This amendment modifies a solicitation for road construction services on the Tennessee National Wildlife Refuge. The scope of work includes maintaining traffic on Big Sandy Road and replacing culverts. The amendment clarifies that temporary closures of Big Sandy Road will be allowed during culvert replacements upon approval from the Contracting Officer. The contractor must provide access and emergency measures during closures. Native materials can be used for topsoil if meeting specifications. Excavated material can be reused for embankments if meeting requirements. The specified pavement striping is waterborne paint. The entire road cannot be closed for the duration of work but only in sections during culvert construction as approved. The bid opening date remains October 17, 2023 at 2:00 PM EDT.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7324B000001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1410/10/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/13/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project FW-TENN 12(1)

The purpose of this Amendment is to:

1) Amend Special Contract Requirements (SCRs) to clarify roadway closures during the construction.

2) Respond to bidder questions.

3) The bid opening date of October 17, 2023, at 2:00 p.m. EDT remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0001

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001

Project FW-TENN 12(1)

Tennessee National Wildlife Refuge

Solicitation: 693C73-24-B-000001

The purpose of this Amendment is to:

1) Amend Special Contract Requirements (SCRs) to clarify roadway closures during the construction.

2) Respond to bidder questions.

3) The bid opening date of October 17, 2023, at 2:00 p.m. EDT remains unchanged.

Solicitation Changes

SCR Changes

Delete the last two paragraphs of the Subsection 156.04 of the SCRs (J pages – page J-9) and substitute the following:

Maintain one lane of traffic at all times on Big Sandy Road (Route 012) from Sta. 100+00 to Sta.

327+04 (MP 0.0 to MP 4.3) at all times, except for culvert replacements. Roadway closure will be permitted during culvert installation as approved by the CO.

Inform CO 14 days before placing Big Sandy Road (Route 012) under full road closure. Maintain access according to Subsection 156.05(b). Open roadway within 24 hours after completion of work or as directed by the CO.

Responses to Questions

1) Question: Will the park (refuge) allow a complete road closure for the culvert work?

Response: A temporary road closure for each pipe culvert installation will be permitted as directed by the CO. The contractor will need to provide access to the refuge and adjacent land users, if required, during the closure. The contractor will also need to provide emergency access measures

(such as steel plates), if directed by the CO. See SCR changes as part of this Amendment.

2) Question: Can we use native material with soil reconditioning i.e. lime, fertilizer in lieu of importing topsoil?

Response: Excavated materials can be reused for the topsoil if they meet the FP-14 (included as part of the Solicitation) requirements for topsoil material (see Subsection 713.01 as referenced by

Section 624).

Amendment 0001

Info Page 2 of 2

3) Question: Does the Roadway excavation line item include re-placing the excavated material or is it an export number.

Response: The roadway excavation pay item includes embankment construction. The excavated material can be reused as part of the embankment if it meets the FP-14 for embankment construction material requirements (see Section 204).

4) Question: Does the striping need to be thermoplastic or is paint sufficient?

Response: the pavement striping pay item that is specified in this project is “type B”, which is waterborne paint. See the FP-14 for the specific material requirements (Subsection 718.10, as referenced by Section 634).

5) Question: Can we close the entire road for the duration of work?

Response: No, the road cannot be closed for the duration, but can be closed during culvert construction in sections as approved by the CO (see SCR 156.04 changes as part of this

Amendment).