Amendment 0005 - NP CHOH 206(1) 913(1) ETC.pdf

PDF 101 KB Posted

Attached to
Chesapeake and Ohio Canal National Historical Park
Solicitation number
693C73-23-B-000006
Issued by

About this file

This amendment modifies a solicitation for a federal construction project. The project involves replacing three bridges and repairing a box culvert within the Chesapeake and Ohio Canal National Historical Park. The work includes structural concrete, steel, timber, a prefabricated pedestrian bridge, micropiles, stone masonry repair, and approach reconstruction. Testing requirements for micropiles are updated, and middle piles can now be used for testing at each abutment. The bid due date remains February 28, 2023. The solicitation is available through the System for Award Management website and issued by the Eastern Federal Lands Highway Division of the Federal Highway Administration to certified small businesses for a project with a budget between $2 million and $5 million.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7323B000006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1402/22/20230005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/20/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project NP CHOH 206(1) 913(1) ETC

The purpose of this Amendment is to:

1) Update the Special Contract Requirements (SCRs), Subsection 567.06 (J pages) of the

Solicitation.

2) Respond to bidder questions.

3) The bid opening date of February 28, 2023, at 2:00 p.m. EST remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0005

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0005

Project NP CHOH 206(1), 913(1), ETC.

Chesapeake and Ohio Canal National Historical Park

Solicitation: 693C73-23-B-000006

The purpose of this Amendment is to:

1) Update the Special Contract Requirements (SCRs), Subsection 567.06 (J pages) of the Solicitation.

2) Respond to bidder questions.

3) The bid opening date of February 28, 2023, at 2:00 p.m. EST remains unchanged.

Solicitation Changes

1) SCR changes:

567.06(b)(2). Delete the first two sentences of the Subsection and substitute the following:

The CO will designate production micropiles for proof testing at Culvert 82 site. One test will be performed on a center micropile at each abutment. Proof test locations for the other three bridges will not be as shown in the plan (sheets R04, R20, R39), and, instead, the CO will assign a production micropile from one in the center of each abutment. Test according to Tables 567-3 and 567-4. Delete verification testing from Table 567-4.

2) Response to bidder question:

Question: Amendment 0004 responded to a question asking about the method of testing for the micropiles. In the response it was stated that compression testing should be performed. In order to perform the compression test, reaction piles need to be installed around the test pile as anchor points to counter act the compressive load created on the production pile. Can the production pile be moved to a middle pile so that other micropiles for the abutments can be used for the reaction force? If not, is there any additional allowance for the micropile line items in the schedules to compensate for the added linear feet of micropiles installed for the reaction piles? Is there a minimum offset spacing of reaction piles from production piles?

Response: The middle miropiles can be used for testing at each abutment. Please see the SCR change under this amendment.