This amendment provides responses to bidder questions for solicitation number 693C73-24-B-000001 from the Department of Transportation Federal Highway Administration for the Tennessee National Wildlife Refuge project. The amendment estimates cut and fill quantities for roadway excavation line items using Geopak software, clarifies that embankment construction and excavation needed for the Kentucky Lake Bank Revetment area are included in the lump sum pay item for that schedule, and confirms that the refuge will clear a beaver dam as needed prior to construction starting on March 15, 2024. Bidders are advised to obtain any necessary hauling permits from the local county and comply with legal load limits, with the contractor responsible for repairs if road conditions are worsened. The bid opening date of October 17, 2023 at 2:00 pm EDT remains unchanged.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7324B000001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1410/12/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/13/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project FW-TENN 12(1)

The purpose of this Amendment is to:

1) Respond to bidder questions.

2) The bid opening date of October 17, 2023, at 2:00 p.m. EDT remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0002

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0002

Project FW-TENN 12(1)

Tennessee National Wildlife Refuge

Solicitation: 693C73-24-B-000001

The purpose of this Amendment is to:

1) Respond to bidder questions.

2) The bid opening date of October 17, 2023, at 2:00 p.m. EDT remains unchanged.

Responses to Questions

1) Question: Can the government please provide cut and fill quantities for each of the Roadway

Excavation line items?

Response: The design consultant estimated the following using Geopak software earthwork calculations: Schedule A (Base Contract) cut: 8,269 cubic yards (cy), fill: 1,881 cy, revetment fill:

1,786 cy; Schedule B (Option 1) fill: 20 cy (cadd-measured); Schedule C (Option 2) cut: 5,571 cy, fill: 4,172 cy; and Schedule D (Option 3) cut: 7,603 cy, fill: 1,878 cy. Earthwork runs will be provided after the project award. Since the roadway excavation quantity is higher than the embankment construction for Schedules A, C, and D, the roadway excavation is a pay item, and embankment construction is not measured for payment.

2) Question: Upon performing a site visit, it has been determined that the site in the Kentucky

Lake Bank Revetment area looks nothing like what is shown in the plans. Will this area need to have embankment installed prior to installation of the revetment? How will this embankment be quantified and paid for?

Response: The embankment construction and any roadway excavation that is needed for the construction of Kentucky Lake Bank Revetment area will not be measured and is part of the

Schedule A 67001-0000 Project Lump Sum (Kentucky Lake Bank Revetment) pay item. Per

Special Contract Requirements (SCRs) Subsection 204.16 (page J-13 of the J pages), roadway excavation for revetment construction will not be measured.

3) Question: Upon performing a site visit, contractor noticed a massive beaver dam obstructing a feature of work. How is the contractor to proceed on this feature of work?

Response: The refuge will clear out enough beaver dam as needed for the standpipe replacement prior to the start of construction. Since construction will not start until March 15, 2024, the beaver dam will be removed closer to the work start date.

Amendment 0002

Info Page 2 of 2

4) Question: We have been made aware that the local county will require some form of agreement and/or protection for the county roadways leading to the project site. Contractor has not noticed this addressed within the contract documents. How will this be addressed?

Response: Contractor is required to get any necessary hauling permits, and to operate trucks within the legal load limits posted by the County/State. If conditions of permit are required, the Contactor will comply at no cost to the Government. It is customary that preconstruction photos and video are taken to document condition prior to starting work. If Contractor worsens the condition, the

Contractor will be responsible for any and all repairs. See FP-14 Subsection 107.02 and FAR

Clause 52.236-9.