.6
I N
V
.7
"X
.4
'R
C P
IN
V
.6
IN
V
.1
NAIL
ROCK WALL
NAIL
TEL CONDUIT
ABANDONED
BENT
EM
NAIL
N
Sta. 122+00
N 847960.4528
E 846636.7822
END PROJECT
Sta. 121+00
Begin Mill & Overlay
End Proposed Concrete Sidewalk
End Roadway Reconstruction
Sta. 122+00
End Mill & Overlay
PR 962 Proposed Centerline
Proposed Edge of Travelway Proposed Edge of Shoulder
Proposed Concrete Sidewalk, width = 5'
Sta. 114+60 to Sta. 121+00
Class A Steel Posts
Proposed Guardrail MGS, Type 2, Sta. 121+00 to Sta. 121+40
Type MGS Flared
Proposed Guardrail Terminal Section, Existing Edge of Right of Way Limits
Proposed Cut/Fill Limits
Sta. 120+88
Remove and replace culvert
Sta. 118+56
Remove and replace culvert
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PLAN
PR-962 (BRIDGE 606)
STA. 118+50 TO STA. 122+00
S T
A
M A
T C
H L I N
E
SCALE IN FEET
0 20 40
S46°55'15"E e = ___
'506.73L =
'269.58T =
'600.00R =
(RT)48°23'21"Δ =
117+93.52PI
.6
.4
P
O
:4
J a n u a ry
S h e e t
D
B
R
P la n
C
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D
-D
-E R
-P R
M N
T -R
P R
(1
B R
-v
P P
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D07
END PROJECT
Sta. 122+00
Elev. 162.23'
Sta. 121+00
End Roadway Reconstruction
Exist. Inv. 138.9595'
Sta. 120+87.75
(Designed by DB Team) to be removed and replaced
Existing 30" Culvert
Exist. Inv. 118.0689'
Sta. 118+55.53
(Designed by DB Team) to be removed and replaced
Existing 30" Culvert (Not Shown)
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-962 (BRIDGE 606)
STA. 118+50 TO STA. 122+00
118+50 119+00 119+50 120+00 120+50 121+00 121+50 122+00 122+50
124 124
126 126
128 128
130 130
132 132
134 134
136 136
138 138
140 140
142 142
144 144
146 146
148 148
150 150
152 152
154 154
156 156
158 158
160 160
162 162
164 164
166 166
168 168
.1
.9
+5.
3%
.1
.9
.8
' VC5
3.92K =
'894.82SSD =
' VC167
25K =
'152.07HLSD =
:0 e c e m b e r
S h e e t
D
B R
P r o f il
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D -D
-E
R -P
R M
N T
-R P
R (1
B
R -v
P
P .d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D08
T C
H L I
N E
U.S. DEPARTMENT OF TRANSPORTATION
CONSTRUCTION PLAN
PR-957 (BRIDGE 653)
STA. 200+00 TO STA. 207+20
PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
SCALE IN FEET
0 25 50
:4
J a n u a r y
D
B r id g e
S h e t]
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\P R
E R
P R
M N
T R
P R
(1
C A
D D
\D -D
E
R -P
R M
N T
-R P
R (1
B
R
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D09
BEGIN PROJECT
Sta. 200+00
N 839761.3684
E 844687.0318
Sta. 200+80
Begin Mill & Overlay
Sta. 203+60
Begin Roadway Reconstruction
End Mill & Overlay
Limits
Existing Edge of Right-of-Way
PR-957 Proposed Centerline
Limits
Existing Edge of Right-of-Way
Proposed edge of pavement
Edge of Travelway
Proposed Edge of Shoulder
Proposed Concrete Sidewalk
Limits
Existing Edge of Right-of-Way
Right-of-Way Limits
Existing Edge of
PR-957
C A
M
IN
O L
O S N
A V
A R
R O
S
Structure transition railing
Structure transition railing
N84°06'59"E N84°27'17"E e = ___
'8.86L =
'4.43T =
'1,500.00R =
(RT)00°20'18"Δ =
203+03.42PI
e = ___ '16.38L = '8.19T =
'1,500.00R =
(RT)00°37'33"Δ =
205+65.77PI
PC
.8
PT
PC
.0
P
B
BEGIN PROJECT
BEGIN PROPOSED BRIDGE
END PROPOSED BRIDGE
Sta. 200+80
Overlay
Begin Mill and
See R-Sheets for Bridge Plans
Sta. 203+60
Reconstruction
Begin Roadway
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-957 (BRIDGE 653)
STA. 200 TO STA. 207+20
200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00
130 130
140 140
150 150
160 160
170 170
Sta. 200+00
Elev. 146.28
Sta. 204+23
Elev. 152.77
Sta. 205+24
Elev. 153.31
MATCH EXISTING
+2.39
3%
+1.781
+1.089%
+0.267% -1.307%
+2.24 1%
+2.39 3%
+1.781
+1.089%
+0.267% -1.307% +2.24 1%1
.1
5 1 .7
.1
.1
.8
.8
H
' VC45
65.00K =
'982.16SSD = ' VC25
30.00K =
'821.28SSD =
' VC55
35.00K =
'449.63SSD =
' VC71
20K =
'181.23HLSD =
.2
:2 u ly
D
S h e
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
H
W Y
D
E S
\C A
D D
\D
-D
E R
-P R
M N
T -R
P R
(1
B R
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D10
U.S. DEPARTMENT OF TRANSPORTATION
CONSTRUCTION PLAN
BRIDGE 653
STA. 207+20 TO STA. 210+91
PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
SCALE IN FEET
0 25 50
M A
T C
H L I
N E
:0 u ly
D
B r id g e
S h e t]
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
H
W Y
D
E S
\C A
D D
\D
-D
E R
-P R
M N
T -R
P R
(1
B R
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D11
BL10 BL10
BL10
B L
B L
P
B
B L
B L
B L
N
Sta. 210+91
N 839863.1115
E 845765.3433
END PROJECT
Right-of-Way Limits
Existing Edge of
Right-of-Way Limits
Existing Edge of
Proposed edge of pavement
PR-957 Proposed Centerline
PR-9579
END PROJECT
U.S. DEPARTMENT OF TRANSPORTATION PUERTO RICO HIGHWAYS AND TRANSPORTATION AUTHORITY
CONSTRUCTION PROFILE
PR-957 (BRIDGE 653)
STA. 207+20 TO STA. 210+91
Existing Ground
208+00 209+00 210+00
140 140
150 150
160 160
170 170
180 180
MATCH E
XIS
TIN
G
MATCH E
XIS
TIN
G
Sta. 210+91
Elev. 165.55
.5
:2 u ly
D
S h e
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
H
W Y
D
E S
\C A
D D
\D
-D
E R
-P R
M N
T -R
P R
(1
B R
.d g n
STATE PROJECT
NUMBER
PR PR ST ER PRMNT RPR(1) D12
OM
CHEVRON
C Rdwy.L barrier (typ.)
Concrete
Exis ting C P
R-9
Gabion wall
Existing bridge
5 7
Overhead telephone Overhead power
R/W
R/W
R/W
R/W
Sta. 109+20.00
Begin Bridge @ C Rdwy.
Gutterline
Sta. 111+72.00
End Bridge @ C Rdwy.
15° concrete I-beam (typ.)
AASHTO III prestress
C West abut. C East abut.C Pier 1 C Pier 2
(typ.)
Approach Slab, 6 Spa. @ 6'-0" = 36'-0"
19'-0"
1'-6"
41'-0"
14'-0" 5'-0"
1'-6"
Gutterline Sidewalk
90'-0" 78'-0"78'-0"3'-0" 3'-0"
Bridge Length = 252'-0"
2'-6" 2'-6"
11'-0" 11'-0"8'-0"
3'-0" Shldr.
(typ. all 4 corners)
Structure transition railing Wingwall (typ.)
Proposed C PR-962
11'-0"11'-0"8'-0"
Shldr.
2%
Profile grade (top of pavement)
2% way
Traveled way
Traveled
5'-0"
Sidewalk
3'-0"
Shldr.
246'-0"
78'-0"
Approx. existing ground @ C Rdwy.
Profile grade
El. 72.00
Approx. low chord railing (typ.)
Structure transition concrete I-beams
AASHTO III prestress barrier
Concrete
C West abut.
3'-0"
Bridge Length = 252'-0"
C East abut.
3'-0" abutment (typ.)
Integral or semi-integral
5.37%
Retaining wall see Geotechnical Data Report No. 22190124.000
For boring logs and other geotechnical information, Drilled shaft (Typ.)
78'-0" 90'-0"
Sleeper slab (Typ.)
Date of Last Inspection: 02/01/2023
Q100
20'-0"20'-0" slab
Approach slab
Approach
G E
O M
E T
R
IC
S
TYPICAL ROADWAY SECTION
SUPER ROTATED ABOUT
RATE
RATESTA.
CROWN
PROFILE GRADE DIAGRAM
EL. ARE AT GRADE
AT
H Y
D R
A U
L
IC
S
Q2
50Q
Q
Q
Q Vm WS EL.
REMARKS
SLOPE PROTECTION TYPE:
TOP EL.:
CLASS:
BOTTOM EL.:
DEPTH:
SLOPE:
S C
O U
R
SCOUR
REMARKS
RECEIVED
RECEIVED
HYDRAULICS REPORT NO.
GEOTECHNICAL REPORT NO.
D E
S
IG
N D
A T
A
TYPICAL BRIDGE SECTION
OVERLOADLIVE LOAD SPECIAL LOADS
SUPERSTRUCTURE
CONCRETE F'C
EPOXY REINFORCEMENT
RAIL
SIDEWALKS
REMARKS
DRAINS
TRANSITION
UTILITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION, DENVER, COLORADO
PRELIMINARY LAYOUT
STREAM NAMEBRIDGE NAME
ROUTE NAME AND NUMBER
FOREST/PARK/OTHER
ACCOUNT NO.
PREPARED BY
SCALE: DATE:
ESTIMATED STRUCTURE COST
RG NO.
STA.
ft/ft ft/ft ft/ft
TERRITORY MUNICIPALITY
/1
/2
M
P R
O J E
C T
S
S T
A T
E D
O T
\P R
\E R
P R
M N
T R
P R
(1
B ri d g e \M ic ro s ta ti o n \T
S
L \6 t s l
(N o rt h A li g n m e n t, n o C
L O
M R d g n
C Rdwy.L
Top of profile
6460 59.81
HL-93 N/A
8.0 ksi (Beams), 5.0 ksi (Cast-in-Place Deck)
5'-0"
1"= 40'-0"
N/A
606 (North Alignment, No CLOMR) Canovanas River
PR-962
Puerto Rico
Nathan Marshall / Kevin Nguyen
Canovanas
N/A
F-Shape Configuration (MASH TL-3) Bridge Transistion Module <45 mph w/ Hrie-Beam Type II
N/A
NoneNone
" concrete deck2
AASHTO III Prestressed Concrete I-Beams with 8
2.00% 2.00%
N
C a n o v a n a s R iv e r
L
PLAN
N 84°41'24" E
L
L
L(typ.
L LL L
Sidewalk
D e p th
S tr u c tu r
LaneShoulder Lane
1.00%
2.00%
N/A
N/A
N/A
N/A
N/A
N/A
AASHTO LRFD Bridge Design Specifications, 9th Edition
ELEVATION
L
EXP
EXP
FIX
FIX
PIER 1 PIER 2
ABUT.
WEST
ABUT.
EAST
C
L
(typ.)
1.5
L
L
29962
33247
34663
69.02
69.65
70.06
December 2023 SHEET NO.: R01 n d B ri d g e
C R d w y
S ta
.0
E le v
.4
B e g in
B ri d g e
L R d w y
S ta
.0
E le v
.0
12" PALM
12" PALM
12" PALM
OHWM 138.68'
STOP
4-INCH DIP
4-INCH PVC
4-INCH DIP
DOUBLE BOX CULVERT
INV 141.45'
INV 141.09'
BARBED WIRE48" WITH
OM
OM
C Rdwy.L
Type 2 Steel Railing, Approx. existing ground @ C Rdwy.
Profile grade
Structure transition railing (typ.)
El. 147.86
Approx. low chord
R/W
R/W
R/W
Culvert
IDOT Type 2399 Steel Railing
Concrete I-Beams
AASHTO III Prestressed
Sta. 204+23.00
Begin Bridge @ C Rdwy.
Proposed C PR-957
C unnamed roadway
C West abut. C East abut.
C West abut.
C East abut.
AASHTO III Prestressed I-Beam (typ.)
Sidewalk
Gutterline
Wingwall (typ.)
Gutterline
(typ. all 4 corners)
Structure transition railing concrete deck"2
AASHTO III Prestressed Concrete I-Beams with 8
Type 1 Steel Railing, Sleeper slab (typ.)
abutment (typ.)
Integral or semi-integral
Overhead power
Sta. 205+24.00
End Bridge @ C Rdwy.
R/W
Overhead power
Overhead power
11'-0" 11'-0" 1'-0"
Shldr.
2%
Profile grade (top of pavement)
2% way
Traveled way
Traveled
3'-0"
Shldr.
5'-0"
Sidewalk
Existing C PR-957
No. 22190124.000 see Geotechnical Data Report other geotechnical information, For boring logs and
Drilled shaft (Typ.)
Date of Last Inspection: 07/19/2023
Q100
Approach slabApproach slab
G E
O M
E T
R
IC
S
TYPICAL ROADWAY SECTION
SUPER ROTATED ABOUT
RATE
RATESTA.
CROWN
PROFILE GRADE DIAGRAM
EL. ARE AT GRADE
AT
H Y
D R
A U
L
IC
S
Q2
50Q
Q
Q
Q Vm WS EL.
REMARKS
SLOPE PROTECTION TYPE:
TOP EL.:
CLASS:
BOTTOM EL.:
DEPTH:
SLOPE:
S C
O U
R
SCOUR
REMARKS
RECEIVED
RECEIVED
HYDRAULICS REPORT NO.
GEOTECHNICAL REPORT NO.
D E
S
IG
N D
A T
A
TYPICAL BRIDGE SECTION
OVERLOADLIVE LOAD SPECIAL LOADS
SUPERSTRUCTURE
CONCRETE F'C
EPOXY REINFORCEMENT
RAIL
SIDEWALKS
REMARKS
DRAINS
TRANSITION
UTILITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION, DENVER, COLORADO
PRELIMINARY LAYOUT
STREAM NAMEBRIDGE NAME
ROUTE NAME AND NUMBER
FOREST/PARK/OTHER
ACCOUNT NO.
PREPARED BY
SCALE: DATE:
ESTIMATED STRUCTURE COST
RG NO.
STA.
ft/ft ft/ft ft/ft
TERRITORY MUNICIPALITY
/1
/2
M
P R
O J E
C T
S
S T
A T
E
D O
T \P
R \E
R P
R M
N T
R P
R (1
B ri d g e \M ic ro s ta ti o n \T
S
L \6
T S
L .d g n
PLAN
ELEVATION
C Rdwy.L
Top of profile
6020 147.84
HL-93 N/A
8.0 ksi (Beams), 5.0 ksi (Cast-in-Place Deck)
5'-0"
1"= 40'-0"
653 Canovanas River
PR-957
Puerto Rico
Nathan Marshall
Canovanas
N/A
IDOT Steel Railing (MASH TL-3) IDOT Transition Bridge Railing
N/A
NoneNone
2.00%2.00%
L
N
ABUT.
WEST
EXP
EXP
ABUT.
EAST
E le v
.8
S ta
.0
B e g in B r id g e C R d w y
L
E le v
.1
S ta
.0
E n d B r id g e C R d w y
L
(typ.)
1.5
L L
C a n o v a n a s R iv e r
L
L
N 84°27'17" E
N/A
Sidewalk
L
L
L
L
D e p th
S tr u c tu r
Lane Lane
1.00%
2.00%
N/A
AASHTO LRFD Bridge Design Specifications, 9th Edition
N/A
N/A
N/A
N/A
N/A
L
Grade +0.267%
24229
26885
28030
156.35
156.97
157.66
December 2023 SHEET NO.: R02
+0.267%
V P
I
.7
K = 35.75
30' VC
V P
I
.2
35' VC
K = 22.23
-1.307%
+1.1
12'-0"
34'-0"
1'-6"
14'-0"5'-0"
1'-6"
5 Spa. @ 5'-9" = 28'-9"
(t yp
"2
2'-7"2
2'-7
11'-0"11'-0"
1'-0" Shldr.3'-0" Shldr.
Bridge Length = 101'-0"
3'-0" 95'-0" 3'-0"
Waterway opening = 92'-0"
Bridge Length = 101'-0"
95'-0"3'-0" 3'-0"
Waterway opening = 92'-0"
10'-0"10'-0"
| A Sheets |
| A01_ER-PRMNT-RPR(1)_Title |
| A02-A03_ER-PRMNT-RPR(1)_symbol |
| A02-A03_ER-PRMNT-RPR(1)_symbol |
| B01-B03.pdf |
| B Sheets |
| B01-B02-ER-PRMNT-RPR(1)_BR606_typ |
| B01-B02-ER-PRMNT-RPR(1)_BR606_typ |
| B03-B04-ER-PRMNT-RPR(1) |
| D01-D08.pdf |
| D Sheets |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D01-D08-ER-PRMNT-RPR(1)_BR606-v2_PP |
| D09-D12.pdf |
| D Sheets |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12.pdf |
| D Sheets |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
| D09-D12 ER-PRMNT-RPR(1) BR 653 |
File details come from the government source that posted it. Updated .